ML20246J309

From kanterella
Revision as of 22:05, 12 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Amend 72 to License DPR-34,imposing Early Shutdown on Plant by Limiting Reactor Power to 2% of Full Power After 900630
ML20246J309
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/30/1989
From: Weiss S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20246J294 List:
References
NUDOCS 8909050117
Download: ML20246J309 (4)


Text

.

6[ o g_ UNITED STATES

c. NUCLEAR REGULATORY COMMISSION 7,, 's WASHINGTON, D. C. 20555

%,....../

PUBLIC SERVICE COMPANY OF COLORADO DOCKET NO. 50-267 FORT ST. VRAIN NUCLEAR GENERATING STATION.

AMENDMENT-TO FACILITY OPERATING LICENSE Amendment No.72 License No. DPR-34

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Public Service Company of Colorado (the licensee) dated June 9, 1989, complies with the standards(the amended andActreq)uirements of the Atomic

, and the Commission's rulesEnergy Act of 1954, and regulations set as forth in 10 CFR Chapter I; B. The' facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission;.

C. There is reasonable assurance: (i) that the activities authorized by this amendmqpt can be conducted without endangering the health

.and' safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

i 8909050117 890830 PDR ADOCK 05000267 P. PDC

2. Accordingly, the license is amended by an addition of paragraph 2.D.(4)'

as indicated in the attachment to this license amendment.

'3. The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY CCMMISSION h :'_ =m , ,,u 4 7

Seymour H. Weiss, Director Non-Power Reactor, Decommissioning and Environmental Project. Directorate Division of Reactor Projects .III,.

IV, V and Special Projects Office of Nuclear Reactor Regulation

Attachment:

Change to. license Date of Issuance: August 30, 1989 1

1

t i -, ATTACHMENT TO LICENSE AMENDMENT NO. 72 TO FACILITY OPERATING LICENSE NO. DPR-34

-DOCKET NO. 50-267 Replace the following page of Farility Operating License No. DPR-34 with the attached page as indicated.. The revised page. is identified by p- . amendment number and-contains a vertical line indicating the area of change.

Remove Insert Page 4 of 4 Page 4 of 4

- = _ _ - _ _ - - _ _ _ _ _ _ - - _

5- Amendment No. 70,72 Page 4 of 4 4

(4)EarlyShutdown l The licensee is not authorized to operate the reactor

-(above 2 percent of full power)-for electric power production after June 30, 1990.

j' . E. This license is subject to'all Federal, State, and local standards imposed pursuant to the requirements of the Federal-Water Pollution Control Act of 1972.

3. This license is effective as of the date of issuance and shall expire at midnight, September 17, 2008.

FOR THE ATOMIC ENERGY COMMISSION "0RIGINAL SIGNED BY:"

A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing Attachments:

Appendices A and B - Technical Specifications Date of Issuance: December 21, 1973

_ _ _ _ _ _ _ _ _ - - - _ - - _ _ -