ML22187A049

From kanterella
Revision as of 07:43, 18 July 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
General Electric-Hitachi Global Laser Enrichment Facility - Inspection Schedule for Calendar Year 2023
ML22187A049
Person / Time
Site: 07007016
Issue date: 07/06/2022
From: Leonard Pitts
NRC/RGN-II/DFFI
To: Long S
GE-Hitachi Global Laser Enrichment
References
Download: ML22187A049 (3)


Text

July 6, 2022 Mr. Stephen M. Long Chief Executive Officer GE-Hitachi Global Laser Enrichment LLC P. O. Box 780, Mail Code J20 Wilmington, NC 28402

SUBJECT:

GENERAL ELECTRIC-HITACHI GLOBAL LASER ENRICHMENT FACILITY -

INSPECTION SCHEDULE FOR CALENDAR YEAR 2023

Dear Mr. Long:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the General Electric-Hitachi Global Laser Enrichment facility in calendar year 2023. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Leonard Pitts at (404) 997-4708 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Leonard Pitts, Acting Branch Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07007016 License No. SNM-2019

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

S. Long 2

SUBJECT:

GENERAL ELECTRIC-HITACHI GLOBAL LASER ENRICHMENT FACILITY -

INSPECTION SCHEDULE FOR CALENDAR YEAR 2023 DISTRIBUTION:

A. Masters, RII/DFFI A. Rivera-Varona, NMSS/DFM J. Rubenstone, NMSS/DFM J. Zimmerman, NMSS/DFM K. Everly, NSIR/DSO M. Bartlet, NMSS/DFM R. Williams, RII/DFFI S. Bazian, NSIR/DSO

2023 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR GENERAL ELECTRIC-HITACHI GLOBAL LASER ENRICHMENT FACILITY Dates July 24 - 27, 2023 Number of Inspectors 3 IP 81815, Access Authorization Inspection Procedures (IPs)

IP 81820, Information Security Enclosure