ML20236T771

From kanterella
Revision as of 23:38, 19 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Violation from Insp on 871001-31.Violation Noted: Allen Bolt Placed in Preset Hanger Pin Hole,Preventing 1/4 Inch Movement as Required by Rev 1 to Drawing BP-15555-1
ML20236T771
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/24/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20236T760 List:
References
50-325-87-36, NUDOCS 8712020081
Download: ML20236T771 (1)


Text

__ ___ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

ENCLOSURE 1 NOTICE OF VIOLATION Carolina Power and Light Company Docket No. 50-325 ficunswick I License No. DPR-71 During the Nuclear Regulatory Commission (NRC) inspection conducted on October 1-31, 1987, a violation of NRC requirements was identified. The violation involved an allen screw placed in a variable hanger preset pin hole.

}- In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:

10 CFR 50, Appendix B, Criterion V, Ins uuctions, Procedures, and Drawings, as implemented by Chapter 17.2.5 of the FSAR, requires that activities affecting quality shall be prescribed by documented drawings and shall be accomplished in accordance with those drawings.

Contrary to the above, activities affecting quality were not accomplished in accordance with drawings in that an allen bolt was placed in the preset i pin hole of hanger 1-E11-98VH555, preventing hanger movement 1/4 inch es l required by drawing BP-15555-1, Revision 1.

This is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Carolina Power and Light Company is hereby required to submit to this office within thirty days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including (for each violation): (1) admission or denial of the violation, (2) the reasons for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION l b / _Au _

l Devid M. V rrelli, Chief Re actor Projects Branch 1 l Division of Reactor Projects Dated at Atlantp, Georgia  ;

this g8 day of thounbc/ 1987 l

l 8712020081 871124 l PDR ADOCK 05000324 l Q PDR

_j