MONTHYEARIR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24295A3742024-10-23023 October 2024 Project Manager Assignment ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers 2024-09-05
[Table view] Category:Operating Plan
[Table view] Category:Status Report
MONTHYEARLR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) ML22076A0502022-03-17017 March 2022 and Salem Generating Station, Units 1 and 2 - Annual Property Insurance Status Report LR-N21-0015, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-03-25025 March 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations IR 05000354/20200062021-03-0303 March 2021 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Report 05000354/2020006) LR-N19-0014, Stations - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2019-03-25025 March 2019 Stations - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N18-0041, Annual Property Insurance Status Report2018-04-0505 April 2018 Annual Property Insurance Status Report LR-N17-0162, Station'S Seventh Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-19019 December 2017 Station'S Seventh Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions LR-N17-0075, Station'S Sixth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number ...2017-06-27027 June 2017 Station'S Sixth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number ... LR-N17-0043, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2017-03-29029 March 2017 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N17-0041, Annual Property Insurance Status Report2017-03-24024 March 2017 Annual Property Insurance Status Report LR-N16-0218, Fifth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions(Order No. EA-13-109)2016-12-22022 December 2016 Fifth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions(Order No. EA-13-109) ML16320A4842016-11-15015 November 2016 Public Telecon Regarding LAR to Upgrade Power Range Neutron Monitoring System (Meeting Handout) LR-N16-0168, 10 CFR 50 Appendix H Status Update for Hope Creek Generating Station2016-10-31031 October 2016 10 CFR 50 Appendix H Status Update for Hope Creek Generating Station LR-N16-0137, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External2016-08-24024 August 2016 Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External LR-N16-0118, Fourth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2016-06-29029 June 2016 Fourth Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions LR-N16-0042, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-29029 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) LR-N15-0169, Fifth Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2015-08-27027 August 2015 Fifth Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. ML15089A4262015-03-30030 March 2015 Annual Property Insurance Status Report LR-N15-0048, Salem, Units 1 and 2, Hope Creek - Annual Property Insurance Status Report2015-03-30030 March 2015 Salem, Units 1 and 2, Hope Creek - Annual Property Insurance Status Report LR-N15-0022, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-18018 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events LR-N15-0024, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-18018 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity LR-N14-0169, Third Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-26026 August 2014 Third Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) LR-N14-0184, Third Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-26026 August 2014 Third Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events LR-N14-0025, PSEG Nuclear Llc'S Second Six-Month Status Report for Hope Creek in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2014-02-25025 February 2014 PSEG Nuclear Llc'S Second Six-Month Status Report for Hope Creek in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. LR-N14-0034, PSEG Nuclear Llc'S Second Six-Month Status Report for the Hope Creek in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-25025 February 2014 PSEG Nuclear Llc'S Second Six-Month Status Report for the Hope Creek in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) LR-N13-0059, NRC Decommissioning Funding Status Report2013-03-26026 March 2013 NRC Decommissioning Funding Status Report LR-N12-0331, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051)2012-10-31031 October 2012 Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051) LR-N12-0330, Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050)2012-10-31031 October 2012 Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) LR-N12-0329, PSEG Nuclear Llc'S Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2012-10-31031 