|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684 - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
{{#Wiki_filter:H G
F E
D C
B A
8 SEALED~
SENSOR CTYP) 12' VACUUM BRKR MD N6101 F601 l
L.P. TURBINE NORTH i
l------f PT r-----
7 REFlOg,?j_
CT
{ L469 A
b ' '
TE\\./
N453 A
(1-2336-06 (B-8)
N61 L411 N6101F601 AT N61 N6100F615 L412 (I-2336-06 <B-6) r I~
c::::JF hT b '
13711 7TEV' N30 N556 A
J 61,'T-N61-7637-1 I N6100F612 I TYP (12)
PLACES EEL ICFD 168 I CV)
F~
(V) l F285A HEATER N.2 NORTH PL T !DENT ND, N2003B006 (D)
(V)
F284A
.,.--__,/
F~A TE\\J b 18*
N452 A
I
~ ---
@TT (Vl
~ (Vl L472
/
F2~
I Fl73A A
(V)
HEATER PL T IDENT N.1 NORTH ND. N2003B003 F282A 3/4 1
b R
- =i=:
TE\\J N30 N556 C
EEL ICFD 168 y,
~
0..
0..
X X
_J
_J z
w
(\\J f--
f--
I I
~~
~I I~
I 71/
ID ID 0
0 0
0
\\._
HTR 2N LXP'S F313A 7 ru IM-2005-1 (C-6>h
~ ~
6'
&~TE\\J LT N61 '(SPARE>
N465 1 A
'---i:1='--
1 -IMIIII (D) i 1'
3540 1' l' F171A L1!.'.*_,;J-"'~c-1 FLOOR 131~0 I 18' y DRAIN
'M-2004-1 (D8) I 0- (6l DUMP STEAM INLETS Q N 61 ~)
.L055~1-C,----------------------------7 v
6 L.P, TURBINE CENTER
~
l31i°sl 18' L..'.:
L_
(VJ 5
b REF 10 &ffi.
CT TE\\J L\\69 013 L,P, TURBINE SOUTH v
r-----
~
12' VAC.
BRKR.
N6101F602 a,
C, --
I..
0 0 ru I
liSi'L A
~..
w --
I..
0 0 ru I,: - 16' 1
L£2.
10*
4*
V
\\.__
18' 18' Dio7
/\\
~
rn.,...--
i==J Q
F629 i-==--=::------j TE\\.J F286 ~
Fb28
'=~
N453 TE\\J (V)
CT C
I 30' N30 !------
L469 }-- 1 N556 CV)
C REF, 10 8. 71 E
EEL Fl 75C F2SSC I
F~
(Vl ICFD,,_~-------~---j I
168 1------1 CV)
HEATER N.2 CENTER PL T !DENT ND, N2003B007
~
285B (V) 4B u
IA HEATER N,2 SOUTH F284C PL T !DENT ND, N2003B008 ~ A
,b
~
Fl74B TE\\./
(Y)
N452 B
(V) 18"' ~===~;;.--""'~~ MTT (V)
L472 F283B
,-...L-Fl 73B B
(D)
F282B (V)
IR
.:i=-
/
F283C HEATER N,1 SOUTH (D)
TE'w' F1?4C N452 C
MTT L472) 18' (V)
C F173C L
'"""' (V)
F282C IR
-l-4
_ l31lsl HEATER N.1 CENTER PL T IDENT ND, N2003B004 3;4~
HTR 2S LXP'S F313B l
M-2005-1 (C2) I PL T IDENT ND, N2003B005
- 314, F313C M-2004-1 (CS)
""' (D)
£lLl]_
M-2005-1 CB4)
-Mrn>
18' Fl 71C HTR lS LXP'S S-2005-1 <B2)1 0
1' CONDENSER PUMP TRIP 1Q*
131 1
191 0
1 HTR lC LXP'S M-2004-1 (F8)
(SPA RD i
0 0
1---------------------------,
TE\\./
N61 N465 B
f---
I 3110 10' 8'
6N V
r-,.
