MONTHYEARML20212H9511999-06-20020 June 1999 Discusses Closeout of GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, for Plant,Units 1,2 & 3.Closeout Ltr for Project Manager to Send to Licensee Encl DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205D2271999-03-24024 March 1999 Notification of 990324 Meeting with Tennessee Valley Authority in Rockville,Md to Discuss License Amend Request for Crediting Containment over-pressure ML20204D0241999-03-17017 March 1999 Notification of 990331 Meeting with Util in Rockville,Md to Discuss Risk Informed ISI Submittal ML20199G8581999-01-19019 January 1999 Notification of 990204 Meeting with Util in Rockville,Md to Discuss Risk Informed ISI Submittal of 981023.Background, Cost & Exposure of Current Program,Proposed Approach & Regulatory & Technical Basis for RI-IGSCC Also Discussed ML20154D5361998-10-0101 October 1998 Notification of Meeting W/Util on 981026 in Athens,Al to Allow Union of Concerned Scientists to Present Info on Issues Raised in 10CFR2.206 Petition Concerning Plants Unit 1 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20197J0631998-08-0505 August 1998 Partially Deleted Response to TVA Ltr Re Implementation of Maint Rule at Browns Ferry,Unit 1 IA-98-330, Partially Deleted Response to TVA Ltr Dtd 980403 Re Implementation of Maint Rule at Browns Ferry,Unit 11998-08-0505 August 1998 Partially Deleted Response to TVA Ltr Dtd 980403 Re Implementation of Maint Rule at Browns Ferry,Unit 1 ML20236X4251998-08-0404 August 1998 Forwards Input to SE Being Prepared for Browns Ferry Units 2 & 3 Proposed Power Uprate License Amend ML20236V8891998-07-31031 July 1998 Notifies of 980810 Meeting W/Tva in Rockville,Md to Discuss Unit 3 IPE & Unit 2 multi-unit PRA ML20236L0101998-06-30030 June 1998 Notification of 980709 Meeting W/Util in Rockville,Md to Discuss Plant,Unit 1 - Technical Working Level Discussions Re License Amend Request for Power Uprate ML20249B7691998-06-22022 June 1998 Informs That Attached Document Re Browns Ferry,Unit 1,should Be Placed in PDR ML20197H9891998-06-15015 June 1998 Discusses Cancellation of 980616 Meeting on Plant ML20197J0571998-06-15015 June 1998 Partially Deleted Response to TVA Ltr Dtd 980403, Browns Ferry Nuclear Plant Unit 1 Revised Response to NRC Request Re Imlementation of Maint Rule,10CFR50.65 (URI 50-259/97-04-01) ML20197H9781998-06-10010 June 1998 Suggests That It Would Be Best to Have Staff Position & Plan for Closure Before Having Public Meeting ML20197H9511998-06-10010 June 1998 Informs That Brian Agrees with Delaying Meeting on Plant Maint Rule ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20248L1971998-06-0404 June 1998 Notification of 980616 Meeting W/Tva in Rockville,Maryland to Discuss Browns Ferry Unit 1 & Licensee Compliance W/ 10CFR50.65 Requirements for Monitoring Effectiveness of Maint at Nuclear Power Plants ML20197J0331998-06-0202 June 1998 Partially Deleted e-mail Informing of Scheduled Internal Meeting on 980605 Re Old Issue That Need Resolution Maint Rule Compliance at Browns Ferry,Unit 1 ML20216C8051998-05-0606 May 1998 Notification of 980508 Meeting W/Tva in Rockville,Md to Discuss General Mgt Re Plant ML20217K5861998-04-28028 April 1998 Notification of 980520 Meeting W/Tva in Rockville,Md to Have Technical Discussion W/Tva Staff Re Plant Power Uprate License Amend.Meeting Will Focus on Instrumentation Issues ML20216E8021998-04-13013 April 1998 Notification of 980414 Meeting W/Tva in Rockville,Md to Discuss Browns Ferry Nuclear Plant Improved TSs ML20217A5261998-03-20020 March 1998 Notification of 980326 & 27 Meeting W/Tva in Rockville,Md