October 2012 PSEG Nuclear Llc'S Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) LR-N12-0087, Annual Property Insurance Status Report2012-03-21021 March 2012 Annual Property Insurance Status Report LR-N11-0086, NRC Decommissioning Funding Status Report2011-03-31031 March 2011 NRC Decommissioning Funding Status Report LR-N10-0116, Annual Property Insurance Status Report2010-04-0101 April 2010 Annual Property Insurance Status Report LR-N09-0074, Letter from Jeffrie Keenan of PSEG Nuclear L.L.C., NRC Decommissioning Funding Status Report for Salem, Hope Creek & Peach Bottom Generating Stations2009-03-31031 March 2009 Letter from Jeffrie Keenan of PSEG Nuclear L.L.C., NRC Decommissioning Funding Status Report for Salem, Hope Creek & Peach Bottom Generating Stations LR-N07-0072, Annual Property Insurance Status Report2007-03-30030 March 2007 Annual Property Insurance Status Report LR-N06-0301, 2Q 2006 PSEG Metrics for Improving the Work Environment2006-07-27027 July 2006 2Q 2006 PSEG Metrics for Improving the Work Environment ML0613902022006-05-17017 May 2006 NRC Decommissioning Funding Status Report, Salem, Hope Creek, and Peach Bottom LR-N06-0179, Iq 2006 PSEG Metrics for Improving the Work Environment2006-04-28028 April 2006 Iq 2006 PSEG Metrics for Improving the Work Environment LR-N05-0239, PSEG Quarterly Metrics Report 04/29/2005 for Improving SCWE for Salem & Hope Creek Stations2005-04-29029 April 2005 PSEG Quarterly Metrics Report 04/29/2005 for Improving SCWE for Salem & Hope Creek Stations LR-N05-0140, Units 2 & 3, NRC Decommissioning Funding Status Report2005-03-30030 March 2005 Units 2 & 3, NRC Decommissioning Funding Status Report ML0506300702005-03-0202 March 2005 January Monthly Report on the Status of Open TIAs Assigned to NRR ML0501202612005-01-12012 January 2005 December Monthly Report on the Status of Open TIAs Assigned to NRR ML0524904972004-08-10010 August 2004 Open Branch 3 Allegation Status Summary ML0620202462004-08-10010 August 2004 Open Branch 3 Allegation Status Summary ML0620201932004-07-19019 July 2004 Open Branch 3 Allegation Status Summary ML0524404732003-09-22022 September 2003 Investigation Status Record Discrimination Against a Senior Engineer for Raising Concerns Through the Corrective Action Program ML0524404712003-09-22022 September 2003 Investigation Status Record Discrimination Against a Senior Engineer for Raising Concerns Through the Corrective Action Program ML0524404602003-09-22022 September 2003 Exhibit 1: Investigation Statue Record, Discrimination Against a Senior Engineer for Raising Concerns Through the Corrective Action Program 2024-03-07
[Table view] |
Text
February 28, 2024
Charles McFeaters President and Chief Nuclear Officer PSEG Nuclear, LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT: ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2023 006)
Dear Charles McFeaters:
The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Hope Creek Generating Station (Hope Creek) reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP)
Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2025.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In addition to baseline inspections, the NRC plans to conduct Inspection Procedure 71003, Post -Approval Site Inspection for License Renewal, Phase 1 and 2 at your facility.
From January 1, 2023 through December 31, 2023, the NRC issued one Severity Level IV traditional enforcement violation associated with willfulness. Therefore, the NRC plans to conduct Inspection Procedure 92702, Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders, to follow-up on this violation. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5312 with any questions you have regarding this letter.
Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety
Docket Nos. 05000354 License Nos. NPF-57
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV SUBJECT: ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2023 006) DATED FEBRUARY 28, 2024
DISTRIBUTION:
BBickett, DORS RClagg, DORS SQuiroga, DORS CDukehart, DORS, SRI JBresson, DORS, RI CFragman, DORS, AA FGaskins, RI OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1 Resource RLorson, RA DCollins, DRA BWelling, DORS RMckinley, DORS PKrohn, DRSS JZimmerman, DRSS DRSS Reactor Branch Chiefs DORS Specialist Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDroIrib Resource ROPassessment Resource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-24 EOC Review/Branch 3/Annual Assessment Letters/AAL_HC_ROP24.docx ADAMS ACCESSION NUMBER: ML24057A244 X SUNSI Review X Non-Sensitive X Publvlle Sensitive n -Publiclyvlable
