Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684 - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
H G
E D
C B
A 8
7 6
5 SIGNALS DERIVED t
FROM LPCl<RHR)SYSTEM
/cc\\
rim' SEE REF. 4 LPCI CRHR)
LPCI (RHR)
1-2200- 02 Jes/
SYSTEM I 1-2200- 02 IE4 SYSTEM 2 lNITIATED INlTJATEO L. ---------- -------------------------------~-- ---
I 7
11 I
SEAL -IN 1 C3 I
AUXILIARY Z NE GS DEVICE AUXIUARY DVICE PERMISSM If ENERGIZED
!3105F031A!Bl tuT FULLY OPEN AUXILIAR.f DEVICE LP
\\
UMIT ON I
S\\JITCH VALVE I
PERMISSIVE IF GDIERA T R F !ELD PERMISSIVE IF BREAKER CLOSED AUXILIARY TIMER NOT
\\
I TIME]l LlUT < !05 SEC 41*
LP AUXILIARY LP I
DEVICE I
PERMISSIVE IF
/1? \\
AUXIUARY SH1JAL NlJT FRESENT
,111/
\\
AUXJLIARY DEVICE LP I Tit,[
ll£LAY OPEN 2 SECONDS PUSHBUTTON SVITCH
[S DEPRESSED AUXILIARY D£VICE LP PE CR PUMP DISCHARGE PLIMP nISCHARGE V,~LVE JOGGING VALVE JOGGING CLOSE CLOSE CKT TINER AUTO CKT TIMER AUTO flJSHEUTTOtl PUSHBUTTON SJGNAL SIGNAL SEAL -IN S\\IITCH IS S\\llTCH IS AUXILIARY AUXlt.lARY
[l[PRESSED DEPRESStD cP LP DEVICE DEVICE AUXILIARY CONT 42*
mNE C6 PB CR PB DSP REr 6
!FEN PUSHBUTTON S1w'JTCH IS DEPRESSED PB DSP I
SEAL-IN NOT PERMISSIVE I
I IF AUTOMATIC NOT PERMISSIVE NOT PERMISSIVE CLOSING SIGNAL IS IF '!FEN' IF 'OPEN' I
PRESENT PUSHBUTTON SVITCH PUSHBUTTON SVIT!ll AUXILIARY ZONE C7 IS DEPRESSED
(
IS DEPRESSED CONT 42*
\\
AUXIUARi' CR I DEVJCE
\\
ZONE £8 /
PB ZONE F7 PB NOT PERMISSIVE IF OPEN PERMISSIVE PERMJSSIV[
I I
PUSHBUTT~
PERMISSIVE PERMISSIVE SVITCH IS
\\JHEN DSP VHEN IlSP VHEN DSP VHEN DSP DEPRESSED TRANSFER SVHCH TRANSFER SVITCH TRANSFER SVITCH TRANSFER S\\JITCH IS IN 'LOCAL' I
IS IN 'CDNTRIJL RDDM' IS IN 'CONTROL ROOM' IS IN 'LOCAL' PB ZONE fl
\\
ss DSP
\\
sv DSP I
\\
sv DSP I \\
sv DSP I I
PERMISSIVE PERMISSIVE If VALVE IS NDT PERMISSIVE VHEN DSP FULLY PEN
\\MN DSP TR/;;SFER SVITCH TRANSFER S\\JITCH IS IN 'LOCAL*
\\
LIMIT rn I
IS IN 'CONTROL ROlil' I
S\\JITCH VALVE
\\
I I
sv DSP S'J DSP PERMISSIVE PERMISSIVE PERMISSIVE PERMISSIVE UN...ESS UNLESS IF VAL VE IS IF VALVE IS VERHJRQUED DVERTIFQLCD FULLY CUJSED IJHiLE OPENING
)
SEE NOTE 4 FULLY CLOSED VHILE CU:lS[NG
)
1/
I
\\
I
\\
I I
PERMISSIVE LIMIT ON TORQUE ON ff VALVE IS CIRCULATING LUBE PUMP
'Al' STARTED LOCAL PERMISSIVE VHEN CMC SV!TCH
'Al' IS IN AUTO POSITION CMC I-1100-01 ZONE 15 LIMIT SV!TCH DN VALVE CIRCULATING LUii[ PUMP
