Category:E-Mail
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24281A0072024-10-0202 October 2024 NRR E-mail Capture - Acceptance Review Results for the Sequoyah License Amendment Request to Modify the FHA Analysis, Tech Spec TS 3.9.4 and Tech Spec 3.3.6 (L-2024-LLA-0117) ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24152A1542024-05-31031 May 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03 ML24128A1802024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review for Sequoyah License Amendment Request to Modify TS 3.8.1 and TS 3.8.2 (L-2024-LLA-0047) ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24074A4252024-03-14014 March 2024 NRR E-mail Capture - Sequoyah Hydrologic Analysis License Amendment Request - Notification of Change to Estimated Completion and Hours ML24059A4052024-02-28028 February 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-02 ML24053A0302024-02-21021 February 2024 NRR E-mail Capture - Request for Steam Generator (SG) Tube Inspection Call for Sequoyah, Unit 1 ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A1002024-02-13013 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Sequoyah Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to TVAs 12/19/2022 Response of the Staffs Rsi Regarding 08/04/2022 SQN Exemption Request ML23058A1312023-02-27027 February 2023 FW: TVA Intentions on EA-22-129 ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23026A0282023-01-12012 January 2023 001 Radiation Safety Baseline Inspection Information Request ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22348A0432022-11-28028 November 2022 NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22214A1582022-08-0202 August 2022 NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033) ML22196A0732022-07-15015 July 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - TSTF-505 RICT (L-2021-LLA-0145) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A0332022-06-17017 June 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - Reactor Trip System Instrumentation (L-2021-LLA-0200) ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22151A0102022-05-27027 May 2022 NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plants LAR to Adopt TSTF-505 ML22151A0092022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22137A2692022-05-17017 May 2022 Notice of Termination, TNR192066, Gravel Lot Restoration Project ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Revised the TVA Plants Radiological Emergency Plans ML22132A1762022-05-12012 May 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 2024-06-11
[Table view] Category:Environmental Monitoring Report
MONTHYEARML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24046A2372024-02-15015 February 2024 Annual Water Withdrawal Report 2023 ML24046A2362024-02-15015 February 2024 Discharge Monitoring Report (Dmr), January 2024 ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23200A0202023-07-13013 July 2023 Discharge Monitoring Report (Dmr), June 2023 ML23165A2852023-06-14014 June 2023 Discharge Monitoring Report (Dmr), May 2023 ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23163A0382023-06-0808 June 2023 Discharge Monitoring Report (Dmr), April 2023 ML23121A0232023-04-27027 April 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 ML23121A0182023-04-27027 April 2023 Discharge Monitoring Report (Dmr), March 2023 ML23075A1932023-03-16016 March 2023 Discharge Monitoring Report (Dmr), February 2023 ML23046A3482023-02-15015 February 2023 Discharge Monitoring Report (Dmr), January 2023 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23017A0182023-01-12012 January 2023 Discharge Monitoring Report (Dmr), October 2022 ML23017A0162023-01-12012 January 2023 Discharge Monitoring Report (Dmr), September 2022 ML23017A0212023-01-12012 January 2023 Discharge Monitoring Report (Dmr), December 2022 ML23017A0202023-01-0505 January 2023 Discharge Monitoring Report (Dmr), November 2022 ML23003A0262022-12-21021 December 2022 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-17, SW-19, and SW-21 ML22347A0812022-12-13013 December 2022 Annual Non-Radiological Environmental Operating Report 2022 ML22255A0252022-09-12012 September 2022 Submittal of Discharge Monitoring Report (Dmr), August 2022 ML22251A1192022-09-0808 September 2022 Discharge Monitoring Report (DMR) Quality Assurance Study 42 Final Report 2022 