Text
_
I
=
3S S V MARY R E PO R~~
COV V A\C-E ?EA< ~~
v \
n;U J NE 30, '989 TU ELECTRIC P.O. BOX 1002 GLEN ROSE , TX.
(
e= =,
O FDC
1
)
I i
l PSI
SUMMARY
[ b
(- / l Purpose l The purpos,e of this summary report is to provide information relating to the preservice inspection (PSI) at the Comanche Peak Steam Electric Station (CPSES)
Unit 1. This report shall serve to document compliance with 10 CFR 50.55(a) and ASME Section XI, 1980 Edition, for all examinations and tests completed to date.
This report is also intended to document compliance with the Texas Department of Labor and Standards, Boiler Division, Boiler Law Rules and Regulations.
Scope I This summary report addresses those examinations and tests of Code Class 1 and 2 systems as stipulated in the CPSES Unit 1 PSI Plan, except integral attachments.
These attachments will be addressed in the PSI Summary Addendum, at which time the Form NIS 1 shall be completed and included. The PSI Summary Addendum shall also include Section XI repairs / replacements as a result of PSI and future leak tests of Class 1 systems.
Eddy Current Eddy current examination was performed on the full length of 100% of the tubes in all four steam generators. These examination.s were performed in accordance with the 1980 Edition of ASME Section XI and NRC Regulatory Guide 1.83. Refer to Appendix A for details regarding the examination.
m
, Piping and Components Examinations were conducted utilizing volumetric, surface and visual techniques in accordance with the requirements of ASME Section XI, 1980 Edition.
Supplemental examinations of the reactor vessel beltline region to address NRC Regulatory Guide 1.150, were also performed. Refer to Appendix B for a summa ty of the examinations.
Indications encountered during non-destructive examination were recorded and evaluated as required by Section XI. Any indication which did not meet the acceptance criteria of Section XI or which was otherwise undesirable to remain in place, was removed. The majority of these indications were removed prior to system N-5 certification or through cosmetic surface conditioning and as such were not accomplished as a Section XI repair / replacement. These situations are identified as re-examined "after rework" in Appendix B. A complete listing of all Section XI repairs / replacements as a result of PSI, shall be provided in the PSI Summary Addendum.
{
\~J E_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . . _
l '
Supports
(^\ .
(_,) Examination of piping and component supports to satisfy the intens of the required VT-3/4 has been addressed in Relief Request F-1. This request provided that installation verifications, preoperational test inspections and system functionability verifications, which are conducted during construction and 4 startup, ~would be used in lieu of a VI-3/4 This request was conditionally approved in /ppendix S of Supplement 12 to the CPSES Safety Evaluation Repott (SER). Conditions of the approval were in regard to scope, timing and recording L of the examinations. These conditions have been met and are discussed in TU Electric letter NE-25366.
Snubbers As allowed by IWF-5200 all inservice tests were conducted at the manufacturers facility and as allowed by IVA-6310 records of these tests are being maintained at the manufacturers facility.
Class 1 System Leakage Test A Section XI system hydrostatic test was performed on those portions of the Reactor Coolant System greater than 1 inch nominal pipe size, which are normally subject to Reactor Coolant System pressure during operation at 100% rated reactor power. This pressure test is documented as " Test Package #5500". The more stringent conditions of the hydrostatic test allow credit to be taken for a ASME Section XI. Class 1 system leakage test alsc. This test encompassed the
,_ majority of the Class 1 piping. Leakage tests for those class 1 portions of f systems (including Reactor Coolant) which are not normally subject to Reactor
- Coolant System pressure during operation at 100% rated reactor power shall be addressed in the PSI Summary Addendum.
Relief Requests For those situations where complete compliance with the Code examination requirements would have created an undue hardship without a compensating increase in the level of quality and safety, a request for relief was submitted to the NRC pursuant to 10 CFR 50.55(a) (2), A total of 25 such requests were submitted to the NRC during the period from October 7, 1982 and August 29, 1984.
NRC review of these requests is documented in Appendix S of Supplement 12 to the CPSES SER. In the course of this review 16 requests were determined to be acceptable, one (1) was conditionally accepted -(F-1) and eight (8) were determined to be unnecessary.
