|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684 - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
I 8
7 6
5 4
3 2
1 I
PANEL v'AlVL INSTRUM.
OEBCIUPTtON P$IO SYSTEM ""
PMB.
VALVE iN,$,~l,lllt P~O Ir"""
ZIC ITEM R
fltWVIIUil
,,,. I=.
0:-1!~
!l"'
0..
tE,.
.Q~iJ NO-PIS N.
OW,SNO....
!!?.Ml PUClflPT!OI ENtlAYUIG DW6 NO.
3B178
$~MD8:,1 Llt§IVIP 2135-PANEL VALVE PIS P&ID 1,c C41R600 IIDICATOI Pu/wtP.:,A#B ITEM DESCRIPTION ENGRAVING SYSTEM D\\JG H
1:11,nHMM P'R.£:U, 01 NO, NO, NO, DW'G ND, ND, 3B179 C11R601 ~ CKAltGii..... witEi *-
... fJ1~-
3A300 H
l PT WHITE R£JIACT lltTll'ACT RETRACT ICTlfAC.l DISPLAY CONTROL SEE TYP 12
-IT PERMIT PUMIT 3B1SO C'96R800B C96 3A301 C32R618 C32 PUCES MONITOR STATION 1-2975-116 J1 3B181 I<<> DIS,UY I-3A302 C32R616A CONTROL SEE I m,r J-.r
,. I GUT I
OOT lilSEff cu
~hl5-STATION 1-2975-116 C32 II IN CONTROL SEE IAN A '4
- "utr 1*
3]182 ffe-.
3A303 N21R858A C32
- ucr'1 STATION 1-2975-116 SELECT 3ll183
~/
3A304 C32R616B CONTROL SEE C32 llTlrA<T STATION 1-2975-116 RETIIACf RETRM:r IIITIIACT PERMIT P!Mll'T P£11itlT
.... IT 3]184 SEE 1-3A305 CONTROL SEE "1
B31R629A INDICATOlt 11>1
~g95-N21R858B C32 Z PT I-2975-125 STATION 1-2975-116 I
I ""
I OUT I
3l!l85 B31R6291!,,_.,...
SEE 11>1 3A306 N21R805 SEE II M
II II OUT IIIIUCATOft INDICATOR C32 I-2975-125 1-2975-116 1111 C.
1111 I..
3B18b IV/A 3A307 C32R620 CONTROL SEE
!ELEOT IElECT SELECT
- UCT STATION 1-2975-116 C32 3B187 B31R601 JtlCOIHt SEE I
BACKLIGHTED POST C32 IETWACT R!TIACT IETRACT AlTIACT 12 l'OIITI 1-2975-125 11>1
~JOS-3A308 DISPLAY SCRAM l'tlltllT PE"Ut Pl:Mtlf PlllHIT 3B188 NESSUIIE:
SEE I-
- ,cu C32R61l5A IIIDICATOI 1-2975-125
~J,25-3A309 PUSHBUTTON RESET C32 I ""
I 1 PT
- II I I-II OUT 001" 00T 3B189 B21R613 llCOltOElt SEE 3A310 BACKLIGHTED POST C32 JC1Z 2 PT.
1-2975-125
~~95-DISPLAY SCRAM t* " 1f8 IRH,
16' i",. \\l."M,. 170 1111 G 171 G
I-
!ELECT SELECT SELECT.
G 3B190 MARKER SRN 'A' C32R609 KCORDY SEE PUSHBUTTON C32 BLUE PEN
,cu 1-2975-125
~125-3A311 RESET t_W1'l*Tli I
PLATE 2 PT.
3Bl91 SRM 'B'
,cu B31R614..,.....
SEE l_-
3A312 RED PEN 2 PT.
1-2975-125 Ul Sl45-DEIAIL A
'--v--~
TYP 12 PLACES 3B192 SRH 'C' SEE I-BACKLIGHTED LIMITER 1 IRI B31R633A IIDICATot
§g95 SPLIT SCREEN B31
- BLUE PEN 1-2975-125 3A313 DISPLAY LIMITER 4 SRI 3B193 SRM 'D' B31R633B IIIDICi.TOJI' SEE II RED PEN ll>l 3A314 Z PT 1-2975-125 3B194
]RH 'A' SEE I
BACKLIGHTED LIMITER 1 BLUE PEN 3Cl7 C32R605B IIQ.IC.lfta 1-2975-125
~J.25-3A315 SPLIT SCREEN B31 2 PT DISPLAY LIMITER 4
,,..... Pllt..,..,.._
SEE
_t:
UP!C UPSC 3B19S IRM 'C' JClf B31R650 ltECORDt:I 1W
~q95 3A316 AMBER..._
DR 110P OI iNOP RED PEN 2 PT.
