May 12, 1995 MEMORANDUM FOR:
Jan. A. Norris, Project Manager (014-H22)
Project Directorate 11-1 Division of Reactor Projects I/II FROM:
Eric W. Weiss, Section Chief Reactor Systems Branch Division of Systems Safety and Analysis
SUBJECT:
St. Lucie Unit 2 - PROPOSED REVISION OF TECHNICAL SPECIFICATIONS FOR REDUCTION IN REQUIRED MINIMUM SHUTDOWN i
COOLING FLOW RATE (TAC NO. M91695)
Plant Name:
St. Lucie Unit 2 Utility:
Florida Power & Light Company TAC No(s).:
M91695
{
Docket No(s).:
50-389 i
t Operating License:
NPF-16 Project Directorate:
Project Directorate 11-1 l
Project Manager:
J. Norris Review Branch:
SRXB/DSSA Review Status:
Complete The Reactor Systems Branch, DSSA, has reviewed the Florida Power & Light Company (FPL) submittal, dated February 27, 1995, by which the licensee requested changes to the Technical Specifications for the St. Lucie Unit 2 plant. These changes are a result of proposed modifications to revise i
surveillance requirements to allow a reduction in the required minimum shutdown cooling flow rate under certain conditions during operation MODE 6.
i Based on our review of the licensee's submittal in our area of responsibility, the staff finds that the proposed changes to the Technical Specifications are acceptable as discussed in the attached evaluation.
This completes the requirements of TAC No. M91695. A SALP evaluation is also attached.
Attachments:
As stated cc:
G. Holahan D. Matthews (014-H22)
PEB/SALP (012-E4)
Contact:
H. Balukjian, SRXB/DSSA 415-2862 DISTRIBUTION Secket File EWeiss St. Lucie P/F f
SRXB R/F HBalukjian 3ig RJones HBalukjian R/F i
SRXB:D A SRX9: DSS N SRX l
JHA3 I HBALUKJIAN EWEQS 5/5 9F 5// o/95 5/l 9 95 G:\\STLUCIE.595
/