Notice of Deviation from Insp on 851201-31
ML20137K528
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/17/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20137K510 List:
References
50-285-85-27, NUDOCS 8601240124
Download: ML20137K528 (1)


Text

'

l APPENDIX B NOTICE OF DEVIATION Omaha Public Power District Docket: 50-285/85-27 Fort Calhoun Station License: DPR-40 Based on the results of an NRC inspection conducted during the period December 1-31, 1985, and in accordance with NRC Enforcement Policy 10 CFR Part 2, Appendix C (1985), the following deviations were identified:

A. Failure to Meet a Commitment Relative to the Cleanliness of Fluid Systems By a letter dated March 15, 1985, in response to Violation 285/8421-01b, the licensee committed to establishing a program for fluid system cleanliness control. The program was to include revision of appropriate procedures and implementation of the requirements.

In deviation from the above, the licensee failed to make procedure changes and implement all of the requirements of the fluid systems cleanliness control program. (285/8527-01)

B. Failure to Meet a Commitment Relative to the Requirements for Temporary Critical Quality Equipment (CQE) Storage Areas By a letter dated March 28, 1985, in response to Violation 285/8501-01, the licensee committed to maintain temporary CQE storage areas in accordance with the licensee's established procedural requirements.

In deviation from the above, the licensee failed to maintain the temporary CQE storage areas in accordance with the requirements. (285/8527-02)

Omaha Public Power District is hereby requested to submit to this office, within 30 days of the date of this Notice of Deviation, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further deviation from commitments made to the Commission; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.

Dated at Arlington, Texas, this J7th of January 1986.