OFFICE / /
ME RClagg BBickett TE 22/2024 26/2024
OFFIAL RERD COPY
Site Inspection Activity Plan Hope Creek
01/01/2024 - 12/31/2025
Unit Start End Activity CAC Title Staff Count
Access Auth, Fitness for Duty 2
1 2/5/2024 2/8/2024 IP 71130.01 000733 Access Authorization
1 2/5/2024 2/8/2024 IP 71130.08 000740 Fitness-For-Duty Program
FY24 Hope Creek Initial License Exam 4
1 1/7/2024 1/16/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 2/11/2024 2/23/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Inservice Inspection - Hope Creek 1
1 4/8/2024 4/12/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
RP - 71124.01 Rad Hazards 1
1 4/15/2024 4/19/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
EP Exercise Inspection - Hope Creek 5
1 5/20/2024 5/24/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1 5/20/2024 5/24/2024 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event
1 5/20/2024 5/24/2024 IP 71151 001397 Performance Indicator Verification
RP - 71124.03 Airborne and 71124.04 Dose 1
1 7/8/2024 7/12/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1 7/8/2024 7/12/2024 IP 71124.04 000728 Occupational Dose Assessment
Cyber Security - Hope Creek 4
1 8/5/2024 8/9/2024 IP 71130.10 000741 Cybersecurity
1 8/19/2024 8/23/2024 IP 71130.10 000741 Cybersecurity
Access Control, Equipment Testing and Maintenance, Training, SPR 3
1 8/26/2024 8/30/2024 IP 71130.02 000734 Access Control
1 8/26/2024 8/30/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1 8/26/2024 8/30/2024 IP 71130.07 000739 Security Training
1 8/26/2024 8/30/2024 IP 71130.09 001656 Security Plan Changes
1 8/26/2024 8/30/2024 IP 71151 001338 Performance Indicator Verification
Hope Creek Requal Insp with P/F Results 1
1 10/7/2024 10/11/2024 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 10/7/2024 10/11/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
Comprehensive Engineering Team Inspection - Hope Creek 7
1 12/2/2024 12/6/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
1 12/9/2024 12/13/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
Prepared on 2/20/2024 11:01:58 AM 1 of 3 Site Inspection Activity Plan
Fire Protection - Hope Creek 3
1 1/13/2025 1/17/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1 1/27/2025 1/31/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
License Renewal Phase 2 - Hope Creek 5
1 2/24/2025 2/28/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal
1 3/10/2025 3/14/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal
EP Program Inspection - Hope Creek 2
1 3/17/2025 3/21/2025 IP 71114.02 000717 Alert and Notification System Testing
1 3/17/2025 3/21/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1 3/17/2025 3/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1 3/17/2025 3/21/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
1 3/17/2025 3/21/2025 IP 71151 001397 Performance Indicator Verification
RP RETS 71124.06 1
1 3/17/2025 3/21/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
Access Control, Protective Strategy, TSR, SPR, PIs - Hope Creek 4
1 6/9/2025 6/13/2025 IP 71130.02 000734 Access Control
1 6/9/2025 6/13/2025 IP 71130.05 000737 Protective Strategy Evaluation
1 6/9/2025 6/13/2025 IP 71130.09 001656 Security Plan Changes
1 6/9/2025 6/13/2025 IP 71130.14 000743 Review of Power Reactor Target Sets
1 6/9/2025 6/13/2025 IP 71151 001338 Performance Indicator Verification
RP Radwaste 71124.08 1
1 6/23/2025 6/27/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
RP REMP 71124.07 1
1 7/14/2025 7/18/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program
PI&R Biennial Team Inspection - Hope Creek 4
1 8/4/2025 8/8/2025 IP 71152B 000747 Problem Identification and Resolution
1 8/18/2025 8/22/2025 IP 71152B 000747 Problem Identification and Resolution
2025 HC Initial Operator Licensing Exam 3
1 7/14/2025 7/18/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 8/11/2025 8/15/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
RP Rad Instrumentation 71124.05 1
1 8/18/2025 8/22/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
License Renewal Phase 1 - Hope Creek 1
1 9/29/2025 10/3/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal
Inservice Inspection - Hope Creek 1
1 9/29/2025 10/3/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Prepared on 2/20/2024 11:01:58 AM 2 of 3 Site Inspection Activity Plan
RP Rad Hazard Assessment and Exposure Control 71124.01 1
1 10/6/2025 10/10/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
RP PI Verification 71151 1
1 11/17/202511/21/2025 IP 71151 001397 Performance Indicator Verification
Prepared on 2/20/2024 11:01:58 AM 3 of 3