MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562'-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
I 8 7 6 5 4 3 2 1
-1 I
INSTRUMENT IDENTIFICATION LETTERS M-2511 F[RST LETTER SUCCEEDING LETTERS M-2611 SYSTEM NUMBERING PROCESS FLUID
,<' ITziv7 '~rSJ READOUT
~ K~]- X MEASURED OR
~r-e~
HI 2 11 1097 ,6 , {005~ ~ 8' '9~ ~11_ , "* ..l"'.J ral~ ,K~*- a~,..
,e,,
INITIATING VARIABLE MODIFIER R
PASS[VE FUNCTION OUTPUT FUNCTION MODIFIER 100 - [99 200 - 299 IlIB TANK SKIIl LOW RAD EVAPORATOR SKID 1 MAIN PROCESS 2 [RESERVEIJJ I IH
~ fu~- ~"' , 3 BACKWASH/SLUICE/TRANSFER 11 V Tl 'l vrAH\J 0 A ANALYSIS ANALOG ALARM 300 - 399 HIGH RAD EVAPORATOR SKID 6 1109 . ._110911 r-.1109A I'
~
1~@1 11U1<N._", t LAMt., 400 - 499 PIB TANK SKID 4 [RESERVED]
~
USER'S USER'S USER'S
~
B COMBUSTIDN 9 ~ - 11 VT!\ nAH> ~ ~ ~
USER'S CHOJCE <TYPICALLY CH ICE CHDICE CHDICE 500 - 599 CARBON BED RACK '5 VENT /DRiUN I' 6JJO - 699 ZIY 1091
/r, 1091
@--c.E_ ,_
3 1108 * ~
11 Tl
~110on 1AH ~'~
09,. 1098 C CONDUCTIVITY-ELECTRICAL USER'S CI-I.JICE <TYPICALLYy DIFFERENTIAL DETECTION CONTROL CLOSED 700 - 799 UV SKID MIXED BED RACK 6 CONDENSATE 7 SERVICE ArR D DENSITY R SPECir[C GRAVIT DIVERT
~-~
~ 1107 1107 800 - 899 SAMPLE BATCH TANK SKID
~ ITT#I-11 6 SENSOR 8 INSTRLMENT AIR 9 109 0
- 1 99 E VOLTAGE <PRIMARY ELEMENT> 900 - 999 [RESERVED]
9 AUXILARY
~
~~ ~ -~ RATIO 9
11 1091 '"'- r{~~~KA Tl TAH>
io 'Tua F G
FLO\/
USER'S CHOICE OR GUAGitt3
<f"RACTION)
GLASS VIE\JING 0 [RESERVEDl
~ ~-
11 G1122B006A 11 G1122B006B (DIMENSIONAL) DEVICE 4 1090 1106 110t; 110011 ~/~-
G1122B007A G1122B007B1 I I H HAND HIGH
~ ~
MATERIALS
~ Mi~
11 Tl TAH G1122BOD8A G1122B008B 9 1026 ~ f\110: 1105 1 ,' 1102 I INPUT INDICATE CSP CARBON STEEL PIPE
~'~
(311228009A WASTE DRUM G11226009B WASTE DRUM
~~ 7ii' 11 11 ITAH j POWER SCAN CPP CPVC PIPE 09 1025 G1122B010A 55GAL I 1104 io' 113 G1122B0108 56GAL (DOT 17-H) ~ 1104 (DOT 17-H) TIME, TIME TIME RATE or CONTROL H HOSE G1122B011A K G1122B011B SCHEDULE CHANGE STATION SSP STAINLESS: STEEL
- I I ~~!~!f-
~'~
02' 002A I I e,>
'7n G1122B012A G11228012B L LEVEL LEAK LIGHT L ~
G G1122 C002A J_ G1122B013A
..JQ2B G1122 C002B G1122B0138 M
USER?$ CHOICE <TYPICALLY M ISTURE OR HUMIDITY)
MOMENTARY MIDDLE, INTERMEDIATE SST PPT STAIN...ESS: STEEL TUBE POLYPRCPYLENE TUBE I IG G11228014A 101 101~ 1012'1 (3112280148 PEI P LYPR PYLEI-£ TUBE MC USER'S USER'S USER'S N USER'S CHDICE 02 CHOICE CHOICE CH rCE 11 Tl' AH ll TRANSFER CART ~ 1011 1011 TRANSFER CART 0 OUTPUT DRIF"JCE, RESTRICT!DN OPEN I MOVEMENT I I "11"' Tl TAH MOVEMENT p PRESSURE, POINT ,<TEST> LlNE NUMBER
~~
VACUUM c Nt-ECTI N 100, <NOT REQ'D FOR INST, AIR)
G1122H001A G1122H0018
____Jrr~
X-AXIS QUANTITY OR X-AXIS Q INTEGRATE, n ....I. I .,-.__ HEAT DUTY T TAUZE
- \
.-.1122]- "11 0021!< *-1A 9 1A 311221..
