|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562'-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
{{#Wiki_filter:8 7 6 5 4 3 2 1 FT"-GAS SYSTEM 20*
~
lf1 M-2008-1 <H-8)
-ru CJ 20*
F041 2' X 314' SOL (VENT) 6\./M-P43-5344-1 1 1/2' F394 r'7 t F396 F397
~
- 00 0
' M-2008-1 CH-8)
SPARE ..... 0 1' H TD D009 1 112* r;-,
(\J F039 2' X 3/4' SOL <VEND 1' 1 1/2' 3/4¥ M-3445 < G-5) 1/2' M-2008-1 <H-8)
H COMPRESSOR F873A 2*i F369 F367 F365 I 6\JM-P43-5345-1I ----------------! >
0 F878 M-200B-1 (H-B)
.THIS D\./G <E-8) 2' X 3/4' CONDENSATE V2 zsv LCV F843 SOL <VENT) 3/4' 3/4' 112* F400 2' X 3/4' MAKE-UP OOJ N402 M-2008-1 (G-8)
FROM D009 l" FB74A -- l" 3/.,. 3/4"F875A F842 F042 SOL <DRN) r;-,
P3302B002 P3302BOD1 DEMINERALIZED B THIS D\rJG (E-8) 4 F043 P3303BD01 \JATER SYSTEM 1 112 112* *,' l6\JM-P43-5209-ll F606 F044A F607 F044B 3;4' F174 DRAIN l,:'2' 1/2' AT F\./ HTR #SN HI/\
~--
F040 3/4' 112*
ACTUATRslEAST DRN DRN 3/4' 2* X 3/4' ... 1, IRV I ... 1, IRV UNITIZED LP VALVES F392 F391 F366 M-2678 (D-6) 4' SOL (DRN) F368 F364 M-2008-1 (H-8)
F841 3/4" FLUSH 3;4'r:7f FOOl F.0, F002 3;4* 3;4* 3;4* 3;4' 3;4' 3/4 1' 1 1/2" DRN F179 VENT[ CONN, UNITIZED AC TUA TORS \./EST LP VALVES 3/4' F231A [ I TD DOU COMPRESSOR F873C 1 1/2" I F051] F051A F051D F051C F051F F051E UNITIZED ACTUATORS HP a. DUMP VALVES 3' PTT L507
;4' Fos4F
,314 F084E 1 /4, FOB4D
;4' F084C
/4.
F084B
;4' F084A F003 2 112*
r;, VENT l' JHIS D'w'G (F-8) 2*1 3' F859 A
3;4* 3;4* 3;4* 3/4' 3/4' FROM DOU l" F874C l" 3/,,, 3/'4"FB75C F840 N6200B012 N6200B013 e--
v
' F089K '
F089B F089C F089E F089D 3/4'
'F089H '
3/4' F089A D019 D013 D021
-I-.,. D015
--J- .,.D023 D017 114*: VENT l/4'r;,
D022 D016 D020 D014 D018 D012 THIS DIJG <F-8) 1 112' 4
40 1 l/2 j6'w'M-P43-52ll-lj 1 1/2' 1 112* 1 112* 1 112* 1 112* 1 1/2" ~
w
"'I 0 @ @ @ @ @ @ @ @ @ @
FROM F395 THIS D\1G, <F -
G003 D029 I D030 l<.:,1 F861 t I IV\..J'-1--'----'*
- 7)
- e-- D024 DOOB D004 D005 D009 ]010 DD06 T\JT DOD? DOH D025 1 1/2' 1 1/2' 1 112" I1 112* I1 112* 1 1/2¥ G004 P43 F227B F177" OJ 001 ( PI P43 F841C L487 '3;4' 3/4 3;4' T314* T314' 3/4' M ~I\R807, A 2* X 3/4' 3* 6
- G PTT L510 F045A SOL (VENT)
F046 F04-5B 1 1.12~ X w
t~
.--~ c.--;-*
F858 DRA:N ;t f F86Q I:RAIN G 2' "- ~ ~ I EBPV "'~ HPS:V l
~HPCVl~
u W
~ HPSV 2 A
~ HPSV 3 ~ HPCV 3 1
~
I HPCV 4 7
~
I HPSV 41 ~ ~ ~
3/4' N3021 [:: N3021 ru N3021 C\J [:: N3021 ~ N3021 [:: N3021 [:: N302l ru N3021 ru i
~
F047 2* X 3/4' T\JT N,.~P,~11 [:: LPSV 2 LPIV 2 LPSV 4 LPIV 4 LPSV 6 LP]V 6 3* SOL (VENT) P43 LPIV 3 LPS:V 1 LPIV 1 C040 C005 LL COO] LL I 1.,uuc: I L _____ llo....llllll C006 C007 C003 C004 LL coos LL C041 2* N3021 N3021 N3021 N3021 N3021 N3021 L487 N3021 N3021 N3021 N3021 N3021 N3021 C016 C010 C018 C012 CO2 C014 B C019 C013 C017 COll C015 C009 c--7 2* u 3* 2'
"':q "':q "'ru""
ru ru
"- "- "- F237F F237E F237D ,.T F237C ,.T F237B F237A FB73B 1 1/2' 2' 2' COMPRESSOR 1 F090K F090A i ~'i-7) X x:x X )<(,X XX XJ<_X )(XX, F038A F038B F03BC 0.
