ML20211M829

From kanterella
Revision as of 13:06, 6 August 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partially Withheld Notice of Violation from Insp on 860428- 0502 (Ref 10CFR2.790(d) & 73.21)
ML20211M829
Person / Time
Site: 07001113
Issue date: 06/05/1986
From: Barr K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20211M455 List:
References
FOIA-86-704 70-1113-86-09-0, 70-1113-86-9, NUDOCS 8612180061
Download: ML20211M829 (1)


Text

.

W. . A.Y

.3.......

s.. 9 ., z

. r-

.:..a . : . .% . . . .

, . a .1 o f I E .

  • I .

ENCLOSURE 1 NOTICE OF VIOLATION Ge eral Electric Company Docket No. 70-1113 b'imington, NC License No. SNM-1097 T.r e following violation was identified during an inspection conducted on A:ril 28 - May 2,1986. The Severity Level were assigned in accordance with the h:iC Enforcement Policy (10 CFR Part 2, Appendix C).

10 CFR 70.51(a)(4) and (e)(4)(1) require the licensee to calculate the limit of error, which is a 95 percent confidence interval, associated with the inventory difference for each material balance interval.

Contrary to the above, for the August 13, 1984 - August 5, 1985 material balance interval, the limit of error associated with the uranium inventory difference was incorrectly calculated in that it was overstated by approximately 179 kilograms of uranium.

This is a Severity Level V violation (Supplement III).

P rsuant to 10 CFR 2.201, you are required to submit to this office within 3; days of the date of this Notice, a written statement or explanation in reply, 1 cluding: (1) admission or denial of the alleged violations, (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken a-d the results achieved; (4) corrective steps which will be taken to avoid f.,rther violations; and (5) the date when full compliance will be achieved.

Se:urity or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

FOR THEj UCLEAR N REGULATORY COMMISSION

'{Htl' enneth P. Barr, Chief 8612100061 861205 Nuclear Materials Safety and i

PDR FOIA Safeguards Branch RATNER 86-704 PDR Division of Radiation Safety I

and Safeguards l

l Dated at Atlanta, Georgia l this 5th day of June 1986 l

,