Text
______
3 ocew
/
I**.
UNITED STATES j
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. N1 January 12, 1994
+
ENCLOSURE 5 Docket No. 50 325 MEMORANDUM TO:
M. W. Hodges, Director, DE A. C. Thadani, Director DSSA C. E. Rossi, Director, DRIL B. A. Boger, Director, DRCH F. J. Congel, Director, DRSS FROM:
Steven A. Varga, Director Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
SUBJECT:
STATUS OF RESTART ISSUES ASSIGNED TO NRR FOR RESOLUTION, BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 Enclosed is a proposed memorandum to Region 11 indicating the completion of those technical issues related to the restart of the Brunswick Steam Electric.
Plant, Unit 1 (Brunswici.), that were assigned to NRR for resolution or assistance. We believe that all technical issues have been satisfactorily I
addressed and know of no open issues assigned to NRR that should delay a' t
restart recommendation to the Region II Administrator by the Restart Panel.
The licensee is progressing towards a Unit I restart during the week of January 24, 1994.
Region !! has scheduled a restart status and review meeting with the licensee on January 19, 1994.
In order to support this restart meeting, I request that all Division Directors inform Gus C. Lainas, Assistant Director for Region 11 Reactors, or Patrick Milano, Brunswick Project Manager, of any outstanding issues involving Brunswick that that could impact the unit restart.
This information should be forwarded as soon as possible, but no later than noon Tuesday, January 18, 1994.
o rya', Direct en A.
'G't Division of Reactor Pro ts - 1/II
.. j, -
Office of Nuclear Reactor Regulation p-
Enclosure:
-u" Proposed Memo to Reg {oniH cc w/ enclosure:
J. Callan S. Varga G. Lainas S. Bajwa P. Milano P. Anderson 9710030143 970929 PDR FOIA O'MEALI97-252 PDR
e' e
CD&L ny Oarotina Power & Light Company Brunswick Nuclear Plant August 11,1993 MEMORANDUM TO: Outage Directors FROM:
K. B. Altman
SUBJECT:
Unit 1 Startup and Power Ascension Contingencies Attached is a listing of proble.ms which have occurred during previous startups along with planned actions to prevent or reduce the probability of recurrence during the upcoming Unit 1 startup. The list was developed with input from Maintenance, Operations, and Technical Support personnel, by a review of BNP Ucensee Event Reports from 1991, 1992, and 1993, and lessons learned from the recent Unit 2 startup.
Please ensure the open items on the attach 9d list are accomplished prior to the Unit 1 startup, unless they are scheduled to be completed during the actual startup and power ascension. Status updates should be provided to me at extension 2802 or pager 754-0429. A written update on the list will be issued periodically at the outag.# meetings, b %% -
KBA/tsc cc:
C. S. Hinnant G. D. Miller J. D. Purkis G.J.Gannon K. J. Ahern C. E. Robertson E. E. Willett R. P. Lopriore J. M. Brown W. Levis J.A.Dobbs G. P. Barnes
+
h Ah C G
BNP UNIT 1 STARTUP AND PONER ASCENSION CONTINGENCY PLAN A.
0-165 PSIG'
~
q PROBLEM CONTINGENCY RESPONSIBILTY STATUS / COMMENTS 1.
SRM/IRM noise or failure.
a.
Ensure all SRM/IRMs a.
T/S a.
Outage are operable at startup.
Scheduled
Reference:
Operations /I&C/ Technical b.
Conduct OCM-NE008, b.
I&C b.
Ou. age Support "LPRM,SRM,and IRM Scheduled Diagnostic I/V Curves."
c.
Conduct OSPP-NE002, c.
I&C c.
Outage "SRM,IRM and LPRM Detector Scheduled Reinstallation and Post-Installation Testing."
d.
Perform 1-MST-IRM25NA, d.
I&C d.
Scheduled "IRM Channels Range Cor-during startup relation Adjustment."
e.
Perform PT-50.2,"SRM/
e.
T/S e.
Scheduled IRM/APRM Overlap Determin-during startup ation" during startup.
f.
Fatablish plans to use f.
T/S f.
EER 93-334 &
a ncise suppression device 203 Approved and as required during Outage Scheduled startup.
2.
Position indicating probe a.
Verify PIP operability a.
Ops a.
Outage.
causing rod blocks.
during CRD testing.
Scheduled b.
Replace identified b.
I&C b.
Outage
Reference:
Operations defective PIPS.
Scheduled c.
Verify, replacement PIP c.
I&C c.
Complete on site to support startup.
i KBA1 Page 1
e BNP UNIT 1" STARTUP AND PONER ' ASCENSION CONTI]Ei. NCY PLAN E
^
0-165 PSIG PROBLEN CONTINGENCY RESPONSIBILTY STATUS /CONNENTS 3.
Uncoupled or hard to move CRD.
a.
Perform PT-14.1A, a.
Ops a.
Outage
" Control Rod Coupling Scheduled
Reference:
Operations /I&C/ Technical Check and CRD Testing."
Support b.
Replace defective b.
Maint b.
Complete.
CRDs.
c.
c.
Ops c.
Outage Scheduled 4.
Incorrect MSIV indication.
a.
Check mounting a.
I&C a.
Outage hardware for tightness.
Scheduled
Reference:
I&C/ Technical Support
.b.
Perform PT-25.1 to b.
Ops cycle PSIVs prior. to b.
Outage startup. (Observe locally)
Scheduled-5.
SRM/IRM drives could hit the a.
Have detectors and a.
I&C a.
Outage CRD vessel platform and bend on platform checked prior to Scheduled withdrawal.
start per AI-105.
b.
Fully withdraw each b.
Ops /I&C' b.
Outage
Reference:
Operations SRM/IRM on completion of Scheduled undervessel work and verify no interference.
Pcge 2 KBA1
PNP UNIT 1 STARTUP AND PONER PSCENSION CuivuavumavCi PLAN 0-165 PSIG R-PROBLEN CCMTINGENCY RESPONSIBILTY STATUS /CONNENTS g
a.
Have Nuclear Engineer-a.
T/S a.
Outage l
6.
Too few LPRMs per APRM channel.
ing review each bypassed Scheduled
Reference:
Operations.
LPRM. Determine status and possible use.
b.
