't UNITED STATES
[
j NUCLEAR REGULATORY COMMISSION 2
WA$HINGToN. D.C. 20Es6-auo1
%... +,o May 24, 1993
~
g g 0. -(
n
~n,1 a -
MEMORANDUM FOR:
The Chai5 nan FROM:
James M. Taylor Executive Director for Operations
SUBJECT:
STATUS OF STAFF ACTIONS REGARDING ACTIVITIES RELATED TO THE RESTART OF SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 -
REPORT NO. 2 In your memorandum of March 25, 1993, you requested that the staff keep you and the other Comissioners advised of progress in resolving issues pertinent to the restart of the Sequoyah Nuclear Plant as well'as other emergent issues at the Tennessee Valley Authority provided an initial report on the s(TVA). By memorandum dated April 9, 1993, I tatus of TVA and indicated that I would advise you and the Commissioners on the progress in resolving the issues that were identified as a result of our reviews.
During the NRC staff meeting with TVA on April 12, 1993, TVA briefly sumarized the recent problems at the plant and the status of restart activities.
The presentation was rather focused, primarily addressing the erosion / corrosion program.
As a result of feedback from the staff expanded the scope of the assessment to address the broader, more g. TVA eneric problems affecting Sequoyah.
The st'aff and TVA are currently scheduled to meet on May 24, 1993, at Sequoyah, to discuss the results of TVA's assessment, and the actions TVA plans to complete before restart of either unit.
TVA recently announced that Mr. Ron Eytchison had been appointed to the position of Vice President, Nuclear Operations, replacing Mr. Joseph Bynum.
Mr. fytchison is a former Navy Vice Admiral 4 th more than 33 years of Navy experience.
Before assuming his present position, he completed six months of development training at TVA corporate headquarters and all four TVA nuclear sites.
Mr. Bynum was appointed to the position of Vice President of Maintenance and Testing Services at TVA.
The position of Senior Vice Piesident, Nuclear Power, which has been vacant for more than a year, has not yet been filled.
In accordance with the guidance provided by NRC Hanual Chapter 0350, the staff has established a Restart Panel, which has developed a Restart Action Plan.
The current plant and checklist is enclosed and will be updated following the meeting with TVA on May 24.
The staff reviewed information in the Sequoyah docket file to identify the backlog of maintenance, engineering, and plant modifications that existed when 1
each Sequoyah unit restarted in 1988.
The staff's purpose was to identify TVA
Contact:
D. LaBarge,'NRR 504-1472 l
{
, O 'NEALI97-252 PDR
i t
The Chairman 2-i commitments to the NRC to resolve open items 'in' the backlog and to determine if TVA has met the commitments. The initial review of TVA documentation has been completed. The review found that all commitments related to the restart 1
activities that were open in 1988 have been closed, with the exception of two
' programs (Detailed Control Room Design Review and various civil engineering issues) that are being actively pursued and tracked by TVA and the staff.
Independent staff verification of this program has not yet been completed.
3
-TVA is developing and' implementing a program to review and prioritize open 1ssues and to measure management effectiveness.
Various internal and external resources (e.g., EPRI, INP0, Northeast Utilities, various Brunswick Nuclear i
i Plant personnel, TVA QA Department) are assisting in the development of the program.
TVA has not developed a schedule showing a proposed restart date.
Howaver, at the meeting on May 24, 1993, TVA is expected to indicate how the various programs will be enhanced, discuss the implementation schedule, and propose a restart date.
The staff will keep the Commission informed of progress as TVA develops programs further.
Origimid;;nd S'j James H. Gn!:::.N James M. Taylor Executive-Director for Operations
Enclosure:
~
Restart Plan and Checklist cc'w/ enclosure:
Commissioner Rogers Condissioner Curtiss Commissioner Remick Commissioner de Planque OGC SECY OCA OPA.
