|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562'-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 7 6 5 4 3 2 1
~ Uz f-
\WASTE 5UR6E OR WASTE. SAMPLE TANK A009 FAILURE.
~;l~ "'~ <! Z
~ ~c.::Ei u
o:::*
,..... \ WA5TE. SAMPLE. 'TANKS \WASTE. CLARIFIER TANK FAILURE.
s C<,- ....
Li...<J:1-- ~
H l
' Zwz >~
~_J::J n,
i--
0
\
\,
\004 A$B FAILURE..
SPEN', RESIN 1ANK FAILURE. H t
O::::Ldu 0
~
- t:c:;, ii'.
t.:l,;:
VENT VEN1' VENT VENT r I i VENT
'~ )$._ 1. ' VENT VENl 0
CXll.UD
~t12_1 I. -
l*..i-I
~~-----*-~---*-~* ,,,_ --
CE.NTRI FUGE.
FEED TANK CONDENSATE.
PHASE WASTE SL\RGE TANK WASTE. COLLEc1*0R TANK CHEMICAL WASTE TANK FLOOR DRAll'._I COLLECTOR TANK WASTE CLARIFIER I
1l;i_ __,..
G1105A032 1l;i'-4, SEf>J-.\R/'\10R G1101D040A 2*~ l GllO:AOOS *-
2_,.. ,i,-c."
GIIOIA002 .,
2"" d,-2" G1101A023 2'__..il)
G1!01A006
- t~
TANK G!101A022 L-------:-;------l '----------------~
THIRD FLOOR EL.<o43'-G,"
r i 11,t
_...., UJ
~
V Z Cf)
~ ~~
VR3 VR?, VR3
~ ...,. - I- :::.::
z co 151
- ,o Iii\
"' --'c
~
~
t> ~
"" ~ ,
<( V'l 0:: §f :<( -w-a > r' <C 2010
<[gj . z z:o 1-u
)
~ ¥--~ - 0::: 2 tj- .r .f_
~
LU
~
VR2 VR g lli ii:
2:;;;w -
°"Li....r.=H--::i Cl<
c" ~ 0 0:: ::> 0 G l
~ ~ 2 2004.
I 1
cc: u.. a
~ 'I VR:, i:"------1> VR:i 2"-< ii s'. 2 ° G v,
Z<e
~z "'
14 2
r,;v, ,%17
.___ :1/418 ,3016 '$.
~<t-i:- <(
tl:i (f)
<(
\
~ - l'.J O <( ::,
- I I sJ
<[o>- 0 "" .,.
0:::'.01- ....J a"' .._
- c ,--.. '
Q~
ru~-
LL, o<r: '-s. -s. X ,......,,,,.1 ~ I- +
i 1-1
=q- (\J uJ G1118C07J . Glll5C072
">> I G1105C071 Jt .t-i' lr-i:: " I- 2."
Gl102C035A G1102C035C 1I G1102C035E G1102C035D Yr":1102co3sB I \ I\ r\ I\ /\.
SUMP
>- SECOND FLOOR " ' I I 5LllVIP I I SUMP SUMP SUMP SUMP SUMP SUMP GllOl D021 ix: 0:::
uJ llJ z0 MEZZANINE Gll01ilC22 G,101D023 G1101D024 (illOJ!JO?S t-z EL.c,,28'-c;, SPENT RE.SIN CONCENTRATES FEED CEt'-ITRIFLlGE FEED EVAPORATOR FEED SURGE TANK, WA.STE SAMPLE l"ANK5 4 WASTE. CLARIFIER TANK 4c
~o - .J CHEMICAL WASTE EAST ,t WEST CONDEN';;;,Al'E.
a'.l I-- ~ I!.! V)
SLURRY FEED TANK ROOM TANK ROOM FLOOR DRAIN COLLECTOR TANKt WA.'2,TE. SURGE TANK ROOM SPENT RESIN TANK ROOM TANK ROOM Fl I- z -z TANK ROOM PHASE SEPARATOR TANK ROC>M
~n oz zz u..t :'.)
.<(
WA5l"E CDLLECTOR TANK ROOM F 0:::
a:: 0 2 LL Cl u.. u z
- i
~
EMERGENCY TANK FAILUR
E. PROCEDURE
~ tr O:::s:
<( - 1-- 0 0 BASEMENT 0:: <( If) 0 .J
~~ A3 ..,.