e--
- PTT 2* 2* F091K F091B F091A V L511 F037A F037B F037C l 1/2' 1 112* w 1 112* 1 1~2" ~112* 1 112* 1 112* 1 1/2' 1 112* 1 112* 1 112*
F229B F229A F229D F229C "'I i (, - 3;4' 3;4' 3;4' 3;4' 3;4' 3/4
- X 3/4 .. 3/4 * ' 314* 3;4" 3/4
- 3/4
- CONDENSER w F052B F052A F052D F052C F085F FOSSE F085D F085C F085B F085A F052F F052E c' I ~
I 1 112* 1 112* 112*
3' F178 1'
lX\-f '< ~
L __ 3;4*
1 112**
2' F829 3' J\----l F395
"'~
ru ~
o' F035A.
112*
F033A 112{
F035B <
112*
I F033B F035C 112*
F033C F053B F053A F053D F053C F053F F053E PTT PTT L509 F233A FLUSH CONN, ,
F086F J
F086E J
F086D J
F086C J
F086B J VENT w'EST CHILLER
- -ru "" F034-;;:::i 1 F034B 1 1/2'1 F034C 1 112* L508 VENT F234 1 112*
[ 3* .____,-
PTT I ru F233B I I y
F181 F REFRIGERATION UNIT N6200D010 w
F872B
'~ "' .
w" e-- :,
Fl76 3/4' 3' 3/4' PTT F231B 3/4 6 3* 4*
L504
'-._____/ 3/4' 4 .. M-2008-1 <F-8) F
<REF EDISON FILE R3-948) DRAIN -"
"- "' U4100B006 U4100B007 U4100B008 1 112*
F175 3/4' L506 F180 ~-
DI DRAIN L'.JDRAIN c--7 I F832 F830 e-- e-- Lc..J ABSORBER RM A/C UNITS 7 13RD FLOOR EL 643'-6"1 3' 4' M-2008-1 (F-8)
F857 F856 IC MPRESSR: FROM FCV <F840C) F852 FB53 1 \-ii) )( )(IX (THIS D\JG (G 8)< 2' DR t I 2' DR t ~,II I ~
~~
_l'_sl. THIS D\rJG (G-8) D 13RD FLOOR EL 643'-6" 3RD FLOOR EL 643'-6' 4' I 4' I 3RD FLOOR EL 643'-6' 3RD FLOOR EL 643'-6' I
I(
, - I CONDENSER FXE R809C REF. M-2024 20' 18' 3*,----,===========--------j~ 18' M-2008-1 <F-8)
CHEM CLEANING
- ._ - L *_y4* 1* F871C1 1/2*
CONNECTIPN
~ L--11----H-------,----Ji>--0-,--,~-218~'-~~'.,_----t-----------------------------------------l----,,-----~>-------------~18~*~,-------------{}*----1~6~*-------------------,----;r------------,1---~,--------.J,----(iM~-;2~0~0~s~-I1~,~F~-]s:,:,
L __ __j CENTER CHILLER 3/4' l6\JM-P43-5211-ll 3;4* M-2008-1 (C- 7)
M-2008-1 <C- 7)
PTH P43 L425 PTH P43 6'
PTT L517 PTT L515 6' L425 REFRIGERATION F872C B A 6' UNIT N6200D011 14------L----,----, 3' 6' w PTT PTT PTT PTT
<REF EDISON 2 1/2" L519 L519 L516 L514 FILE R3-948 ) DRAIN B A E F059 E
c--7 ICMPRESS R: FROM FCV (F840A) F147 ,ti_
1 1/4."
