Forwards SE Accepting Licensee Application for Amend to TS for Plant.Proposed Changes Would Modify TS Related to Reactor Coolant Pressure/Temperature Limits
ML20138E843
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/05/1995
From: Weiss E
NRC (Affiliation Not Assigned)
To: Norris J
NRC (Affiliation Not Assigned)
Shared Package
ML20136C539 List: ... further results
References
FOIA-96-485 TAC-M92412, NUDOCS 9510130235
Download: ML20138E843 (1)


Text

O

(

October 5, 1995 MEMORANDUM T0:

J. Norris, Project Manager Project Directorate, 11-1 Division of Reactor Projects I & II FROM:

Eric W. Weiss, Chief PWR Reactor Systems Section Reactor Systems Branch Division of Systems Safety and Analysis

SUBJECT:

St. LUCIE UNIT 1 - TECHNICAL SPECIFICATION CHANGES REGARDING EXTENDING THE REACTOR COOLANT SYSTEM PRESSURE / TEMPERATURE LIMITS (TAC NO. M92412)

Plant Name:

St. Lucie Unit 1 Utility:

Florida Power and Light Company TAC No(s).:

M92412 License No(s).:

DPR-67 Docket No(s).:

50-335 Project Directorate:

PD II-l Project Manager:

J. Norris Review Branch:

SRXB/DSSA Review Status:

Complete By letter dated May 17, 1995, Florida Power and Light Company submitted an application.to amend'the technical specifications (TS) for St. Lucie Unit 1.

The proposed changes would modify technical specifications related to the reactor coolant pressure / temperature limits.

The Reactor Systems Branch (SRXB) has completed a review of the licensee submittal and prepared the attached Safety Evaluation (Attachment 1) covering the areas for which SRXB has primary responsibility.

We conclude that the proposed TS changes regarding low temperature overpressure protection (LTOP) are acceptable. Our conclusion is based on the acceptance of the licensee proposed pressure-temperature limits for heatup and cooldown which are currently under review by the staff of the Materials and Chemical Engineering Branch of NRR. This safety evaluation is limited to the changes in limitations associated with the use of the high head safety injection pumps as the required boration flow path while shutdown.

Our Systematic Assessment of Licensee Performance (SALP) evaluation is provided in Attachment 2.

This completes the SRXB effort for TAC No. M92412.

Attachments: As stated cc:

G. Holahan DISTRIBUTION D. Matthews Docket File C. Jackson PEB/SALP (012E4)

SRXB R/F C. Liang RJones C. Jackson R/F

Contact:

C. Jackson, SRXB/DSSA EWeiss St. Lucie P/F 415-2947

  • see previous concurrence page

{

SRXB:DSSA*

SRXB:DSSA*

SRXB:DSSA*

JHARRIS CJACKSON CLIANG 9/22/95 9/27/95 9/27/95

/d/6795 G:\\STLSER.CPJ 7 0 M

(.

.m I

=

10l }@ M ggQ2CEE3 N

,