ML20203C947
| ML20203C947 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 02/05/1998 |
| From: | Noss D SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER |
| To: | Tom Pham NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| DLN:98:006, DLN:98:6, NUDOCS 9802250303 | |
| Download: ML20203C947 (1) | |
Text
_
SIEMENS February 5,1998 DLN:98:006 Director, Office of Nuclear Material Safety and Safeguards i
U.S. Nuclear Regulatory Commission Attn: Thomas Pham, Mail Stop T 8-D 14
)
Washington, DC 20555 1
Dear Mr. Pham:
Ref.:
FNMC Plan Revisions (EMF-12), January 1998 Enclosed is one copy of the changes constituting Revision 31 to our Safeguards Plan (EMF-12,
" Nuclear Materials Safeguards Procedures Description for the Fuel Fabrication Plants *).
In this revision, we are replacing all sections of the existing plan. Revised sect!ons are marked with a line in the margin.
The nnformation in this letter is proprietary in accordance with 10 CFR 2.790(d).
Should you have any questions, please feel free to give me a call.
V ry truly yours, t@
D. L. Noss, Senior Scientist, Safeguards
/pg Enclosures I,
}\\
p l]f f5
~
9902250303 990205 lgi i j PDR A00CK 07001257 C
N Siemens Power Corporation hhN*
. Nuclear Division.
2101 Horn Rapids Road Tel:
(509) 375 810o
' Engineenng & Manufacturing P.o. Box 130 Fax:
(509) 375-8402 Richland. WA 99352 0130
. ('I
,