ML20217D334
| ML20217D334 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/30/1997 |
| From: | Jaudon J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20217D186 | List:
|
| References | |
| FOIA-97-252 NUDOCS 9710030128 | |
| Download: ML20217D334 (4) | |
Text
...
.. ~-... - -
f 4 E Joq'o UNITED STATES
,?,4
~
NUCLEAR REGULATORY COMMISSION o
REGION 11 y
ATLANTA FEDERAL CENTER e
61 FORSYTH STREET, sW. sulTE 23T85
[
ATLANTA GEORGIA 30303
....+
- July 30,1997 MEMORANDUM TO:
File te Sf/)
FROM:
J ns P Jaud irectur Division of React Safety
SUBJECT:
TRANSMITTAL OF ATTACHMENT D TO THE MINUTES OF RESTART (0350) PANEL MEETING FOR CRYSTAL RIVER The purpose of this memorandum is to transmit Attachment D to the memorandum of July 29,1997, which forwarded the n.;nutes of the Crystal River 3 Restart Panel meeting held July 22,1997. The July 29,1997, memorandum did not include' Attachment D as the result 'f an inadvertent error. Attachment D to the July 29,1997 memorandum is forwarded herewith.
Docket: 50-302
Attachment:
as stated.
cc/w/att:
L. Reyes, ORA /Ril S. Collins, NRR
' Johnson, DRP/Rll B. Roger, NRR F. Hebdon, NRR L. Raghavem, NRR H. Christensen, Ril s
K. Landis, Ril C. 'Julian, Ril-N. Dudley, OEDO R. Schin, Ril S. Cahill, SRl/Ril 1
9710030128 970929
~
f; MEA 252 PDR
O CRYSTAL RIVER 3 - SCHEDULE AND SlniUS OF LICENSING ACTIONS /ACTIMITIES Juiy 29, 1997 Co TAC No.
Action Description Application kequest Stat Remarks Target 1
98991 SBLOCA Hitigation of SBLOCA. A conbination of ECCS, 06/14/97 11/1/97 FPC items: 01, D2.
The stkmittat includes:
License EFW flow, and EDG toad management are required Amendment to address SBLOCA event. This amencinent RCS 1500 psi signal for Makeup Supply addresses: EDG upgrade, requalification and valve (MUV-27) automatic ctesure (not an toad management; EFW ard HPI system USQ).This is in a Cition to the exliting modifications; and TS and FSAR changes operator action.
asscciated with the above.
MP1 anat$ sis without cavitating venturis.
Other Open items:
EDG fan upgrade. Due 8/25/97.
EDG toading calc and testing requirements due 9/d/97.
Draft E0Ps 3 and 8, and AP 770 due 8/4/97 l
Letter to confira E0Ps do not result in additional USQs due 9/15/97 Proprietary and non proprietary versions of the LBLOCA analysis due 8/29/97.
2 99128 License Delete license ct,ndition 2C(5) which requires 06/26/97 9/26/97 Amencinent testing of flow indication in the ECCS for DH-45-FI boron dilution.
3 Appendix R Appendix R III.0 exemtion for RCP tube of t 08/27/97 Request will be similar to ANO Exenpt ion fitt line - welded connections.
4 958*7 Thermotag Enhanced sprinklers in certain areas in lieu 06/21/96 (a) of thermat barrier trxpede.
5 95817 Thermotag Emergency lighting. Attow use of AC and 06/21/96 7/25/97 FPC reevatustion of lighting exemption request (b) portable DC powered tighting in two areas.
6 99277 LTOPs License PORV setpoisit and LTOP TS using P/T curves for 07/18/97 10/18/97 Approved exemption from 1C CFR 50.60 Amenchent 15 EFPY.
acceptance criteria (Code Case N514) by letter dated 7/3/97 7
97987 ItRT/LtRT App. J. Option B, including Rev.1 (see 2/1/97 05/01/97 7/29/97 LER 97-014 (7/17/97): R8 pressure sensing Line 5/1/97) penetrations local test not done. FPC to co mtete att *ests by 11/30.
Q License Operator action (20 ets) to isolate letdown 09/15/97 LER 97-015 (7/11/97)
Amendment USQ (MUV 49) per E0P followl.ig loss of st.bcooling
- Letdown margin.
1ine rupture 9
Potential USQ EDG Protective Trips not bypassed during ESAS 08/25/97 and LOOP. (May modify design instead of a license amendment). Add new EDG trips.