ML22195A2362022-07-14014 July 2022 June 2022 Discharge Monitoring Report ML22166A3572022-06-15015 June 2022 May 2022 Discharge Monitoring Report (DMR) ML22137A2672022-05-17017 May 2022 Discharge Monitoring Report (Dmr), April 2022 ML22132A1912022-05-12012 May 2022 Submittal of Discharge Monitoring Report (Dmr), March 2022 ML22132A1842022-05-12012 May 2022 Submittal of Discharge Monitoring Report (Dmr), February 2022 ML22132A1762022-05-12012 May 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 ML22131A1342022-05-11011 May 2022 Annual Radiological Environmental Operating Report for 2021 ML22115A1782022-04-25025 April 2022 Annual Radioactive Effluent Release Report for 2021 Monitoring Period ML22045A0222022-02-11011 February 2022 Discharge Monitoring Report (Dmr), January 2022 ML22018A0422022-01-13013 January 2022 Discharge Monitoring Report (Dmr), December 2021 ML22018A0342022-01-13013 January 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, and SW-21 ML21348A3372021-12-14014 December 2021 Annual Non-Radiological Environmental Operating Report - 2021 ML21348A7152021-12-14014 December 2021 Discharge Monitoring Report (Dmr), November 2021 ML21347A9022021-12-13013 December 2021 Discharge Monitoring Report (DMR) Quality Assurance Study 41 Follow-up Report 2021 ML21320A0152021-11-15015 November 2021 Discharge Monitoring Report (DMR) Quality Assurance Study 41 Final Report 2021 ML21320A0192021-11-15015 November 2021 Discharge Monitoring Report (Dmr), September 2021 2024-05-13
[Table view] Category:Letter
MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] |
Text
TENNESSEE VALLEY 1\\14 AUTHORITY
Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, TN 37384
February 15, 2023
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555- 0001
Subject:
Sequoyah Nuclear Plant, Annual Water Withdrawal Report 2022
Attached is the annual water withdrawal report for CY 2022 f or Sequoyah Nuclear Plant.
Respectfully,
Travis R. Markum Environmental Scientist From: Markum, Travis R To: DWRWater.Compliance@tn.gov Cc: Rebecca Rush
Subject:
SQN Water Withdrawal Annual Report 2022 Date: Wednesday, February 15, 2023 3:04:00 PM Attachments: SQN Annual Water Withdrawal Report 2022.pdf
Please see attached Water Withdrawal Annual Report for calendar year 2022.
Travis R. Markum Env. Scientist (Compliance)
Environmental Operations
TVA Sequoyah Nuclear Plant PO Box 2000, OPS 5N Soddy Daisy, TN 37384
(: 423-843-6714
NOTICE: This electronic message transmission contains information that may be TVA SENSITIVE, TVA RESTRICTED, or TVA CONFIDENTIAL. Any misuse or unauthorized disclosure can result in both civil and criminal penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution, or use of the content of this information is prohibited. If you have received this communication in error, please notify me immediately by email and delete the original message.
TENNESSEE VALLEY W4 AUTHORITY
Tennes s e e Valle y Authority, Sequoya h N uclea r Pla nt, P.O. Box 2000, Sodd y Da isy, TN 3738 4
Sent Via Electronic Mail
February 15, 2023
State of Tennessee Department of Environment and Conservation Division of Water Resources William R Snodgrass Tennessee Tower 312 Rosa L. Parks Avenue, 11th Floor Nashville, Tennessee 37243
VIA EMAIL TO: DWRWater.Compliance@tn.gov
TENNESSEE VALLEY AUTHORITY (TVA)-SEQUOYAH NUCLEAR PLANT (SQN)
WATER WITHDRAWAL REGISTRATION 2022 - REGISTRATION NUMBER: 628
In accordance with the provisions of Tennessee Code Annotated Section 69-7-301 et seq, enclosed are completed Water Withdrawal Registration Forms for calendar year 2022.
As previously reported, federal agencies are not subject to laws and regulations promulgated by state governments unless Congress has clearly waived the federal government 's sovereign immunity. However, TVA has voluntarily agreed as a matter of policy to p~ vide the registration information to assist both TVA and TDEC in carrying out their water management responsibilities. By voluntarily cooperating with the State of Tennessee in its water management programs, TVA does not waive any immunity it may have under the Constitution from State regulation and control, nor manifest any position on who may control or own the water.
Please contact Travis Markum at (423) 843-6714, or by e-mail at trmarkum@tva.gov, if you have any questions about this submittal or need additional information.