F145 3'
F140A F140B PDS P43 ---7 r-------------
1 I
I
------------------------7 PDS P43 N442
---7 F064A \
F063A
\ F061A F062A F064B \
' F061B NOTES
- PUMPS ARE SIZED FDR 3000 GPM EACH,
<D FDR LEGEND F SYMBOLS & ABBREVIATIONS,
' \-ii) X XIX (THIS D\JG (H-8)< F232B 2 1/2' N442 8
!J 6' A
"' r,7 r,7 SEE D'v/G M-2000 & 2001,
~~ '
F232A 3*
F226 1'( F141A F141B 6 0 (2) DELETED I _,:_:,1*L. THIS D\./G (H 8) 3/4' 1 l/4" ru
"'ru 6' ru ru F814 F815 F063B F062B
/
3/4' <3) FDR DETAIL OF GEN SERVICE 'w'ATER,
><:B<
1 4' F142A;(D)( ¥ F142B
,- I ' 1/2' F370 ,, '
I *** =i SEE D\JG M-2010.
I ( CONDENSER (R~t§A. ~
F362 F151 F143B PTL F05BB\ ~F604 F603~ \ FOSSA PTL F200A F199A (4) SYSTEM PRESSURE IS 100 PSIG MAX.
HIGH P INT (3RD FLOOR) EQUIPMENT SHALL
' (5)
D M P43 v FSE F143A P43 6' HAVE VENTS,
- '- I '.3/4' F871A M
?
3/4' 3/4" V41 L426 B I i.. 1, IRV RVI ,1 .o1 I I L426 A
6' F200B F199B C6) UNLESS OTHER\JISE N TED1 1~ 1 1/2' P3303B002 _N430 L __
' 1--F~"LI
__J ls\JM-P43-s2os-11
~
~
AT F'v/ HTR 5S 1 1/4' 1/2" 2 112*
T\JT L528 T\JT L528 I
I I 2 1/2' 2 1/2' 2 1/2' 2 1/2' J.J J.J ALL INSTRUMENT PIS NUMBERS ARE PREFIXED P43 ALL VALVE AND EQUIPMENT PIS NUMBERS ARE PREFIXED P4300, EAST CHILLER 3/4' ,;'
~ 3/4' F150 2 112*
B A I I G)c::=J DENOTES ISOMETRIC D'wG ND, (PREFIX 6M721-),
I REFRIGERA TI N F872A F363 112* I F805 F803 F804 F802 CB) FDR SYSTEM FUNCTIONAL OPERATING SKETCH SEE UNIT N6200D009 I I D\./G M-5728-1 AND M-5728-2, L.J 314 1 4" BATTERY RrmM COMPRESSOR- F144 I VFNTI
<REF EDISON 112* I N6200B006 1' N6200B005 VENr, (9) FDR CONTINUATION OF THIS D\.JG FILE R3-948 ) DRAIN A/C UNIT CONDENSER I 1' 1 SEE M-2008-1, SAMPLE V4100B005 4" V4100B001A I Fl95B,~-- f - - - ~ Fl 95A COOLERS I I (10) ALL VALUES ARE NOMINAL NUMBERS, 3' I I U4100B025 U410DB026 ClD@- INDICATES INTERNALS HAVE BEEN REMOVED I
D PTT L521 I
1,F347 J
F342 1, I 3'
[
I I
UNIT COOLER 2 1/2' 2 1/2'
,2 v2* ,I, II~ UNIT COOLER FROM STRAINER PER RID 70639.