ATTACHMENT D
4 10 98262 OTSG License TSCRN 211 exclusion of specif;c set of tubes 05/01/97-8/30/97'
'In staf f eview. RAI d;e 8/13/97 (See stes Amendnent '
in "B" steam generator from random selection 3/27/97 submittal) for inspection and sample expansion criteria 11' 96696 Reg. Guide" T, PAN, EDG kW Meters (Other new Type A's).
07/25/97
- Scope of response has been increased to 9
1.97 License 9/27/96 sub. Requested to add the stbcooling include kW meters. See previous FPC submittet Amendnent.
margin monitors and LPI flow indication to the 9/27/ %. Additional design details required.
PAM instrument table.
FPC to justify to implement by Refuel 11.
t (TSCRM 209-1) 12 96314
$8LOCA Issues iPI Mission Time (DNP) letter 05/13/97 In staff review 13 Boron IPAP issue. FSAR change rettes on reactor 09/02/97 URI M-201-01 Precipitation hotteg injection instead of active method foi Potential preventing boron precipitation.
USC.
14 Appendix R Description of Issues related to r/C Restart 09/25/97 Design item D11. Requested more specific '
Issues Issue D-11 to support staff clo v aut.
definition of issues. Inspection 8/4/97.
15 Arpendia R Capability to achieve shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 09/01/97 Issues (Atmospheric dimp valve capahitity) 16 Appendia R Use of Current Transformer Protectors in 08/15/97 9/15/97 Expedited review needed to steport issues safety related circuits (hot shorts) construct ior=
Potentist USQ i
17 Appendix R Response to IN 92-18 regarding modification to 08/08/97 Issues valves needed for cold shutdown 18 Appendix R Remote Shutdown Panet addition of fuses to 08/25/97 Expedited review needed to.4 port f
tasues controt circuits construction Potential USQ 19 94668 GL 96-01 Logic testing. First submittal 4/18/ %A.
08/22/97 Severat LERs (%-011, %-025,97-003) indicate Stmunary Report expected problems with logic testing.
i t
20 Potential FSAR Rev. 23 includes severat potentist USos.
07/10/97 US02 NRC totter j2/20/% identified 15 exanptes.
Licensee provided response 21 Seismic qual.
Several outliers. Licensee to provide schedute 07/28/97 of equip, -
and status for resolution of restart related A-46 Phase II items.
response.
[
22 License ECCS/EFW requirements / operable equipment 09/01/97 amendnent required for LOCA in Mode 4.
(TS) i 23 License Operator Actions in E0Ps and APs 09/30/97 amendnent Potential USos i
ATTACH.*NT D 2
y l
.lj l
3 e
de t s at dl u rs ee t r t
ef t o Cn P o Fi s
g k
de r
nR a
a m
m e
2r R
0o f 5 n 1i
-5 o 9t 2
Id 6
F e I e 0
N e
m c
e n.
t e7 I
r9 e/
C f5 P
e/
F R6 ta t
S t
st ee ug qr ea RT no i
t 7
7 7
7 a
9 9
9 9
c r
/
/
/
i 5
7 6
1 l
2 1
2 1
p
/
/
/
/
D p
8 6
9 8
A 0
0 0
0 T
N EM H
t i
l r
C s
a s
ia o
A T
f l
oa it T
c y
o nl g
A n
n n
i I
i t a k
w a
c o
me t
.A o
ru e
g7 l
l f
og J en9 fi hi/
e n
nt et p5 r
n i/
u i
ia ime s
f n p6 s
n r
o og reWd e3 f n ewS e r3 i g ip eedi V
t tt v
p-cn t
ui si db ne gF dn ep ac id,
nE ee u
on e
R p qd t oer o
ee in r2 rh nti) a3 yr c
ocl t o oa a
ip g-eV if t t it reh rF c
t aegw E
an ea ut r I
po s
l nue A,
ai nS aisp ct oC v
i R2 1
n c
pR et rp o-d o
na s
ne(
tV i
g eg f ez F
t iso i c ers s
r rny omie eE p
ir da eru enso oe et wda wgun ns c
r iaq sp pv ii s
V e vge vpes sl e
D p eed es re ee D
A c R ro Ri pr R v Q
c SU i
ma tl t.
gn na ny eei e
m n
snt s
iD 7
s-C o
ndn n d.
nss i
ene e
eid 5
t cet ce csa 9
mo m
ao t
c i
i A
LAP LA iLBL C
.o 7
4 N
4 0
3 6
C 5
6 A
9 9
T M
M o
4 5
6 7
N 2
2 2
2 l
_