'Al' STOP LOCAL PERMISSIVE VHEN CME S~ITCM or LUBE PUMP'/'11' IS N T IN RUN PDS!TIDN l-1!00-01 me ZONE F5 PERMISSIVE,~EN CMC SVITCM or LUBE PUMP'A2' JS IN RUN P SITIDN CMC l-1!00-01 ZONE F4 IORI.IJE ON SVITCH VALVE OPEN I
REVERSING AC MT R STARTER 42*
PUMP DISCHARGE VAL VE B3105FOJ!A F
PUMP DISCHARGE VALVE B3105 031B VALVES ARE SHD\\./N FDR BOTH RECIRCULATION LOOPS - REF.2, SH-1
<FUNCTION IS TYPICAL FDR EACH VALVE AS INDICATED) 1-2100-02 "ZONE JS R
"LP /
R
/
/
CIRCULA Ti,¥;
LUBE Pli<P
'Al' START LOCAL "CR /
/cp" "LP G
/
CIRCULATING LUBE PUMP
'Al' STOP 51*
LOCAL
/
" LP/
R 1-2100-02 ZONE B4
/
\\ G
/
/
AUXJLIARY LUBE OIL PUMP
'C' START LOCAL
" LP/
G 1-2100-02 "ZONE )3 G
/
/
AUXILIARY LUBE rL PUMP
'C' STlP LOCAL
'D" TYPICAL FOR SET 'B" CR CR A
AL FLUlD :DRIVE LUBE IL LOii' TEMPERATURE VITH MIG SCOOP TUBE DRIVE MOTOR LOCK BREAKER CLOSED AUXILIARY LP AUXILIARY LP DEVICE DEVICE I-2100-01
~NE ~
/
R
/
M/G DRIVE MOTOR BREAKER CLOSE SVGR CR AH LUBE OIL HIGH TEMPERATURE AUXILIARY LP DEVICE
/
/ 'AUTO' CR FLASHING
-- TYPICAL FOR CIRCULATING t~ ___ /_._,_" ______
CR_/_
11_" ______ ~/:]~--~
LUBE PUMP 'A2' 8
7 CLOSE SVITCH VALVE 1-2100-01
~NE HJ
/
G
/
MIG ll<IVE IIITOR BREAKER OPEN S\\.11.iR CR AL LUBE OIL LOV PRESSURE \\rllTH MIG DRIVE MOTOR BREAKER CLOSED AUXILIARY LP DEVICE SVITCH VALVE
\\
GENERATOR FIELD BREAKER CLOSED LOCAL LP CR A
INCOMPLETE SEQUENCE AUXILIARY LP DEVICE
/
GENERATOR FIELD BREAKER OPEN LP CR A
GENERATOR LOCKOUT RELAY TRIPPED 86G*
LP FDR ADDITIONAL ALARM REQUIREMENTS SEE REFERENCE 2 SEE NOTE 3 6
FULLY CLOSED LIMIT ON svurn VALVE A/H MIG DRIVE
),f[JT[JR INTERNAL AIR HII,,
TEMPERTURE TS-~2SA LllCAL CR A
RECIRCIJLATIDN FLDV 01 LIHITlNG CONDITION AUXILIARY LP OCVICE 5
I CR A
GENER,TOR l.OCKOUT RELAY FAJLIJRE AUXILIARY DEVICE A
LP CR OUTER SEAL LEAAAGE HI FLOV AUXILIARY DEVICE LDC AL 4
CR A
RECIRC SYS DCS TROUBLE AUXILIARY DEVICE A
LP CR PUMP SEAL STAGING HlU~/LO\\rl FlO\\rl C
AUXILIARY DEVICE LOCAL CR A
UENERATOR FIELD GROUND AUXILIARY DEVICE LP CR A
PUMP SEAl CDLll'{i \\/ATER lOV FLDV RY L n.-AL DEVIC~
U'~
CR A
PU\\IP MOTOR FLUID DRIVE OIL COOLER HI TEMERATURE AUXILIARY DEVICE A
CR CR PUMP MOTOR BEARING IL HIGH/LDV LEVEL NJXILIARY IlEVlCE LP 3
CR PUMP MHJR Vl]RATION AUXilIARY DEVICE A
LOCAL CR MU DRIVE MOTOR GROUNG FAULT OR OVER CURRENT LP CR A
RECIRCULATION COOLANTS TEMERATUR£ HIUH R601 CR SEE NOTE 3 PERMISSIVE VHEN RESTART LO[]{OUT DEVICE
(
'Al' IS OPERATD<G AUXILIARY LP
\\
DEVICE 2
/
A
)
I CR A
ALTERNATE RDD
!NSERTlffil TRIP A/B AUXILIARY DEVICE PERMISSIVE CR VHEN RESTART L []{ UT OCVICE