~cm-11:1 7 r.,uA51 11,"\I , CHl-18 R RADIATION RECORD PROCESS FLUID SYSTEM (SEQ, 3 DIGIT)
~
G11
~'~
014 ' 101 I B~,~
N102 ffl'lt> ~ ~1~. [tD,, ~ ~'~
-1a > 048 T!
JQ.41 TAH JQ41 s
SPEED, FREQUENCY SAFETY S\.'ITCH TRAIN <IF APPLICABLE)
G11
~
--1' 21* I ITT,,
11u-*n*
fiiia
~ 1!
HOME T
u TEMPERATURE MUL TIVARIABLE TRANSMIT MUL TIFUNCTJ N MUL TIFUNCTI N THROUGH MULTIFUNCTION MATERIAL <1 TO 3 CHARACTERS)
SCHEDULE (JF APPLlCABLE>
UNE SIZE IN NPS OR TUBE HOME V[BRATIN, VALVE, DAMPER V MECHANICAL ANALYSIS LOUVER (E,G, t = 1', ,5 "' 112* ETC.)
EVAPORATOR "A" SKID EVAPORATOR "B" SKID (LOW RAD) (HIGH RAD) ',/ WEIGHT, F RCE \JELL X UNCLASSIF"IED X AXIS UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED F y E:VE:NT, STATE:,
PRESSURE R
Y AXIS RELAY, COMPUTE, COOVERT F P SITI N, DRIVER, ACTUATOR z DIMENSION Z AXtS UNCLASSIFIED f"lNAL CONTROL ELEMENT LEGEND M-2512 (G,F-1) 0 rIELD MOUNT tel BALL V?J...VE S:IGHT 8 PANEL MOUNT
[ID GLASS
~
PLC / CHECK INTERFACE N VALVE E
a HMI / INDICATH.N /
INTERFACE I I PRESSURE VESSEL I IE TP 112 -£2 CENTRIFUGAL PUMP
ELECTRICAL PLUG 5800-SSP40-1 1/2"" VENT <"? VALVE SICiNAL
'LAHH LALL M-4952 1016 I I
I I
I I
1016_
0 FILTER *,,
Ii II INSTRUMENT AIR
~:_, G11N 1016 I
- 1. - ~ 1016 @ AIR OPERATED BALL VALVE l~I SK[D BOUNDARY FLEX CONNECTION
)1K P~EUMATIC QUICK DISCONNECT
, - - l - - -T- 11/2" OVER FLOW ~ SOLENOID VALVE
--If--
TUBE FITTING CONNECTION G1122A004 PRESSURE tbrit1gfnN
~ REGULATING/REDUCING
--ii--
~ L.!'.'. TP VALVE
- CAM - TYPE CONNECTION
"';" ~ SAMPLE
~ G1122F014 ' G1122F001 BATCH TANK 111
[Ji THERMOSTATIC 5i 1-------<M>---~-tt---------r-<[::0::]f-l 5801-SSP40-11/2" CONTROL VAL VE er=] EDUCTOR D ~ i 1801-SSP40-11/2" 1000 GAL.
(STAINLESS N.C.
FLOOR DRAIN D028-38 [XJ GLOBE VALVE I ID i2 1706-SSP40-1 1/2 I G1122F020 W N.C.