LL
,st' REFER TO DWG. M-2031 1 SUMP PUMP DIA6RAM
- +8
_, n::
'$. 0 al 'iiT
- '(Y] <:.:,I l ,i/ ,+
~*
REFERENCE DRAWINGS:
M-2028 THRU 2033 & 2040 SUMP,
- PROCESS $SYSTE.WI DIAGRAMS RADWASTE. SYSTEM M-2259 FLOOR DRAINS- PIPE TUNNEL EL. S<o4'-o" BETWEEN COL'S. 12.-10? ELECT. MAN.HOLE.
SECOND ELOOR SUMP PUMP DISCHAR6E..
I EL. C,f3'-G," M-2287 FLOOR .t FIXTURE. DRAINS- ME.DICAL DECON. ROOM-El v'l z z 0 FIRST FLOOR R/\DW/\STE BLDC,. *
~ - ..J fJ1 lf)
M-2547 FLOOR~EQUIPMENT DRAINS- PLAN, BA5EME.NTI
\JI
-z
<(
0 I-
!;i:
i--: z zZ uJ z
~ -<Cz FIRST FLOOR- RADWASTE. BLD6, . '
0::
zUJ w::, ls M-2548 FLOOR tfQUIPMENT DRA.IN5-PLAr--.l,FIR5T FLOOR
~
0 2 LL MEZZANll'll;:- RAOWASTE BLDC,. *,
'2 z (l:: ix:
a:: 0.. ::J M-2549 8 :5 QI 0:::
I;:; 0 s: 0 0
...J 0
0
_J FLOOR f' EQUIPMENT DRAINS- PLAN, SECOND FLO.OR
~SECOND FLOOR MEZZAi\llNE-RADWASTE. BLDG.
..J w u.. LL.
....IL za ...... M-2550 FLOW DIAGRAM OF EQUIPMtNT DRI\INS
..... "G,.
~~-I
" "<r <t
"-.t- (f) in IN THE RADWASTE BLD6.
ti]' , Cf)' 2' z
- M-2585 FLOOR¢ EQUIPMENT DRAINS- SECTIONS, l l l l l U'I z
~
a::
uJ1 30 M-4811-1 M-5270-1 RADWASTE BL06.
MISC. DRAINS 10 FLOOR DRAlll COLLECTOR 1;'1,NK DRAIN FROM ON-SITE STORA6E. BLD'1. TO FLOOR DRAIN COLLECTOR TANK
~
<( 00 u.J Cl:'. :t: a::
FIRST FLOOR ME.ZZANIN!;. 0
,,.... t:1/1 CJ M-5404 FLOW DIA<a,RAM. OF .FLOOR DRAINS D EL loO l'- (i," ,,..,,. :t ..,,_z ll'l D
I <1l1 N/1 (fl z
<( zO i' zz
.J UJ
- J z Z1
-o
.ci::o
..I UJ z
z
- '.) zO
-0::.
~
0
..J w
2 z z!
r-z-
z It'. z
-~ z
..J t,J z ix:UJ z 4 ~,..-,,.-
~*
z- 0:::4:
(/} !ll z-
~
<(
..J
(/)
6~
2a
!a
- t:
z-0
~~--
er 2
- S-2047 & 2048 S-2051 1.N Tl-IE. RADWASTE. BLD6. (SHEET 2)
DETAIL FLOOR DRAIN SUMP LINER IN BASEMENT OF RADWASTE BLDG.
~~ -o 0::: -z DETAIL SUMP LINERS ... , THRU ....S IN Cl U
-0 a:: IJ.. ~ IJ.. ::J <( '...J ,..... :::> <( 0 OJ 0 ....
' Cl 3' a:: 0:: 0:::
~ "'
a:
oc <( a:-:zU. <( 0:: J-
~ Cl:'.3
<fl rr.: ~
o
~
l1.. BASE.ME.NT OF RADWA'S,'TE BLD6, irugJru w2~
ll::
a::
0:::
a a:: C Cl
~ Q a:: a:. ol!..03" o _.go IJ) 0::
0:r: lL. ro UJ z
-a: 11:'.~ z- 0 8~z I
,Q
,._, g 0
u.
a:: r.
0 :...J o- ,t a::
0 0
0~
ow
~
11:'. ~
a oCl uJ z a:: w o.'::i o-er g
0 O:oo:::z 0 O 0 o..
-' 0 z* -a:
< ~0 ~~8 Ir ,.J ov _.....
0 "'
0 a.
_J LL :r 2
4..