Following issuance of Supplement 12 it was determined that aclitional requests for relief would be necessary. In a submittal dated April 17, 1989 five (5) new requests were provided to the NRC for revieu along with a revision of three (3) previously approved requests.
All requeste for relief (30 total) are summarized below and are referenced as appropriate in Appendix B.
s.) _ _ _ _ _ _ - _
s l
4 x
L'
. REQUEST FOR RELIEF
SUMMARY
i
( ' IDENTIFIER. SUBJECT- STATUS B l' VT-3 of pump casings and' valve bodies ' Approved B-2 J Limited ultrasonic testing-(UT) of Approved safety injection pystem piping B-3 pressurizer attachments 'Not required B-4 Limited UT of the steam generator. Approved channel head to tubesheet. weld B-5 Limited UT of the reactor vessel Approved
- safe end welds B Limited UT of the reactor vessel -Not required head studs B-7 ' Limited UT cf the pressurizer nozzles Approved B-8 Limited UT of the pressurizer and , Approved-steam generator safe end welds
~B-9 Examination of the reactor vessel Not required bottom head weld to the 1974 Edition, Summer 1975 Addenda of Section XI B-10 Linited UT of various Class 1- Approved piping welds (Revised to add' additional welds)
B-11 Reactor vessel closure head seal Not required leakage monitoring tubes.
B-12 Examination of pressurizer welds Not required to the 1974 Edition, Summer 1975' Addenda of Section X1 B-13 Recording of UT indications from Approved geometric reflections B-14 UT of Class 1 nozzle inner radii, Approved (except reactor vessel) i O ___- __. _ _ _ _ _ _ _ _ _ - .
1 f.' q ,
.. REQUEST FOR RELIEF
SUMMARY
.(Cont:.)
pl ., . IDENTIF?ER , SUBJECT . STATUS B 15- Use of vendor examination records :Not required for reactor vessel' interior and.
insernals B 16 Limited UT of reactor vessel closure Under review head welds B-17 -Limited UT of reactor vessel nozzle Under' review inner radii C'1 Limited UT of certain Class 2 heat Approved exchangers (also addressed in C-6)
C2 Use of visual and surface examination Approved ,
in lieu of UT of thin walled (0.187")
vessels C-3 Use of VT-3 in lieu of a surface " Approved examination on a unique integral attachment (welded shim)
C-4 UT of Class 2 nozzle inner radii Approved (Revised to add O an additional radius)
C Limited UT of Class 2 piping welds Approved C-6 Limited UT of Class 2 vessel welds Approved (Revised to add additional vessels)'
C-7 Limited surface examination of a Under review unique integral attachment C8 Limited UT of steam generator Under review nozzle to vessel welds C-9 Four (4)-3" long 1 longitudinal seams Under review on the main steam system
REQUEST FOR RELIEF
SUMMARY
(Cont.)
f-~q .
'k : IDENTIFIER SUBJ ECT S_TATUS -
D-1 Class 3 pressure testing Not required D-2 + Use of vendor records for Not required mechanical snubbers D-3 Use of installation records for Class 3 Approved' integral attachments F-1 Use of various installation and Conditionally reoperation test records for approved Class 1, 2 and 3 supports j
o 1 ~5~
f i
=
I e
O 4
l O .
I
fx l
h k
Q CPSES UNIT'l EDDY CURRENT
SUMMARY
1.0 Baseline Eddy Current Date: August 17, 1982 to September 11, 1982 '
Westinghouse Field Service Report MRS 4.4.TBX-1 Westinghouse Nuclear Services Integration Division performed a one' hundred percent baseline tube wall degradation eddy current inspection of the full length of all accessible (not. plugged or restricted) tubes in all four steam generators. The multifrequency.
inspection was conducted in accordance with Westinghouse procedure'"
MRS 2.4.2 GEN-23, using standard model "D" steam generator frequencies of 550 KHz and 130 KHz differential, and 300 KHz and 100 -
KHz absolute. Evaluation of the eddy current data by Westinghouse j reveoled 2 tubes exhibiting indications exceeding the plugging limit :
Q 40t thru wall) in S.C.1 and 1 tube in S.C. 2. Additionally, 2 ;
tubes in S.C. 4 were plugged'due to restricted access (<.318" dia.)
for the eddy current probe.
