|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A2412021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-09, Logic Diagram Emergency Equipment Cooling Water System Valve - Division I ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A3022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2410, Fire Protection Evaluation Reactor and Auxiliary Buildings Roof Plan El. 697' - 6 and 735' - 6 ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B ML21055A2962021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011, Rev. AP, Diagram Condensate Polishing Demineralizer System ML21055A2952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2046, Reactor Water Clean-Up Reactor Building ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A2922021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2028, Rev. K, Process Flow Diagram Radwate System ML21055A2902021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-4, Rev. B, Logic Diagram Nuclear Boiler System ML21055A2862021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing 6C721-2308, Rev. H, Reactor and Auxiliary Building Foundation Sections & Details Unit 2 ML21055A2842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2034, Diagram Core Spray System C.S.S. Reactor Building ML21055A2832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M271-2550, Flow Diagram of Equipment Drains in Radwaste Building ML21055A2822021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2023, Diagram Feedwater System ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2612021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2400-25, Post Accident Sampling System - P & Id Sh. 1 ML21055A3952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5878, Reactor Core Isolation Cooling Following Main Condenser Isolation Using Suppression Pool as a Backup Water Source ML21055A2422021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-03, Rev. F, Logic Diagram Nuclear Boiler System ML21055A2432021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-6, Rev. a, Logic Diagram Neutron Monitoring System (Part 6) ML21055A2452021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2086, Diagram Fire Protection System Reactor Building & Auxiliary Building ML21055A2462021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2100-01, Rev. C, Logic Diagram Reactor Recirculation System Part 1 ML21055A2482021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2404, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Tray Area Plan - El. 603' - 6 ML21055A2492021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2511, Side Stream Lrwp System P&ID ML21055A2502021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-03, Logic Diagram Reactor Core Isolation Cooling System ML21055A2522021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-03, Rev. J, Logic Diagram Emergency Equipment Cooling Water System Pumps a & B ML21055A2532021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-05, Logic Diagram Neutron Monitoring System (Part 5) ML21055A2552021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011-1, Diagram Condensate Polishing Demineralizer System (Sheet 2 of 2) ML21055A2562021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 7M721-2218, Floor & Equipment Drains Sub-Basement Plan Reactor Building ML21055A2582021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2430-01, Logic Diagram Turbine Building Closed Cooling Water Pump North Center & South ML21055A2592021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2408, Fire Protection Evaluation Reactor and Auxiliary Buildings Fourth Floor Plan El. 659' - 6 ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 7 6 5 4 3 2 1