D DRAIN DRAIN 'II 1'"'\.01 314 ,IF809 2 1/2' F806 F196B F19BB F198A F196A T\JT l I LU LU I&C REFERENCES L526 314* F34Q F343 314 i F 197B Y DRN FF - GAS SYSTEM DRN I F197 A
~-~---<1'"'\.01 J
VENT
[-+~'"7 F325 3' 2 112'
- L_________________________________________________________________
TDRN AFTERcLERs 1'"'\,01~/4'1F807 F80813/4' 1. EDIS: N D\./G M-2015.
VENT L_{>(f--,h;:-+j)--1~-- --- TnRN J w 2, EDISON D\./G M-2010, PTT P43 M F398 __ > CHILLER 1 1/2' 1 1/2' 2ND FLOOR 3, EDISON D\.JG M-2007, L520 F329 .. I F344 112* I <:: __ > 1 CONDENSER 314* ' - /~ l<>f--v 314'1" 4, MOTOR CONTROL LOGIC DIAGRAM INDEX 1-2070-8,
~ <--- I t
1 1 V4100B006 5. PLANT SAMPLING SYSTEM I-*2400-01, 10* 10' I.. 3' I txl.---~ FN6 I 3' D2 112*L==:_:J REF. M-4953 (D/E-7l FOR INSTRUMENTATION THIS AREA SEE 410 F348
'y I y 4100 347_
T\JT P43 N525 F328 F327 1, .. t L':'l,1<=::
F345 - -
M-2017-1 DRAIN DRAIN 2ND FLOOR 2ND FLOOR 2ND FLOOR 10' 8' 8' 8' 6' M-2008-1 <D-8) 1 112* SPLIT TEE F800 6' W/BLIND FL_)7\
10' F160 l\,/M-N20-5060 314 1LC, 8' 8' s* 6' M-2008-1 (C-8)
T\J s*
8' F173 8' FLUSH
\.JM-N20-5060 F161 3/4' FBOl 2
e 6'1 /
, , II 'i 2' PTT L523 4* 4' 3'
C N400 OUTLET 1 112* F848 I v1NT C
~
2' 2* 3' 1 1/2' F104 1 112*
f m 1 F262 1* : : 5 PTT )
L522 I ' VENT I
2" F108 J I D 1 1/2' 1
zxv 3'
F115A 3*
zxv 3'
F115C 3'
F261 6WM-P43- ~ f 2' rJ 1/4 1 1/2'
,-1-----
N21 Fll4A r-1----- F114C F263 N21 3/8' 1' 3/4' 4+-] 5038-1 I I F116A N435
~"A~..JJ--, l DRN F116C N435 B
lf1
(\J 3/8' 3/8' 3/8' 3/8' F163C 3/8'
.F162C 1* I, :l F264 t 112*11 112*
1 112*11 1/2'" 1 112* ~..fltiX~~3A N21 3'
TCV N21 FD F:"1qC >DRAINS 3' F097 ).. , ~ u. 3/8' 3/8 1 F107A)<'. /'. F105A F107B F105B F408 DRN F408 F265 F266 F107C F!OSC
~ DRAIN F163B '5/8" 3/4" A F112A B
F112C Fl63A l 1/2' 1 112*
F162A 3/4'1 A/C UNIT F093 ' 3/8~ 3/4" _1/2,'
X4101BD13 VENT~ VENT~
F605
(")
6M721-2008 N2001 F269 F268 F267" 1/2" TCV SUPPLIED
\JI A/C UNIT F106A it F106B CL~
' s:::'
F106C
"'...0.' - F280 3'
F281 3' 3' LATEST REVISION t.'
N2001 N2001 112'1 I 6'w'M-P43 1 112*1 :ii: I 3* 3' F096 CO!B C019 C020 ;3319-1_
), M 1 1/2'
,.'° "'"'M x- '
F111A FllOA F111B FllOB FlllC FllOC FlllD FllOD BO s*
3/4 1 VEN1\ F357 3/4 1 112 '- TD BEARING
"'...' -'° 3;4"111~
(')
3/4 1 TE/P', F279A I J3' 3*
F279B COOLING COIL 1 1/2" N21 ~~~~~F279D F335 314 " ,J CONDENSER PUMPS ~J INLET CTYP)
CL ' 0. '
K1,_09 I I TE/P X '° F334 6WM-P43- I ' (\J
[ 3/4' [:" 1' Ir M -] 3316-1
,c -
""' ,o I VENT VENT N21 I F27'.3C VENT t~ F359 3/4'1314'"
"' "" 314*T314*
"' lf1 3/4' 3/4' I I
z K409J.--...
