Category:Operating Plan
Jump to navigation
Jump to search
(previous page) (next page)
Category Used between: 15 June 1976 to 30 September 2025
Plant
University
Fuel Processing
- BWX Technologies (0)
- Barnwell (0)
- Claiborne (0)
- Consolidated Interim Storage Facility (0)
- Eagle Rock (0)
- Erwin (0)
- Framatome ANP Richland (0)
- Global Nuclear Fuel (0)
- HI-STORE (0)
- Holtec (0)
- Orano USA (0)
- Paducah Gaseous Diffusion Plant (0)
- Portsmouth Gaseous Diffusion Plant (0)
- Triso-X (0)
- West Valley Demonstration Project (1)
- Wood River Junction (0)
Laboratory
- 05000470 (0)
- Battelle Memorial Institute (0)
- Dow Chemical Company (0)
- General Atomics (0)
- Hermes (0)
- Idaho National Laboratory (0)
- Knolls Atomic Power Laboratory (0)
- Los Alamos National Laboratory (0)
- Lynchburg Research Center (0)
- National Bureau of Standards Reactor (1)
- National Institute of Standards and Technology (0)
- National Renewable Energy Lab (0)
- Northwest Medical Isotopes (0)
- Oak Ridge National Laboratory (0)
- PM-1 (0)
- PM-2A (0)
- Pacific Northwest National Laboratory (0)
- Plum Brook (0)
- SHINE Medical Technologies (1)
- SM-1 (0)
- SM-1A (0)
- Sandia National Laboratories (0)
- Tuxedo (0)
- U.S. Geological Survey (0)
- Vanowen (0)
- Waltz Mill (0)
Hospital
- Advocate Illinois (0)
- Avera McKennan Hospital (0)
- Banner Boswell Medical Center (0)
- Bard Brachytherapy (0)
- Dermatology of Seattle and Bellevue (0)
- Fred Hutchinson Cancer Center (0)
- George Washington Hospital (0)
- Karmanos Cancer Institute (0)
- Kennedy Memorial Hospital (0)
- Lincoln Memorial Hospital (0)
- Northwestern Memorial Hospital (0)
- Piedmont Hospital (0)
- UMass Memorial Health Medical Center (0)
- University Hospitals of Cleveland (0)
- West Virginia University Hospital (0)
Manufacturer
- 05200045 (0)
- Braun Intertec Corporation (0)
- Electric Boat (0)
- Martinez Refining Company (0)
- Mistras Group (0)
- Reliable Testing Services (0)
- Sacyr Construction (0)
- Screaming Eagle Coal (0)
- Tilden-Mine (0)
Agency
Pages in category "Operating Plan"
The following 200 pages are in this category, out of 277 total.
(previous page) (next page)B
C
- CNL-14-191, Compliance Status Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049
- CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval
D
I
J
- JAFP-13-0023, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- JAFP-13-0024, Entergy’S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050)
- JAFP-13-0025, Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
- JAFP-14-0075, Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
- JAFP-18-0050, Report of Full Compliance with Phase 1 & Phase 2 of 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
L
- L-08-110, Corrective Action Program Assessment Plan for 2008
- L-09-011, First Energy Nuclear Operating Company - Davis Besse, 2008 Independent Assessment of the Davis-Besse Nuclear Power Station Safety Culture and Safety Conscious Work Environment Report
- L-12-167, Enclosure B, Offsite Dose Calculation Manual, Revision 18 and Enclosure C, Process Control Program, Revision 12
- L-16-123, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
- L-19-159, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI - Irradiated Fuel Management Plans
- L-2013-079, Florida Power & Light/St. Lucies Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- L-2024-133, Snubber Program Plan Submittal
- L-PI-13-006, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
- LIC-11-0095, Post-Flooding Recovery Action Plan, Revision 1
- LIC-13-0086, Integrated Performance Improvement Plan, Revision 5, Cover Through Page 73
- LIC-13-0099, Plan for Sustained Improvement, Revision 0
- LR-N12-0185, Submittal of Snubber Program Plans for the Hope Creek Third Ten-Year Inservice Inspection Interval
M
- ML022210441
- ML030340157
- ML030590084
- ML030590142
- ML030590149
- ML030590156
- ML030620080
- ML030870880
- ML030870885
- ML040560670
- ML040680502
- ML041400031
- ML042040380
- ML043060471
- ML050750301
- ML050840122
- ML050840464
- ML050840490
- ML050950080
- ML051030011
- ML051570082
- ML051890400
- ML052170280
- ML052860224
- ML060890644
- ML060970629
- ML061290566
- ML061730285
- ML062360014
- ML070110342
- ML070300805
- ML070300817
- ML070400472
- ML070680348
- ML070890319
- ML071160342
- ML071300549
- ML071310038
- ML071440374
- ML071440380
- ML071450153
- ML071450162
- ML071670008
- ML071670009
- ML071770453
- ML071770458
- ML072670391
- ML073170697
- ML080160256
- ML080230335
- ML081010196
- ML081010451
- ML083380576
- ML090270823
- ML090690300
- ML091530388
- ML092740149
- ML093350600
- ML093380701
- ML101260445
- ML102100095
- ML103220201
- ML103230386
- ML110940459
- ML11171A079
- ML11214A193
- ML11229A706
- ML112560085
- ML11262A151
- ML112991513
- ML11305A042
- ML11318A027
- ML11318A028
- ML11318A030
- ML11319A067
- ML11319A068
- ML11319A071
- ML11319A072
- ML12052A115
- ML12054A145
- ML120610068
- ML120610074
- ML12157A180
- ML12240A106
- ML12271A468
- ML12331A175
- ML13057A873
- ML13059A267
- ML13063A012
- ML13063A013
- ML13063A016
- ML13063A017
- ML13063A032
- ML13063A065
- ML13063A096
- ML13063A098
- ML13063A149
- ML13063A181
- ML13063A182
- ML13063A183
- ML13063A436
- ML13063A437
- ML13063A440
- ML13064A265
- ML13064A271
- ML13064A302
- ML13064A353
- ML13066A036
- ML13066A172
- ML13067A030
- ML13071A580
- ML13098A511
- ML13116A279
- ML13136A022
- ML13169A134
- ML13172A342
- ML13172A343
- ML13309B621
- ML14007A244
- ML14080A140
- ML14119A120
- ML14168A475
- ML14177A364
- ML14177A731
- ML16232A631
- ML17138A119
- ML17277B643
- ML18026A014
- ML18254A265
- ML18283B043
- ML18283B044
- ML18283B691
- ML18320A036
- ML18347A559
- ML18354A652
- ML19025A312
- ML19119A372
- ML19123A321
- ML19163A032
- ML19239A078
- ML19282D133
- ML20069A759
- ML20078J643
- ML20080K386
- ML20090B942
- ML20090B947
- ML20090C949
- ML20092J667
- ML20099A149
- ML20099A154
- ML20104A931
- ML20247J606
- ML20282A715
- ML20282A717
- ML20335A566
- ML20335A567
- ML21035A245
- ML21105A858
- ML21105A859
- ML22053A062
- ML22053A064
- ML22129A188
- ML22157A033
- ML22216A059