Informs That 961022 Response to GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks, Satisfies Required Actions Under GL & Acceptable
ML20138F308
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/01/1997
From: Raghavan L
NRC (Affiliation Not Assigned)
To: Richard Anderson
FLORIDA POWER CORP.
References
GL-96-04, GL-96-4, TAC-M95937, NUDOCS 9705050337
Download: ML20138F308 (2)


Text

. _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -- _

May 1, 1997 -

Mr. Roy A. Anderson e Senior Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing Crystal River Energy Complex (SA2A) 15760 W Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 - GENERIC LETTER 96-04, "80RAFLEX DEGRADATION IN SPENT FUEL POOL STORAGE RACKS" (MPA L604) (TAC NO. M95937)

Dear Mr. Anderson:

On June 26, 1996, the Nuclear Regulatory Commission issued Generic Letter (GL) 96-04, "Boraflex Degradation in Spent Fuel Pool Storage Racks." GL 96-04 requested licensees that use Boraflex as a neutron absorber in their spent fuel storage racks to submit (1) an assessment of the capability of the Boraflex to maintain a 5 percent subcriticality margin, and (2) a plan describing proposed actions if this subcriticality margin cannot be maintained by Boraflex material because of current or projected future Boraflex degradation.

By letter dated October 22, 1996, you provided your response to the GL. Your response included Crystal River 3-specific fuel rack designs, an assessment of the capability of the Boroflex to maintain a 5 percent subcriticality margin, current programs to monitor Boroflex degradation, and your planned actions for maintaining a 5 percent subcriticality margin in future.

Your letter satisfies the required actions under the GL and is, therefore, acceptable. Please note that your response and proposed actions relating to the GL may subject of future audit / inspections. This completes our effort under the technical assignment control (TAC) number M95937 and the TAC is closed.

Sincerely, I.kagTavar!,"ProNetManager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-302 cc: See next page Distribution CR-3 r/f 0GC S. Varga g@ % hh b ,

C. Grimes S. Bloom ACRS W. Bateman U g.-Ql p JZwolinski DOCUMENT NAME: G:\ CRYSTAL \95937.LTR To receive a copy of this document, Indicate in the boa: 'C' = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE PDil 3/PM l i PDIl-3/LA 1 ,l P0ll-3/D ,) l C, l l l NAME LRagavan \.M BClaytort r%P FHebdon N DATE 05/l /97 05/i /97 05/l /97 RECMD COM 97o5050337 970501 PDR ADOCK 05000302 p PDR

i  :

Kr7 Roy A. Anderson CRYSTAL RIVER UNIT NO. 3 Florida Power Corporation GENERATING PLANT i

CC:

Mr. R. Alexander Glenn Senior Resident. Inspector Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commis'sion MAC-A5A 6745 N. Tallahassee Road '

P.O. Box 14042 Crystal River, Florida 34428 St. Petersburg, Florida 33733-4042 Mr. John P. Cowan Mr. Bruce J. Hickle, Director Vice President, Nuclear Production Nuclear Plant Operations (NA2C) (SA2C)  !

Florida Power Corporation Florida Power Corporation Crystal River Energy Complex Cr.,stal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street .

Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 3

Mr. Robert B. Borsum Regional Administrator, Region 11  !

B&W Nuclear Technologies U.S. Nuclear Regulatory Commission 1700 Rockville Pike, Suite 525 61 Forsyth Street, SW., Suite 23T85 '

Rockville, Maryland 20852 Atlanta, Georgia 30303-3415 Mr. Bill Passetti Mr. Kerry Landis i Office of Radiation Control U.S. Nuclear Regulatory Commission <

Department of Health and 61 Forsyth Street, SW., Suite 23T85 Rehabilitative Services Atlanta, Georgia 30303-3415 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700  ;

Attorney General l Department of Legal Affairs i The Capitol Tallahassee, Florida 32304 l

Mr. Joe Myers, Director l Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245 Mr. David Kunsemiller, Director Nuclear Operations Site Support (SA2A)

Florida Power Corporation Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708 4

l

_ _ . , _