'A2' IS OPERATING
.\\ AUXILIARY DEVICE LP 1
MIG DRIVE MOTOR
\\
BREAKER TRIPPED I
52*
SY@
ON BKR
'.__ ____________________________________ _//
SEAL -[N AUXILIARY ZONE C3 c,1 42 *
!OT PERMISSIVE IF CLOSE PUSHBUTTON SWITCH IS DEPRESSED PB ZONE F2 PERMlSSrYE ff OPEN TffiQUE S'JITCH IS N[ll OVfRTDRblUED TORQUE SVITCH GENERATOR INTCRNAL AIR HIGH TEMPERATURE TS-N026A LIJCAL
" CR/
A
/
RECIRCULATI N FLOV LIMITED ffEED\\rlATER PUMP INTERLCCK)
AUXILIARY CR DEVICE rn VALVE Pl OPEN PUSHBUTTON SVITCH JS DEPRESSED CR PERMISS!Vi W(N RSP TRANSFER Sv/lTCH JS
'OFF' SY RSP PERMISSIVE IF VALVE IS NOT FULLY OPEN LIMIT SVITCH ON Wt.VE
~CR A
FLUID ll<IVE OIL I
CR A
EMERGEll:Y MJST [UMJNATOR IlfFFERENT AIL LUBE IL PUMP PRESSURE HIGH AUTO START I I DP ON fLUlD 41*
LP SVJTCH DRIVE SH 3 SH 3 ZONES Cl, C3 ZONES Cl, C3 "CR
/ ~SP /
"CR
/
~SP G
G R
R
/
" /
/
" /
FDR VALVES SEE NOTE 3 OPEN PUSHBUTTON S1JITCH IS DEPRESSED PERMISSIVE
\\./HEN RSP TRANSFER S'JITCH IS
'ON' SW RSP OPEN
\\
SEAL**!M AUXILIARY CIINT 41
\\JHEN RSP TRANSFER S1J!TCH IS
'[FF' NT PERMISSIVE If CLOSE PUSHBUTTON SVITCH IS DEPRESSED PB CR RSP I REVERSING AC MOTOR STARTER 42*
PERMISSIVE
\\.!HEN RSP TRANSFER SVITCH IS
'IJN' NOT PERMISSIVE ff CUlSE PUSHBUTTON SVITCH IS DEPRESSED RSP PB RSP SEAL-IN AUXILIARY cNT 42
- ZONE C3 PERMJSSIVE VHEN RSP TRANSFER SVITCH IS
'OFF' SW RSP NOT PERMISSIVE Ir !PEN PUSHBUTTON SVITCH IS DEPRESSED PB CR PERMISSIVE IF VALVE IS FULLY OPEN LIHIT SVITCH ll'J VALVE CLOSE I ' i I
I
' I CIRCULt,TING CIRCULATING LUBE PUff' LUBE PUMP
'Al' ST PPETI
'A2' STOPPED j AUXILIARY LP AUXILIARY LP 1JEVICE I
SEE NOTE 3 PERMJSSIVE
\\JHEN RSP TRANSFER SWITCH IS
'ON' SV RSP NOT PERMISSIVE Ir OPEN PUSHBUTTON SVITCH IS D£PRESSED PB RSP PERMJ~IVE IF CLOSE TDRQL[ S\\JfTCH IS HOT OVERTDRI.IJ£D HIR(!J[
S\\JlTCH ON VALVE LOCAL DEVICE CLDSE PUSHBUTTO~
WITCH IS DEPRESSED PB CR PERMISSIVE WEN RSP TRANSFER S\\llTCH IS
'OFF' sv RSP 1-2100-02 ZONE C3
/
II
/
LOSS OF 260
'DC PD\\IER TD PUMP 'C' AUXILIARY DEVICE LP PUMP
'Al' DR 'A1' RUNNING AUXILIARY DEVICE LP PUMP SUCTION VAL VE B3105F023A-------------------'"
/
PUMP SUCTl N VALVE B3105F023B----------------------'
P£RMISSIVE IJHEN CMC S\\IITCH
'C' IS
' Ff /RESET' PDSITill'J VALVES ARE SHD\\/N FDR BOTH RECIRCULATION LOOPS-REFERENCE 2 CR CR A
A EMERGENCY CIRCULATI,!; LUBE LUBE ll PUMP A/B OIL PUMP OPEN FEED AUT START 11 x*
LOCAL AUXILIARY LP DEVlCE
~R
/
{R
/
R R
/
/
i!IUXILIARY DEVICE CR
/ 'AUTO'
\\.I FLASHING
/ CR "
NOTES
- 1.