Re Technical Discussion Related to Plant Improved TSs ML20197B6201998-03-0404 March 1998 Revised Notification of 980305 Meeting W/Tva in Rockville, Maryland Re BFN Improved Sts.Meeting Cancelled ML20203K7111998-02-25025 February 1998 Notification of 980226 Meeting W/Util in Rockville,Md to Discuss Plant Inproved Sts.Meeting Cancelled ML20203L2211998-02-25025 February 1998 Notification of 980312 Meeting W/Util in Rockville,Md to Discuss Browns Ferry Improved Std TS ML20203L5321998-02-25025 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Maryland to Discuss Browns Ferry Improved Std TS ML20216G0501998-02-25025 February 1998 Notification of Cancellation of 980312 Meeting W/Tennessee Valley Authority in Rockville,Md to Discuss Browns Ferry Improved Std TS ML20203E7581998-02-18018 February 1998 Notification of 980226 Meeting W/Util in Rockville,Md to Discuss Issues Related to Browns Ferry Improved Std TSs ML20203B3921998-02-0303 February 1998 Notification of 980212 Meeting W/Tennessee Valley Authority in Rockville,Md Re Technical Discussions Related to Browns Ferry Improved TSs ML20199H4931998-01-14014 January 1998 Notification of Cancelled 980126 Meeting W/Util in Rockville,Md to Disuss Browns Ferry Improved TS ML20198S1101998-01-14014 January 1998 Notification of 980126 Meeting W/Tva in Rockville,Md to Discuss Technical Discussion Re to Plant Improved TSs ML20198M9931998-01-12012 January 1998 Notification of 980126 Meeting W/Tva in Rockville,Md to Discuss Implementation of 10CFR50.65 ML20197H9341998-01-0606 January 1998 Expresses Appreciation for Info Re Browns Ferry Unit 1 Maint Rule Issue.Either R Gibbs & Author or Both Will Be at 990126 Meeting ML20205M2341997-12-24024 December 1997 Forwards for Review Draft Ltr Ack Receipt of TVA Ltr & Electronic Transfer of $80,000 on 971219 in Payment for Civil Penalty Proposed by NRC in Ltr .Requests Ltr Be Forwarded to Regional Ofc ML20197J0241997-11-0606 November 1997 Refers to Re Implementation of Maint Rule for Browns Ferry Nuclear Plant Unit 1.Concludes That Scope of Unit 1 Maint Rule Program Was Inconsistent with Requirements of Rule.Memo Partially Deleted ML20217E2601997-09-30030 September 1997 Notification of 971008 Meeting W/Tva in Rockville,Md to Discuss Revs to Section 3.8 (Electrical) of Browns Ferry Improved TSs Submittal ML20217D8851997-09-30030 September 1997 Notification of 971009 Meeting W/Util in Rockville,Md to Discuss TVA Response to Staff RAI on Section 3.4 of Plant Improved TSs Submittal ML20210K1641997-08-15015 August 1997 Notification of 970821 Meeting W/Util in Rockville,Md to Discuss Hydrodynamic & Structural Loads Evaluation for Planned Emergency Core Cooling Suction Strainer Mods ML20197H9151997-07-28028 July 1997 Informs That Region II Asked for NRR Assistance in Addressing Unresolved Item 50-259/97-04-01 Which Deals with Implementation of Maint Rule on Unit 1.Requests That Encl Draft Ltr Be Reviewed ML20197H8851997-07-25025 July 1997 Informs That Author Plans to Send Encl Ltr to Tva,Discussing Implementation of Maint Rule on Browns Ferry Unit 1,re URI 50-259/97-04-01 ML20197H9011997-07-25025 July 1997 Informs That B Holland Should Concur on Browns Ferry,Unit 1 Maint Rule ML20197J0121997-07-25025 July 1997 Partially Deleted e-mail Discussing 10CFR2.201 Which Provided Requirements for Responses to Novs.Agrees That 60 or 90 Days,Ok,As Long as Response Requested within Certain Time Frame & Not Leave Open Ended ML20197H7781997-07-25025 July 1997 Informs That Based on Input from QA & Maint Branch,Encl Ltr Which Ask TVA Which of Three Apparent Options It Intends to Pursue,Or to Propose