Retert each LPRM b.
I&C b.
Outage string after CRD work per Scheduled OCM-NE008,"LF?M, SRM, and IRM Diagnostic I/V Curves."
c.
Retest each LDRM c.
I&C c.
Ourage string after CRD work per Scheduled OSPP-NE002, "SRM, IRM, and LPRM Detector Pre-Instal-iation and Post-Installa-tion Testing."
a.
Ensure main steam a.
Ops a.
Outage 7.
Failure to properly drain MSL can cause scram due to water lines are properly drained Scheduled in steam lines.
just prior to startup per OP-32, Section 8.10,
Reference:
Operations
" Removing the Condensate p
System From Condenser Cooling."
8.
Due to condenser cooling, crud a.
Verify the following a.
I&C a.
WR/JO being may build up in MSL flow instruments are filled and issued to perform transmitter instrument lines vented per OSPP-PIX 002:
work and cause spurious Group 1 1-B21-PDT-N006A-D isolation.
1-B21-PDT-N007A-D 1-B21-PDT-N008A-D
Reference:
Operations 1-B21-PDT-N009A-D C
Page=3 KBA1 L_
BNP UNIT 1 STARTUP AND POWER ASCENSION CONTINGENCY PLAN
~
0-165 PSIG l
_1 1
PROBLEM CONTINGENCY RESPONSIBILTY STATUS /COBOEENTS
~
a.
Inventory and verify a.
Maint a.
Complete 9.
Lost coupling parts - on 11PCI/
RCIC can delay startup.
coupling parts are under-control for IIPCI and RCIC
Reference:
Maintenance prior to startup.
10.
RPV water level instrument a.
Verify reference legs a.
Ops a.
Outage spiking can cause_ scram.
are full prior to startup Scheduled, by channel check during Performed prior
Reference:
Operations /I&C RPV drain down.
to mode change 1-B21-LT-N017A-D and daily by CO DSR.
a.
Assess SPTMS points a.
T/S a.
Complete 11.
Inadequate SPTMS points to support mode change.
b.
Monitor SPTMS RTDs for b.
T/S b.
Outage
Reference:
Operations /OM&M drift. Repair RTDs which Scheduled indicate problems.
12.
4160 vac equipment breaker a.
Conduct a walkdown of
,a.
Ops a.
Included in charging springs off.
4160 vac breakers. Check PT-12.6 all charging spring motors
Reference:
Operations on and springs charged.
b.
Perform PT-12.6, b.
Ops
- b. Routinely
" Breaker Alignment Sur-Performed veillance" to verify breaker status.
13.
AOG Guard Bed high moisture a.
Perform N drying of a.
Ops a.
Outage a
can delay startup.
guard bed one week prior Scheduled to startup per OP-33,
Reference:
Operations Section 8.4.
Page 4 KBA1 l
]LNP UNIT 1 STARTUP AMD POWER ASCENSIOtt Cussaususa;CY PLAN
^
0-165'PSIG PROBLEN CONTINGENCY RESPONSIBILTY STATUS /COOSEENTS 14.
Honconservative APRM setpoints a.
Conduct simulator' a.
Training a.
Complete have occurred at BNP and other training on' alternate-plants.
power indications.
- b. Licensed Operators per-b.
Ops b.
Conducted i
Refererce: Operations form hourly verification:
routinely at of APRM GAF settings in power-conjunction with Periodic Core Evaluat, ion (P1).
a.
Cycle. valves whi.ie, a.
Ops /I&C a.
Outage.
15.
Imprcper operation of-Reactor 11ead. Vent Valves ~(1-B21-F003 &
observing limit switch Scheduled F004).
performance locally'and RTGB indications.
Reference:
I&C 16.
Unreliable-operation of SJAE a.
Rebuild 11 analyzers a.
I&C a.
Outage-2 II analyzers.
prior to startup.
Scheduled 2
Reference:
- b. Ensure vendor represen-'
b.
.I&C.
b.
Outage tative'is.on site to Scheduled assist in rebuilding of analyzers.
17.
SJAE valves in vertical runs a.
Set limit switches to a.
I&C a.
Outage may bind'(OG-V10, V11, V13, &
reduce.pctential tripping Scheduled SJE-V4; reference EWR #07539).
of torque switch when.the valve " pops" out of the
Reference:
I&C seat.
b.
Supply 24 hour-cover-b.
Maint/ Ops b.
Scheduled age to. support Operations during startup to stroke the valves (manually.
8
.Page 5 KBA1
BNP UNIT 1 GTARTUP AND PONhR ASCENSION CONTIiiumarli PLAN
_0_-165 PSIG PROBLEN CONTINGENCY RESPONSIBILTY STATUS /CONNENTS 18.
Unit 1 Li. censed Operators do a.
Unit 1 Operators stand a.
Ops a.
Inprogress not have recent experience watch on Unit 2 to gain performing duties on an opera-operating experience prior ting unit..
to startup.
Reference:
Operations 19.
2-MST-HPCI39R did not include a.
Revise 1-MST-HPCI39R a.
I&C a.
Prccedure
. steps to ensure breakers for to open breakers for E41-Revision E41-F008 and F011 are opened F008 and F011 after estab-inprogress as required.
-lishing initial conditions.
Reference:
Unit 2 Startup Report a.
Revise PLP-20 and a.
Work Mgmt a.
Procedure 20.
.PMTR process improvements in effectiveness and efficiency implement PMTR process Revision are needed.
improvements.
Inprogress
Reference:
Unit 2'Startup Report 21.
Test equipment problems were a.
Procure appropriate a.
Maint a.
Complete experienced during HPCI and test equipment to improve-RFPT overspeed testing.
ability to obtain over-speed data.
Reference:
Unit 2 Startup Report 22.
OP-26 specifies an-inadequate a.
Revise OP-26 to a.
Ops a.
Procedure vacuum when warming Low Pres-specify a vacuum that is Revision sure Turbine 12th stage.
adequate to properly warm Inprogress the Low Pressure Turbine
Reference:
Unit 2 Startup Report 12th stage.
O O
Page 6 KBA1
?l BNP UNIT l' STARTUP AND' PONER ASCENSION CONThewai PLAN i
'~
0-165 PSIG-PROBLEN CONTINGENCY RESPONSIBILTY STATUS /C00SMNTS 23.
