ML20202G943

From kanterella
Revision as of 02:06, 8 September 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 70-1257/97-202.Corrective Actions:Dry Conversion Pilot Program Will Remain in Shutdown Condition Until Required Engineered Barriers Are Installed
ML20202G943
Person / Time
Site: Framatome ANP Richland
Issue date: 12/05/1997
From: Edgar J
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
70-1257-97-202, JBE:97:173, NUDOCS 9712100150
Download: ML20202G943 (6)


Text