Sincerely, l,'!Y~
Tony McMutuary Senior Manager, Chemistry/Environmental Sequoyah Nuclear Plant
Enclosure
cc (Electronic Distribution w/ Enclosure) :
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 State of Tennessee DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES William R. Snodgrass Tennessee Tower 312 Rosa L. Parks Avenue, I J'h Floor Nashville, Tennessee 37243
WATER WITHDRAW AL REGISTRATION
In acco rd ance with the provi s ions of Tennessee Code Annotated Sect ion 69-7-301 et seq., t he Water Resources lnfonnati on Act,
this registration is required for anyone withdrawing an average of 10, 000 gallons or more of water per day.
See attached instructions.
PART A. FACILITY & CONTACT INFORMATION
- 1. Water Withdrawal Registration No.: 628
- 2. Water User: TV A - SEQUOYAH NUCLEAR PLANT Type: The r ma l {Nuclear)
Mailing Addres s: P.O. BOX 2000, OPS SN-SQN City: SODDY DAISY State: TN Zip: 37384 County: HAMILTON
- 3. Location (if different from mailing address):
Street Address: SEQUOYAH ACCESS ROAD City: SODDY DAISY State: TN Zip: 37379 County: HAMILTON
- 4. Number of employees at location: 1069
- 5. Indicate the contact individual for water withdrawal information:
Name: TRAVIS MARKUM
Title:
Environmental Scientist (Compliance) email: trmarkum@tva.gov Phone: 423-843-6714 Fax:
PART B. WATER USE REPORTING PERIOD
- 6. Year: 2022
- 7. (Check One): __ New Operation X Renewal
- 8. List any water problems you have experienced in the last reporting period:
- 9. Classifications of Water Use (Enter Percentage of Total use-Total must equal I 00%):
--- % a) Domestic water use (drinking, human con s umption and general san itation uses)
___ % b) In stitution a l or other general use s (lawn watering, laundry)
--- % c) Irrigation of crops, pastures and nursery s tock
___ % d) livestock watering (includes feed lots, dairy sanitation and fish farming)
___ % e) navigation (lock usage and flow augmentation for navigation)
I 00 % t) thermoelectric power production, including cooling purposes (excludes hydroelectric)
___ % g) recreational use, park use, golf course irrigation, water park use
--- % h) indu strial use s include manufacturing, food processing, washing, and cooling
--- % i) hydroelectric power generation (provided none of it is used consumptively)
--- % j) minin g (milling or where water is used to wash or proce ss an ore)
--- % k) dewatering (mining, quarry rock production, other operations where water is withdrawn)
___ % I) any other use not defined above. Describe:
I 00 % Total (Must equal 100%)
CN -1226 (Rev. 05-15) RDA 2853 WATER WITHDRAWAL INFORMATION
Yea r : 2022 Water Wit hdra wa l Registrat io n Number (From Part A, Lin e I): 628 Comp a ny Name: TVA - S EQUOYA H NUC LEAR PLANT Copy this page and sub mit a comple ted page for eac h withdrawal s ite. See attached instru c tions.
Part C. Water Withdrawals Part D. Water Discharge (if applicable)