Unit 2 experiencedIvarious equipment problems during-startup:
a.
Verify EDG operability a.
T/S a.
Complete a..#2 EDG cylinder scoring and reliability.
- b. EllC 125vdc power supply b.
Verify proper opera--
b.
I&C b.
Outage failure.
tion of. Unit 1 EHC 125vdc Scheduled power supply prior to startup.
- c. Drywell Chiller failure.
c.
Verify proper opera-c.
Maint c.
Outage-tion of Drywell Chiller Scheduled to ensure _ reliability to support Unit'1 operation.
.d. CAC-4409 and'4410 monitor d.
Replace'1-CAC-4409 &
d.
Maint d.
Outage failure.
4410 sample pumps prior to Scheduled startup.
Revise-OP-24 to place Ops Complete 1-CAC-4409 & 4410 monitors in standby to ensure rel-iability.
- e. Main Steam Line flow e.
Calibrate and func-e.
I&C e.
Oatage transmitter failure.
tional test Main Steam Scheduled Line' flow transmitters prior to startup.
8 Page 7 KBA1
- ^
.BNP UdIT 1 STARTUP AND POWER ASCENSION CCNTINGENCY PLAN 0-165 PSIG PROBLEM CONTINGENCY RESPONSIBILTY STATUS / COD 9 TENTS
- f. Main Steam Line radiation f.
Calibrate and func-f.
I&C-f.
Outage monitor detector failure.
tional test Main Steam Scheduled Line radiation detectors prior to startup.
- g. Off-Gas Drain Tank loop g.
Verify proper opera-g.
,I&C g.
WR/JO being seal flooding.
tion of the Off-Gas Drain issued to perform Tank level control prior work to startup.
- h. 2-E11-F015B seat leakage h.
. Verify 1-E11-F015A & B h.
Maint h.
Outage and pressurization of RIIR disc / seat integrity prior Scheduled Heat Exchanger.
to startup.,
- i. Gland seal steam pressure i.
Calibrate and func-i.
I&C i.
WR/JO being controller failure.
tional test Unit I gland issued to perform seal steam pressure cont-work roller prior to startup.
- j. EllC filters clogged.
j.
Replace, Unit 1 EllC j.
Maint j.
Complete filters prior to startup.
Reference:
Unit 2 Startup Report 24.
OPM-TRB501 required a tempor-a.
Revise OPM-TRB501 to a.
Maint a.
Complete ary change during Unit 2 allow Operations to use startup to allow use of the the RTGB control switch to RTGB control switch to avoid avoid AOP cycling during cycling of IIPCI auxiliary oil IIPCI overspeed testing.
pump during overspeed testing.
Reference:
Unit 2 Startup Report 25.
Possible air binding of'RWCU a.
Revise OP-14'to permit a.
Ops a.
Procedure-system.
bypassing RWCU heat exch-Revision angers during initial Inprogress
Reference:
Operations system startup at < 140 F.
V Page 8
KBA1
- l i
BNP UNIT 1 STARTUP AND POWER ASCENSION CONTINGENCY PLAN 0-165 PSIG PROBLEN CONTINGENCY RESPONSIBILTY
' STATUS /COISMNTS a.
Operations Management a.
Ops a.
Scheduled
- 26.. Operators may not understand Operations Management expecta-explain expectations during LOR tions during startup.
during startup to Operat-ors prior to startup.
Reference:
Operations 27.
OP-29 does include. steps to a.
Revise OP-29 to a.
Ops a.
Procedure open outlet waterbox air include steps to open Revision removal valves.
outlet waterbox air Inprogress-removal valve when placing
Reference:
Operations
.waterbox air' removal system in service.
27.
OPM-TRB508 has conflicting a.
Revise OPM-TRB508 to a.
Maint a.
Complete steps regarding RCIC trip resolve conflict regarding throttle-valve operation for trip throttle valve opera-overspeed testing.
tion.
Reference:
Unit 2 Startup Report KBA1 9"
BNP UNIT 1 STARTUP AND POWER ASCENSION CCNTINGENCY PLAN 1
165-1000 PSIG i
i I
B.
i l
PROBLEM CONTINGENCY RESPONSIBILITY STATUS / COMMENTS i
1.
RFPT fails to reset or trip a.
Conduct MI-10-519F, a.
Maint a.
Scheduled from Control Room.
" Reactor Feedpump Turbine during startup Overspeed Trip Test" prior Heles e:nce : Operations /I&C/ Technical to placing RFPT in service.
Support b.
Conduct PM 91-152, b.
Proj Mgmt b.
Scheduled
" Reactor Feedpump Logic during startup Redesign" acceptance testing.
2.
- a. Scheduled limit switch failure.
motor and limit switch During Startup operations.
Reference:
Operations 3.
SULCV fail open or shut.
a.
Verify full operation a.
Ops a.
Scheduled of SULCV prior to startup during startup
Reference:
Operations /I&C/ Technical per GP-01, "Prestartup Support Checklist".
b.
Rebuild SULCV actuator b.
I&C b.
Complete and install new positioner.
c.
Install five micron air c.
Projects c.
Complete i
filters to minimize air-related problems.
Page 10
JV !
BNP UNIT 1 STARTUP AND PONER ASCENSION CUusausumavCi PLAN j
265-1000 PSIG~
i PROBLEN CONTINGENCY RESPONSIBILITY STATUS /COOSEENTS.
a.
Perform. service air a.
Ops /T/S a.
Outage 4.
Water in off-gas pipe caused'by valve failure for loop seal purge of SJAE per OP-30, Scheduled fill at Off-Gas Drain. Tank Section 8.6.
(Ensure drain (loss of vacuum).-
cap is removed from recombiner during this
Reference:
Operations evolution),
b.
Turn on recombiner heat b.
Ops b.
Outage-strips and verify tempera-Scheduled ture' rises to =400 F.
(Low temperature indicates that the catalyst bed is wet).
c.
During startup, verify c.
Ops c._
Scheduled that the Off-Gas loop seal during startup level is normal twice per shift until >50% power.
a.
Verify Steam Packing a.
Ops /T/S a.
Outage 5.
Steam packing exhausters have been found filled with water on Exhauster is' drained per Scheduled some startups.