4' V
M-2004-1 ff8) 1321081 L *I
'-!/ EQUIP I DRAIN 6wM-N20-5852-lf-1/4' F439 I
,v -"'
I w -
CJ :,
I f--
'v 3
P9000 ATMOS.iP9000 16 \\JM N20-5852-ll 1/4' Ir F014 F015 I
_IA In
~~~
~
I 114*
1 1,,
R402 1/4'
~
PCV' 3/8' P90 s;-cM-;-_--;2c;;O-;c13c---;(c;-A--6;c))---IDl(J--c--1Xi-"
F404 HYDROGEN \\JATER PF9o1~0 CHEMISTRY r'CV P90 F405.
(D)
8'
__L 4' (Vl
- J F222
/
LIQUID OXYGEN TANK
[32181 2
,,~ ~
I PCV P90 v4o3
@ zxv RBOS N430 GAS OXYGEN TANK r'
~
\\N4-32)
/
1 NOTES L ALL FLD\\./S AND VELOCITIES SHD\\JN \\./ITH THE EXCEPTION OF PUMP BY PASSES ARE AT 105% w'ARRANTED REACTOR LOAD.
- 2. DELETED 3, c::::J DESIGNATES ISOMETRIC PIPING DRA\\./ING ND. PREFIX TD ALL ISOMETRIC DRA\\JING N.S IS 6M721--c=J
- 4. ALL PIPING AND EQUIPMENT IS QA LEVEL II, SIESMIC U 5, VENT Sc DRAIN VAL VE NO.S TYPICAL FDR EACH DRAIN COOLER UNIT.
- 6. FDR SYSTEM FUNCTIONAL PERA TING SKETCH SEE D\\JG, M-5714-1 7, UNLESS OTHED\\.JISE SHD\\JN1 ALL INSTRUMENT PIS NUMBERS ARE PREFIXED N20 ALL VALVE & EQUIPMENT PIS NUMBERS ARE 0 REFIXED SYSTEM N20
REFERENCES:
- 1. SEAL \\./ATER CLG SYSTEM 2, C ND, STORAGE DJAG.
3, POL, DEM, SYS DIAG, 4, FEED\\JATER DIAG.
5, IR D\\JG
- 6. MAIN STM, & REHEAT STM. DIAG, 7, DIAG. OF TURB, BLDG. SAMPLES 8, MOTOR CONT. LOGIC DIAGRAM
- 9. CV SYS. DIAG, 10, PLANT SAMPLING
- 11. GEN, SER. SYS DIAG.
DLB654-34 M-2006 M-2011 &. 2011-1 M-2023 N4 242 RET M-2002 1-2400-03 1-2070-08 M-2007 1-2400-0L M-2010 501Xl<T2-57)
N2000 11-2336-06 (B-7) H N61-N466
\\
- ~ _______ J_
I I
I LT
t
~ (.=
L~ik
,,--_ABANDONED
___________________________ J !
L ____________________________ 1 ~~=----~~ LT
~---- -- ------7 1
"'"" ABANDONED,,-'""'
N6l
~~"--_l_J LT L
I 6\\JT-N61-7636-1 I 2
SEALED SENSORS (TYP.l
~
F217 t J
(D)
F216
<Vl I
F220 EMERG HOH/ELL SUPPLY LINE M-2006 (C-6) <
(D)
FC (D)
LP/E N61 K404 I
I LXP N61 N427
_L
',/\\JR
~
N61
.R809 LSE HI~
ii:_',-NS ~AO_~ _ _L__
LSE 1
N61 N803 A
LXP N61, I.
N~09/;
I LI~
N61 N406 C
I I
)
LIS N61 N405 C
31061 LSE IN PLACE LSE I
N~t~
N~i~
r _____________________________ j I'
16' L--'\\2" 0,
A A
I LT I
~
r N61 C--~F""----7 I
~
(_I) C L023 6\\JT-NGl-7637-1
- NORTH
____________________________.J I.. g NE NI../
7 CONDENSER r
R H TWELL 24 1
~
1../ IB
~E~*
r N401 ;---,
TE '--~
Ah A
N400 ~
LT A
A K
~
24' ru
(')
~
STRAINER TYPICAL SEE T2-57 N61 ffi j 6\\.JT-N61-7637-l I L056 CT REF, 10 I!-: 7 1
CT L474 A
REF.tog.7 l_______________________________
~lT IN~~E ~li L026 L~i~
__c :
N405.,,,-.