- see previous page for concurrence PDII-4/LA PDII-4/PM Tech Editor RII PDII-4/D MSanders*
DLaBarge*
DGable*
EHerschoff*
FHebdon*
5/17/93 5/17/93 5/13/93 5/17/93' 5/17/93 AD:RII D:DRPE ADP NRR:DD NRR:DIR EDO
- Glainas*
SVarga*
JPartlow*
FMiraglia*
TMurley*
JMTaylor
- 5/13/93 5/14/93 5/14/93 5/14/93 5/19/93 5/ /93 document name:c:\\ restart.seo 4
i 1
e r
.t-tey 2
, Sequoyah Restart Action Plan Enclosure April 13, 1993 1.
Purpose To provide a plan,and assign responsibility for NRC activities related to rest, art of Sequoyah Nuclear Power Plant.
2.
Backoround.
TVA voluntarily shutdown both Sequoyah Units foll; wing the rupture of a 1
Unit 2 ten inch extraction steam pipe at 100 percent power on March 1, 1993.-
The NRC issued a confirmatory action letter on March 4,1993, to confirm early commitments by TVA for corrective action.
An Augmented Team Inspection, conducted March 3 - 11, 1993, revealed insufficient maintenance and surveillance of balance of plant piping caused by a-failure of management to clearly assign responsibilities and provide oversight in this area.
The NRC established a Sequoyah Restart Panel on March 25, 1993, pursuant to NRC Hanual Chapter 0350.
TVA began implementation of a corrective action program which they described to NRC management during a meeting in the NRC office in Headquarters on April 12, 1993.
3.
Rgsoonsibilities i
3.1 The Seouovah Restart Panel will coordinate staff _ activities, monitor licensee activities, and keep the Regional Administrator informed regarding restart of Sequoyah. The Panel Chairman will provide weekly briefings to the Regional Administrator.
3.2 The Reaional Administrator has the responsibility and authority to approve restart.
The Regional Administrator will coordinate with e
the Deputy Executive Director for Nuclear Reactor Regulation; _
Regional Operations and Research, and with the Director of Nuclear Reactor Regulation (NRR) in granting restart approval. The Regional Administrator will keep the Director of NRR informed of staff and licensee restart actions.
3.3 The Associate Director Proiects. NRR will assure that the Commission is kept informed of staff-and licensee restart actions through Comnission papers, EDO highlights, or_ communications with the EDO.
Based on these interactions between the staff and-the Commission, the need for Commission briefings will be determined by the circumstances and the Commission's wishes.
Sequoyah Restart Action Plan 2
a.v z
-4.
Seauovah Restart Checklist NRC activities related to restart of Sequoyah are listed on the sequoyah Restart Checklis+. A copy of this checklist is provided as Appenoix A.
The checklist will be mainta',ned current and revised as appropriate by -
the Restart Panel. The scope of each inspection listed on this checklist is described in Appendix B.
5.
Records All documents relating to the restart process will be included in-the-
. docket file and, to the extent permitted by 10 CFR 2.790, made public in accordance with NRC policy. Such records include:
i L
a)
Minutes of Restart Panel meetings
~'
b)
Minutes of meetings with licensees c)
Other govegnment actions communicated to the NRC d)
Commission papers e)-
Documents approving restart f)
Inspection reports g)
Safety evaluations e
t
.c t%
f APPEN0lx A HAY 14, 1993 p
SEQUOYAH RESTART CHECXLIST-i 1
TASK-
- RESP, DATE STATUS n.
c-m s.
s i (IriitiaEno,tificidioni(50'272)I o.y'e
--Licinsee R, 337J/93=13 iCOMPLETE4 nw ~-n p.n
, m.w_. m:
J22 Elssue3PNi ~m
'w.,
i P i, * '
w%
'Regi6EIIF 43/2/935'" kCOMPLETE:
~ ~ ~ ~
1__,
M s.
~.
- 3.RAITGng~pertio(./[r n
, ~
..g
@egion;1If s3/3 % T. @RCOMPLETE
, s,-
% % :WhJ V
6
%)J/939 ?;
4
% m
<a
- 4 F.,. mz.. Issue
- CALF. d" w
' Nn.
!Rsdio;;;rmnrIIE L3/4/93h, w^COMPLElE;.,.