OP-26.1, Section 8.2 b.
Verify Steam Packing b.
Ops /T/S b.
Ot.tage
Reference:
Operations Exhauster loop seal is Scheduled filled with water to prevent loss of vacuum.
6.
TIP drive / drawer failures have a.
Exercise TIP system a.
T/S a.
Outage delayed power ascensions.
prior to startup by perfor-Scheduled' mance of PT-1.9E, " Axial
Reference:
Operations Alignment of Traversing Incore Probes".
Page 11 KBA1
.' BNP UNIT 1 STARTUP AND POWER kSCENSION Cusv41svumeCi PLAN
~
165-1000 PSIG E
9 PROBLEN CONTINGENCY RESPONSIBILITY STATUS /COOSEENTS a.
Ops a.
Scheduled 7.
SRV tailpipe temperature a.
Monitor SRVs closely' increases may be observed.
during startup.
during startup b.
Operations review b.
Ops b.
PLP-17
Reference:
Operations /I&C actions associated with briefing at power stuck-open SRV prior to addresses.this performance of PT-11.1.2, issue
" Automatic Depressurization System and Safety Relief Valve Operability Test".
c.
Verify spares; certify.
c.
T/S c.
Complete replacement SRV base body, pilot, and solenoid valves.
8.
Steam leaks in dryw211 or MSIV a.
Conduct inspection at a.
Ops /Maint/
a.
Scheduled Pit.
rated pressure. Evaluate' T/S during startup repair requirements.
Reference:
Operations 9.
SRV sonics failure.
a.
Perform SRV " ping" test a.
I&C a.
Outage as one-of the final drywell Scheduled
Reference:
Operations closecut items.
Page 12 KBA1
- }
BNP UNIT 1 STARTUP AND PONER ASCENSION CONTINGENCY PIJ.E 165-1000 PSIG' 1
I PROBLEN CONTINGENCY RESPONSIBILITY STATUS / COMMENTS 10.
Possible problems with instru-a.
Perform operability a.
Ops a.
Outage ments worked on Instrument tests of EHR, Core Spray, Scheduled Rack modification (PM-92-070).
and SLC systems prior to startup.
Reference:
Technical Support b.
Verify HPCI operability b.
Ops b.
Scheduled by performance of PT-9.2, during startup "HPCI System Operability Test" during startup.
c.
Verify Reactor Recirc-c.
Ops c.
Scheduled ulation instrumentation by during stactup performance of PT-13.3,
" Reactor Recirculation Jet Pump Operability Below 25%
Rated Power".
d.
Channel check Main d.
Ops d.
Scheduled Steam Line Flow Transmit-during startup ters (1-C32-PDT-N003A-D).
e.
Verify the following e.
Ops e.
Scheduled reactor instrumentation as during startup required by CO DSl: 1-D21-LT-NO36, NO37, 1-B21-PT-N021C and D, 1-B21-PDT-N006A&B, N007A&B, N008A&B, N009A&B.
a.
Place Heater Drain sys-a.
Ops
- a. Scheduled 11.
Delays in power ascension to allow cleanup of Heater tem in cleanup mode as during startup Drains.
early as possible per per GP-01.
f }
OP-35, Section 5.1.
Reference:
Operations Page 13 KBA1
a BNP UNIT 1 STARTUP AND POWER ASCENSION CONTINGENCT PLAN 165-1000 PSIG
~
PROBLEN CONTINGENCI RESPONSIBILITY STATUS /COpWEENTS a.
OG-03, " Primary Con-a.
Ops a.
Scheduled 12.
PT-2.6.6 not performed before and after each drv #.1 entry tainment Access Control" during startup and exit to verify cy'ra-controls drywell entry at bility.
power and directs perfor-mance of PT-2.6.6,
" Primary
Reference:
LER 1-91-008 Containment Airlock In. er-lock Operability Check" prior to and following each drywell entry.
b.
Pre-job brief for dry-b.
Ops b.
PLP-17 brief well entry should include at power address-requirements for control es this issue and post-entry tests req-uired.
a.
Maint a.
Complete Perform preliminary 13.
~ a.
1-B21-F022B has a galled stem.
inspection of 1-B21-F022B Packing leakage is a possibil-stem and packing and repack ity.
if r.ecessary prior to startup.
Reference:
Maintenance 14.
Unit 2 experienced various equip.nent problems during startup;
- a. 2B RFPT shaft driven oil a.
Ensure 1A and IB RFPT a.
Maint a.
Outage pt.mp failure.
shaft driven oil pumps are Scheduled properly rebeilt/reassem-bled prior to startup.
- b. RFPT minimum flow valve b.
Calibrate 1A and IB b.
I&C b.
Outage did not shut at required RFPT minimum flow valve scheduled flow rate.
control systems prior to startup.
}- Re f.erence :
I Unit 2 Startup Report Page 14 KBA1
5 BNP UNIT 1 STARTUP AND PrWER ASCENSION Cvus2hi PIAN
~
165-1000 PSIG PROBLEN CONTINGENCY RESPONSIBILITY STATUS /COOSGNTS 15.
PT-37.1 duplicates testing a.
Delete PT-37.1, " React-a.
Ops a.
Procedure performed by MI-10-519F for or Feed Pump Overspeed Revision RFPT overspeed test'ng.
Check" prior to startup.
Inprogress
Reference:
Unit 2 Startup Report 16.
Unit 2 Drywell entry during a.
Assign key personnel a.
E&RC/T/S/
a.
Complete startup was not well coor-to coordinate the Unit 1 Maint dinated.
Drywell entry during startup.
Reference:
Unit 2 Startup Report 17.
MI-10-519F specifies too a.
Revise MI-10-519F, a.
Maint a.
Procedure restrictive a range for RFPT
" Reactor Feed Pump Turbine Revision i
speed during overspeed test-Lever Adjustments for Mech-Inprogress ing.
anical Hydraulic Control System" prior to startup to
Reference:
Unit 2 Startup Report specify a more realistic range for RFPT speed during overspeed testing.
O KBA1 Page 15
BNP UNIT 1 STARTUP AND PODER ASCENSION Cuusa usus-Ci PLAN 1000PSIG TO FULL PODER C.