'-. N406 r-,
Q I
LXP LXP 1
B B
.,-""" \\.~~,
N61 N61
'--s======'=c--1 LT LIS LIS N410 N409 N61 J
r 1 \\
N61 N61 B
B 1
I 6~T-N61-7636-1 I 027
\\J ~-!)-WS7tt,-,--,-,
N405 N406 L---------------------------- --7
,1 6 D
D 3/4' 16' 1
SW LT I
F311 1
I(")
N61 1
I I
!al
- L058 I
I (V)
D)
V) r--.
L._
I I
M 1/4
,. F369 SOUTH x
~
-(,f,;6 ~
~'--V
.I.
FROM SAMPLE DRAIN CL TN, TANK P3301A001 k3, REF.10 ~ 7 3
-~
M I
~
I b
TEii 1---~
1
- CHEM, 1
F136 F135 F134 ~f-:
1 Nial I
CLEAN I
u_
~132 Hr L _______ c.9~~-------J
--'~
cm F131 TIE_
(D)
~
CT REP, 10, 7 6',/T-N61-7636-1 I LCP I
~
L474 F'-'>-'
_-,;L----H~-~;L---"'---"c_J N61
~
24'
[3io6l 24#
B KBDO 10' tstf'~
@ -+,;,,.,.1-A Lf3 24' r*
K403 j
~
30 1 1 112* I Q-2400-03 (B-3) I 7-'24 1
FCV F404 A
N61 N61
7 30' L~/
~P/c K\\02 K\\03
&-J 6'
13707'-I 3' F601 ~
-r' 30' MD 36' J3100 i I
36' LOOPc#
~
F602~ MD 30' 7
~THIS "T
DwG, <G-3) <
6\\JM-N20-5852-1 13100 I 36, rD F603 "\\
T30*
MO HI/\\_ __,
6" H~
t5~
I
PT PXP 3*
31 --7 PT PXP L401 N458 I
- --;
- :~~CJ' L401 N458 FSE A
A I -
B B
3' H~--
3 7 I
- EXP, J INTTI P.LS,#
N2001D020 1/2#
NOOl 11--~
..-,~
FSE pp /E J\\
N002 *~~
.,-t--J pp /E F092A K408 -~
c.:,._L;
-=le)
Ki?S l'
A L___fr'----~j-~_F[0;9'-'_2=B~~*;;5~;;::~--~
F300A 1'
~lE F093A '---¥-__J PIE
~ 300B F093B CONDENSER PUMP R800A CONDENSER PUMP L_,,,___
RSODB NORTH 1/3 SIZE CENTER 1/3 SIZE
[?@-,
I~
FSE I~
I N003 J:
130' 2
F092C,,
c)
I\\
" - 'J f-300C r1;93~ ---* I CONDENSER PUMP L-;)
SOUTH 1/3 SIZE i
PT L401 C
PXP PP/E &
N458 K408 K
C C
~
~
- 1'
~
N61 K406
,--,-----_J I
I I&
I I
I r------1 i
K
.....L
,--J LSE LSE I
I N61
,\\J61 I
1 N804 N803 L...---7 1----1
\\... B B
I I
- ~,
I HI I
I L
I I
03 LO u
N61
-~
DUAL
. \\ l.X2~
IAS' 1'-~
FCP I
KOSO
~@
CJ :,
,n "
"' :r:
I f--
°' w
"- z IA c'
~
F617
- J F130 (D)
MIN FLO\\./
RECIRC
~
~
I Q
~
I I
F618 ~
lO~LJ 16'
~
i,j
<C
°'
~
I-00 c,
I "
w f--
<C 0
0 z
W I
z C,
u 0
f--
w F218 C ND.
( LCV
~~~~~uf1/ 406 /
~---
L _____ F636 1 112/ M 2006 (D 4) (
zsv
~07
\\"7-0'-" N431 L_---~-~*~*'"'214u-ue 3~
4'
~
t~
(D)
FC (D)
F212 C ND, ~
NORMAL LCV MAKE-U F407
{iilj y
co bi zxv zxv l
~
N428 N427 F211 M--
v ru -
(')
1-----ic----i-.--------hs*
4'rn,
~
F203 1~;2;2 I 3/4N (D) I F209,z~
tF208 H TW'ELL SUPPLY LINE M-20Q6 (C-6) <
A
~
I "' --'
PL T, IDENT, ND.