1-2975-125 r- ~
IRM 'D' BACKLIGHTED COP4Plllt 311:196 BLUE PEN
,c" N/A 3A317 RUNBACK B31 DISPLAY 3B197 IRM 'B' B21R007 lt£C.Oll0~
R6ACfl>R _,E.5.SIU,,,
I-CONTROL SEE RE:D PE:N 3~ZO 2.-PIN
--- ~,_,lllflthJA,6 8ZI
~Q.95-3A318 B31R621A STATION 1-2975-116 B31 WHITE IY-,.1SS l'f-,-SII 3B198 IRM 'H'
,cz, 3A319 B31R621B CONTROL SEE B31 BLUE PEN STATION 1-2975-116 3B199 IRM 'f' sczz N'/,4 DETAIL,I RED PEN 38200 IRM 'E' BLUE PEN F
3B201 MARKER IRM 'G' F
I PLATE RED PEN I
PANEL w'HITIE' I'
VALVE PIS PIUD I&C 3B210 6t¥D)
M~NC,,.IIIL
... ~
c71 1~);~5-ITEM NO.
ND, DESCRIPTION ENGRAVING D'w'G ND, SYSTEM D~G e lllD/
ND, ND, PtlSJI A"TT "Al I-FLAT PANEL NOTE 38211 M..IIN~A.;'",...Sc !(/II,_,
1~!~5-3B300 C32 f1reo1 -
DISPLAY EACff IRM JUl'OC TltlP
-OCAll/
~ti'~
I LEVEL SEE CHANMEL TD HAVE ONE 01 INOP I 3B212
?j07-3B301 C32R606D INDICATOR 1-2975-120 C32 DETAIL 'C' & ONE DETAIL IT-P-J ii!$
IH, r- \\~t CkLl"'IIT60 I
'D' UNDER ITS ASSOCIATED 3C.2:4
~""""' r,.Mo,/l C7I ?,.! RECORDER It 011l"'
11m 3C25 D~TAIL C DETAIL D LEGEND TO HAVE CHANNEl I D AND PEN COLOR PANEL VALVE PIS PIUD l&C
[
I ASSOCIATED JITK THAT ITEM ND.
ND, DESCRIPTION ENGRAVING D'w'G ND.
SYSTEM DWG AMbt:F\\
3C2G NO.
ND, CHANNEL MIIUIM:IATDI' 3C300 C32R614 RECORDER SEE C32 3C.2:7 11--
LlllfT IKIK SEE REF D'w'G NO. I-2083-06 1-2975-125 FOR z,1 VIIIOCIWI EXAIPlE 3C301 C32R604A FLO\\,/
SEE C32 3C28 I
SEE REF DVG ND. 1-2083-06 INDICATOR 1-2975-125 I
I I*
IRH A iL,,..,,
3C302 C32R604B FLD\\i/
SEE C32 ILUE PB 3C"9 SEE REF DIJG NO. l-2083-07 INDICATOR 1-2975-125 w.,.~
3C303 C96R800C DISPLAY C96 3C30 SEE REF Dw'G NO. I-2083-07 MONITOR
~,9<,... IIIH'?'60 I
3C304 PIEZO C97 IJ/l'Llf~ 5$(/l C.11 ?)55-11"'"*~
SEE REF Dw'G NO. 1-2083-08 ALARM 3C31
~-
E MA,&,:611 SEE 3C305 BACKLIGHTED TOTAL E
SYSTEM C97 3C32 f'LllrE SEE Rff D'JG NO. I-2083-08 DISPLAY FAILURE 1-2975-125 3C33 M~Rl<~R SEE LIGHT IOX SEE REF DVG NO. I-2083-09 3C306 PUSHBUTTON C97 F'I..ArE 1-2975-125
- M WINDM Nlf/rlt*ll SEE 0
3C34 1-2975-125 3C35 I
I I
I I
I I
I I no WHITE' A
/
3C36 f~~
l=
r~~..,..,
- 1 t~~, I
.., UPSCIU Dl;IMBCiJ..i 3C37 TIIP
,:"L.Ufl-l ~au,.,r 1-1'10 11'11:
IY-N8StD" 3C38 Ml*Co~
l Olt 110,
-l-lj\\t,,i.O 5':T i
COMf!Wt*hlM'llt,J, JF\\CK
/ DETAIL G DETAIL D VIJ-B31 ]E I-I 3A207 n
?J:05-4M&61t.
