ML24078A214

From kanterella
Revision as of 13:13, 5 October 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC-2018-000103 - Publicly Available Records-Item 102
ML24078A214
Person / Time
Issue date: 03/14/2024
From:
NRC/OCIO
To:
Shared Package
ML24078A173 List:
References
NRC-2018-000103
Download: ML24078A214 (1)


Text

Publicly Available Records Responsive to Item 102

All correspondence between Ameren Corporation and the NRC since February 26, 2010 regarding the 2003-0ct-21 reactor shutdown.

NRC-2018- 000096 NRC-2018- 000103

1. ML072140876 - Letter to Union Electric Co., transmitting IR05000483-07-003, on 3/25-06/23/2007; Callaway Plant: Equipment Alignment, Refueling and Outage Activities, and Identification and Resolution of Problems, dated August 2, 2007.
2. ML092090664 - Letter to AmerenUE, transmitting IR05000483-09-003, on 3/25-6/23/2009, Integrated Resident and Regional Report, Maintenance Risk Assessments and Emergent Work Control and Access Control to Radiologically Significant Areas, dated July 28, 2009.
3. ML110470066 - Response to Legal Counsel for Callaway Plant RE: Ameren Missouris Understanding that Lawrence S. Crisciones Official NRC Duties and Responsibilities will not involve Callaway Matters (TAC No. ME4721), dated March 7, 2011.
4. ML111030542 - Letter to Thadani, NRC, from Shapiro, Pillsbury, Winthrop, Shaw, Pittman (and enclosures)

Subject:

Ameren Missouri Response to September 17, 2010 10 CFR 2.206 Petition Filed by Lawrence S. Criscione, dated January 6, 2011.(Note that the enclosures are copies of records processed, and made publicly available, in FOIA/PA-2008-0011 (web package is ML073540275) or FOIA/PA -2009- 0042 (web package is ML090420452) or are publicly available as ML090350418 and ML11297A239).

5. ML033630592 - Licensee Event Report (LER) 03-009-00 for Callaway Plant Regarding Failure of Electrical Inverted Resulted in Technical Specification Required Plant Shutdown, dated December 19, 2003.
6. ML090350418 - Letter to Naslund, Union Electric, from Gaddy, NRC, Callaway Plant -

NRC Integrated Inspection Report 0500043-07-003, dated August 2, 2007.

7. ML090350417 - Letter to Naslund, AmerenUE from Smith, NRC, Callaway Plant NRC Problem Identification and Resolution Inspection Report 05000483-08-006, dated April 21, 2008.

8.