PL T, IDENT, ND, N2001C020 N200~1C019 f-------1 PT PXE J\\
PT PXE &
CT L402 N403 -~
PL T, !DENT, ND.
N2001C018 PT PXE &
L402 N403 K
..v N6100F178
¢ 3/4
?-
v 0
0 ru
.,. 4" TO L p, EXHAU_ST SYSTEM SEE D\\JG, I -2336-06 CE-5)
CT C
C REF 10 & 7 CT
>-----< L402 N403 L463 B
B L463 r-----1 A
A K
3/4" REF. 10 & 7 B
L 463 1------1
~
A F097A 3101
~
F 60 4 L.__J lls*
1 1/2#
If 3/4' 1291401 GLAND SEAL \\JATER 310fl t F098A
,', F097B 18' F267 2* ~
6' F266 2'
- t F098B 3/4#1 REF. 10 B. 7 C
F097C 2' GLAND SEAL*
2' CAPPED 14'lf---
18' 131011
~
~t 2'
B~YE,E, TI-908
(} r I 31oi I 30*
f-"605 6'
1 1/2" l8'}-7c----~
F606 18' CONN JO~
n 20*
TE\\J N409 1 1/2_/\\ HI
,---~LO FE FT N410 L408 ANNUBAR 4"'
CODLING L--l'iiiJiU"j;-}-'=l~1~(V) 3101 0 3111 ru 14
PT L490 gx
~ '¢o_
~ rul:l
_ 3480 GPM
~
1 14' 20' r---..
F119
~
PT L~r4,-:--
120' M
'er '
14u
~~~f t @
- :lo~
L407 REF 10 e. 1
°.H 2
273
<D> 3200 GP
<v, n17 L413 PDI F
%+f *--
RBOl PDJS\\_
N488 1291 401 2' GLAND SEAL _/
TD H TWELL SUPPLY
~,~PUMP DISCHARGE
~ SEE M-2006 (D-3) 4*
$::ro54
~
(')
WI zw rl -
_J
(')
-' ru
_J 0 ru q,:
_J 0
C, u:, "
0 W
c-w u"
<C w.
a:::,3
~
16'
~
r210i 7' [Mo
- F620, CT J~
z Q_
_J u
C LCV F 401
_J "-
i=i i !::!
ZQC_J DOW uz"'
8' I
I 3*
u
<DJ z F201 M--
g 4..
f: ¢ ZF199 8'
13126)--
LCV~~
F402 Le i:;;i D:'. !::!
ZW-1
>CW uw"'
~t ZF206 314* I.rn:
~F205 REF, 10 8. 7
. (')
,: I
- , C, i-' -
0 oo z'
°',:
=,
I-C, w:,
OC,P P9000 4245 1--002 2'
1/4' F278
,301 HYDROGEN PEROXIDE INJECTION PUMP
~DOOCOOl 1/8'~
FTH LOSO r1
)0 I() i"2 0-
'<~
I 1-0.. us, Le I w
D f-- w z r:l VI'--
/\\NNUBAR FT L052 FE N070 I
]AS 1-zH FY -r K051 CT L466
~l-e':
8'
_,_ ---l- -
L FTL LOS!
L'
!AS
/
r----------------------------------- --------------------,
6' -
L_::=::::::-__ ________ ~--r--
I"," I "':Jc:]:"'"'"" """' u~
@fl f 113frn, I '",
~:';
FE/P
_ _J 1 114 1 01 K400 10' 10' 12..
14~
~
14' 18' 24' 131131 131221 T
31221 1 131 1
271 7
SEE REF 7 &. lO FCIR SAMPLING &. CONTROL PEROXIDE FEED.
1 I
I I
I I
~---~-L__--**----~
I 132371 "227B
~F609 F227A F611 ~ ~
V"'J F229B 3/4 1
F228B
-M (Vl I
tp1
~8A (V)
F229A 3/4" IR_
F230B 1'
!--JIii (D)
L2'
~
1' F230A 12'f--M (D)
I I
I I
I I
I I
I I
I I
I
- ANNUBAR I
I I
I I
I I
FE N411 6'
FlO!Az tF1 2A
[@---
rl
(')
3/4"1 J:r j FTT F103A U' L503 6'
131111 '-.J
' 6' Fl01B t F1 2B FlOlC s
3;4*
F103B~
r103cffe I
i 6..
