Discusses Cancellation of 980616 Meeting on Plant
ML20197H989
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/15/1998
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: De Agazio A
NRC
Shared Package
ML20197H447 List:
References
FOIA-98-330 NUDOCS 9812140225
Download: ML20197H989 (3)


Text

. . . - - - - - ,_ ,_.__ . _ __ _ . - - -- - - ~ -

  • ~ ~ ^ ~ ~~" . y^ ~.^ ~ ~ ~

n (e,-- i, ,i ,

^

From: Beverly Clayton l To: ada - (All.ut'l 3 L O.Jcjcc '

Date: 6/15/9810:14am

Subject:

CANCELLATION OF JUNE 16TH MTG W/ BROWNS FERRY -Forwarded I i

e 5

I i i

i I

I s 9812140225 981202 PDR FDEA f LOCHBAU98-330 PDR I

\ ywrc, ag __

( w.

MAINTENANCE BRANCH IFS ITEM

SUMMARY

SEPTEMBER 1998 The Maintenance Branch has the following number of open items:

14 Violations, 2 > 1 Year

~ '

3 Unresolveci items,3 > 6 Months 12 Inspection Followup items, 1 > 2 Years Status of Old items:

VIOs Catawba. VIO 96-12-02. Failure to Adecuatelv Train Welders. (Opened for 24 months)

Item not in IFS cut-set for Code 2310, used by Maint. Branch. Error identified about 4 months ago. This item will be closed the week of 9/14.

Surry. VIO 97-055. 01023: Inadeouate Performance for MR SSCs and inadeouate Historical Reviews. (Opened for 13 months) ltem needs to wait for Surry certification of new PRA. This along with IFl 97 01 are estimated for closure by 4/1/99.

UNRs Browns Ferry. UNR 97-04-02. Resolve Maintenance Rule imolementation of Browns Ferry Unit 1. (Opened for 18 months)

This item resulted in a TIA to NRR in the Spring of 1997. NRR waiting for the completion of the 2.206 on Browns Ferry to finalize this issue.

Farlev. UNRs 97-15-03 and 04. Adecuacy of Welder Performance (03) and Calibration Procedure (04). (Opened for 7 months.

These items will be closed the week of 9/28.

IFis Browns Ferrv. 95-041-01. EDG 1 A Turbocharoer inspection. (Opened for 36 months)

Item not in IFS cut-set for Code 2310, used by Maint. Branch. 5rror identified about 4 months ago. This item will be closed the week of 10/19.

l i

e -

4 Page No. 1 10/01/98 TECHNICAL ASSISTANCE REQUEST TASK INTERFACE AGREEMENT (TIA) b ACTION TIA NUMBER MEMO DATE MEMO FOR MEMO FROM FACILITY TIA NO. SUBJECT CONTACT STATUS ISSUE DATE NRR TARGET CLOSE DATE REMARKS 97TIA015 06/04/97 HEBDON JOHNSON BROWNS FERRY 97-15 MAIffrENANCE RULE FREDRICKSO OPEN 05/28/97 / / / / (COPY OF MEMO REC'D FROM S.

IMPLEMENTATION FOR BF N PLACK TO F.NEBDON}

97TIA021 11/05/97 ZWOLINSKI JOHNSON CRYSTAL RIVER 97-21 ACCEPTABILITY FOR CONTAINMENT CHRISTENSE OPEN 10/27/97 / / / /

INTEGRITY OF THERMAL M EXPANSION 96TIA023 11/26/96 BERKOW MERSCHOFF FARLEY H-PRIOR LICENSE BASIS AND MILLER OPEN k1/19/96 02/28/98 / / ADDITIONAL INFO PROVIDED IN ITY ACCEPTABILITY OF KAOWOOL AS MEMO DTD 11/21/97 TO HQ W/IR AN ELECTRICAL RACEWAY FIRE -

97-12 BARRIER 97TIA002 01/16/97 BERKOW MERSCHOFF MCGUIRE 97-02 ENV QUAL OF SAFETY RELATED CASTO OPEN 01/10/97 12/31/98 / / ,

GRINELL HYDRAULIC PIPE k SUPPORTS 98T1A008 07/29/98 ZWOLINSKI PLISCO MCGUIRE 98-08 USE OF MANUAL COMPENSATORY OCLE OPEN 07/28/98 / / / /

ACTIONS ON CONTROL ROOM EMERO VE?rTILATION SYSTEM 97TIA004 02/19/97 REINHART JOHNSON NORTH ANNA 97-04 FIRE PROTECTION REQUIREMENTS BELISLE OPEN 01/21/97 12/31/97 / /

FOR EMERG SWITC1tGEAR ROOMS 98T1A005 07/13/98 ZWOLINSKI PLISCO OCONEE 98-05 TIMELINESS REQUIREMENTS FOR SCHIN OPEN 07/08/98 / / / /

REPORTING DESIGN BASIS EVEffrS 98TIA007 07/21/98 ZWOLINSKI PLISCO SEQUOYAH 98-07 ELEVATED BRIDGE READINGS ON SHANNON OPEN 07/14/98 / / / / ,

STATOR WINDINGS FOR EMER DIESEL GENERATOR