|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684 - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
H G
F E
D 8
'OPEN' PU\\HIIJTTON S\\IITCH IS
!£PRESSEi PB I
RSP PERMISSIVE VHEN DSP TRANSFER SV IN 'LOCAL' PDSITIDN I
\\sv lnsP/
SYSTEM AUTO VALVE ACTUA T!DN SIGNAL FROM SYSTEM II I
I MOF017A MDF017B
'OPEN' PU\\HIIJTTN SW'ITCH IS DEPRESSEI I
PB I
DSP PERMISSIVE VHEN RSP TRANSFER sv rs 'UH'
\\
SV I
RSP
\\
PERHISSIVE
\\/HEN REACTOR PRESSURE rs LOY PIS B21 CR N690A REF 3 P£RHJSSIVE ll<LESS VALVE OVERTDRQl£1l VHILE OPENING TIJRQUE DN SVITCH VALVE
'OPEN' PU\\HIIJTTN S\\/ITCH IS DEPRESSEI I
I PB I
CR 7
~
~
I I
RR 2 ID6 -
I
~
~
I PERMtssr.VE
\\/
VIEN RSP TRANSFER SVITCH rs 'DFF' I
I I
\\
\\
w RSP
/
PERMISSIVE
\\.'HEN DSP TRANSFER SV IN 'CDNTRDL RIIJH' PDSITIDN
\\__:"
SP j PERMISSIVE VHEN DSP TRANSFER SV IN 'Cll'lTROL ROOM' PDSITIDN
\\
sv I
ISP I
I PERMISSIVE
\\/HEN VALVE rs Fill¥ CLOSED LIMJT DN VALVE SYITCH MCFOI5A PERMISSIVE UNLESS VALVE IS FlLL i PEN LIMIT DN SI/ITCH VPlVE PERMISSIVE
\\
lM.ESS VALVE
> 95Y.. DP£N LIMIT I
DN I SVITCH VILVE PEN REVERSING CONTACIDR 42-*-
I
'°T PERMISSIVE IJl-fN SYSTEM I VALVE ACTUATION SIGNAL PRESENT
\\
AUXILIARY DEVICE CR I
NOT PERMISSIVE VHEN SYSTEM II VAL VE ACTUATION SIGNAL PRESENT
\\
AUXILIARi DEVICE CR
~
J J
/
PERMISSIVE C
CLOSE
'<§>
AUTO/MANUAL 1
AIJXILIARi 71C-F RELAY 1 POS, 3A SYSTEM AUTO VALVE ACTUA TI N SIGNAL FROM SYSTEM II
~
I I
MOF017A MOF017B
\\~
~
I PERMISSIVE UNLISS \\/
PERMISSIVE VALVE IS VHEN VALVE FULLY CLOSED rs ) 95"1. CLOSED LIMIT I DN I \\
LIMIT I
ON SVITCH VALVE S\\IITCH VALVE I
PERMISSIVE ll<LESS \\/
PERMISSIVE VALVE OVERTORQUED UNLESS VALVE VHILE CLOSING rs ) 9~/. CLOSED
\\
TORQUE I DN J \\
LIMIT I
DN SVITCH VALVE SVITCH VALVE CLOSE RHR SYSTEM I VALVE MDF017A [THROTTLING TYPE]
[NOTE 2 & 12 & 17l 6
'CLOSE' PUSI-IBUTTDN WITCH rs DEPRESSEI I
PB CR PERMJSSM VHEN RSP TRANSFER SVITCH IS '[Fr' sv RSP
/
PERMISSIVE VIEH DSP TRANSFER SV IN 'CONTROL RlllH' PDSITIDN sv 1
/nsP/
NOT PERMISSIVE
\\/HEN SYSTEM l VALVE ACTUATION SIGNAL PRESENT
\\
AUXILIARY DEVICE CR NOT P£RHJSSIVE VHEN SYSTEM II VALVE ACTUATill'l SIGNAL PRESENT
\\
AUXILIARY DEVICE CR I
I I
I i
'CLOSE' PUSHBUTTON SVITCH rs DEPRESSED PB RSP PERMISSIVE VHEN RSP TRIV1SFER SVITCH IS 'ON' sv RSP PERMISSIVE VHEN DSP TRIV1SFER SV IN 'COOR[)_ ROOH' POSITIDN sv DSP
\\
'CLOSE' PUSHBUTTON SVITCH IS DEPRESSED PB DSP PERMISSM VHEN DSP TRANSfER SV IN 'LOCAi.'