==-101D
"Mo r11*
H-4, (D)
F613 N468
",,@xv 20*1
/
FT ZIV MD F614 I [ MD i
Fl20' : F607 cj Xii--,. I i,,,,---..._
F115t l_
FCV I F403 zxv N425r-7 F116
~
-M<D>
~
v---
TE\\J N472
- ,TT N20 L497 l,
F252 L409 FE FT FE FT FE FT R825 ANNUBAR ANNUBAR ANNUBAR I @
N412 L410 N413 L411 N414 L412 L--------
I I
0 ru z 0..
D
_J
~
v I @
f y
2 fl
~
~
30N I 12 1 '.J I
-.J 112*
~
12'
! 12'
~
]12v 12' 12' c---1 ---
~--,
12*
I,- / - ----r;~-i -------- -----------------7 II I
1
, ', ri K00 4 f--------- -------1 I&C REF,3)
F016H FOlSH F016G FOlSG F016F F015F F016E F015E i:-016D F015D FD16C F015C F016B F015B F016A F015A I
( { 01~ ) : L:~_..... -:'_j 20*
I 1,.
1 6
1~
t*
1' 1"
11 1'
_J
\\._..,-_,;I ll/2 I
Ir -- ------ ---~ -- ------ -------- ---------~--*-
1- :
F051~x7
~,7 r-o---1l 1&c LOOP N20-3 I POLISHING DEMINERAL PL T. !DENT, N2002D015 POLISHING DEMINERAL PL T, !DENT.
N2002D012 I
POLISHING DEMINERAL PL T, !DENT, N2002D011
? LISHING DEMINERAL PL T. !DENT.
N2002D010 POLISHING DEMINERAL PL T, IDENT,
- \\12002]009 POLISHING DEMINERAL PL T. !DENT.
N2002DOOB I
J052
~-
,~ : _J_,~
i I/ PDX lJ / PDIC\\11
-1 POLISHING POLISHING
\\ NOll ;I
\\ KS40 I G' 7 I
DEMINERAL DEMINERAL L~_J le I
PLT, IDENT.
PL T, IDENT, 1
]
1-i
\\J v7ci
,---, FDR INSTRUMENTATION i N2002D007 N2002D006 i
r-1""": 7 fl AW.:
I SEE M-2011 Be 2011-1 I
I l-iJ25\\IY
\\
/
'-\\
I IL __ ~ / zsv )
'-... I PDCV I "/.+/
I I
I I
I I
I I
I I
I PDS N20 N553 B
y FF-GAS CONDENSER PL T. IDENT.
N6200B004 PDS N20 N553 A
y FF-GAS CONDENSER PL T, IDENT, N6200B003 I
I I
I I
I I
I
[sToj rn°' -----"' -----"' ----- °' -----7
(.-')._:
vi,...:
(./Ji--:
VJ._:
AZ:"<t Oz(\\J AzM i=lz.....a Zwo Zwo zwo Zwo 8A@
gi::::ig gi=ig gi::::i§:
4 -1/4 STEAM I
GLAND STM COND PL T IDENT, N3013B021
~
PTT N20 L498 u.,
'-'='-
I I
I I
_J_ k
/
' j I /,,,.--
~ Lh,--
I
_c_--------~-,
~,\\t::~o/ :::zle~')
\\~~~o/
<C
-.., DA
,7
._-7 I
F034E
"'T 1 /
\\ ; \\
- i:: F047.:..X..:,.
