ML21055A219

From kanterella
Jump to navigation Jump to search
3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D
ML21055A219
Person / Time
Site: Fermi, 07200071  DTE Energy icon.png
Issue date: 02/02/2021
From:
DTE Electric Company
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21055A091 List: ... further results
References
NRC-21-0002
Download: ML21055A219 (1)


Text

8 7 6 5 4 3 2 1 01'TJ,JARIIO H H KEY PLAN G G CONTROL CENTER AIR CONDITIONING UNIT it.TURBINE WATER F CHILLER JcRANE BRIDGE F MOTOR GENERATOR SET FIFTH FLOOR EL.684~6"

---=

,,-.MOTOR GENERATOR SET OIL COOLERS I EL. 655'-6" FOURTH FLOOR OMPUTER EL.659,:_6 "

ROOM EL. 643 - 6" ---

~§'§§p~-\:---1 coNTROL1 E D ~

+

~...:::...-,::;._ILI.-----<=f===!- -J==='F~~+---"--"'----1---....! crs:-'RrOO~M~

THIRD Fl-.OOR EL.641~6' E

-I

~-

REACTOR EECv/ HX 0 I

'- SECOND FLOOR

- --- EL.613i..6 11 EL. 603'-6" STEAM I

TUNNEL FIRST FLOOR 1'-1--/ I ==='--

EL.583:6 1' D D BASEMENT I ' EL.562~0" TORUS rORUS J-----=

__,_____ __ ~- -------1-+:---------t----+-----'------=l.j__------1--'

-+-EL. 551~0* -,-

DRYWELL SUB- BAS 1 EMENT EL.540-0" C CONTROL AIR SYSTEM A C EQUIPMENT SECTION D-0 6A721-2411 LATEST REVISION I

B B NON-NUCLEAR SAFETY RELATED THIS IS AN AUTOCAD PRODUCED DRAWING.

CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.

1HTS DRAWING WAS REFORMA'ITED BY AUTOCAD AT REVISION "H". ALL INC.CODE Detroit Edison Fermi 2 I DCD'S INCORPORATED, PREVIOUS APPROVAL SIGNATURES ARE ON FITE ON MICROFILM IN DOCUMENT CONTROL.

PREPARED BY u

DATE TITLE FIRE PROTECTION EVALUATION REACTOR AND AUXILIARY BUILDINGS A PORTION OF THIS DRAWING IS AFFECTED BY TBE FOLLOWlNG:

EDP-30530.B028, REV. ¢ SECTION D-D TC CH.ANGE DOCUYENT CHECKED BY DATE A lOTHER

- - -REVISIONS:

- - - - - - - - - - - - + - - - + - - - - - - - - ~ = ~ - - - - t - ~ " ' APERTURE - - - -CARD i fTITLE


1A FIRE PROT EVAL RB BLDG SECTION APPROVED BY D T PLANT IDENTIFICATION SYSTEM NUMBER ARMS Rl!:CIPIENT #

y TBOOO & TOOOO PREPARED BY DATE T. RIFFNER 01/10/05 OTHBR APPROV APPROVED BY EDP POSTING ENTRIES REQUIRE TBE REV.

ADDITlON OF THE .ARMS ST.A.TVS CODE: DRAWING NUMBER A,J. G.,~e,lc. EITHER "AFC" OR "ASB" 6A721-2411 I 8 7 6 5 4 3 2 1