1.1 Skip Rolling Date: September 10, 1982 to October 7, 1982.
Westinghouse Field Service Report MRS 4.4 TBX During performance of the baseline eddy current it became evident that many tubes were not fully rolled against the tubesheet. As a result NCR 82-0012 was issued.
A total of 3219 tube ends were verified as not being completely rolled using a special skip roll detection eddy current probe. A skip roll correction program was implemented wherein these tubes were rerolled. As determined by Westinghouse (Ref. SGPMS-FDG 030),
it is not necessary to reinspect these tubes for evidence of degradation and therefore the baseline inspection was not repeated except in rows 1 and 2 where eddy current of the shotpeened area was performed (Ref. Section 1.5). There' were l'S tubes in rows 1 and 2 of the 3219 rerolled tubes. The absence of any denoted abnormalities in these 135 tubes (4 % of the total) supports the position of not reinspecting.
O 1 l
i i
]
i I
f,*
% [
1.2 Baffle Plate Expansion-
- Date: June 13, 1983 to August 25, 1983 Westinghouse Field _ Service Report MRS 4.4 TBX-3 q Accelerated wear involving interaction between the tubes and tube support plates at a number of domestic and foreign Westinghouse nuclear facilities prompted formation of a study to identify and correct the cause of the problem.- The wear was attributed to flow induced vibrations in the preheater region due to turbulence at the steam generator'feedwater inlet. A two part modification was implemented to prevent this wear phenomenon from occurring at CPSES.
This two part modification included: (1) the hydraulic. expansion of tubes in the T-slot and peripheral area at the B and D baffle plates in the preheater section, and (2) the routing of 10 percent of the feedwater flow into the steam generator through the auxiliary feedwater nozzle, thus reducing the flow through' the preheater region.
124 tubes in each steam generator were expanded as follows.
Row Column 37 56, 59 38 56, 59 39 56, 59 40 56,-59 41 56, 59 42 56, 59 43 56, 59 44 56, 59 45 56, 59 46 55, 56, 59, 60 47 27, 28, 51-56, 59-64, 87, 88 48 29-31, 43-56, 59-72, 84-86 I 49 31-56, 59 84 Note: 3 tubes in the expansion region had shown plugs (welded).
These plugs were removed on the outlet side, the tubes were expanded and replugged.
Row Column S.G. #1 48 86 49 46 S.G. #3 49 48
~(
)L
V' f-];
'G Following the; tube expansion, the expansion region in each steam generator tube was examined using multifrequency eddy current.
_ Frequencies utilized were the'same as for the baseline inspection,-
l4 with a .610" probe being the general size.
l To provide comparison with the objectives of the modification a vibration monitoring program was initiated. This pro;; ram entailed installing accelerometers in the following tubes in S.C. #1.
Roy Column 48 33 unexpanded tube.
48 41 unexpanded tube 49 41 expanded tube 49 59 expanded tube
- Following installation of this instrumentation, each tube was plugged.
Two tubes (R47/C88, R49/C35) in S.G. 4 were plugged as a result of tube overpressurization during the baffle expansion process.
.1.3 Shotpeening Date: May 5,1986 to June 12, 1986 Westinghouse Field Service Report MRS 4.4 TBX 4 In an effort to reduce the residual tensile stresses in the mechanically expanded portion of the tube within the tubesheet region and the expanded /unexpanded transition area, a stress relief program using shotpeening was initiated. The region of the tube subject to shotpeening began no greater than 1/2"' from the tubesheet primary surface to approximately 2" above the tubesheet secondary surface. This process was performed on the hot and cold leg of all active tubes in each steam generator (18,279 total).
Westinghouse has det. ermined, by test, that the shotpeening process does not detectably alter the baseline signal (Ref. WPT.8277) and therefore the baseline inspection was not repeated.
O 3
/ ,
- ) .
L ,)
1.4 U-Bend Heat Treatment J Date: June 27, 1986 to July 7,1986 Westinghouse Field Service Report MRS 4.4 TBX-5 In en effort to relieve residual tensile stresses in the U-bend region of rows 1 and 2, these tube regions were subjected to a heat treatment. This effort encompassed 228 tubes in S.G. 1, 3 and 4 and 227 tubes in S.G. 2 as R2 C41 was shop plugged.