Another Course of Action Consistent with Regulatory Requirements.Rev & Comments Requested ML20197H9951997-07-25025 July 1997 Partially Deleted e-mail Requesting Response Re Browns Ferry Unit 1 Maint Rule,Within 30 Days ML20205D9871997-07-16016 July 1997 Informs of Typographical Error in NOV EA 95-220 Which Ref Incorrect Docket & License Number.Correct License & Docket Numbers Listed ML20197H7231997-06-17017 June 1997 Discusses Region II TIA 97-015 Request to Technical Assistance with Issue of Limited Implementation of 10CFR50.65,at Plant,Unit 1.Results of Insp Are Documented in Insp Repts 50-259/97-04,260/97-04 & 296/97-04 ML20197H6501997-06-0404 June 1997 Requests Assistance in Resolving Issue of Extent of Maint Rule Implementation for Browns Ferry,Unit 1.Results of Insp Conducted on 970418,documented in Insp Rept 50-259/97-04,50-260/97-04 & 50-296/97-04 1999-06-20
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212H9511999-06-20020 June 1999 Discusses Closeout of GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, for Plant,Units 1,2 & 3.Closeout Ltr for Project Manager to Send to Licensee Encl DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205D2271999-03-24024 March 1999 Notification of 990324 Meeting with Tennessee Valley Authority in Rockville,Md to Discuss License Amend Request for Crediting Containment over-pressure ML20204D0241999-03-17017 March 1999 Notification of 990331 Meeting with Util in Rockville,Md to Discuss Risk Informed ISI Submittal ML20199G8581999-01-19019 January 1999 Notification of 990204 Meeting with Util in Rockville,Md to Discuss Risk Informed ISI Submittal of 981023.Background, Cost & Exposure of Current Program,Proposed Approach & Regulatory & Technical Basis for RI-IGSCC Also Discussed ML20154D5361998-10-0101 October 1998 Notification of Meeting W/Util on 981026 in Athens,Al to Allow Union of Concerned Scientists to Present Info on Issues Raised in 10CFR2.206 Petition Concerning Plants Unit 1 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20197J0631998-08-0505 August 1998 Partially Deleted Response to TVA Ltr Re Implementation of Maint Rule at Browns Ferry,Unit 1 IA-98-330, Partially Deleted Response to TVA Ltr Dtd 980403 Re Implementation of Maint Rule at Browns Ferry,Unit 11998-08-0505 August 1998 Partially Deleted Response to TVA Ltr Dtd 980403 Re Implementation of Maint Rule at Browns Ferry,Unit 1 ML20236X4251998-08-0404 August 1998 Forwards Input to SE Being Prepared for Browns Ferry Units 2 & 3 Proposed Power Uprate License Amend ML20236V8891998-07-31031 July 1998 Notifies of 980810 Meeting W/Tva in Rockville,Md to Discuss Unit 3 IPE & Unit 2 multi-unit PRA ML20236L0101998-06-30030 June 1998 Notification of 980709 Meeting W/Util in Rockville,Md to Discuss Plant,Unit 1 - Technical Working Level Discussions Re License Amend Request for Power Uprate ML20249B7691998-06-22022 June 1998 Informs That Attached Document Re Browns Ferry,Unit 1,should Be Placed in PDR ML20197H9891998-06-15015 June 1998 Discusses Cancellation of 980616 Meeting on Plant ML20197J0571998-06-15015 June 1998 Partially Deleted Response to TVA Ltr Dtd 980403, Browns Ferry Nuclear Plant Unit 1 Revised Response to NRC Request Re Imlementation of Maint Rule,10CFR50.65 (URI 50-259/97-04-01) ML20197H9781998-06-10010 June 1998 Suggests That It Would Be Best to Have Staff Position & Plan for Closure Before Having Public Meeting ML20197H9511998-06-10010 June 1998 Informs That Brian Agrees with Delaying Meeting on Plant Maint Rule ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20248L1971998-06-0404 June 1998 Notification of 980616 Meeting