LR-N16-0168, 10 CFR 50 Appendix H Status Update for Hope Creek Generating Station

From kanterella
Jump to navigation Jump to search
10 CFR 50 Appendix H Status Update for Hope Creek Generating Station
ML16305A004
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/31/2016
From: Carr E
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N16-0168
Download: ML16305A004 (2)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 p G 10 CFR 50, Appendix H, Section IV.B LR-N16-0168 October 31, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354

Subject:

10 CFR 50 Appendix H Status Update for Hope Creek Generating Station

Reference:

Letter No. 2016-114 from EPRI to NRC "BWRVIP-298NP: BWR Vessel and Internals Project, Testing and Evaluation of the Hope Creek 120° Capsule,"

dated October 31, 2016 On October 31, 2016, the Electric Power Research Institute (EPRI), on behalf of the Boiling Water Reactor Vessel and Internals Project (BWRVIP), submitted "BWRVIP-298NP: BWR Vessel and Internals Project, Testing and Evaluation of the Hope Creek 120° Capsule," as required by 10 CFR 50, Appendix H, Section IV.A.

PSEG Nuclear LLC (PSEG) has reviewed the test results provided in BWRVIP-298NP and determined that changes to the Pressure-Temperature (P-T) Limit Curves (Figures 3.4.6.1-1, 3.4.6.1-2 and 3.4.6.1-3) contained in the Hope Creek Generating Station (Hope Creek)

Technical Specifications (TS) are required. PSEG will submit a license amendment request to revise the Hope Creek P-T limit curves by March 31, 2017.

The Hope Creek TS P-T curves are valid for 32 effective full power years (EFPY), and Hope Creek is currently at approximately 25.5 EFPY. However, preliminary analysis of the results of

_ _ _ _ _this_Le_c_an_t_cap_s_ule_iotormation_sbows_tbaUbere_is_a_negati'leJmpact_onJheJ-Iope_Creek _ _ _ _ _ _ __

pressure-temperature operating limits.

PSEG implemented a 28°F adjustment to the P-T limit curves to ensure that the fracture toughness requirements for the reactor coolant pressure boundary contained in 10 CFR 50 Appendix G are maintained through administrative controls until the license amendment request is submitted and approved.

There are no regulatory commitments contained in this letter.

LR-N16-0168 10 CFR 50, Appendix H Page 2 If you have any questions or require additional information, please contact Ms. Tanya Timberman at 856-339-1426.

Eric S. Carr Site Vice President Hope Creek Generating Station cc: Mr. D. Dorman, Administrator, Region I, NRC Ms. C. Parker, Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Chief, NJBNE PSEG Corporate Commitment Tracking Coordinator Hope Creek Commitment Tracking Coordinator