ML20070K811

From kanterella
Jump to navigation Jump to search
Interim Part 21 Rept Re OP 38TD8-1/8 CS Injection Pump Erosion Sleeve Cavitation,Reported by Bg&E.Vendor Pursuing Evaluation to Determine Whether Situation Could Potentially Affect All Nuclear Utils Who Operate Subj Sleeve
ML20070K811
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/20/1994
From: Fratianne S
COLTEC INDUSTRIES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-94 NUDOCS 9407270211
Download: ML20070K811 (1)


Text

5.,

i ColtecIndustries

@,74"$'f,f,7*

701 Lawton Avenue Beloit, Wisconsin 535115492 Telephone: 608/364-4411 Telecopier: 608/364-0382 20 July 1994 Document Control Desk U.S.

Nuclear Regulatory Commission Washington, DC 20555

Subject:

Interim report - 0.P.

38TD8-1/8 CS Injection Pump Erosion Sleeve cavitation. (94-003)

On Hay 1994, Coltec Industries. Fairbanks Horse Engine Division (FHED), notified Baltimore Gas end Electric Co.(BG&E) vfa Engineering Report No.: R-5.08-4306 that the Fuel Injection Erosion Sleeves (part number 03730049) experienced accelerated wear during a 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> endurance test.

The failure of the sleeves required engine shut down at the 1313 hour0.0152 days <br />0.365 hours <br />0.00217 weeks <br />4.995965e-4 months <br /> mark.

FHED is currently pursuing an evaluation pursuant to the requirements of Part 21 to determine whether This situation could potentially affect all Nuclear Utilities who operate O.P.38TD8-1/8 Emergency Diesel Gen-Sets.

FHED will notify all affected engine owners via letter from our Parts and Sales Harketing Group.

A final report will be made available as'soon as the formal evaluation is completed.

Sincerely.

cott A.

ratianne Quality Assurance Hanager, Systems and Supplier Quality h {j o o.

gli Uci i p

  • * " of con.c inounin. inc.

9407270211 940720 PDR ADOCK 05000317 S

PDR.

.