W/Tva in Rockville,Maryland to Discuss Browns Ferry Unit 1 & Licensee Compliance W/ 10CFR50.65 Requirements for Monitoring Effectiveness of Maint at Nuclear Power Plants ML20197J0331998-06-0202 June 1998 Partially Deleted e-mail Informing of Scheduled Internal Meeting on 980605 Re Old Issue That Need Resolution Maint Rule Compliance at Browns Ferry,Unit 1 ML20216C8051998-05-0606 May 1998 Notification of 980508 Meeting W/Tva in Rockville,Md to Discuss General Mgt Re Plant ML20217K5861998-04-28028 April 1998 Notification of 980520 Meeting W/Tva in Rockville,Md to Have Technical Discussion W/Tva Staff Re Plant Power Uprate License Amend.Meeting Will Focus on Instrumentation Issues ML20216E8021998-04-13013 April 1998 Notification of 980414 Meeting W/Tva in Rockville,Md to Discuss Browns Ferry Nuclear Plant Improved TSs ML20217A5261998-03-20020 March 1998 Notification of 980326 & 27 Meeting W/Tva in Rockville,Md Re Technical Discussion Related to Plant Improved TSs ML20197B6201998-03-0404 March 1998 Revised Notification of 980305 Meeting W/Tva in Rockville, Maryland Re BFN Improved Sts.Meeting Cancelled ML20203K7111998-02-25025 February 1998 Notification of 980226 Meeting W/Util in Rockville,Md to Discuss Plant Inproved Sts.Meeting Cancelled ML20203L2211998-02-25025 February 1998 Notification of 980312 Meeting W/Util in Rockville,Md to Discuss Browns Ferry Improved Std TS ML20203L5321998-02-25025 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Maryland to Discuss Browns Ferry Improved Std TS ML20216G0501998-02-25025 February 1998 Notification of Cancellation of 980312 Meeting W/Tennessee Valley Authority in Rockville,Md to Discuss Browns Ferry Improved Std TS ML20203E7581998-02-18018 February 1998 Notification of 980226 Meeting W/Util in Rockville,Md to Discuss Issues Related to Browns Ferry Improved Std TSs ML20203B3921998-02-0303 February 1998 Notification of 980212 Meeting W/Tennessee Valley Authority in Rockville,Md Re Technical Discussions Related to Browns Ferry Improved TSs ML20199H4931998-01-14014 January 1998 Notification of Cancelled 980126 Meeting W/Util in Rockville,Md to Disuss Browns Ferry Improved TS ML20198S1101998-01-14014 January 1998 Notification of 980126 Meeting W/Tva in Rockville,Md to Discuss Technical Discussion Re to Plant Improved TSs ML20198M9931998-01-12012 January 1998 Notification of 980126 Meeting W/Tva in Rockville,Md to Discuss Implementation of 10CFR50.65 ML20197H9341998-01-0606 January 1998 Expresses Appreciation for Info Re Browns Ferry Unit 1 Maint Rule Issue.Either R Gibbs & Author or Both Will Be at 990126 Meeting ML20205M2341997-12-24024 December 1997 Forwards for Review Draft Ltr Ack Receipt of TVA Ltr & Electronic Transfer of $80,000 on 971219 in Payment for Civil Penalty Proposed by NRC in Ltr .Requests Ltr Be Forwarded to Regional Ofc ML20197J0241997-11-0606 November 1997 Refers to Re Implementation of Maint Rule for Browns Ferry Nuclear Plant Unit 1.Concludes That Scope of Unit 1 Maint Rule Program Was Inconsistent with Requirements of Rule.Memo Partially Deleted ML20217E2601997-09-30030 September 1997 Notification of 971008 Meeting W/Tva in Rockville,Md to Discuss Revs to Section 3.8 (Electrical) of Browns Ferry Improved TSs Submittal ML20217D8851997-09-30030 September 1997 Notification of 971009 Meeting W/Util in Rockville,Md to Discuss TVA Response to Staff RAI on Section 3.4 of Plant Improved TSs Submittal ML20210K1641997-08-15015 August 1997 Notification of 970821 Meeting W/Util in Rockville,Md to Discuss Hydrodynamic & Structural Loads Evaluation for Planned Emergency Core Cooling Suction Strainer Mods