PROBLEM CONTINGENCY RESPONSIBILTY STATUS / cot 3mNTS 1.
Fuse failure in FWLC.
a.
Complete installation a.
Projects a.
Outage and testing of Digital Scheduled and
Reference:
LER 2-90-008 and Feedwater Control System Scheduled During 2-90-016 (PM 89-001).
Startup 2.
Water in main turbine lubricat-a.
Obtain chemistry analy-a.
Maint a.
Outage ing oil, sis on completion of lube Scheduled oil flush to verify acc.spt-
Reference:
operations able moisture level.
b.
Perform routine analy-b.
E&RC b.
Routinely sis of main lube oil for performed after moisture and particulate.
generator gassing c.
Verify that main lube c.
Opa
- c. Outage oil conditioner is in ser-Scheduled vice and monitor on AO rounds.
3.
Generator core monitor fails to a.
Revise OP-26 to include a.
Ops a.
Procedure reset.
main generator core monitor Revision startup testing.
Inprogress
Reference:
Operations b.
Perform main generator b.
Ops b.
Scheduled core monitor test during During Startup startup.
a.
Flush High Pressure a.
Ops a.
Outage 4.
Suspended solids in RPV when High Pressure Feedwater Heaters Feedwater Heaters back to Scheduled are placed in service.
condenser prior to startup per OP-32, Section 8.13,
Reference:
Operations "Long Cycle Cleanup".
Page 16
BNP UNIT 1 STARTUP AND POWER ASCENSION Cussausumsssi PLAN 1000PSIG TO FULL PONER PROBLEN-CONTINGENCY RESPONSIBILTY STATUS /COOSEENTS a.
T/S a.
Outage 5.
Main generator lockout and tur-a.
Verify visually that bine trip.because of an impro-main generatcr and trans-Scheduled per relay setting.
former trip and lockout relays have correct
Reference:
Operations setting. (Located in Con-trol Room backpanel XU-8).
6.
Main Generator manual / automatic a.
Perform portions of a.
T/S/I&C a.
Outage voltage regulator failure.
OSPP-GEN 007, " Main Scheduled Generator Voltage Regulator
Reference:
LER 2-91-005 Board Replacement and Func-tional Checkout" as direct-ed by System Engineer prior to startup.
b.
Conduct PT-40.2.11, b.
Ops b.
Scheduled
" Main Generator Voltage during startup Regulator Manual and Auto-matic Operational Check",
during startup.
7.
Main Generator bearings low a.
Check bearing ground a.
I&C a.
Outage meggar readings.
readings routinely prior to Scheduled startup per OPM-BPD002, Referencer Operations
" Generator-Exciter Bearing Insulation Check".
a.
Complete installation a.
Proj Mgmt a.
Outage 8.
Spurious RWCU isolations.
and operability of PM Scheduled
Reference:
LERs 2-91-004, 1-91-028,91-038, " Steam Leak Det-1-92-014, 1-92-015 ection Upgrade".
b.
Train Operators on FM b.
Training a.
Scheduled in 91-038 and use of new steam LOR leak detection equipment.
8 Page 17 KBA1
\\
BNP UNIT 1 STARTUP.AND POWER ASCENSIOW CONTINGENCY PLAN
~
1000PSIG TO FULL POWER PROBLEN CONTINGENCY RESPONSIBILTY STATUS /rvimmeruTS 9.
Main Turbine rub or high vibra-a.
Verify equipment and a.
Maint a.
Complete tion during startup.
personnel available to bal-ance main turbine.
Reference:
Operations b.
Verify balance weights b.
Maint b.
Complete are on site.
c.
Verify procedures to c.
Maint c.
Complete balance main turbine.
10.
Actuations, isolations and/or a.
Review previous MST/PM a.
Maint/I&C a.
Planned prior scram due to improper MST/PM events with appropriate to startup performance or wrong unit.
personnel.
b.
Verify plant condition b.
PATM/WCC
Reference:
LERs 2-90-009, 2-91-001, requirements as part of b.
Outage 2-91-005, 2-91-018, 2-scheduling process.
Scheduled and 91-021, 1-91-014, and Scheduled During 1-91-018 Startup 11.
Reactor scram during perform-a.
Replace #2 TSV Master /
a.
I&C a.
Outage ance of MST-RPS35R (Main Turb-Slave Logic Board.
Scheduled ine Stop Valve Testing) due to b.
Perform 1-MST-RPS35R b.
I&C b.
Outage malfunction of master / slave prior to startup.
Scheduled logic for #2 TSV.
Reference:
LER 1-92-005 a.
Install warning sign on a.
Ops a.
Complete 12.
Attempts to adjust RPS "A" bus voltage by an AO without using each RPS MG Set.
the WR/JO process resulted in a voltage overshoot and a 1/2 scram, 1/2 Group 1 signal, and Group 1,2,3,5,and 8 isolations
Reference:
LER 1-92-022 KBA1 Page 18
u
, e wm 2
.,.... +.
/
BNP UNIT 1 STARTUP AND POWER ASCENSION CONTINGENCY PLAN 1000PSIG TO FULL POWER l
PROBLEM CONTINGENCY RESPONSIBILTY STATUS / COMMENTS 13.
Reactor scram - Transmission a.
Establish strict cont-a.
T/S a.
Complete.
Maintenance Relay technician rols for switchyard work.
did not return overcurrent relay setting to correct set-ting following calibration.
b.
Develop list of work b.
T/S b.
Complete performed on the off-site
Reference:
LER 1-91-007 electrical supply system during the outage.
c.
Develop recheck / reins-c.
T/S c.
Inprogress pection list based on work performed.
14.
MSR level controllers not con-a.
Tune controllers during a.
I&C a.
Scheduled trolling at setpoint.
startup.
during startup
Reference:
I&C/ Technical Support 15.
IIeater Drain level controllers a.
Conduct functional ver-a.
I&C/T/S a.
Outage not controlling properly.
ification of Heater Drain Scheduled level control loops prior
Reference:
Technical Support to startup.
a.
Issue EER to allow ins-a.
T/S a.
Complete 16.
Due to improved ventilation in the Main Steam Tunnel, prob-tallation of higher wattage lems could be experienced in heaters for temperature satisfactorily performing switches.
PT-2.1.22.
b.
