ML20198N039
| ML20198N039 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/13/1998 |
| From: | Jacob Zimmerman NRC (Affiliation Not Assigned) |
| To: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| Shared Package | |
| ML20198N043 | List: |
| References | |
| TAC-M99034, TAC-M99035, NUDOCS 9801200233 | |
| Download: ML20198N039 (3) | |
Text
...
Januarys13,L1998' L.[e1 4 Mr. D.~ N. Mor:y -
y J
Vee President-Fcrisy Project Southem Nuclear Operating
-i
. Company, Inc.
Post Office Box'1295 :
Birmingham, Alabama 35201-1295-
~
~
i
SUBJECT:
L JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - WITHDRAWAL OF AN a
AMENDMENT REQUEST (TAC NOS. M99034 AND M99035).
Dear Mr. Morey-:
' By letter dated June 13,1997, you applied for amendments to Facility Operating License Nos.
l
~ NPF-2 and NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The proposed change would have modified the Technical Specifications (TS) by: (" adding a note
- to TS 3.9.13 to specifically indicate the normal or emergency power supply m6, ! e inoperable d
z in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfie ; and (2) extending the TS 3.9.13 completion time allowed for retuming one out-of-service penetratico room l
- filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days.- Subsequently, by lotter dated January <,1998, you submitted a revised amendment request which modified the original submittal by effectively L i
4 eliminating part 2, mentioned above, from the origina! amendment application.' It is our.
q f understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing Manager, that your January 7,1998, letter constitutes a withdrawal of part 2 of the original,
j amendment appOption.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, concoming part 2 of the original an.,sndment application with the
- Office of the Federal Register for publication.
4 Sincerely, ORIGINAL SIGNED BY:
Jacob is Zimmerman, Project Maneger Project Directorate ll-2 Division of Reactor Projects - l/11 Office of Nuclear Reactor Regulation Docket Nos.30-348 and 50-364 DISTRIBUTION 19519tWPPIFJ ACRb
Enclosure:
- Notice of Withdrawal PUBLIC OGC PDil-2 RF JJohnson,RI
' cc w/ encl: See next page PSkinner,RI BBoger l'
SCoffin JZimmerman 4
HBerkow hhh h((hh {QQQpy DOCUMENT NAME: G:\\FARLEY\\M99034 WIL i To receive r1 opy of this document, indicate in the box: "C" = Copv without -
attachment /encloswo "E" = Qopy with attachmept/ enclosure "N" = No copy 4(
h,
. { OFFICE 'PM:P,f)TQ
]G LA:PDil-2 : l6 D p Qlf%
l'
-l-iNAME-J2thf(AE#tMAN:en LBERR%f)
H)fR@W s
lDATE
/ // 1198 -
4 /ITU198 -
i / d /98 -
i
/
~
OFFICIAL RECORD COPY :
c
'I 1
9801200233 980113 PDR -ADOCK 05000348 memm mamm
)
~
lg glgl M ggg P
...s1<.
.L
,n
.n
,.w.,
. ~
.,....,.y
Uru 3*
t UNITED STATES s
g NUCLEAR REPULATORY COMMISSION
't WASHINGTON, D.C. 2006H001 8
%,.....io JanJary 13, 1998 i
Mr. D. N. Morey i
Vice President - Farley Project Southern Nuclear Operating Company, Inc.-
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. M99034 AND M99035)
Dear Mr. Morey :
4 By let'er dated June 13,1997, you applied for amendments to Facility Operating License Nos.
NPF-2 and NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The proposed change would have modified the Technical Specifications (TS) by: (1) adding a note j
to TS 3.9.13 to specifically indicate the normal or emergency power supply may be inoperable in Modes 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied; and (2) extending the _TS 3 9.13 completion time allowed for retuming one out of-service penetration room filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days. Subsequently, by letter dated Januar/ 7,1998, you submitted a revised amendment request which modified the original submittal by effectively eliminating part 2, mentioned above, frorr. che original amendment application. It is our understanding, confirmed by a telephone conversation with M. Ajiuni, Farley Licensing Manager, that your January 7,1998, letter constitutes a withdratval of part 2 of the original amendment application.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses, conceming part 2 of the original amendme7t application with the Office of the Federal Register for publication.
Sincerely, 1
N acob1.
merman, Project Manager Project Directorate ll-2 Division of Reactor Projects -1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364
Enclosure:
Notice of Withdrawal ec w/ encl: See next page 4
4 7
a -
x--
m v
Joseph M. Farle Nuclear Plant
- oc:
- Mr. R. D. Hill, Jr.-
General Manager- -
Southem Nuclear Operating Company Post Omco Box 470 Ashford, Alabama 36312
- Mr. Mark Alluni, Licensing Manager Southem Nuclear Operating Company Post Office Box 1295
- Binningham, Alabama 35201-1295.
Mr. M. Stanford Blanton
~ Balch and Bingham Law Firm
< Post Office Box 306
-1710 Sixth Avenue North t
~ Birmingham, Alabama 35201_
Mr. J. D. Woodard Executive Vice President j
Southem Nuclear Operating Company-f Post Office Box 1295 l
Birmingham, Alabama 35201 4
s State Health 04icer-Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 Chairman
- Houston County Commission Post Office Box 6406 Dothan, Alabama 36302 Regional Administrator, Region ll U.S. Nuclear Regulatory Commission At:anta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303 -
Resident inspector U.S. Nuclear Regula'ory Commission A:
2 7388.N. State Highway g5 Columbia,- Alabama 3631g l 9
i b
-I L-...
-