ML20197H9151997-07-28028 July 1997 Informs That Region II Asked for NRR Assistance in Addressing Unresolved Item 50-259/97-04-01 Which Deals with Implementation of Maint Rule on Unit 1.Requests That Encl Draft Ltr Be Reviewed ML20197H8851997-07-25025 July 1997 Informs That Author Plans to Send Encl Ltr to Tva,Discussing Implementation of Maint Rule on Browns Ferry Unit 1,re URI 50-259/97-04-01 ML20197H9011997-07-25025 July 1997 Informs That B Holland Should Concur on Browns Ferry,Unit 1 Maint Rule ML20197J0121997-07-25025 July 1997 Partially Deleted e-mail Discussing 10CFR2.201 Which Provided Requirements for Responses to Novs.Agrees That 60 or 90 Days,Ok,As Long as Response Requested within Certain Time Frame & Not Leave Open Ended ML20197H7781997-07-25025 July 1997 Informs That Based on Input from QA & Maint Branch,Encl Ltr Which Ask TVA Which of Three Apparent Options It Intends to Pursue,Or to Propose Another Course of Action Consistent with Regulatory Requirements.Rev & Comments Requested ML20197H9951997-07-25025 July 1997 Partially Deleted e-mail Requesting Response Re Browns Ferry Unit 1 Maint Rule,Within 30 Days ML20205D9871997-07-16016 July 1997 Informs of Typographical Error in NOV EA 95-220 Which Ref Incorrect Docket & License Number.Correct License & Docket Numbers Listed ML20197H7231997-06-17017 June 1997 Discusses Region II TIA 97-015 Request to Technical Assistance with Issue of Limited Implementation of 10CFR50.65,at Plant,Unit 1.Results of Insp Are Documented in Insp Repts 50-259/97-04,260/97-04 & 296/97-04 ML20197H6501997-06-0404 June 1997 Requests Assistance in Resolving Issue of Extent of Maint Rule Implementation for Browns Ferry,Unit 1.Results of Insp Conducted on 970418,documented in Insp Rept 50-259/97-04,50-260/97-04 & 50-296/97-04 1999-06-20
[Table view] |
Text
. . _ . . . - - . - - - . ~ - . . - - . . . - - . - - - - >-. -- - - - - - --
, 4 ,. '.'
J g l 9 UNITEo STATES I
' */as.# 880 ,%'4
' NUCLEAR REGULATORY COMMISSION REotoN 11 i ~i i g 101 MARIETTA STREET. N.W., SUITE 2900 gl ATLANTA. GEORGIA 3C3234199 November 16, 1995 l,
'5A M T...../
Reoional Office Notice No. 0510 _
NRC MANAGEMENT ACTION PLAN FOR BROWNS FERRY UNIT 3 STARTUP A. Eurpose:
- To establish a management action plan for the Browns Ferry Unit 3 startup.
B. Discussion:
Browns Ferry Nuclear (BFN) Unit 3 has been shutdown since 1985. The TVA
.has nearly completed -all activities required for the restart of Unit 3.
These activities have been closely monitored by the Browns Ferry Restart Panel. To ensure adequate NRC coverage and evaluation cf the startup, the NRC Management Action Plan for Browns Ferry Unit 3 Startup was developed.
The Plan provides guidance for assessing the return to power of Unit 3.
C. Action:
Attached is the plan to provide augmented coverage for the Unit 3 startup.
. The NRC Browns Ferry startup organization will implement the plan when 4
directed by the Regional Administrator. -
D.
Contact:
Suggestions or comments should be directed to M. -Lesser at. extension
- - 10342, 4
E. Cancellation Date:
This Notice. is cancelled for record purposes when Browns Ferry Unit 3 Restart is completed.
\
hiwaafdddp gon1dd trator
Attachment:
Browns Ferry Unit 3 Startup Management Action Plan Distribution List A l
9710030095 970920 PDR FOIA A //
.i O'MEALI97-252 PDR f.df 4
(
l l
BROWNS TERRY STARTUP MANAGEMENT ACTION PLAN Auomented Covernae A. Purnose:
The Browns ferry Unit 3 Startup organization has been established to augment the normal NRC regior.al inspection activities in order to:
- 1. Provide an increased NRC inspection oversight of BFN Unit 3 startup activities.