,.n u
n man u m w
2 iS [ { Rig,ionilzAdmi ni s trhton Wi s' ins i th-
.~.
.n
. ~
- xRegiof. m C3/lI/93t$
. -m ~ ~ w
, n.;.+
~#
lit MCOMPLETE
. ~,. ~hairm,an?vi+ sit nite?
~%
O?
cmNRCh 43/17/93 M PCOMPLETEs a
.. n ng u w.~ne e-m n.
.n.-
6MC
+c
.n.-
17; iEstibli'sh',iResta'rEPaneld ~ '
G iRIls/INRR2 0,3/25/9I89 JCOMPLETO
-~
..m
~
.~
lRegi$n....1I4 14/2/93#4 JCOMPLETE5
,+
~
- 8.~;Nothy;..
7 M'
C FEMA
- --w
< 4
.... on mg ;
.,, cw s.
w.:. x. :a
. s.a a.,
'9;' NotifyTOSHAP RegionVII9
'4/2/93s
TIOMPLETEC W.s
-... =.
.n
~ nn s-no
- n.,w t
310d First Panel: Meeting (Ondsite) W '
N Panell S 34/5/934
^ COMPLETEk, i
~
- -. ~.. -.. ~..
N1 h finipe,d!BOPMPartil?" e@ M eResibn1Ild 1,4/573/93 6 YCOMPLETES e m..
-~.
m -o mm.,m c,
n.
.~..,
n..
m 212 FTVAltMi$flNRC'manageEent,i Gff M f' illi,cids^e~e@ T4'/12/93 M CCOMPLETE:1 y,
,,..p
+.
m.e.waam,.y.m. n s a
- .. yy ~ Region II3 44/13/93M ACOMPLETEM e+r en~w w-
- 13 Is suei restart::actionTp"lan
'M l
s,
~
tm
- NRRC ' @
WW M
^^@ ~ ~ ~
- lETIssue)m-etter;tosconfirm{licenseef
-...NRRi Og'44/J5/930 m"i.,COMPLETEi m
m s...
vs M; A e
.v.w. >.
_'., commitmentsLmadeion:4/12.L
'x NM
~
- I 05ESecuM
$1nspictioni s
V'
)Rigi.onFIIly 1(y m
m 95/10$n~7 (COM.PLETE :
.. _s -
2 y,
gn 314fg3 jg,
vg n.x e
716.USIfprogramCihspetiiod+
jf-g;
~
iRegi6nIIf 74/264 ? P._. COMPLETE.~
- j V30/931 P' ^^W "
~
s
- 17. Operator licensing initial exams Region II 5/17-OPEN 21/93
- 18. Inspect management oversight Region II ONG0ING OPEN
- 19. Inspect BOP - Part 2 Region II
- TBD GPEN
/50l'Se~condfPaneFMeetingr(N1)l-JPaner <
SS/30/93fl sCOMPLETET
.~ e,
~m
.~.
- 21. Third Panel-Heeting (onsite)
Panel 5/25/93 OPEN
- 22. Provide status report to EDO
-NRR 5/14/93 OPEN
- 23. Inspect safety systems Region II TBD-OPEN 24._ Operational Readiness Assessment NRR TBD OPEN Team Inspection (0 RAT)
4 SEQUDYAH RESTART CHECKLIST.(Continued) 2 TASK RESP.
DATE STATUS
- 25. Memo to staff inviting commetits on RII / NRR 30 DAYS OPEN restart PRIOR TO RESTART
- 26. Submit Commirsion. Paper NRR 14 DAYS OPEN PRIOR TO RESTART
- 27. Review letter from licensee RII / NRR 10 DAYS OPEN providing oasis for restart PRIOR TO RESTART
- 28. Establish watch bill for NRC RII 10 DAYS OPEN observation of restart PRIOR TO RESTART
- 29. Recommendation mamo to Regional Panel 2 DAYS OPEN Administrator PRIOR TO RESTART
- 30. Approve or Disapprove RA PRIOR TO OPEM W
z :::pg3 - W4 e g;p w
f ppi xx:l'
~
To be determined based on TVA Restart Schedule
-