SEE I-2100-01 FOR OTHER NOTES, REFERENCES, AND LEGEND.
2, THIS DRA\\./ING SUPERSEDES EDISON'S SITE MASTER
< VENDOR DRA\\JING 729E625AB, SHT. 3, REV.5 )
OF EDISON FILE NO. Rl-200,
- 3.
FUNCTIONS SHO\\JN FDR RECIRCULATION SYSTEM 'A'
<EXCEPT AS NOTED> AND IS TYPICAL FOR RECIRCULATION SYSTEM 'B',
CUJSE PUSHBUTTON SVITCH IS DEPRESS£D PB RSP PERMISSIVE
\\II-EN RSP TRANSFER SVITCH IS sv
'ON' RSP BREAAER OPEN S-GR PERMISSIVE If CMC S\\.IITCH IN 'RUN' POSITJN EMC CR
/
'TRIP' SEAL -IN AUXILIARY ZONE CJ caNT 42J:
MOT PERMISSIVE lF OPEN PUSHBUTTON SVITCH II DEPRESSED PB ZONE F4 GENERATOR LOCKOUT BUS ENERGIZED LP 61721-2100-03 LATEST REVISION C
NUCLEAR SAFETY RELATED BJI05r023A &
~--'----L--c:;B3105f031A~+/-==-_J-~
- 4.
ROTOR 3 IS SET AT 7 /8' TD I" FROM THE FULL CLOSED POSITION (MECHANICAL ZERO) REFER TD VMC2-24.7, VOTES 2.0 USERS MANUAL.
LIGHT FF VHEN VALVE IS FULLY OPEN LIMIT S\\JlTCH DN VALVE L!UHT [ff Wf£N VALVE IS FULLY CLOSED LIMIT ON S\\JITCH VAL VE TYPICAL FDR F ACH VAL VE 4
LOOKOUT BUS PO\\JER AVAILABLE C DCD'S INCORPORATED: EDP-27412 REV,\\?l THIS DRAWING WAS REFORMA'ITED BY AUTO CAD AT REVISION "B". ALL PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFil.J,[ IN DOCUMENT CONTROL.
TC A PORTION OF THIS DRAWING IS AFFECTED BY THE FOLLOWING:
CHANGE DOCUMENT PREPARED BY CHECKED BY u
TITI.E DATE DATE THIS IS AN AUTOCAD PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED Detroit Edison Fermi 2 LOGIC DIAGRAM REACTOR RECIRCULATION SYSTEM PART 3 OTHER REVISIONS:
APERTURE CARD TITLE c RRECTED 01,1G. N :s T AGREE \\,/ITH AR Ms FRMAT, r-:===t========1=::::::i~~[E=::1=::iamd~L2;:00G]I~C~D~IA~G~R~E~A~C~TP.0,1_RIL-1R1.1ESLCLlIR[1;.C1 -.;ai:isRECWIE1IT#-
AND PIS ND,'S TD AGREE \\./ITH CECO, THESE CHANGES~
APPROVED BY D
PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT#
MEET THE EXEMPT CRITERIA OF MLS07 4.I.7.3b B3100 PREPARED BY D.CORRIN APPRO\\IED BY DATE CH~D!IJ,.µ_.,
7-28-0 7).
5.( iM~ ( t),C (,j,.-, ~ C. f(v/r 3
DATE 00 DATE EDP POSTING ENTRIES REQUIRE THE ADDITION OF THE ARMS STATUS CODE-EITHER "AFC" OR "' ASB" OTHER APPROVALS DATE 2
DOCUMENT TYPE CODEDDDINC NUC OPS FILE NO.
1801 DRAWING NUMBER 61721 _ 2100 _ 03 1
C H
G F
E D
C B
A