- 2. Provide timely NRC staff response to operational problems or l events that may occur during this period. !
- 3. Provide a sound technical basis for determining the effectiveness of licensee management controls for safe facility operation.
B. Action:
- 1. Organization The organizational chart for the NRC augmented startup inspection ;
organization is contained in Appendix 1.
- 2. Positions and Responsibilities
- a. The Browns ferry Restart Panel will continue to act in an oversight role and in an Hvisory capacity to the Regional-Administrator. The Panel-will maintain awareness of startup developments and progress.
- b. Senior Resident inspector (SRI) - The Sal reports to the DRP Branch Chief and is responsible for the overall site inspection stivities. The SRI provides day-to-day coordination of the operation of the NRr. Augmented startup organization, Responsibilities include:
(1) Providing an overview of startup activities to assure that regulatory requirements are met.
(2) Preparing and transmiting a weekly status report to
-the ORP Branch Chief for approval and distribution.
(3) Providing recossmendations to regional management with respect to startup hold points and with the licensee proceeding beyond each point.
Attachment
l 4 ' ', '
- i 2
(4) Providing recommendations to regional management
- concerning any additional support staff that may be i required, changes in inspection scope, and any 3
schedule changes.
1 (5) Coordinating support between the restart organization and the resident inspection staff.
(6) Assigning inspection activities for Unit 3 to support the BFNP augmented inspection plan shown in Enclosure 2. -
]
4 (7) Assuring continued inspection and assessment of j Units 1 and 2.
! c. NRC Shift inspector responsibilities include:
(1) Inspecting and monitoring assigned activities in the control room and plant as directed by the SRI and in accordance with the augmented inspection plan.
i (2) Providing inspection report input at the completion of
- the week.
! (3) Maintaining the NRC shift log and ensuring all items ,
requiring followup are properly identified and logged '
in the shift log.
j (4) Advising the SRI of plant status, licensee schedule
- changes and significant inspection results,
- d. Resident inspectors responsibilities include:
(1) Executing the core inspection program on the respective unit assigned.
(2) Observing for appropriate interface between units.
- 3. BFNP Unit 3 Startup Inspections Anticipated augmented inspection activities are outlined in Appendix 2. Shift inspection coverage will start with the Holdpoint No. I release inspection for initial criticality and
- continue as required through Holdpoint No. 4 (55% power). Several holdpoint release inspections are planned. It is anticipated that approximately 25 days of shift coverage will be required for these
- activities, Beginning with the establishment of shift coverage, all startup inspection activities will be conducted in accordance with a
e s
7y ,.. ,,, .- . ,. - _ . _ , . _ - - _ _ , . - - ,,,,7,m,. _ , _ . . , . , , , , _ , . . . , . . , , _ , , _ ,, , . ..m.. 7,,_m,-7y-,,- , , , - , , - - -
3 Appendix 2. Specific activities to te observed will be assigned and coordinated by the SRI. Holdpoirt release inspections will be documented in inspection reports using the normal format.
- 4. Shift inspection Coverage .
J The BFN startup organization will be augmented by inspectors from other NRC offices, as necessary, to support startup inspection activities. These individuals will be assigned to observe the conduct of control room operations and licensee activities performed in other plant areas. Control room activities will be monitored using inspection module 71715 (Sustained Control Room and Plant Observation). Shift coverage will be aligned with the licensee operating crews of 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> shifts. Oncoming shift inspectors shall observe the operating crew shift turnover, to the extent possible. The oncoming and offgoing shift inspectors shall conduct a turnover between themselves. The SRI will be kept informed of all inspection results. The SRI shall ensure that the DRP Branch Chief is briefed on plant status prior to the DRP 8:15 a.m., morning a,eeting.