I a7l0 F014A fflE1II 2833
... !ru.
lf'EN I
SEE f'llJIAJNC.IATo,\\
3A208 -.. -,., Ill-3ll Puseevmi"'
I 2975 116 A<k,\\16WLD~
ve-B31-I-
3Z2.
A~,..~
3A209 3S,o F014B oP1N lffEOI 2J05-fU5H6UTTtW St4*NCC D
Jf"'-'"""
SEE 3l3 A'-'Nw,./c,*ltT°"-
D 3A210 _,_
P(JSHWTTO~
B31-c (-
1-2975-116 M,kJ*J1:;vJ~ii t:.6£ 3A211 VII-I-
Jl'f
...,W.,~l,tTO.,
37,7 F016A llll!DI f'.!05-PVS"""..-rn,.,
S1.IJM.I 3A212 -J,-
-u-...
SEE CLOIID I I
1-2975-116 3A213 va-B31 Pl
¥10~-
3768 F016B -* <IIIDI 3A214 _,,_
SEE CUlll C*ltNI 1-2975-116
~843 aMK4."'Nl>>O SEE I
3A215 DIS~..,
I 2975 116 B3/ fJD5-
~,,.~ SEE i
3A2l6
~--v 1-2975-116 1
'2~7~
SEE I-
$7/IIIT /'lf/N 1-2975-116 C.32 ~F5-3A218 N'/A Cll IJl'C~_J.HIR (o/'4*
I 3A220 DUF'Llf'Y, *.,..-
Cl/
?.!06-F160B _,,,,.. ~
zo '
SACl<L/
NOTES:
C 3A221 O#SPUf1' C11-F160B C
C Cll MCl(~t-N~
I.
INF RMATl N IN DESCRIPTION COLUMN NOTED 3A222 D,.,,.,.V F162B oH,-J(~*P, "N/Alf INDICATES ITEM NUMBER IS NOT APPLICABLE 3A223 l!IIICl(L.l*~r o,snN *-***
C11-F162B TD THIS PANEL.
3A224 Cll
°'"~" ~..
~&
- 2. PANEL ITEMS, MARKED \\./ITH A TRIANGLE A, LOCATIONS ARE F 16 2 D,,,.,,,,,,-,.,,,,1 Mt:.,,.u, SHO\\/N ON I-2007-21.
3A225
-u-,,,,,,..
C11-F162D cuu~o t&i,w)
Cll
[ lp"IC,~1,(6116-3A226 D,.s.PIJIIJ/
F163B oPIN (RED)
~ t:KI.ISNTlf.
i 3A227
-JI- ="'"'c~--,
C11-F163B r::---""D
)
3A228
~11Kf1'1 ATWS A!II/RPT 161721-2007-03
?J..a.T PIV. 1I LATEST REVISION REFERENCE DRA\\./INGS p
SEE I -2007-02 FOR CONTINUA Tl N OF EQUIPMENT LIST SEE DRA\\./ING 1-2007-01 FDR PANEL LAYOUT B
B NUCLEAR SAFETY RELATED THIS IS AN AUTOCAD PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS ORAWWG WAS REFORMATTED BY INC.CODE Detroit Edison Fermi 2 AUTOCAD A1" REVJS[ON "L". AlJ..
PREVIOUS APPROVAL SIGNATURES ARE T[TLE ON FILE ON MICROFILM lN OOCUMENT u
DESCRIPTION OF EQUIPMENT ON CONTROL p loco's INCORPORATED, PREPARED BY DATE COMBINATION OPERATING PANEL A PORTION OF THIS DRA1'1NG IS AFFECTED BY THE FOLLOWING:
H11P603 EDP-32523.A051 REV. ¢ I
CHANGE DOCUMENT CHECKED BY DATE i
A OTHER REVISIONS, APERTURE CARD TITLE A
CORRECTED DRAFTING ERROR@ ZONE C-7 EOUIP LISTING OF COP H11P603 APPROVED BY DATE PLANT IDENTIFICATION SYSTEM Nt.JMBER ARMS RECIPIENT#
HllOO PREPARED BY DATE CHEC~=---
DATE DOCUMENT TYPE CODED DD INC I NUC OPS FILE NO.
DATE ISSUED TO IS J, 'wH!TE 03/16/05 U/
,,;,,,4..
OTHER APPROVALS DATE 1B01
'-/ s-os APPROVED BY '?'C:.., ;&ic,// ~
A'~
DAT<
EDP POSTnfG ENTRIES REQUIRE n£E DRAWING NUMBER REV.
.?/4/4 ADDITJON OF THE ARMS STATUS CODE:
61721 2007 03 p
( /-7../
EITHER "AFC~ OR "ASB" I
8 I
7 I
6 I
5 I
4
~
I
?
I