ML20138E737
Text
,
s-I May 22, 1995 MEMORANDUM T0: Richard Croteau, Project Manager (014-H22)
Project Directorate 11-1 i
Division of Reactor Projects I/II FROM:
Laurence Kopp, Sr. Reactor Engineer Reactor Systems Branch Division of Systems Safety and Analysis
SUBJECT:
SER - TOPICAL REPORT NF-TR-95-01
" NUCLEAR PHYSICS METHODOLOGY FOR RELOAD DESIGN OF TURKEY POINT AND ST. LUCIE NUCLEAR PLANTS"
.(TAC NOS. M91393 AND M91394)
Plant Name(s):
Turkey Point, Units 3 and 4 Utility:
Florida Power and Light Company TAC No(s):
M91393 & M91394 Docket No(s):
50-250 and 50-251 Operating License:
DPR-31 and DPR-41 Project Directorate:
PD II-2 Project Manager (s):
R. Croteau Review Branch:
SRXB/DSSA Review Status:
Complete The Reactor Systems Branch, DSSA, has completed the review of Topical Report
)
NF-TR-95-01, Nuclear Physics Methodology for Reload Design of Turkey Point &
St. Lucie Nuclear Plants." We find the report acceptable for referencing in i
licensing applications for Turkey Point Units 3 and 4.
Attached is our Safety Evaluation Report as well as our SALP input. This completes our effort on TAC Nos. M91393 and M91394.
Attachments:
DISTRIBUTION As stated CentuaI48 Ass i
SRXB R/F cc: w/ attachments:
Turkey Point P/F G. Holahan RJones D. Matthews (014-H22)
EWeiss PEB/SALP (010-A19)
LKopp LKopp R/F
Contact:
L. Kopp, SRXB/DSSA 415-2879 OFC SRXB:DSSg SRXB:DS{
NAME LKOPP
[//'//9f
(/2.2/95 DATE
=::=::
OFFICIAL RECORD COPY Document Name:
G:\\NFTR9501.SER es oe uossm