Source Po int ID Number: NI A Disch a rge Point ID Number: 116 So urce Point Na m e: ____ T--'N--'-R-'-'i_v.;:..;er'-('--'C:....C:....W---L) _ _ _ Dischar ge Point Name : TN River-CCW Backwa s h So urce Type: (G, S, or P): ____ S ___ _ NPDES Pe rmit No.: TN0026450 Coun ty: Ha milt o n Cou nty : Hamilt on Ri ve r Mile: 485.2 River Mile: 485.2 Latitude: 35 - 13 - 33 Latitude: 35 33 Longitude: 85 - 05 - 13 Lon g itud e: 85 - 05 - 13 Dat um (NA D 27 o r NAD 83): NAD 27 Datum: NAD 27 or 83: NA D 27 Map: NA _x_O n File Attached Map on fil e or attached: On Fi le Method of Mea s ure (A, B, C, D, or E): - - --=B=---- Method of Measure (A, B, C, D, or E): B JAN Total Withdrawal s: 50,086 MG JAN Total Di sch arge: 0. 1825 MG
FEB To tal Withdrawals: 45,239 MG FEB Total Discharge : 0.1825 MG
MAR Tot a l Withdrawal s : 50,086 MG MAR Total Di sc harge: 0.1825 MG
APR Total Withdrawals: 48,470 MG APR Total Discharge: 0. 1825 MG
MAY To ta l Withdrawals: 48,470 MG MAY T ota l Di scharge: 0.1825 MG
J UNE Tot a l Withdrawal s: 46,855 MG J UNE Total Di sch arge: 0.1825 MG
J ULY Total Withd rawa ls: 50 086 MG J ULY Total Discharge: 0.1825 MG
AUG Total Withdrawal s: 50, 086 MG AUG Total Di sch a rge: 0.1825 MG SE PT Total Withdrawal s: 48,470 MG " SEPT Tota l Discharge: 0.1825 MG
OCT Tota l Withdrawal s: 44,431 MG OCT Total Discharge: 0.1825 MG
NOV Tota l Withdra wa ls: 33,929 MG NOV Total Di sch arge: 0. 1825 MG
DEC Tota l Withdrawal s: 50,086 MG DEC Total Di sc harge: 0.1825 MG
- 10. Total A nnu a l Withdrawals: 566,296 MG 17. Total Annual Discharges: 2. 19 MG
- 11. Total # Days Water Withdrawn in Year: 365
- 12. Grand Total Water Withdrawals: 580,348 MG 18. Grand Total Discharges: --~~-- 6 14, 252 MG
- 13. Grand Tota l # Days Water Withdrawn in Year : 365
- 14. Avera g e Daily Wat e r Withdrawals: ____ l,.c.,5...:..9....:.0 ___ MGD
- 15. Maximum Day Water Withdrawal: 1,659 MG
- 16. Max imum Day Water Withdrawa l occ urred in this m o nth: _____ A_u~o~u_s_t ___ _
Part E. Signature I cert ify, unde r penalty of law. includin g b111 no t limit e d to penalti es for perj w y. that this doc 11me111 and all a11achments we r e prepared by me, or unde r my dir ection or supervision; that all of the su bmill ed i,iformation is 10 the bes/ ofmy knowledge and belief tru e. accurate, a nd comple te: and thal lam lawf ully p r e sent in the United Stat es as a U.S. c iti=en or a q ualifi ed a lie n as defined in 8 USC. § 16./1 (b). As sp ecified in Tennessee Code Anno JaJed Section 39-1 6-702(a)(4 ). this declaration is made unde r penalty ofperj111y. I unde r s tan d that the p enalti es fo r p r ovidingfals e infor mati on and makingfalse or jra udule n/ s la tements or r epr esen tati ons include revocation in a.fin e, per mit or license, civil p enalti e s. ndlo r criminal prosec ution re sultin g in a.fine. impriso nme /11 or bo//1.
Date: --'"'---'=-t-1--+-1---<, l\\..=>_,_ ____ _ _
- 19. Print Name : Tony McMutuary T itle : Se ni or Manager, C h e m /Environmental
- 20. S ig nature: ~ 1/IJ~
CN-1226 (Rev. 05~15) V ~ RDA 2853 WATE R WITHDRAWAL INFORMATION
Year : 2022 Wa te r W ithd rawa l Reg is t ra ti on N umb er (Fro m Part A, L ine I): 628 Com pany Name: TV A - SEQ UOY AH NUCLEAR PLANT Copy this page and subm it a co mpleted page for each withdrawal site. Se e attaclt e,I i11stru ctio11 s.
