ML20091P427

From kanterella
Revision as of 05:30, 25 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Part 21 Rept Re Regular Locknut Being Installed on Governor Where Thinner Locknut Required at Calvert Cliffs. Applications of Thick Nut P/N 75233A06 on Control Linkages Will Be Reviewed to Insure Applications Correct
ML20091P427
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/24/1995
From: Grandusky E
DRESSER-RAND CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-95 NUDOCS 9509010203
Download: ML20091P427 (3)


Text

l I .

e 1 Form EF-066 '

l Rav B REPORT NO. 39 Nuclear NNSOP 1.2.001 -

FINAL REPORT 10CFR PART 21 pg. 1 REPORTING OF DEFECTS AND NON-COMPLIANCE PREPARED BY: Ed Grandusky File No.: F-36674 A/B/C/D TITLE: Nuclear Product Engr. T-36674 A/B/C/D Serial No..

DATED: 8/24/95 Type: GS-2N TIME: 4:30 MPM RM-  %

j D R Part No.: 75233A06 PART NAME: Nut, Lock-Flexloc Reg Hgt. D-R Dwg. Noj 75233A D

Rev. Level: i

1. Description of Defect or Non-Compliance

4 Regular locknut, SPS-Flexloc no. 21FA616, D-R p/n 75233A06 may i be installed on governor valve linkages where the thinner locknut, SPS-Flexloc no. 21FK616, D-R p/n 75232A06 is required.

See Attachment. Pg. as required

2. Safety Hazard Created or Non Compliance: j

, Inadequate thread engagement in the thicker locknut may result in linkage separation if the nut loosens from vibration and spins

' off. This will result in loss of turbine control capability. I See Attachment. Pg. as required i

3. Number and Location of all such components which contain this defect or fail to comply with 10CFR21:

One confirmed misapplication at Calverts Cliffs.

j i See Attachment. Pg. as required l\

4 Corrective Action by the following individual Ed Granduni:" By Date 9-15-95 All applications of thick nut p/n 75233A06 on control linkages will be reviewed to insure there application is correct.

See Attachment. Pg. as required

5. Advice to Customer related to defect or non-compliance:

Inspect all applications of locknuts on the control linkage for full thread engagement in locknut. (

2 See Attachment. Pg. as required

_m 9509010203 950824 10 PDR ADOCK 05000317 5 PDR /} 0l

J 6-

. l r .

4 I

j y

Clevis Rod End l

[ ' -

SSh-Full Thread

  • m-N

~.

i I Pin .

/j Nut i  !

  • All threads in the locknut must be engaged by the threads on i the pin. Amount of exposed threads will vary with application.  !

! I 4

TYPICAL ASSEMBLY ,

l.

FINAL REPORT.10CFR PART 21 REPORT NO. 39 pg. 2 1

]'

i j.

i 1

l

a

a. Ai dii- ..c.

',_.s a--

-- - . w_<_-.(w,..'.~., . -, .,% _,4 w J s e ' '* ' w. wg L._m

.u 6  %. C_. ss.m . ,v _ %

'Of a ' site OvgF 030 ett 0+:. . ~1 -

rtyht' of the eekern address .

DRESSER-RAND '[Usi 2

geam Tu , bine, uotor a ceneraio P.O. Box 592 l .

bf07f Terry Wellsville, NY 14895-0592 1 YN

  • gg Turtodyne 7g 3- ~

N4 s.$ls 5 Reform W m t control nese U. S. Nuclear Regulatory C n insion .

2 i

ReiguGSted 1 Washington, D.C. 20555 i

L ,

i i

.1

... l..l.Ill....l.l..l l. l.l. .ll.1 4

' - " ' ' ' ~ " " " " ' ' - ' ' ' ' " - * N**~"""-

'Nwwn%. .v e" ,ew n w ' .e mw .- e ,--*-se w w -- ' e -e e-:'%v'^w'+*:'2=+=*= ~*'= w ~t%m.v o =t-w- r-= 5-- e m**w~'se-+- - "-

- +,wm y w - - - - -

9 = m w T m- 9 $ g- - -- evw -

w--ew33 w 1y wwww ,, .-w-w- w w-- g +m-e 9.w- w +- ,.w-. *-%-g- .-m+ t-s----