ML23257A046

From kanterella
Jump to navigation Jump to search
General Electric-Hitachi Global Laser Enrichment Facility - Inspection Schedule for Calendar Year 2024
ML23257A046
Person / Time
Site: 07007016
Issue date: 09/18/2023
From: Mathis R
NRC/RGN-II/DFFI
To: Long S
GE-Hitachi Global Laser Enrichment
References
Download: ML23257A046 (1)


Text

September 18, 2023 Stephen M. Long Chief Executive Officer GE-Hitachi Global Laser Enrichment LLC P. O. Box 780, Mail Code J20 Wilmington, NC 28402

SUBJECT:

GENERAL ELECTRIC-HITACHI GLOBAL LASER ENRICHMENT FACILITY -

INSPECTION SCHEDULE FOR CALENDAR YEAR 2024

Dear Mr. Long:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the General Electric-Hitachi Global Laser Enrichment facility in calendar year 2024. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Leonard Pitts at (404) 997-4708 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Mathis, Robert on 09/18/23 Robert Mathis, III, Chief (Acting)

Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07007016 License No. SNM-2019

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

ML23257A046 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII/DFFI RII/DDFI RII/DDFI NAME L. Pitts T. Vukovinsky R. Mathis DATE 09/18/23 09/15/23 09/18/23 2024 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR GENERAL ELECTRIC-HITACHI GLOBAL LASER ENRICHMENT FACILITY Dates July 22 - 26, 2024 Number of Inspectors 3 IP 81815, Access Authorization Inspection Procedures (IPs)

IP 81820, Information Security Enclosure