ML20217D334

From kanterella
Jump to navigation Jump to search
Transmits Attachment D to Memo of 970729,which Forwarded Minutes of Crystal River 3 Restart Panel Meeting Held 970722.Memo Did Not Include Attachment D as Result of Inadvertent Error
ML20217D334
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/30/1997
From: Jaudon J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20217D186 List:
References
FOIA-97-252 NUDOCS 9710030128
Download: ML20217D334 (4)


Text

...

.. ~-... - -

f 4 E Joq'o UNITED STATES

,?,4

~

NUCLEAR REGULATORY COMMISSION o

REGION 11 y

ATLANTA FEDERAL CENTER e

61 FORSYTH STREET, sW. sulTE 23T85

[

ATLANTA GEORGIA 30303

....+

- July 30,1997 MEMORANDUM TO:

File te Sf/)

FROM:

J ns P Jaud irectur Division of React Safety

SUBJECT:

TRANSMITTAL OF ATTACHMENT D TO THE MINUTES OF RESTART (0350) PANEL MEETING FOR CRYSTAL RIVER The purpose of this memorandum is to transmit Attachment D to the memorandum of July 29,1997, which forwarded the n.;nutes of the Crystal River 3 Restart Panel meeting held July 22,1997. The July 29,1997, memorandum did not include' Attachment D as the result 'f an inadvertent error. Attachment D to the July 29,1997 memorandum is forwarded herewith.

Docket: 50-302

Attachment:

as stated.

cc/w/att:

L. Reyes, ORA /Ril S. Collins, NRR

' Johnson, DRP/Rll B. Roger, NRR F. Hebdon, NRR L. Raghavem, NRR H. Christensen, Ril s

K. Landis, Ril C. 'Julian, Ril-N. Dudley, OEDO R. Schin, Ril S. Cahill, SRl/Ril 1

9710030128 970929

~

f; MEA 252 PDR

O CRYSTAL RIVER 3 - SCHEDULE AND SlniUS OF LICENSING ACTIONS /ACTIMITIES Juiy 29, 1997 Co TAC No.

Action Description Application kequest Stat Remarks Target 1

98991 SBLOCA Hitigation of SBLOCA. A conbination of ECCS, 06/14/97 11/1/97 FPC items: 01, D2.

The stkmittat includes:

License EFW flow, and EDG toad management are required Amendment to address SBLOCA event. This amencinent RCS 1500 psi signal for Makeup Supply addresses: EDG upgrade, requalification and valve (MUV-27) automatic ctesure (not an toad management; EFW ard HPI system USQ).This is in a Cition to the exliting modifications; and TS and FSAR changes operator action.

asscciated with the above.

MP1 anat$ sis without cavitating venturis.

Other Open items:

EDG fan upgrade. Due 8/25/97.

EDG toading calc and testing requirements due 9/d/97.

Draft E0Ps 3 and 8, and AP 770 due 8/4/97 l

Letter to confira E0Ps do not result in additional USQs due 9/15/97 Proprietary and non proprietary versions of the LBLOCA analysis due 8/29/97.

2 99128 License Delete license ct,ndition 2C(5) which requires 06/26/97 9/26/97 Amencinent testing of flow indication in the ECCS for DH-45-FI boron dilution.

3 Appendix R Appendix R III.0 exemtion for RCP tube of t 08/27/97 Request will be similar to ANO Exenpt ion fitt line - welded connections.

4 958*7 Thermotag Enhanced sprinklers in certain areas in lieu 06/21/96 (a) of thermat barrier trxpede.

5 95817 Thermotag Emergency lighting. Attow use of AC and 06/21/96 7/25/97 FPC reevatustion of lighting exemption request (b) portable DC powered tighting in two areas.

6 99277 LTOPs License PORV setpoisit and LTOP TS using P/T curves for 07/18/97 10/18/97 Approved exemption from 1C CFR 50.60 Amenchent 15 EFPY.

acceptance criteria (Code Case N514) by letter dated 7/3/97 7

97987 ItRT/LtRT App. J. Option B, including Rev.1 (see 2/1/97 05/01/97 7/29/97 LER 97-014 (7/17/97): R8 pressure sensing Line 5/1/97) penetrations local test not done. FPC to co mtete att *ests by 11/30.

Q License Operator action (20 ets) to isolate letdown 09/15/97 LER 97-015 (7/11/97)

Amendment USQ (MUV 49) per E0P followl.ig loss of st.bcooling

- Letdown margin.

1ine rupture 9

Potential USQ EDG Protective Trips not bypassed during ESAS 08/25/97 and LOOP. (May modify design instead of a license amendment). Add new EDG trips.