,:_~F048 1 I F033H F034H F033G F034G F033F F034F F033 F033D F034D F033C F034C F033B F034B F033A 2
I : tl2~ I,:'Cl!~\\ /--,,,,' ', r-I I 6 M7 21 2 00 4 1*
t*
11 1 CT \\
11 1'
1#
LL I
\\
/I ZIV JI-( ZYE )
11/21 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I (D) 112*
F231B M--
F233B f--t-4 (V)
'------l):(l----~F232B F234Bt
'MD L_,' F610 Ir (D)
I 12' F231A M,-
f:233A I
V"'J I
I I
I I
F234A:t :
I I
I I
I I
~
~ F612 F232A
~
(V)
I I
I L----------------------+-------------------------
I I
I
_______ J FDR INSTRUMENTATION SEE M-2017-1
~
1!J Mfil 12'
>-<.-I
('.t::
_ D Cl:::
_ O 0::
11 r1--::o wl--::o wl---::o L.JI--~
j
~~i[~------ ~i[Z
~i[Z ------ ~i[Z ____ \\::_
6' I 6' I 6'
- 6' SEE D\\JG
~
H-201 7 -1 00--
F105Az:
ino6A nosBZ cu
- I-C 3/4" 6'
'ru
- C-c" 3/41 F1 6B nose$
.F106C F105D$: t F106D 3/4" 10'
[ID-
~
12' 3/4'1 r;;;i' lill1 i4' A
~
20*
~
20*
(D) 31,021 :123 :-
F253
&--@ 14'1 Fl21*
~F608 11/4' F122' <V)
~
FXE N433 g
q' r--{ ~4~0~ f---~
I GI ( FTL \\--
\\ l.4i6;,,------- L415 FE N444/,,---,
1 J
1--~
r~
11 I
I '+-""
II R604
\\ K407 20,.
I 1.. \\ L025 1 1 I
'\\.., __,,/ ',
.,/
1 LATEST REVISION 10*..-,
110*
,-1
,10*
10*
'7-""
10*
r--,
10#
r--.
10*
10*
I L_ __________ -;_" ___ _::-~--- ----7 1
II I
I I
I j3L29I I
I C LCAT~ IN PANEL H21P25~
~
.~
L6 131281 18 1'1 24' 6'
30' FROM T.\\./,M.S, r3129 24' i.-
20' BC REF. 10 &/4 7
CCTT L465 /
K 1*0921 13102>--
Dw'G, M-4100 (G-3)
LOCATE ON CTL PANEL THIS DRAwING SHOULD BE USED wITH M-2004-1 wHICH wAS INITIATED AS NON-NUCLEAR SAFETY RELATED
~
12' f3213§
'-J
'-J J:F107 (Vl
-1,_ 14' FTH L418 FTL
\\ L4L7
~/
_1_ ~
30*
_, i I
I 0£fil I
IF124
~
30' I
PT PXE rn, r-
. L439 N442 K
~
I I I 21.200 GPM/U i2.4ocp, I
I A RESULT F REDRAw AT REV AB, THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
BCIDCD'S INCORPORATED:
RlD-81900, REV, ~
THIS DRAWING WAS REFORMATTED BY MICROSTATION AT REVISION "AX'. AIL PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MiCROFILM IN DOCUMENT CONTROL.
A PORTION OF THIS DRAWING IS AFFECTED BY THE FOLLOWING:
PREPARED BY INC.CODE T
DATE TC CHANGE DOCUMENT CHECKED BY DATE TCTLE Detroit Edison Fermi 2 DIAGRAM CONDENSATE SYSTEM H
G F
E D
C B
OTHER REVISIONS:
A APERTURE CARO TITLE REVISI NS MADE PER CARD 20-26861 DIAGRAM CONDENSATE SYSTEM LISTED DCD FDR A CHANGE THAT Ii/AS PREVIOUSL y INCORPORATED APPROVED BY DATE PLANT IDENTIP'l'CATION SYSTEld NUMBER I
ARMS RECIPIENT#
N2000,N2002,N3013 N6100 N6101 N6200 DATE I C~ECKED BY DATE DOCUMENT TYPE CODE NUC OPS FILE NO.
DATE TSUfD TO IS 7-31 20
/ I 1
i-1-io OTHER APPROVAI.S DATE DDDMEC 1601
~ri:f,7,0o PREPARED BY ZACH VILLERS I
M. h lM L **1*
/
I ADD1T!ON OF THE ARMS STATUS CODE, 6 M7 21 2 0 0 4 BC
~~ c aue_--:.'"
Yi J
EITHER HAFc OR "ASE"'
I APPROVED BY
~ -
r I' DATE EDP POSTING ENTRIES REQ1JIRE THE DRAWING NUMBER REV.
8 7
6 5
4
?
1}}