ML20198N039

From kanterella
Revision as of 11:27, 8 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards Notice of Withdrawal of Applications for Amend to Licenses NPF-2 & NPF-8.Proposed Change Would Have Modified TSs as Stated
ML20198N039
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/13/1998
From: Jacob Zimmerman
NRC (Affiliation Not Assigned)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20198N043 List:
References
TAC-M99034, TAC-M99035, NUDOCS 9801200233
Download: ML20198N039 (3)


Text

. .. - . . .- .. .

Januarys13,L1998' _

y L.[e1 4 Mr. D.~ N. Mor:y -

J Vee President- Fcrisy Project .

Southem Nuclear Operating -i

. . Company, Inc.

Post Office Box'1295 : ~

Birmingham, Alabama 35201-1295-

~

i

SUBJECT:

L JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - WITHDRAWAL OF AN a AMENDMENT REQUEST (TAC NOS. M99034 AND M99035) .

Dear Mr. Morey-:

' By letter dated June 13,1997, you applied for amendments to Facility Operating License Nos. l

~ NPF-2 and NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The proposed change would have modified the Technical Specifications (TS) by: (" adding a note '

- to TS 3.9.13 to specifically indicate the normal or emergency power supply m6, ! e inoperable z in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied ; and (2) extending

. the TS 3.9.13 completion time allowed for retuming one out-of-service penetratico room l

filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days.- Subsequently, by lotter dated January <,1998, you  ;

submitted a revised amendment request which modified the original submittal by effectively L i 4 eliminating part 2, mentioned above, from the origina! amendment application.' It is our . q f understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing .

Manager, that your January 7,1998, letter constitutes a withdrawal of part 2 of the original , j amendment appOption.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, concoming part 2 of the original an.,sndment application with the 4

Office of the Federal Register for publication.  :

Sincerely, ORIGINAL SIGNED BY: -

Jacob is Zimmerman, Project Maneger Project Directorate ll-2 Division of Reactor Projects - l/11 Office of Nuclear Reactor Regulation Docket Nos.30-348 and 50-364 DISTRIBUTION ,

19519tWPPIFJ ACRb

Enclosure:

- Notice of Withdrawal PUBLIC OGC PDil-2 RF JJohnson,RI

' cc w/ encl: See next page PSkinner,RI BBoger l' SCoffin JZimmerman .

4 HBerkow DOCUMENT NAME: G:\FARLEY\M99034 WIL hhh h((hh {QQQpy

  • i To receive r1 opy of this document, indicate in the box: "C" = Copv without - -

attachment /encloswo "E" = Qopy with attachmept/ enclosure "N" = No copy

. { OFFICE ' PM:P,f)TQ ]G LA:PDil-2 : l6 D p Qlf% l' -l- .

' 4( h, iNAME- J2thf(AE#tMAN:en LBERR%f) H)fR@W s)

~

lDATE / // 1198

/ - 4 /ITU198 - i / d /98 - ,

i OFFICIAL RECORD COPY :

c ' '

1 9801200233 980113 'I

PDR -ADOCK 05000348 memm mamm )

P PDR lg glgl M ggg  ;

' ~

...s1<.

l

.- .L . . --

. ,n .n .- ,, _ . , , . , , , -, ,.w., . ~ .,....,.y

Uru 3* t UNITED STATES s* g NUCLEAR REPULATORY COMMISSION

't WASHINGTON, D.C. 2006H001 8 JanJary 13, 1998

%,.....io i

Mr. D. N. Morey i Vice President - Farley Project I Southern Nuclear Operating Company, Inc.-

Post Office Box 1295 Birmingham, Alabama 35201-1295 l

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -WITHDRAWAL OF AN l AMENDMENT REQUEST (TAC NOS. M99034 AND M99035) l

Dear Mr. Morey :

4 By let'er dated June 13,1997, you applied for amendments to Facility Operating License Nos.

NPF-2 and NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The proposed change would have modified the Technical Specifications (TS) by: (1) adding a note j to TS 3.9.13 to specifically indicate the normal or emergency power supply may be inoperable l

in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied; and (2) extending  ;
the _TS 3 9.13 completion time allowed for retuming one out of-service penetration room '

filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days. Subsequently, by letter dated Januar/ 7,1998, you submitted a revised amendment request which modified the original submittal by effectively eliminating part 2, mentioned above, frorr. che original amendment application. It is our understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing Manager, that your January 7,1998, letter constitutes a withdratval of part 2 of the original amendment application.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, conceming part 2 of the original amendme7t application with the Office of the Federal Register for publication.

Sincerely, 1 N

. acob1. merman, Project Manager Project Directorate ll-2 Division of Reactor Projects -1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Notice of Withdrawal ec w/ encl: See next page 4

4 7

-- -,. - a - -------x-- - m v

Joseph M. Farle Nuclear Plant

- oc:

. - Mr. R. D. Hill, Jr.-

General Manager- -

Southem Nuclear Operating Company ,

Post Omco Box 470 Ashford, Alabama 36312

- Mr. Mark Alluni, Licensing Manager Southem Nuclear Operating Company Post Office Box 1295

- Binningham, Alabama 35201-1295.

Mr. M. Stanford Blanton

~ Balch and Bingham Law Firm ,

< Post Office Box 306 -

-1710 Sixth Avenue North t ~ Birmingham, Alabama 35201_

Mr. J. D. Woodard Executive Vice President j Southem Nuclear Operating Company-f Post Office Box 1295 Birmingham, Alabama 35201 4

s State Health 04icer-Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 ,

Chairman

Houston County Commission Post Office Box 6406 Dothan, Alabama 36302 Regional Administrator, Region ll U.S. Nuclear Regulatory Commission At:anta Federal Center 61 Forsyth Street, S.W., Suite 23T85

, Atlanta, Georgia 30303 -

Resident inspector .

U.S. Nuclear Regula'ory Commission A: 2 7388.N. State Highway g5 Columbia,- Alabama 3631g l -

9 -

i b

-I L-... -- -

- - - -