ML20211Q244

From kanterella
Revision as of 21:12, 5 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Deviation from Insp on 870101-31
ML20211Q244
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/19/1987
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20211Q231 List:
References
50-285-87-02, 50-285-87-2, NUDOCS 8703030046
Download: ML20211Q244 (1)


Text

_ _. ..__ . .

t APPENDIX B-NOTICE OF DEVIATION Omaha Public Power District Docket: 50-285/87-02 Fort Calhoun Station License: DPR-40 Based on the results of an NRC inspection conducted on January 1-31, 1987, a deviation of your commitments made to the NRC was identified. The deviation consisted of the failure to place all manual containment isolation valves under administrative control. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986),

the deviation is listed below:

Section 5.9.5 of the Updated Safety Analysis Report states that where a system penetrates containment and the system is inactive during reactor operation, operation of manual isolation valves is under administrative controls. Section 5.9.5 also states that branch line connections between the containment and the outside containment isolation valves are equipped with valves to provide isolation integrity equal to at least that of the main system.

In deviation from the above, manual isolation valves in branch lines between the containment and the outside containment isolation valve were not placed under administrative controls. -The affected branch lines identified by the NRC SRI with manual valves were in the chemical and volume control system (Valves CH-517, CH-518, and CH-535), main steam system (Valves MS-101 and MS-103), low-pressure safety injection system (Valve SI-375), and component cooling water system (Valves AC-1133, AC-1134, AC-857, and AC-858). (285/8702-01)

Omaha Public Power District is hereby requested to submit to this office, within 30 days of the date of the letter transmitting this Notice, a written statenent or explanation in reply, including for each deviation: (1)the 4

reason for the deviation if admitted, (2) the corrective steps which have been taken and the.results achieved, (3) the corrective steps which will be taken to avoid further' deviations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas this l f day of $ 6 e 1987 1 8703030046 870219 PDR G ADOCK 05000285 i

PDR

, . , . . - - - - -- . _ _