_B -
z B
VENJ DRAIN /8' I
I I
N2102B001 N2102B002 N2102B003 N2102B004 THIS D\v'G, SHOULD BE 6'
F120A D3/ 4' ]
1/2' 3/8' 3/8'
~ f 3/ 8
I I
I F828A f--~---<
NORTH F828B F828C e----~-_,F828D USED \./ITH M-2008:::1 B 8 DRN DRN SOUTH I
RFP & RFPT DRN DRN 6' 6'" 1 1/ 4' 1114' ;JL+/-' 3/8' I IL COOLERS RFP & RFPT 6' e*
F120B 0 0 0 I I IL COOLERS F095B \ \ F094B I N2200C001 N220DC002 N2200C003 I I
~~
El INON-NUCLEAR SAFETY RELATEDI F095A ' no1 /noo I *TcE TE\J e--
6Lfh =>
I "T L N21 N21 0 5' F099 K803 TRE A
N120) f
___ TY THIS IS A MICROSTATION PRODUCED DRAWING.
I ~ l 2* HEATER DRAINS PUMPS A
--- N21 N21 *TcE ~g 1ST FLOOR CHANGES OR REVISIONS MUST BE BROUGHT Fl02 HI A K805 RBOO N21 N21 1Gs~o
~
A f----~I, ~oll l L ~-- N120 TO THE ATTENTION OF THE PLANT ENGINEERING L ,£:z;--
FROM BEARING 2*
CODLING COIL A K803 B. B HI
~
TY KN21 FR' N21 OUTLET <TYP) 8 5 I..
DESIGN GROUP TO ENSURE THAT CONFIGURATION
~
0 0 CONTROL IS MAINTAINED.
N6101COD1 N6101C002 P43 PI PT THIS DRAWING WAS REFORMATTED HY R407 L492 MICROSTATION AT REVISION "AY. ALL INC.CODE Detroit Edison Fermi 2 MECHANICAL VACUUM PREVIOUS APPROVAL SIGNATURES ARE TITLE 1ST FLOOR PUMPS 6' 6' ON FILE ON MICROFILM IN DOCUMENT CON'l'ROl. T DIAGRAM R405 TI T\J L490 T\J L491 BOIDCD'S INCORPORATED: A PORTION OF THlS DRA'll'INC-PREPARED BY DATE TURBINE BUILDING 1S AFFECTED BY THli: FOLLOWING, EDP 80043.009, REV. A CLOSED COOLING WATER SYSTEM 3/4' 3/4" ,c CHANGE DOCOMENT A F273 F272 OTHER REVISIONS:
CHECKED BY DATE APERTURE CARD TITLE A DRN. DRN. DIAGRAM TBCCW SYSTEM 1ST FLOOR APPROVED_~}'" DATE PLAN'T lDENTlFICATION SYSTEM: NUMBER ARMS RECIPIENT #
P4300,N3021,N2200,N21 2,N6200,N6101, V41 0,X4100, U4100 PREPARED BY DATE CHECKED BY DA7"'
DOCUME>n TYPE CODEDDDMEC NVC OPS FILE N0.1 DA_TE t~/xj A. DITTMAN 4/2/2[)
t\J.a,.J 1,1.,...,..,..,......---.. 1/4I17./w OATE EDP POSTING ENTRIES ror:QmRE THE OTHER APPROVALS DATE 1B01 APPROVUIJ\ijjfKakoczki DRAWING- NUMBER RE
~~,
ADDITION OF THE ARMS STATUS CODE:
C:or T. Murphy III qi tv//-0 EITHER "AFC" OR "ASB" 6M721-2008 BO 8 7 6 5 4 3 ?. 1}}