( AA \
\ 3 E3 /
H 'OPE>!'
FUShBUTTON VALVE H
S\J!TCH IS FULL CUS!NG >9Si: CLOSED /n'\_
DEPRESSED SHJN/\L F016A ~
PB CR
'--L-IH- 11 - - - - - - ' FULL CLOSED
\',ITCH v!~vE FOi6B, FG24A(B)
I SEAL IN
'OPEN' PUSHBUTTON S\JITCH IS DEPRESSED
'OPEN' PUSHBUTTC~
S1./ITCH IS DEPRESSED '
I PERMISSIVE VHEN RSP TRAIISFER S'JITCH IN
'DfT' POSITION I
PERMISSIVE 1.VHEN AUXILIARY R[LAY IE-ENERGIZED
\
'CLOSE' PUSHBUTTON S'wlTCK IS OEPRESSED
'CLOSE' PUSHBUTTON Sw'iTCH IS JEPRESSED
'CLOSE' PUSHBUTTON S\.llTCH IS JEPRESSED SE.AL IN L I
AUXILIARY ~ AUXILIARY_ --ZONE 04 1 AUXILIARY CONT ACT 42* ,
Z'.lNE OS Pl DSP PB RSP RMS RSP I
I \ AUXILIARY DEVICE CR I PB CR PB RSP PB DSP I i CONTACT 42J ZONE D4 ~ CONTACT 41'
/ - FDR F018A ONLY I r R f024A & (612200-3, a:,__ FIF F0!6AJ024A ~
" FC28A ONLY ZONE F4l F028A ONLY PERMISSIVE PERMISSIVE
?ERMISSlV~
UNLESS 'CLOSE' PU Sh BUTTON PERMISSIVE UNLESS ~cL SC' PUSHBUTT[}l PERMISSIVE UNLESS CLOSE PUSHBUTTON I PERMISS[VE VH[N ,/SP TRANSFER SVITCH IN I PERMISSIVE VHrn SELECTDR S','!TCH IN +E PERMISSIVE VHEN RSP TRANSFER SVITCH IN FERMISSIVE
'.JHEN RSP TRANSFER SVITCH IN PERMISSIVE UNLESS 'OPEN' PUSHBUTTON PERMISSIVE UNLESS 'OPEN' PUSHBUTTON PERM!SSiVE UNLESS 'OPEN' PUSHBUTTON
\v'HEN OSP TRANSFER SVITCH IN
'w'HDI DSP TRANSFER S>ITCH IN l l SV!TCH DEPRESSED 'LOCAL' POSITION 'CONT.RM.' PIJSJTION
'OPERATE' POSITION SVITCH DEPRESSED SWITCH DEPRESSED S\JITCH [(PRESSED 'ON' POSITION
' I 'OIT' POSITION 'ON' PDSITl[l1 SVITCH DEPRESSED S\./lTCH Df PRESSED G \'---_PB_-+-_zll'l_E _4-,-1 \ PB ZONE G4 /
\ PB ZONE G3 / '\ RMS RSP / rR RMS RSP / rrn RMS RSP / \'--_RH_s_L-_,_s_r_j/ \~_P_B _-+_z__NE_c_s~/ \~_P_B_4-_z_oN_E_G6-' \'---_P_B _____,_____,z_N_E_G6_;/ \L___sv_,--+-.D;--SP____J/ \c__,-_svi_.-+--o_s, -1/ G
~ - - - + - - - ~ f028A t ~---+---~ F028A & '-----+---___J CRSPJ (CR) <DSP) r24A NLY_._.,.
/,/
F!J24A ONLY
,C
'-P--- rCfi FQ24A i (CRl FOR F02SB ONLY (RSPl (DSP)
FDR EOI6A t F024A ONLY -----'-'
'f r02!:'lA ONLY PERMISSIVE VHEN RSP ffiANSFER SVIiCH PERMISSIVE WHEN RSP TRANSFER S\JITCH PERMISSIVE
\JHEN AUXILIARY RELAY E)l[RGlZED I PERMISSIVE VHEN AUTO SIGNAL NOT PRESENT I PERMISSIVE 1.r'HEN SELECTOR SVITCH IN PERMISSIVE
'Jf-CN RSP TRANSFER SVITCH IN
(
PERMISSIVE
\/HEN RSP TRANSfER SIJITCH IN PERMISSIVE
'w'HEM RSP TRANSFER SVITCH IN IN '[J,j' P[]SITION IN 'OFF' POSITION "OPERATE" POSITION 'OFF' POSITION 'ON' PDSITI[l1 'OFF' POSITION FDR F024A ONLY
' 1------\~----1/
\~_R_,M_s___,_ _R_sP_~ \ RHS RSP / \ AUXILIARY DEVICE CR I AUXILIARY DfVICE CR I \~_R_Hs_ __,__c_R_~/(612200-3, \ RHS I RSP / RMS RSP \~_R_M_S-1-----R-SP_J/
(612200-3, ZD~E H4) EIIR F028A ZONE F41 mu I I I I PERMISSIVE PERMISSIVE PERMISSIVE PERMISSIVE PERMISSIVE PERMISSIVE VHEN VHEN SELECTOR VHEN SELECTOR VHEN SP VHEN DSP TRANSTER \JHEN DSP DSP TRANSEER SVITCH SVITCH IN S\JlTCH IN TRANSEER SVITCH IS SVlTCH IN TRANSFER S'w'ITCH IS IN 'LOCAL' PSlTIN l I "OPERATE" P SIT!ON
\ "OPERATE" POSITION IN 'CONT.RM! POS 'CONT.RM.' POSITION IN 'LOCAL' POS l
\ RMS CR I I sv,
\'--------------~
DSP RMS DSP I \ RMS DSP I \'---_RM_s_-+-_n_sP_.J \RMs CR/
~ - - - + - - ~ FDR F028B rR F016A,E024A i r R r l6A,F024A i NL!
