ML24198A034

From kanterella
Revision as of 11:29, 4 October 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Transmittal Letter - Penn State License Amendment Request to Add One Authorized Building, Request for Supplemental Information
ML24198A034
Person / Time
Site: 07000113
Issue date: 08/05/2024
From: Stephen Poy
NRC/NMSS/DFM/FFLB
To: Read A
Pennsylvania State Univ, University Park, PA
Shared Package
ML24198A031 List:
References
EPID L-2023-NFA-0002
Download: ML24198A034 (1)


Text

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION Andrew F. Read Senior Vice President for Research The Pennsylvania State University 304 Old Main University Park, PA 16802-1589

SUBJECT:

PENNSYLVANIA STATE UNIVERSITY - LICENSE AMENDMENT REQUEST TO ADD ONE AUTHORIZED BUILDING (ENTERPRISE PROJECT IDENTIFICATION NUMBER L-2023-NFA-0002)

Dear Andrew Read:

In accordance with requirements in Title 10 of the Code of Federal Regulations Paragraph 70.25(e), by letter dated April 19, 2024 (Agencywide Documents Access and Management System [ADAMS] Accession Number ML24120A055), the Pennsylvania State University submitted an application requesting U.S. Nuclear Regulatory Commission (NRC) approval of proposed changes to special nuclear materials license number 95 (SNM-95) to reflect a planned relocation of the Environmental Health and Safety's Radiation Protection Office.

The NRC staff performed an acceptance review of your application to determine whether the application contains sufficient technical information in scope and depth to allow the staff to complete the detailed technical review. The purpose of this letter is to advise you that additional technical information is needed for the NRC staff to complete the acceptance review of your license application. The information needed to complete the acceptance review is described in the enclosure to this letter. Please provide a formal response within 25 business days of receipt of this letter. Note that the formal technical review of the license application will be placed on hold pending receipt of the necessary supplemental information. A review schedule will be provided once the acceptance letter is issued. If the information described is not received by this date, the application will not be accepted for review.OFFICIAL USE ONLYSECURITY-RELATED INFORMATION of this document contains Official Use Only and Security-Related Information. When separated from, this letter and Enclosure 1 are decontrolled.August 5, 2024 A. Read 2 OFFICIAL USE ONLYSECURITY-RELATED INFORMATION OFFICIAL USE ONLYSECURITY-RELATED INFORMATION In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter and the enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The PDR is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.

If you have any questions regarding this communication, please contact me at 301-415-7135, or via email to Stephen.Poy@nrc.gov.

Sincerely, Stephen Poy, Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 07000113 License No.: SNM-95

Enclosures:

1. Request for Supplemental Information (Public)
2. Request for Supplemental Information (non-public)

Signed by Poy, Stephen on 08/05/24

ML24198A031 (Pkg.), ML24198A034 (Ltr.),

ML24198A033 (Encl. 1), ML24198A032 (Encl. 2)

OFFICE NMSS/DFM/ NMSS/DFM/ NMSS/DFM/ NMSS/DFM/ NSIR/DPCP/ NMSS/DFM/ NMSS/DFM/

FFLB/PM FFLB/PM FFLB/LA CTCFB/BC(A) MSB/BC FFLB/BC FFLB/PM NAME OSiurano SPoy JGoodridge ASotomayor-JCuadrado-SLav SPoy Rivera Caraballo DATE 07/17/2024 07/22/2024 07/23/2024 07/23/2024 07/25/2024 08/02/2024 08/05/2024