STL) 11/2* G1122F067
t>---
REDUCER/
INCREASER I!] AIR TRAP 2"
HS F067 0
_F067
-i
~
+l><1 OPEN DRAIN FUNNEL DUMP VALVE l~I
~
STRAINER R£LIEF VALVE
~
N NORMALLY OPEN AIR VENT G1122F012 TP I- NC CT NORMALLY CLOSED CHEMICAL TAP
~ X TIE POINT #
107 0 S:AMPLE PDINT
) 1-2453-01 (C-7) ) ~ -
PAHJ I ~
V T-STRAINER
",, \\ \\
\\
4 f011_,,
C
@ A~ i I~ I' 21oc*
\ \\
I ~ ~ I 1<~1
. _F011 C
G1122D025 '\ \\
~ ::ls l "
0 st
~
1 NOTES, D..
rJ)
(J)
[2t]=
~ 1'1914'1 L ALL PIS NUMBERS Gl122, ALL INSTRUMENTS GU N ' TP UNLESS OTHERw!SE NOTED 0
co 110
.I G1122 coo, REFERENCES TP 11 I L M-2512 M-5766-3 SIDE STREAM LRwP SYSTEM <FOS) 108 .
M-5724-1 r
G1122F011 PROCESS SAMPLING RADVASTE BLDG, (FOS)
~ :
G1122F00:3 2"x11/2" "'-::":::
C:-:::::,, _I
~
N I 1803-SSP40-1 1/2" 1808-SSP40-1 1/2" 1-2400-05 PLANT SAMPLING REQUIREMENTS
~
M-2040 (G-1) )--- ,,, 1 Gll22C004 co 6M721-2513 1807-SSP40-11/2" I-2403-DI SAMPLE SINK SUPPORT AND DETAILS LATEST REVISION
' 1804-SSP40-11/2" (40 GPM@ L1-*l,-CT-G11-9 VARIOUS PLANT LOCATIONS.
HS 60, PS,IG) " " 1 L965 'V
!~' ** - 1806-SSP40-1 1/2" ]-2400-02 DIAGRAMS OF SAMPLES IN RAD\IASTE BUILDING F003
'a 1'--- ,f:003 B
1 F003 - /o"- . ~
V HS F013 F0\3
~
THIS DRAwING IS BEING B
G1122F013 ISSUED PER EDP 32645,B049, REV. 0 N.C.
ZIOC F013 *J=:(l1 5802-SSP40-1/2" INON-NUCLEAR SAFETY RELATED I FLOOR DRAIN D028-38 THIS IS A MICROSTATION PRODUCED DRAWING, TP CHANGES OR REVISIONS MUST BE BROUGHT M-2512 (D-1) 109 TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED,
*-----------------------*----*-----*----------.J SAMPLE BATCH INC.CODE Detroit Edison Fermi 2 ITITI.E TANK SKID T SIDE STREAM DCD'S INCORPORATED: A PORTION OF THIS DRAlflNG PREPARED BY DATE LRWP SYSTEM P&ID IS AFFECTED BY THE FOLLOWING:
C. M, BRZUSTE',/ICZ 4/16/08
,c CHANGE DOCUMENT CHECKED BY DAT!;.
A OTHER REVISIONS: J, ',/HITE
'D. \(,,A,-1,<0t-';-l,,..., .._I,. I s I ID I o8 I APERTURE CARD TITLE IA
- ..\.. 4: SIDE STREAM LRWP SYS P&ID APPROVED BY I DATE I PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT #
,=a;;-;,;;a.,.,v---rn,..,,-T,,Fi<cKED8'~---TiiAi'1----j'----------<.1~~!£,
I~PREPARED aY DATE cHEcKED aY DATE E°--t===jc============jr.~t;;J,";lft~ p01Z,. ~ /.1
G1122 DOCUMENT TYPE CODE DDDMEC NUC OPS FILE NO.
1eo1 :f -d-crl%
DATE ISSUED TO IS APPROVED BY
DATE I EDP POSTWG ENTRIES REQUIRE THE ADDl'I10N OF THE ARMS STATUS CODE:
I DRAWING NUMBER 6 M7 21- 2 513 ' RE:V.
EITHER "AFCn OR ~ ASB~
(/)
8 7 6 5 4 3 ? 1