- 5. Inspection Documentation While assigned to shif t coverage, each inspector will maintain the shif t inspection log. The purpose of this log is to record inspector observations and all significant findings or potential safety concerns. The inspector is responsible for identifying in the shift log all items requiring followup and the log will indicate the disposition of the identified concerns. All significant information exchanges with the licensee will be documented in the log. Licensee documents listed in the log will be identified in sufficient detail (procedure or record number, title, revision, issue date and completion date) for subsequent reference in the inspection reports. Each inspector is responsible for providing complete inspection report input documentation before the end of the inspection period.
- 6. General Information and Guidance This section contains information and guidance that describes policy, operating guidelines and routine instructions that are applicablu to BFN startup organization practices.
Weekly status reports will be transmitted to the DRP Branch Chief discussing the major issues identified and resolved
' each week. The weekly status report will be approved by the DitP Branch Chief.
The on duty shift inspectors normally are expected to remain onsite during the entire shift period. If for some unforeseen reason an on duty shift inspector finds it necessary to leave the site, the SRI will be notified and a
l ,
I 4
replacement inspector will be directed to the site to assume those duties.
l All publ-ic inquiries and media requests for l status / interviews related to the startup of BFN Unit 3 should be referred to the ORP Branch Chief or the Region !! '
. The oreferred method is Public referralAffairs to the PAO. Officer (PAO)
All al legations pertinent to BFN Unit 3 restart should be reported promptly to the SRI for i review of operational safety significance and then forwarded to the regional office allegations coordinator.
The protocol for holdpoint release is as follows:
l The SRI will determine that the licensee has completed the requirements and objectives for each assessment plateau..as delineated in the licensee's power ascension program and in ,
the holdpoint release criteria addressed in Appendix 2. The SRI will notify the DRP Branch Chief in advance to assemble the ORP Division Director and the Browns Ferry Unit 3 Restart Panel. The ORP Division Director and Panel will discuss the results of licensee completed activities, NRC !
inspections and other emergent issues as appropriate. The .
l- ORP Division Director will then provide a briefing and i i
recommendation of holdpoint release to the Regional l Administrator. Following this brief, licensee management l will provide their basis for holdpoint release to the l Regional Administrator, at which time the Regional '
l Administrator will determine if holdpoint release is acceptable,
- 7. Browns Ferry Startup Staffing l
Prior to initial criticality, the following will be established at :
' BFN for the duration of the startup test program and until such !
time as the Regional Administrator deems it acceptable to terminate augmented coverage.
Shift Coverage:
One Shift inspector per shift. Three 8-hour shifts.
One Resident Inspector will be dedicated to Units 1 and 2 and one. Resident Inspector will be dedicated to Unit 3.
Resident Inspectors will conduct inspections and assessments :
of Unit 2 interface activities and Unit 3 restart activities as defined by the SRI.
j Appendices: 1. BFNP Startup Organization i 2. Augmented Inspection Plan ,
i i
.,-_.-m- _ , , - - - - _.m -,- 4-m.__ _ . . . _ - . . , _ - - . - - - , . , , , , . - _ _ _ . . _ , . . . _ , _ . . . , , . _ . , .
n 3nda V 3 90WN S E 9 9Y R ES~~AT~ 0 9GA \ lZA~~lO \
I REGIONAL ADMINISTRATOR Browns Ferry 3 Restart Panel Division Director, DRP I
Branch 6 Chief i
Project Engineer Senior Resident inspector Augmented Shift Resident inspector Resident inspector Inspectors Unit 3 Units 1,2 i .
c:\BFRESTRT CH3 Appendi
,. , i
. 1 AUGMENTED INSPECTION PLAN j Holdpoint No.1 (Initial Criticality) Release inspection - To be completed prior to Initial Criticality. The inspection will consist of an assessment of ;
outstanding issues followed by an inspection to ensure systems . programs, !
personnel and procedures are in place to support initial criticality. !
!. Holdpoint No.1 Release Inspection (Prior to Criticality) !
The number in parenthesis denotes the Inspection Module being used as guidance for assessing the designated areas. -
A. Review of Licensing Activities Needed to Support initial Criticality (40500)
Review the results of the licensee's holdpoint .
assessment /evaluaton. l B. Review of Outstanding Employee issues l
Review open NRC allegations for issues which may effect initial criticality.