Install heaters as b.
I&C b.
Outage required by EER.
Scheduled
Reference:
Technical Support 17.
Need additional on-site per-a.
Implement staffing plan a.
All a.
Scheduled sonnel to rapidly respond to as required by " Unit 1 During Startup operational requirements.
Startup and Power Ascension Performance Objectives and i'
Reference:
Operations / Maintenance Management Plan".
6 Page 19 KBA1 i
I u_
BNP UNIT 1 STARTUP AND POWER ASCENSION CONTi m i PLAN 1000PSIG TO FULL POWER PROBLEN CONTINGENCY RESPONSIBILTY STATUS /COOWEENTS Complete Repair leaking disc /
a.
Maint.
a.
18.
Unequal heating of LP turbine a.
can result when placing reheat seat in IMS-v66.
steam in service due to uneven b.
Ensure reheat steam is b.
Ops b.
Scheduled pressures.
slowly placed in service to During Startup preclude uneven heating and
Reference:
Operations turbine vibration.
19.
Performance of on-l2ne stator a.
Develop a procedure for a.
T/S a.
Procedure cooling runback test can off-line testing of stator Preparation result in main genera.or cooling runback circuit to Inprogress damage.
replace OPT-36.4 A, b..
Perform off-line stator b.
T/S b.
Outage
Reference:
Operations cooling runback test prior Scheduled to startup.
a.
Issue EER prior to a.
T/S a.
Engineering 20.
Special covers could be inct-alled on LP Turbine to enable startup to allow installa-Work Inprogress on-line balance weight instal-tion of special covers for 1.it ion.
on-line balancing of LP Turbine.
Reference:
Unit 1 Startup Report b.
Install special covers b.
Maint b.
Outage on LP Turbine prior to Scheduled startup.
21.
Main Turbine-Generator rolls a.
Implement temporary a.
T/S/I&C a.
Outage off turning gear.
modification to disable Scheduled high speed operation of
Reference:
Operations /Tecchnical turning gear.
Support b.
Implement procedure for b.
Ops /T/S b.
Procedure use of reduced number of Revision lift pumps.
Inprogress OO KBA1 Page 20
BNP UNIT 1 STARTUP AND POWER ASCENSION CONTINGENCY PLAN i
1000PSIG TO FULL POWER i
PROBLEN CONTINGENCY RESPONSIBILTY STATUS /C00SEENTS 22 Special instimcpions are not a.
Revise 10P-26 to a.
Ops a.
Procedure included in IDP-26 for,startup include infrequent Revision of the Main Turbine-Gqnerator operations for Main Turbine Inprogress following majbr maintenance.
startup following major maintenance.
j e
Reference:
Operations / Technical b.
Perform Main Turbine b.
Ops b.
Scheduled Support.
e startup in accordance with During Startup
{
revised 10P-26.
23.
Unit 2 feedwp 'r flow instru-a.
Evaluate the need to a.
T/S a.
Scheduled mentation fou to be out-of-restrict Unit 1 maximum Prior to Startup T
power until a feedwater i
tolerance.
flow instrumentation cali-j
- ~
Reference:
Operati,I/dechni, cal bration is performed.
Support" 1
24.
Unit 2 experienced various equipment probkas during startup:
J.
j
- a. TSV/TCV scram bypass a.
Verify Unit 1 TSV/TCV a.
I&C a.
Outage i
failed to' reset et 30%
scram bypass is properly Scheduled power.
set prior to startup.
- b. Main Genefator H leak.
b.
Verify Main Generator b.
Maint b.
Complete 2
and bus duct covers are properly sealed and installed.
- c. TIP B detector failure.
c.
Verify operability of c.
T/S c.
Outage TIPS prior to startup.
Scheduled
Evaluate to ensure PM d.
Proj Mgmt d.
Evaluation J
073).
wiring controls are Inprogress adequate to preclude errors such as occurred on FM 89-073 prior to startup.
O KBA1 Page 21 1
1
/N
pum jn w/ - / ?.
6 BRUNSWICK UNIT 1 STARTUP READINESS ASSESSMENT Debrief Notes 8/27/93 Report No. B-SP-93-06 An assessment of the Brunswick Nuclear Plant Unit I readiness for startup was performed on August 20-27,1993, and was debriefed on August 27,1993.
Purpose:
The Nuclear Assessment Department conducted an assessment of the readiness of the Brunswick Nuclear Plant (BNP) Unit I to conduct a safe startup and maintain sustained, reliable plant operation.
Results:
Overall Amnessment Summarv The progress of the BNP Unit 1 outage, coupled with the Unit 2 proven line management self assessment of readiness for restart (PN 31 process), supports safe startup of Unit 1.
The uncertainties associated with the core crack will require additional investigation and resolution.
A strong management team and good performance by Operations were noted.
Improvement in work scoping, scheduling, and coordination were noted compared to the February 1993 Unit 2 Startup Assessment.
Assumptions:
1.
'Ihat the plant completes the Integrated Startup Plan (ISP) submitted to the NRC on November 30,1992 (BNP Ltr 309-13510, Ser BSEP 92-0046, of November 30,1992).
2.
That the commitments to the NRC contained in the July 23,1992, CP&L 1mprovement Program (CP&L Ltr NLS 92-160 of July 23,1992) are met.
3.
That the PN 31 (Line Management Self Assessment of Readiness for Restart of BNP Unit 1) is satisfactorily completed.
4.
That the Unit I restart targets, as set forth by CP&L in the NRC June 9,1993, presentation to the NRC regarding " focus" syr'em work request / job orders, corrective maintenance, operator work arounds, temporary modifications, Control Room annunciators, permanent caution tags, and short-term structural integrity items, are met.
bap9306. deb Page 1
v h,
5.
'those elements of the Unit 1 Startup and Power Ascension Performance i
Objectives and Management Plan needed for initial rod pull and power ascension I
are satisfactorily completed.
Potential Issue; Managesnent of contracton involved in refuel floor activiiles must be strengthened.
Unit I refuel floor activides have resulted in several events or near misses in July and August 1993.
1 e
Itemt for Mannerment Consideration:
1.
Continued improvement in work control and scheduling is needed to optimize Safe Shutdown Risk Management.
2.