ATTACHMENT D

4 10 98262 OTSG License TSCRN 211 exclusion of specif;c set of tubes 05/01/97-8/30/97'

'In staf f eview. RAI d;e 8/13/97 (See stes Amendnent '

in "B" steam generator from random selection 3/27/97 submittal) for inspection and sample expansion criteria 11' 96696 Reg. Guide" T, PAN, EDG kW Meters (Other new Type A's).

07/25/97

- Scope of response has been increased to 9

1.97 License 9/27/96 sub. Requested to add the stbcooling include kW meters. See previous FPC submittet Amendnent.

margin monitors and LPI flow indication to the 9/27/ %. Additional design details required.

PAM instrument table.

FPC to justify to implement by Refuel 11.

t (TSCRM 209-1) 12 96314

$8LOCA Issues iPI Mission Time (DNP) letter 05/13/97 In staff review 13 Boron IPAP issue. FSAR change rettes on reactor 09/02/97 URI M-201-01 Precipitation hotteg injection instead of active method foi Potential preventing boron precipitation.

USC.

14 Appendix R Description of Issues related to r/C Restart 09/25/97 Design item D11. Requested more specific '

Issues Issue D-11 to support staff clo v aut.

definition of issues. Inspection 8/4/97.

15 Arpendia R Capability to achieve shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 09/01/97 Issues (Atmospheric dimp valve capahitity) 16 Appendia R Use of Current Transformer Protectors in 08/15/97 9/15/97 Expedited review needed to steport issues safety related circuits (hot shorts) construct ior=

Potentist USQ i

17 Appendix R Response to IN 92-18 regarding modification to 08/08/97 Issues valves needed for cold shutdown 18 Appendix R Remote Shutdown Panet addition of fuses to 08/25/97 Expedited review needed to.4 port f

tasues controt circuits construction Potential USQ 19 94668 GL 96-01 Logic testing. First submittal 4/18/ %A.

08/22/97 Severat LERs (%-011, %-025,97-003) indicate Stmunary Report expected problems with logic testing.

i t

20 Potential FSAR Rev. 23 includes severat potentist USos.

07/10/97 US02 NRC totter j2/20/% identified 15 exanptes.

Licensee provided response 21 Seismic qual.

Several outliers. Licensee to provide schedute 07/28/97 of equip, -

and status for resolution of restart related A-46 Phase II items.

response.

[

22 License ECCS/EFW requirements / operable equipment 09/01/97 amendnent required for LOCA in Mode 4.

(TS) i 23 License Operator Actions in E0Ps and APs 09/30/97 amendnent Potential USos i

ATTACH.*NT D 2

y l

.lj l

3 e

de t s at dl u rs ee t r t

ef t o Cn P o Fi s

g k

de r

nR a

a m

m e

2r R

0o f 5 n 1i

-5 o 9t 2

Id 6

F e I e 0

N e

m c

e n.

t e7 I

r9 e/

C f5 P

e/

F R6 ta t

S t

st ee ug qr ea RT no i

t 7

7 7

7 a

9 9

9 9

c r

/

/

/

i 5

7 6

1 l

2 1

2 1

p

/

/

/

/

D p

8 6

9 8

A 0

0 0

0 T

N EM H

t i

l r

C s

a s

ia o

A T

f l

oa it T

c y

o nl g

A n

n n

i I

i t a k

w a

c o

me t

.A o

ru e

g7 l

l f

og J en9 fi hi/

e n

nt et p5 r

n i/

u i

ia ime s

f n p6 s

n r

o og reWd e3 f n ewS e r3 i g ip eedi V

t tt v

p-cn t

ui si db ne gF dn ep ac id,

nE ee u

on e

R p qd t oer o

ee in r2 rh nti) a3 yr c

ocl t o oa a

ip g-eV if t t it reh rF c

t aegw E

an ea ut r I

po s

l nue A,

ai nS aisp ct oC v

i R2 1

n c

pR et rp o-d o

na s

ne(

tV i

g eg f ez F

t iso i c ers s

r rny omie eE p

ir da eru enso oe et wda wgun ns c

r iaq sp pv ii s

V e vge vpes sl e

D p eed es re ee D

A c R ro Ri pr R v Q

c SU i

ma tl t.

gn na ny eei e

m n

snt s

iD 7

s-C o

ndn n d.

nss i

ene e

eid 5

t cet ce csa 9

mo m

ao t

c i

i A

LAP LA iLBL C

.o 7

4 N

4 0

3 6

C 5

6 A

9 9

T M

M o

4 5

6 7

N 2

2 2

2 l

_