5 I
I PDSITlll'l
)
SEAL IN I
AUX I
CONT 42 ZDNE E7 PERMISSIVE
\\/HEN RSP TRIV1SFER WITCH IS 'OFF' sv RSP PERMISSIVE VHEN DSP TRANSFER S'J [N 'CONTROL ROOM' POSITION 4
I SY nsP/\\sv 1
sP/
I I
SEAL IN
/lJJXILIARY CONT 42*
ZONE E4 PERMISSJVE IJHEN RSP TRANSFER SV rs *orr*
sv RSP
/
PERMISSIVE Vf£N DSP TRANSFER SV IN 'CDNTRDL ROOM' PDSITIDN
\\sv/nsP 1
I P£RMISSJVE UNLESS 'CLOSE' PUSHBUTTlll IS DEPRESSED PB ZONE E2 Pl
'PEN' PUSHBUTTON SVITCH [S DEPRESSED DSP PERMISSIVE VHEN DSP TRANSFER SIi IN 'LOCAL' Psrrrrn
)
Pl
'OPEN' PUSHBUTTDN S\\JITCH IS OCPRESSED RSP PERMISSIVE VHEN RSP TRANSFER SV IS 'ON' sv RSP t
\\sv IDsP/
I PERMISSIVE VH£N RSP TRANSFER SIJ rs *ow
\\sv/RsP/
I PERMISSIVE \\/HEN DSP TRANSFER SV IN 'CONTROL ROOM' PsmN
\\sv/nsP/
PERMISSIVE VHEN 'CLOSE' PUSHBUTTON IS DEPRESSED PB ZONE El I SYSTEM AUTO VALVE ACTUA TIDN SIGNAL FROM SYSTEM II I
I MDF015A MOF015B j
PERMISSIVE WHEN REACTOR PRESSURE rs LOV N690A CR
/
\\
PIS B21 I I
PB
'OPEN' PUSHIUTTDN S\\r/[TCI-{ IS DEPRESSED CR PERMISSIVE
\\/HEN RSP TRANSFER Sir/ITCH rs 'OFF' sv RSP
/
PERMISSIVE VHEJII DSP TRANSFER SV IN 'CIJNTRDL ROOM' PDSITIDN
\\
sv DSP J
/
PERMISSIVE VHEN SP TRANSFER SV IN 'CONTROL RODM' PDSI1l N
\\
sv SP J I
PERMISSIVE
\\JHEN VAL VE rs FULLY CLOSED UMIT WITCH ON VALVE/
lilf017A I
f;
' \\
3
~
\\.1liV (£
~
I PERMISSIVE VHEN DSP TRANSFER S'w/ IN 'CONTROL ROOM' POSITION sv DSP NDT PERIUSSIVE VHEN SYSTEM I VALVE ACTUATION Slll'iAL rs PRESENT
\\
AUXILIAAi DEVICE CR I
NDT PERMISSIVE VHEN SYSTEM II VALVE ACTUATION SIGNAL rs PRESENT
\\
AUXILIARi DEVICE CR I PERMISSIVE Al/TD/MANUAL CLOSE AUXILIARY 72C-F RELAi
-.,...,vv--
\\(.,
PERMISSIVE ll<L£SS VALVE IS FULLY CLOSED
\\
LIMIT I
/
SVITCH 11N VIL VE SYSTEM AUTO VALVE ACTUATION SIGNAL FROM SYSTEM II I
I MOF015A MDF015B I
PB
'CLOSE' PUSHBUTTON SIITTCH rs OCPRESSED CR PERMISSIVE VIEN RSP TRA~rER Sw'JTCH rs *1rr*
sv RSP PERIUSSIVE
\\/HEN DSP TRANSFER S\\/ IN 'CONTROL ROOM' POSITION sv DSP HITT PER~SSIVE VHEN SiSTEM I VALVE ACTUATION SIGNAL IS PRESENT
\\
AUXILIARY DEVICE CR I
MDT PERNISSIVE
\\/HEN SYSTD4 ll VALVE ACTUATIDN Slll'i,\\L IS PRESENT I
\\
AUXILIARY DEVICE CR
/
2
)
)
i
'CLOSE' PUSHBUTTON SVITCH IS DEPRESSED PB I
RSP P£RMISSIVE VHEN RSP TRANSFER SVITCH IS 'DN' sv RSP PERMISSIVE VHEN DSP TRANSFER SV IM 'cNTRII. RlllM' PDSITIDM sv DSP PERMISSIVE VHEN RSP TRANSFER SV IS 'FF' sv RSP PERMISSIVE \\/HEN DSP TRANSFER SV IN 'CONTROL ROOM' POSITION w