UI
<(
-:(:_
~
..J l.C 0 ~ - rviB\
-I u.. ..J a ..J u. Z ti Gll01C005A
'El. LI. . Cl ..J
- u. u. . ...J
- u. u
_J
...J > Cl
- ..J_J-...J ..J -
IL :,Z 0::: ix: _'S. \J _311lsJ ~
-s.o 0 LL u.. l1.. LL IJJ ~ I.I.. -'<I'<( 00 CJ -'<I'~
<I- -s.. 'El. 'El- Cl -s.. ~ -e. w u:i "' -,,. ::J LI.I .... '$..uJ _.... r- 'ti,.
-Q._
2a e6 Af'-" ('
~r/~ ,r
.!::!, ",t ~~
=(l') st___, -(() ~<T 'st o, *,_;i IJJ "s;I"
,i/ ,J;'- ,+ ,i/~ ,l 0 2.Vi' --0,....~~-, I !ti' j/ +/ +
/7".~;:;-;;:----7 2"
!/ l ,J/ ,+/
- 0 l r----------tj~...,.....,---t..:l+-r"'V'~ G-t,4--CJ--~..!:M:-_2~0:3_2"'".: : : : : : ~ ~ - ~ - -
4 C ** f',
..... I\(,i' C FIRST FLOOR EL. 5S3'*G, 4",¢ DRAIN L I N E - - - - - - - - - - - - - .
~ e,
- tit"'
y ~ * ~
~( rj <M-2032 ( f2" t I' NOTES.: -
FROl,,A RE.ACTOR BLD6.
SEE DWG. M-2224
- --4---0------'1'-----------------*-***~~---*-*JL_
VENT
~--------~~---------~
VENT ~
~ - ') G1101C005B , i I .t. VE.NT (I) FOR SYMBOLS ~ ABBREVIATIONS SEE DW6'S. M-2000 i 2001.
FOR FLDW DIA6RAM (2.) NOMENCLATURE CLASSl Fl CATION FLOOR DRAIN COLLE.CTOR 'TANK WASTE COLLECTOR. FLOOR DRAIN FQR EQUIPME.NT- GIIQI G'.101'\00G TANK- SUMP (3)THI$ SYSTEM QUALITY LEVEL 3 G1101Aoo2 G110JD028 I 6M?21-2551 LATEST REVISION BAS.fJ\/lENT BASEMENT BASEtAE.NT SEE DE';;;,IC.N INSTRUCTION NO. 24 I
EL. 557'- Co" QUALITY ASSUR,"'-.NCE LEVEL 1II SE.ISMIC CLASS TI E E NON-NUCLEAR SAFETY RELATED THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS DRAWJNG WAS REFORMATTED BY MlCROSTATION AT REvr5ION "H". ALL INC.CODE Detroit Edison Fermi 2 PREVIOUS APPROVAL SIGNATURES ARE 'rl'l'Llll ON FILE ON MICROFILM IN DOCUMENT CONTROL. T FLOW DIAGRAM OF'
!JDCD'S INCORPORATED, A PORTION OF THIS DRA'WlNG PREPARED BY DATE FLOOR DRAINS IN THE IS Af'f'ECTED BY THE FOLLOWING:
EDP-37378.BOC9, REV. ¢ RADWASTE BUILDING (SHEET 1)
TC CHANGE DOCUME.t."'l' A OTHER REVISIONS, CHECKED. BY DATE I APERTURE CARD TITLE: IA AI:'J'.RQ ','11;:0 ]3Y ON
.ELQW DIAG FLOOR DR RAD BLDG PLANT IDENTIFICATION SYSTEM NUYEER ARMS RECIPIENT#
V4500 PREPARED BY IDAtt******************1*ca~k-- ,I DATE DOCUMENT TYPE CODE DD M INUC OPS FILE NO. DATE ISSUED TO JS A. LE\./ALLEN 5-25-16 I),,,,,,,, V..AJ,;;..1.U,,,.L <~/11,,
EDP POSTJNG ENTR!ES REQUJRE ntt:
OTHER APPROVALS OtU:_E D EC 1sa1 s--?s-Jl 6 M7 21- 25 51 DATE
~ V E D BY ..:Jc,(//.J ,<,/a.5'G$ _1,;d!- ADDrI10N OF THE ARY$ STATUS CODE, REV.
&-t ;f;;IJ~,,_, ,foc<,:- ¥?;,-0,:z e
- 715/.-f t?'u;.c Vfl W* .
IS~s!tii EITHER AFC" OR "A.SB" DRAWING NUMBER I
I 8 I 7 I 6 I 5 I 4 ' 8
~ 1 1