Ownership of the design by Nuclear Engineering Department (NED) discipline managers is an important element of configuation management.
N E D is allowing design decisions to be made by non-design personnel.
3.
As a result of fuel debris, GE has recommended that BNP consider " Gentle" fuel cycles to further minimize the potential for fuel leaks. BNP management is encoumged to reach a decision regarding this recommendation prior to leginning Cycle 9.
I bg9306. deb -
Page 2 e
i 4 e
C t
NAD ROLL UP August 24, 1993
)
Qverettgu A.
Achilles' Heel: Operations Resources Returning systems to services LOR Exam in progress Clearance handling Manning WCC Supporting spent fuel shipments B.
Undercurrent that schedule is unachievable given total scope, Operations resources, etc.
C.
Large areas of plant roped off.
Look at coordinator.
Labelling program is very weak; not visible.
l D.
Large number of roped areas may channel Ao rounds.
E.
Control Room short-handed; caused personnel to have to wait at window about 10 15 minutes.
F.
When quizzed about shutdown risk management, Shift Foreman was asked who was in charge of safe shutdown risk.
He wasn't sure, but he ) mew there was an instruction.
i Welding job above RWCU; sparks from welding rolling around G.
SDGT - Scaffolding installation; walking on small pipes CPRM Initially handled without gloves
,H..
Opstatjigne' egp^" af ^"t,ageeplanninay-and-pr4 rirMzation"bhgEAW ::--
I.
operations ownership Prioritization of work / clearances Shutdown risk (expectation?)
J.
Supervision of contractors.
Maintenance A.
Work control focused on corrective maintenance instead of total work required for closure PMs Maintenance planning Operations / Craft resource limits B.
340 ILC Maintenance must be completed by August 31.
70 are overdue; 2/3 cannot be worked due to required boundary changes, window closeout, etc.
C.
Mechanical Maintenance is in better shape.
110 due by August 31; 11 overdue.
D.
Unit 1 has more PMs because it is a refueling O/H and because crew site is
- smaller,
[
a:mdb/82493.rol 1
871$/93
O Maintaapace (Continued) l E.
70% of work packages must be returned to Planning for more planning. This is a precess problem vice a planning problem.
F.
11 work activities monitored - 4 worked; 1 complete Inadequate planning i
)
Sense of urgency?
G.
BARC A.
Adverse HPES trend.
Not sure what to do.
B.
Management confused on effective communication.
C.
Spent fuel shipping - Concern for Maintenance support given; need to work i
1 down the backlog.
D.
Refuel floor ownership Resources during fuel shipping hainaarina/ Tech sunnart A.
Don't have the intensity on Unit 1 that we had on Unit 2.
" People are getting worn out.*
B.
Lack of time in field by design engineers.
C.
Core shroud; boat sample; work all the way through, f?
.. *: Y '
l*!
' ' '~
(J/t (
(*?/
g
'*^"
JW~! r
- gu.1/
14
/..c,,
s-g
.,.g
, e
- g.,,... L, c <l <
l,u g. *. l t -
I
.e i
j&
' ~
- l
't e 2
- C 4'
, i. r
,J.' * < /w
- , w tj g,,, r,.
..]
'. ~ ',.
v
/
/
- ff7WNrf
- l f
/.!
a:mdb/82493.rol 2
8/2993
N1410) /dDu4 o,. s e,.,A /,/u A u ~
a.H...,,,...j,,,,,,,,4
.....s r..
,. if,
.x
..,.,,e j.(,.'n ' '
G.. ~.,,' i,"
e ACROSS TER SMRD
,e Q'
O r7p '
4 w
, vy ;.
.,),/
/ 9,;a,,
3
& :n Y..,
\\
m-
t involy--- t / coachi na / c-
-leation Qq Plant senior management heavily involved / knowledgeable.
PN 31 a plust A.
y
\\
B.
Management involvement gets through ranks / personally accountable.
E C.
Positive / optimistic, i y D.
Shitt supervisors: Not proactive in pushing closeout.
[
E.
First line Maintenance supervision: Visible / coaching.
(:
// -
Ownership of fuel floor ( f f actively delegated to GE.
o J,
F.
G.
First line Operations supervision:
tiot visible outside Control Room.
s 4
H.
Increased Operations management presence over past month observing e
simulator training.
'A.; g
-4
~
OM Lessons Learagd s s7 A.
Visibility in Operations.
Event rate down versus Unit : startup.
,\\
N B.
I&C Maintenance voltmeter incident third of this type in past year.
N -
NN C.
Late to use systems sponsors.
D.
Doing system walkdowns/Startup Management Team - plus.
E.
Unit i Outage Management Team reviewed Unit 2 emergent items.
F.
Rewrite of modification / implementation process (Three-Year Plan).
G.
Failure to contain contamination while cutting up fuel pool material.
Backlos Reduction Operations being driven by work, not driving work - resource / schedule.
A.
B.
Temporary modifications: Will go below goal.
C.
I&C Maintenance PM backlog concern.
D.
Unit 2 corrective maintenance backlog above goal.
E.
Unit 2 Operations Manager:
Not sure of kinds of jobs to be worked off.
May be a communications issue.
1 Corrective Action Effectiveness Happy with CAP enhancements; training deficiency at working level.
A.
B.
Fire Protection - too many reports.
C.
Overtime violations actions ineffectivo; wrong approval level / batch approvals.
8/25/93 a:sulb/82493.ml 3
s s O
r corrective Action Iffactivanama (Continued)
D.
Program starting to bear fruit (EutC). Downsides No ef fective corrective actions reports not getting out.
E.
EutC Not factoring CAP output to training - sitewide.
F.
ETS: NED not responding to CAP due dates.
G.
Maintenance Quality Team looking at HPES issues.
Attitude /tiorale A.
Management - high morale overall.
B.
Expect energy level to pick up as we get to end of Unit 1 outage.
Schedule Use/Ferformance A.
What schedule? Not a practical tools focus system schedule / critical path being used.
B.
POD 4-day schedule - critical path (f ocus system) being used.
C.
No way to measure performance to schedule.
4 Mouseksenine/ainterial Condition A.
Unit 1 - Lots of work but not much dirt.
B.
Housekeeping signs blank.
l C.
Model areas (EDG #1, Service Water Building) require much work.
