Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-461/97-06 on 970516
ML20217J138
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/31/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
ILLINOIS POWER CO.
References
50-461-97-06, 50-461-97-6, NUDOCS 9708140019
Download: ML20217J138 (2)


Text

. . . - . . - . - - . - . = . - . . . . - ~ ~ - . . - .-.-. - -- ..- -- . . - . _ ~ ~ - - -

  • .
      • %  !

.

  • ,, UNITED STATES

,

[ NUCLEAR REGULATORY COMMISSION

" '1.

- REGION lil ,

Ea

  • 1 j-c g 801 WARRENVILLE ROAD
  1. ' '

usLt. ILUNOIS 60532-4351 '

... *

1 - Joly 31,199/

. .

,

,

j Mr. John ,

Senior Vice President Clinton Power Station t Illinois Power Company Mail Code V 275

' P. O. Box 678 - '

[ Clinton, IL 61727 -

i

SUBJECT
!

NOTICE OF VIOLATION (NRC INSPECTION 50-461/97006) REPORT NO.

i

Dear Mr. Cook:

r

, .

!'

j This will acknowledge receipt of Vour June 16,1997 lett4r in response to our j May 16,1997 letter transmitting a Notice of Violation (NOV) associated with the

. above mentioned inspection report,

, -

i-

In your letter, Illinois Power (IP) admitted that, in general, the violations occurred as L described in the inspection report. However, in Attachment A of your letter, you state that occur.one of the seven examples associated with the first violation cited in the NOV d

,

,

The contested example of the violation, example a(3), dealt with the failure to docu i- b'y signing for the applicable Job Step, that new actuator shafts met dimensional requirements after the final machining operation documented in the work package for modification of Feedwater check valve 1821-F032A.

E in Attachmeat A to your letter, you state that the applicable Job Step for documentation of conformance to the dimensional tolerances was signed on February 28,1997, after the

last machining of the actuator shafts was completed. The NRC concurs that the app
Job Step was signed on February 28,1997.

y The basis of the violation was that the work -

package documented re-machining of the actuator shafts on March 1,1997, but does not

_

!- contain' documentation that dimensional tolerances were maintained after t i- machining. During the course of the subject inspection, the inspectors discussed the re-

!~ machining activities of March 1,1997, with managers in your Maintenance Department.

s As documented in the inspection report. vour ataff acknowledged that finals onal dimen i tolerances were not obtained for the ficc-d re-machining. Based upon the original inspect findings, a re-examination of the work package documentation, and the absence of

'. additional information concerning the machining activities of March 1c1997, in your

. response, the NRC believes that the contested example of the violation occurred as cited. ,

,

i We have reviewed your corrective actions for the six non-contested examples of the I '

violation discussed above, and believe that they adequately address the root cause of the

^

violation, including the contested example. We have also reviewed the corrective actions

[(

9708140019 970731 '

[^ h

--

t --r-----,, -n- y w w , #-.- - - - - - - --. - e " - - -- - - - - - - - - . - - --- --- - -----

- - - - - . - _ - -

.. . - - .

.

I

.

John '

for the other violations cited in the subject inspection report and NOV, and have no further questions at this time. These corrective actions will be examined during future

,

inspections.

.

Sincerely,

,

/s/ M. Dapas for Geoffrey E. Grant, Director Division of Reactor Projects Docket No. 50 461 cc: W. D. Romberg, Assistant Vice President P. Yocum, Plant Manager Clinton Power Station R. Phares, Manager Nuclear Assessment J. Sipek, Director - Licensing Nathan Schloss, Economist Office of the Attorney General G. Stramback, Regulatory Licensing Services Project Manager General Electric Company Chairman, DeWitt County Board State Liaison Officer Chairman, Illinois Commerce Commission Distribution:

Docket File DRP OC/LFDCB PUBLIC IE-01 SRI Clinton, Dresden, RlilPRR LaSalle, Quad Cities CAA1 (E-mail) .

Project Manager, NRR A. B. Beach Rlli Enf. Coordinator Deputy RA TSS DRS (2)

DOCDESK (E-mail)

DOCUMENT MME: RXTRS20C\ll1 POWER \CU97006.RSP To veceve e copy of this document, recate si the bos *C* = Copy wthout attach /enct *E' = Copy wth attach /ect *N* = No copy ofMCE M __ M full O M b fWI