C. Review status of NRC Identified Issues (92700, 92701, 92702 and 92703) 1 (1) Review NRC outstanding items and verify that items effecting initial criticality are either closed or resolved for initial criticality.
(2) Review of any pending escalated enforcement items.
l D. Review of Testing Activities (61701, 61707, 61720, 61728 and 72701)
(1) Review results of Restart Test Program (RTP) and implementation inspection.
(2) Review status and inspection results for initial :
criticality, i
! (3) Review effectiveness of controls that were established for the conduct of testing.
L i
i Appendix 2 1_, _ . , ~ , , . - . _ . _ . , - - - _ - _ . . . _ _ .,_._,m.. , , , _ , , . - _ . , - - . _ _ - - .
2 E. Review of Plant Procedures Needed for Initial Criticality (71707)
(1) Review any changes to the Startup Procedures and ensure that the procedures were validated and that operating personnel have been trained.
(2) Review the Operating Instructions for control of startup and ensure that holdpoints have been established. Additionally, verify that proper levels of licensee review and management involvement have been established for mode change decisions.
(3) Review the Initial Criticality Procedure F. Review of Licensee Operational Readiness Assessment (71711)
(1) Review all licensee operational readiness reports and NRC ORAT inspection findings to ensure that BFN has resolved open restart issues.
(2) Review outstanding maintenance requests, PMs. and Problem
-Evaluation Reports associated with selected systems and assess their effect on operability.
G. Review Status of Safety Systems (71707, 71715)
(1) Verify the correct use of the configuration control procedure.
(2) Verify that required separation boundaries on systems shared by Unit I are in place.
H. Plant Material Condition (62700, 62702, 62703, 71707)
(1) Conduct a drywell walkdown and verify that the general condition will support initial criticality (i.e., fire hazard, housekeeping, meltable materials, etc.).
(2) Conduct a plant tour and assess the general material condition and housekeeping. Review the status of the licensee's walkdown inspection results.
(3) Review plant water chemistry with the chemistry supervisor.
- 1. Review Committee Activities (40500)
Review PORC and/or NSRB activities associated with Unit'3 restart.
3 J. Maintenance Status (71707. 72.'01, 62703)
(1) General material condition of plant (2) Annunciator alarm statur, acceptable (3) Post-maintenance testing complete or scheduled (4) Selected licensee System Health Status Repor's (5) Outstanding work items reviewed and consistent for restart K. Information Meeting with Local Officials (1) Discuss with local, State and Federal officials to explain the NRC restart inspection effort.
(2) Respond to media inquiries as necessary.
- 11. Holdpoint Release Evaluation Objective / Criteria for HP Nos. 2, 3 and 4 HP No. 2 -
(Prior to MODE switch in "RUN")
HP No. 3 -
(Before exceeding 35 percent rated thermal power)
HP No. 4 -
(Before exceeding 55 percent rated thermal power)
NOTE: (1) The inspection objectives listed below should be reviewed by the startup organization and applied to the holdpoint release process.
(2) The evaluation should consider information gathered since the last holdpoint however, the cumulative effects of data should also be considered.
A. Plant Material Condition (71707, 62703)
(1) General plant housekeeping (2) Review of significant equipment issues identified after mode change (3) Hanagement involvement with maintenance backlog B. Sustained Control Room and Plant Observation (71715)
(1) Control Room Conduct (2) Control Room Operations (3) Shift Turnover and Relief-(4 Shift Logs and Records (5 Event Response (6 Surveillance Testing (7) Accomplishment of Haintenance
...o. .,*
4 C. Management Oversight of Operations (71707, 71715)
(1) Evaluate involvement of supervisors and managers in operational activities and problem resolution.
(2)- Evaluate effectiveness of PORC oversight of operations D. Additional (1) fvaluate the nature and safety significance of allegations received by the NRC since the last holdpoint evaluation 2)~ Review the number and nature of. personnel errors
- 3) Review 10 CFR 50.72 or 50.73 reports
- 4) Evaluate QA/QC involvement in day-to-day activities (5) Evaluate the nature and safety significance of employee
-concerns received by the licensee (6) Evaluate HP effectiveness in controlling personnel exposure and contamination (7) Evaluate the conduct of and results of power ascension tests
__