Part C. Wat e r Withdrawals Part D. W a t e r Dischar ge (if applicable)
Sou rce Po in t ID N um ber : N I A ----- --- Di scharge Po int ID N u mber: --- ---11 7 Sou rce Po int Na m e: ____ T_N_ R_iv_e_r ~(E_ R_C_W_)~-- D ischa rge Po int Na m e: TN R ive r-E RCW b ackwash Sou rce T ype : (G, S, or P): ____ S __ _ N PD ES Pe rm it No.: TN0 026450 County: H am ilton Coun ty: Ha m ilto n R iver M i le: 484.85 Rive r M ile : 484.85 Lat itude: 35 - 13 - 32 La ti tude: 35 -1 3 - 32 Lo n g it u de: 85 - 05 - 1 3 Lo ng it ude: 85 - 05 - 1 3 Da tum (NAO 27 o r NAO 83): NA O 27 Datum : NAO 27 o r 83: NA D 27 Ma p : NA x O n File A ttac h ed Map on fil e o r attac he d : On F il e Met hod of Meas ure (A, B, C, D, o r E): B Me th od of Meas u re (A, B, C, D, o r E): _----=.B __
J AN Tota l W ithdrawa ls : I, 128 MG J AN T ota l D ischa rge: 0.4258 MG
FEB Tota l Wi t h d r awa ls: 997 MG FEB Tota l D isc h a rge: 0.4258 MG
MA R Tota l W ith drawa ls: I, I 03 MG MAR To ta l Di sch arge: 0.4258 MG
AP R Tota l W ith drawa ls: I, 111 MG A PR T o ta l D ischa rge: 0.4258 MG
MAY Tota l W ith drawa ls: 1, 204 M G MAY Tota l D isch arge: 0.4258 MG
J UNE Tota l W it hdrawa ls : 1, 2 12 MG J UNE Tota l D isc h arge: 0.4258 M G
J ULY Tota l Wit hd rawa ls: 1,302 MG J ULY Tota l Disch arge: 0.4258 MG
AUG T ota l W it h drawa ls: 1,3 0 5 MG AUG Tota l D isch a r ge: 0.4258 MG SEPT Tota l Wit h dr awa ls: 1, 264 M G ' SE PT Tota l D isch arge: 0.4258 MG
OCT Tota l W ith drawa ls: I 20 I MG OCT To ta l D isc ha rge: 0.4258 MG
NOV Tota l W it h drawa ls: 1, 10 1 MG NOV T ota l D isch arge: 0.4258 MG
DEC Tota l W it hd rawa ls: I, 123 MG DEC To ta l Di sc harge: 0.4258 MG
- 10. Total A nnu a l W it h drawa ls: 14,052 MG 17. Tota l An n ua l D isch a rges: 5. 11 MG
- 11. Tota l # Days Wate r Wit h drawn in Year : 365
- 12. G ra nd Tota l Water Withd rawa ls: 580,348 MG 18. Gra nd To ta l D isc h- -~~-- 614,252 MG a rges:
- 13. Grand Tota l # Days Water W it h drawn in Year: 365
- 14. Average Dai ly Water Withdrawa ls: ____ 1~,5_9_0 ___ MGD
- 15. Maxi m um Day Water Wit h drawa l: 1,659 MG
- 16. Maxim um Day Wa te r Wi th drawa l occurred in th is mont h: _____ A_u~o~u_s_t ___ _
P a rt E. Si g na tur e I cer1ify, 1111de r p e nally of law, including bu/ no/ limil e d lo p e nalli e s for p erj111J1, 1ha1 !his do c11111e n1 and all a11ac hme 111s we re prepar e d by me, o r unde r my dir e clion or supe n 1ision; 1ha1 all of1h e submill ed informalion is 10 the be st ofmy kno wledge and b elief/rue. a cc11ra1e, and c omp/e 1e : and 1ha1 I am lawfully prese m in 1he Uni le d S1a1e s as a U.S. c ili= en o r a qualifi ed ali e n as define d in 8 U.S. C. § 1641 (b). As sp ecifie d in Tenness ee Code Anno1a1ed Sec/ion 39-/6-702(a)(.f), !his de claralion is made unde r p e nally ofperjw y. I unde r s /and 1ha1 !he p e nalli esfo r pro vidin g fals e informal i o n and making f als e or fraudu/e nl s/ale m e ms o r r epresenlali o n s in clude r e vocali o n in a fine. p e rmi l o r licen se. c ivil p e nalti e s, an d/or criminal pros ecution re sullin g in a fin e. imprisonm e nl o r both.
Date: 0 'J/)t(;B
- 19. Print Name: Tony McMut uary
Title:
Sen io r Ma nage r, C he m /En v iro nm e n tal
- 20. S ign ature: z~1tl?~
CN-1226 ( R ev. 5 -1 RDA 2853 WATER WITHDRAWAL INFORMATION
Year: 2022 Water Withdra wa l Registration Number (Fro m Part A, L in e I ): 628 Compa ny Name: TVA - SEQUOYA H NUCLEAR PLANT Copy this page and subm it a comple ted page for each withdrawal site. See atta c hed instru ctions.