D.
Labeling "Not Good" by industry standards. Labeling responsibility turned i
over to operations (no impetus).
Saves exposure, reduces errors.
Persa--e1 to Sunnart Scent' Fuel Shinaiho llanagement of Startun Remainess Plan A.
Same structure as last time.
B.
Proven plan, i
C, S}.ecial digital FW testo on simulator plus other startup tests.
I 4
3 a
i 8MM 4
a:adb/82493.rol
~
STARTUP READINESS ASSESSMENT TEAM d
BRUNSWICK NUCLEAR PLANT Q%
MM MEMBERS NoeCP&L Ops. Mgmtf Maint Mget' Eng. Mgmtf EARC Mgnuf Pk Gen Mgrf SRO/SRO Navy Nalear INFO A~...- ;
N-.. _
.,_. ;a,.
oyenema Cert 3%.ee E,asamaw MitC Empenence I
I
/
/
L L toilm (Team trader)
(temt - E&M
/
M. D. Bradicy (Yeam tzader)
(trad - Mann)
OPS & Manarem-ntOvenicht I
I I
J. W. Mover (lead)
I I
/
/
K. J. Christian
/
E. R. Ilarkcan W
W G.C.Botmum I
Y
/
/
/
B. P. Izonard I
I I
/
/
/
L C. Issinr I
/
D. W. McCaddl Y
Y Y
/
/
J. L Suffran I
/
/
J. P. Dompenn Engmeerme TectmicalSappnet r
I J. W. McKav R. M. Rorers I
C. L Schacher I
R. L Sarwert 88W "I Angum 25.1993
A
.ama.da 2A_.A14m mBm#
MM4 ann _ J e4.iwF.-i.*
-4AJ.=4 sh4ew4-Ss<
4-4.i.4 4hd 44m&-=A--4.-44,-aA hai @rd4_Ja4
%_A.r.A 4
ae.-
-.m e
_.+h a,,_
.4-4= _ - -hJ--+__S.**.4---w--A.C-2 A--Lw%--sLda--
h k
95 a
i s.
k n
\\
l al ek 1
y 2,
t,-
1, l.:
l E
R s
J 4
5 u
1 J
d W
d" 6
W W
A N
a R
-.,--w,,-
---r,-
,--e.-,-v.,,-
,,-,r
., -.m
i t
BRUNSWICK UNIT 1 STARTUP READINESO ASTASSMENT TEAN Total Nuclear Namme Classification Experience Experience Level Michael D. Bradley Manager-Proj.
31 yrs 11 mos
'31 yrs 11 mos BS-Naval Academy '61; MS l
Assess. BNP (Computer Sys. Mgt.) '71; EOOW (Navy) *63; Nuc. Engr (Navy) '66 Kenny J. Christian Manager-Plant Ops, 19 yrs 9 mos 19 yrs 9 mos Cert.
Qual. NAVSHIPS '74; HL&P L2O (FP&L) '81: SRO, South Texas Project '87 v
J. Wayne Gurganious Senior Specialist 13 yrs 9 mos 14 yrs BA (Chem.) *78; E&C Foreman BNP *E2 *87; E&C Spvsr BNP "91
"?;
Erik R. Harkcom Principal Engineer 10 yrs 2 mos 10 yrs 2 mos Navy Nuc. '79 '88; EIT Cert.;
STA Cert.
Thomas E. Hicks Director-Nuc. Prog.
14 yrs I mos 14 yrs 1 mos BS-Naval Academy '79; Navy
[
Div.; STS, Inc.
Nuc. '79 *84; USNRC Res.
Insp. *84 '85 (2 yrs, 3 mos) tf Glenn C. Johnson Project Specialist 29 yrs 12 yrs 5 mos Began Pre-Engrg '73 *74
,/
Bruce P.
Leonard INPO Team Manager 16 yrs 9 mos 16 yrs 9 mos Mgr. Trng BNP '90
- 92; INPO J
Asst. Team Mgr. '86 *90; Ops.
Trng Mgr. "IMI 1-2 *82 *86; US Navy Nuc. Prog. '76 *82; SRO Cert.
Leo C. Lessor INPO Team Manager 36 yrs 9 mos 36 yrs 9 mos BS (Chem. Engrg) '56; RO; Shift Spvsr.; Plant Superintend. '70 '83 Leonard I. Loflin Manager - Nuclear 29 yrs 6 mos 24 yrs 11 mos BS (EE) '64; (NE) '69; Assessment Dept.
SRO '72: PE (CA) '76 arw/exrprof.ut
.I-8/2593
c.
- G l
Total leselear l
Name Classification Experience Emporience Lowel j
1 i
Donald W. McCaskill Project Specialist 21 yrs 11 mos 20 yrs 6 mos RO '75 '79; SRO '79-Pres.;
]
Sr. Control Oper. *79 '82; Shift Spysr. '82-Pres.
John W. Moyer Manager-Proj.
'32 yrs 31 yrs 6 mos Navy Nuc '61 '83; Cert. SRO -
Assess. HNP BNP; BS (Mgt) '78 Donald R. Quick Manager-Mgmt/Org 41 yrs 2 mos 36 yrs 7 mos SRO '66
.N.
Curtis L. Schacher Project Engineer 22 yrs 1 mos 14 yrs 1 mos BS (EE) '71; EIT '71 Ralph Schlichter Principal Engineer 29 yrs 29 yrs BS { Naval Science (Engr))
yf
'64; EOON (Navy) '66; Nuc Engr (Navy) *69 l't Roger L. Stewart Principal Engineer 21 yrs 7 mos 21 yrs 7 mos BS (ME) '71; PE (CT) *78; PE (NC) '79; Cert. as Shift Test Engr. '74 John L. Sullivan D3 Mctor-Independ.
27 yrs 9 mos 27 yrs 9 mos BS (ME) '64; SRO '75 '85; NJ Safety Review; Gold Seal, Nuc. Licen.
Chairman-GORBS James P. Thompson, III Principal Engineer 27 yrs 8 mos 25 yrs 6 mos BS (Textile Tech) '65; SRO (BNP) *77; SRO (HNP) '86 408.00 94.00 379.00 99.00 OVERALL AVERAf"E:
24.46 22.78 l &~23/93 arw/expptr(el