r T7 E01BA ONLY r028A ONLY F
PERMISSIVE VHEN PERMISSIVE Vf£N L "- FOR P0!6A,F014A &
F028A NL Y PERMISSIVE WHEN 'VALVE F006A CLOSED PERMISSIVE PERMISSIVE VHEN DSP TRANSFER L FDR F028A NL Y PERMISSIVE VHEN DSP TRANSEER DSP TRANSFER SVITCH DSP TRl,NSFER SVITCH SEAL IN UNLESS VAL V( SVITCH IN S\llTCH IN IN 'CONT.RH.' POSITION IN 'LOCAL' POSITiON LIMIT IS PULLY CL SED 'CONT.RM.' POSITION 'LOCAL' F1JSITION ON DSP /
l
\ RMS ]SP /
\ SWITCH VALVE FOR F028A AUXILIARY ZONE 04 LIMIT ON / \ RHS DSP / \ RMS DSP /
\ RMS ll'lLY CONTACT 42~ \ S1ilTCH VALVE
~-~ r R f018A FOR E018A Dr-lY ONLY PERMISSIVE FDR f0181\ ONLY _ _;:µ VHEN VALVE F006C CLOSED
,, rrn
/(R LIMIT ON E028B NOT REQUIRED ON THROTTLING TYPE VALVES ~---_,_+, \ SVJTCH VALVE P018A Olf,! ' - P - - - - - - - - - NOT REQUIRED ON THROTTLING TYPE VALVES~--rl, NL y r R E028A & B ONLY P[RHISSIV[
E UNLESS VAL VE JS FUll Y DP£N FOR FD24A (B) & EOI6A (B) NI Y E LIMIT ON VALVE SVITCH VALVE /rnR FULL CLOSING SIGNAL
~----+---~ F028A<B) 2 POSITION SwITCH ONLY LIMIT Svl!TCH N
VALVE * "LOCK" - "OPERATE" MAINTAINED CONTACTS PERMISSIVE UNLESS VALVE IS OVERTDRQIJED I PERMISSIVE Ur-lESS VALVE IS PERNISSIVE UNLESS VALVE IS I PERMISSIVE UNLESS VERTORQUED c h - GROUP 3 VALVE M[MIC DISPLAY LOGIC KEY REMOVABLE IN "L CK 11 FDR VALVES
)9~/. OPEN FDR F024A & B )95% CLOSE '
\.IHILE CLOSING VHILE DPOIING THE BYPASS D\ F016ACB) 8' F028ACB) NL Y
\
TDRI/JE SVITCH ON /
VALVE LIMIT SVITCH vl:'vE /
PERMISSIVE WHEN VALVE IS FULLY CLOSED
\ LIMIT SVJTCH N
VALVE
/
\ TIRUE SVITCH ON VALVE
/
12 C/Dj_
NOTES:
L SEE [-2200-01 FDR NOTES, REFERENCES AND LEGEND,
- 2. THIS DRA\JING SUPERSEDES EDISON'S SITE MASTER
<VENDOR DRAvl!NG 729E630AB, SHT, 3, REV, 8) OF I PERMISSIVE VHEN VALVE I 3, EDISON FILE NO. R4 88, ALL VALVES ARE PREFIXED BY Ell50 )
FODGE CLOSED UNLESS THER\./ISE NOTED.
D D LIMIT SVITCH
~ - - - < - - - ~ F02BB ON VALVE /rnR ONLY 0
I PERMISSIVE IJHEN VAL VE f006D CLOSED LIMIT ON WITCH VALV[ /rnR
~ - - - ~ F018B IINLY OPEN CLOSE REVERSI!fi CONTACTOR 41 AC*
SUPPRESSION CHAMBER SPRAY OUTBOARD ISDL, VAL VEI NO-F028ACB)
TYPICAL FDR THROTTLING TYPE VALVES, MO-F024ACB) -F016ACB) C C
UNLESS THERwISE NOTED
( NOTES 2 8' 3) 61721-2200-11 LATEST REVISION D
B B NUCLEAR SAFETY RELATED THIS IS AN AUTOCAD PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS DRAWING WAS REFORMA1TED BY AUTOCAD A1' REVISION A . ALL INC.CODE Detroit Edison Fermi 2 D DCD'S INCORPORATED:
PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFILM IN DOCUMENT CONTROL.
PREPARED BY u
DATE TITLE RESIDUAL HEAT REMOVAL LOGIC DIAGRAM A PORTION OF THIS DRAWJNG ECR 29195-1 REV '2\
IS AFFECTED BY THE FOLLOWING:
SYSTEM TC CHANGE DOCUM:ENT CHECKED BY DATE A OTHER REVISIONS: APERTURE CARD TITLE A LOGIC DIAG RHR SYSTEM ADDED NOTE 3 PER LABELING PROGRAM, APPROVED BY DATE PLANT 1DENTIFICATION SYSTEM NUMBER ARMS RECIPIENT#
EllOO PREPARED BY DATE KED BY
- WC, DOCUMENT TYPE CODED DDIN C NUC OPS FILE NO. DATE ISSUED TO IS c . m . i l i ~ 912s191 OTHER APPROVALS DATE 1801 10- -
APPROVED BY DATE EDP POSTING ENTRW REQUIRE THE DRAWING NUMBER ADDITION OF THE ARMS STATUS CODE:
~~ I 0/1/97 EITHER "AFC" OR "_i>,E,F/'
61721-2200-11 D s 7 6 5 4 3 2 1