DSP PERMISSIVE UNLESS 'OPEN' PUSHIIJTTON rs DEPRESSED PB ZONE E4 1
H G
'CLOSE' PUSHBUTTll'l SVITCH IS DEPRESSED Pl ISP IF PERMISSIVE VHEN DSP TR..,SFER \\
I SV IN 'LOCAL' POSITIDM sv DSP SEAL IN AIJXILIARi ZONE B3 CONT 421 IE PERMISSIVE \\/HEN RSP TRANSFER SV JS 'ON' SV RSI' PERMISSiVE VHEN DSP TRANSFER SV IN 'CDNTRIJL RDDH' PDSITIDN sv ISP PERMISSIVE UNLESS 'OPEN' PUSHBUTTll'l IS DEPRESSED Pl ZNE E4 I D
CI I
I IC I
B A
8 7
6 5
PERMISSIVE UNLESS VILVE DVERTll<QUED VHILE IFENING PERHISSJVE UNLESS-VALVE IS FULL¥ OPEN
\\
LIMIT SVITCH DN J VALVE I
PERMISSIVE UNLESS VALVE
> 95Y. PEN HJRQUE ON LIMIT SVITCH VALVE S\\JITCH ON V&VE OPEN REVERSING CONTACTOR 42-*-
CLOSE PERMISSIVE UNLESS VILVE
> 951. CLOSED
\\
LIMIT SVITCH DH VALVE /
I PERMISSIVE UNLESS DVERTRQlEI w'HILE CLOSING
\\
Til<QUE S\\JITCH
~-~~VE I NOTES
- 1.
2, SEE 1-2200-01 FOR NOTES, REFERENCES, AND LEGEND, THIS DRA\\,IJNG SUPERSEDES EDISON'S SITE MASTER (VENDOR DRA\\,IJNG 729E630AB, SHT.2, REV.7) OF EDISON FILE NO, R4-88.
l6I721-2200-08 THIS DRA'w'ING ISSUED EDP-1702, REV. C AND VALVES MO FOlSA AND I-2200-02.
- "F.Vl~TON LATEST ; __. --*-**
BASED N EFFECT OF TRANSFERRED LOGIC FOR FOl 7 A FROM D\\,/G. NO.
NUCLEAR SAFETY RELATED C
B RHR SYSTEM I VALVE MOF015A
<NOTE 12 & 17) 4 C IDCD'S INCORPORATED:
EDP 35305,B004, REV. ¢ mrs DRAWING WAS REFORMATTED BY MlCROSTATION AT REVISION "C~. ALL PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFILM IN DOCUMENT CONTROL.
A PORTION OF TIIlS DRAWING IS AFFECTED BY THE FOLLOWING:
PREPARED BY INC.CODE u
DATE TC CHANCE DOCUMENT TITLE THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION.
CONTROL IS MAINTAINED.
Detroit Edison Fermi 2 LOGIC DIAGRAM RESIDUAL HEAT REMOVEL SYSTEM
'-'U""""'-"-' "".
I OTHER REVISIONS:
APERTURE CARD TITLE I A ADMINISTRATIVE CHANGES PER PEPS-0019 LOGIC DIAG RHR SYSTEM THESE ADMJN. CHANGES PER PEPS-0019 FALL
\\,IITHJN THE SCOPE OF MES09, STEP 3,J.2 (\\,1/NOTD PREPARED BY IDATE ICJiF!jE~,
C M. BRZUST APPROVED B KN-S,l/e:>>11}-
~
DATE 11/1/07 i
"/"'/'f
'1
,Z,,o7 EDP POSTING ENTRIES REQUJRE THE ADDITION OJ' THE ARMS STATUS CODE:
EITHER "AFd' OR "ASB" APPROVED BY OTHER APPROVALS
?
PLANT lDENTIFICATION SYSTEM NUMBER EllOO DOCUMENT TYPE CODED DD INC
1801 ORAW>NG NUMBER 61721-2200-08 1
ARMS REClPIENT #
DATE ISSUED TO IS REV.
11-C/* O_:]_
C
. I i