Part C. Water Withdrawals Part D. Water Discharge (if applicable)
So urce Po int ID N umb er: N /--------A Di scharge Point ID Number: IO I So urce Po int Na m e: N / -------------A Dischar ge Point Na m e: TN River ( Diffu ser Po n d)
So urce Type: (G, S, o r P): ___ N_/A __ _ NPDES Permit No.: TN0026450 Co un ty: Ham ilton Co un ty: H a milton River Mile: N /A River Mile: 483.65 Latitude: N / A Latitude: 35 35 Long itud e: N /A Longitude: 85 - 05 - 14 Datum (NAO 27 or NA O 83): N /A Datum: NAO 27 or 83: ___ N_A_ D_2_7 __
Map: x NA On File Attac hed Map o n fil e or attac hed: O n F il e Method of Measure (A, B, C, D, or E): NIA Method of M eas ure (A, B, C, D, or E): __ E __
J AN Total Withdrawals: N /------A MG JA N Total Di sc harge: 53, 115 MG
FEB T ota l Withdrawals: N /------A MG FEB Total Di s charge: 47,490 MG
MAR Total Withdrawals: N /------A MG MAR Total Di sch a rge: 52,807 MG
APR Tota l Withdrawals: N /------A MG APR Total Discharge: 52,468 MG
MAY Tota l Withdrawals: N-----IA MG MAY Total Discharge: 53,446 MG
JUNE Total Withdrawals: N /-----A MG J UNE Total Discharge: 51,877 MG
JULY Total Withdrawal s: N /-----A MG J ULY Total Discharge: 53,079 MG
AUG Total Withdrawals: N-----IA MG AUG Total Discharge: 54,965 MG
'I SE PT Tota l Withdrawal s : N------IA MG SE PT Total Di sc ha rge: 53,424 MG
OCT Tota l Withdrawals: N-----IA MG OCT Total Discharge: 49,498 MG
NOV Total Withdrawal s : N /------A MG NOV To t a l Di sc ha rge: 38, 132 MG
DEC Total Withdrawal s: N /------A MG DEC Total Discharge: 53,945 MG
I 0. Tota l Annua l Withdrawals: N /------ -A MG 17. Total A nnu a l Di sc ha rges: 614,245 MG
- 11. Total # Day s Water Withdrawn in Year: 365
- 12. Grand Total Wate r Withdrawal s : __ 5_8_0~,3_4_8 __ MG 18. Grand To tal Disch arges: 6 14,252 MG
- 13. Grand Total # Days Wat e r Withdrawn in Year: 365
- 14. Average Daily Water Withdrawals: ___ _ l ~,5_9_0 ___ MGD
IS. Maximum Day Water Withdrawal: 1,659 MG
- 16. Maximum Day Water W ithd rawa l occ urre d in this month: _____ A_u~0_,_u_s_t ___ _
Part E. Signature I certify. under p enalty of law, including but not limit ed to penal ties for pe 1jwy, that this documen t and all attachments were prepared by me. or under my dir ection or supervision; that all of the submill ed informa tion is to the best of my knowledge and belief /rue, acc ura1e, and co mplete; and thar I am la11fully presenl in !h e United Sta les as a U.S. ci ti=e n or a qualifi e d alien as defined in 8 U.S. C. § 16./ I (b). As specified in Tennessee Code Annota/ed Section 39-l6-702(a)(./), !his declaralion is made under p enalty ofpe,jwy. I unders/and !hat !he penalties for providingfalse informa tion and makin gfa lse or fraudulenr statements or r eprese nlali ons includ e r evoca tion in a fin e. p erm/I or li cense. c ivil p enalt ies, and/or criminal pros eculion r esulting in a fine, imprisonmenl or both.
Date: D'J.//1f(J.J
- 19. Print Name:. Tony McMutuary T itle: Se nior Manager, Che m /Env ironm enta l
- 20. Signa ture : 7'.Jf 1ft <-~
CN -1 226 (Rev. 05 -1 RDA 2853