The heat treatment zone was comprised of the area from 1/2" below the U-bend tangent point on the inlet side to the sane point on the outlet side. This zone was taken to a nominal temperature of 1440 F on S. G. 1 and 2 and 1420 F on S.G. 3 and 4 and held for 5 minutes. This technique was performed using an internal heater probe inserted from the outlet side.
1.5 Eddy Current Following Shotpeening and Heat Treatment Date: July 7, 1986 to July 17, 1986 Westinghouse Field Service Report MRS 4.4 TBX-6 A
C) Following the shotpeening and heat treatment processes on the Unit 1 steam generators, Echoran Technology Inc., under contract to Westinghouse, performed a multifrequency eddy current examination of the affected regions in all accessible tubes in row 1 and 2.
The regions examim were (1) the tube end to 6" above the top of the secondary surisce from both the inlet and outlet side and (2) the U-bend region from the eleventh tube support on the inlet side to the tenth tube support on the outlet side.
The lone indication exceedin5 20% thru-wall was detected in R1/C26 of S.C. 3. This tube was plugged (Ref. NCR 86-0138, Section 1.6.C).
During performance of this testing a tightly adhering metallic substance was detected in the inside of R1/C114 of S.G. 3. This substance was visually examined and addressed in Westinghouse letter WPT-8558. It was determined that attempts to remove this substance l would prove of no advantage and to plug this tube would be unwarranted as the presence of this material in the reactor coolant inventory would not be significant. A detailed analysis of the j l options surrounding this substance may be found in the referenced ,
field service report.
l l O)/
l i I
! l
) !
l
V-p L
./m 1.6 Significant Nonconformance Reports (NCRs) l- ; .The following provides a summary of significant TU generated NCRs l' associated with the Unit 1 steam generator eddy current inspection.
A. 82-0012 - Issued following observation by Westinghouse baseline eddy current personnel that certain tubes were not completely rolled in the tubesheet area. (Ref. Section 1.1).
B. 82-0013 - Following the baseline eddy current this NCR was written to mechanically plug the 3 tubes which exhibited indications exceeding the 404 plugging limit, and the 2 tubes.
that restricted access to the eddy current probe.
Additionally, this NCR installed a mechanical plug in the nonleaking side of tubes identified as leakers during field hydrostatic testing.
C. 86-0138 - While performing heat treatment in S.C. 3, R1/C26, the heater probe failed. During removal attempts the probe broke in half with one half lodging in the tube. Upon_ removal, both helves fit together indicating no loose parts and there was no evidence to suggest tube damage. However, when Echoram performed eddy current testing following the shotpeening and heat treatment processes, a 944 thru-wall indication was d(N detected. The tube was plugged October 9, 1986.
l l
I O 1
V_ _ .
- 1. 7 - Plugged Tubes a Row / Column Plug Type Comments
.S.G. 1 1/26 M. > 40t ET 7/86 W(inlet)/M(oatlet) Hydrot.ast lenker 17/57 W Shop plug-24/7 W(inlet)/M(outlet) Hydrotest leaker 24/26 M >40% ET 42/51 W Shop plug 45/87 M >40% ET 4E/33 M Vibration monitor 48/41 M Vibration monitor 48/86 W Shop / field (outlet) 49/33 M 49/41 M Vibration monitor 49/46 W Shop / field (outlet) 49/59 M Vibration monitor S.G. 2 '2/41 W Shop plug 11/75 M >40s ET 38/16 W Shop plug 47/42 W Shop plug,
) S.G. 3 5/36 W W
Shop plug Shop plug 12/113 12/2 W Shop plug 42/70 V(inlet)/M(outlet) Hydrotest lenker 49/48 W Shop / field (outlet)
S.G. 4 3/22 M Restricted ET 6/86 W . Shop plug 10/30 M Restricted ET 19/92 W Shop plug 21/86 W(outlet)/M(inlet) Hydrotest leaker 33/69 W Shop plug 39/69 W(inlet)/M(outlet) Hydrotest leaker 44/79 W Shop plug 47/88 M Overpressurized 48/77 V(inlet)/M(outlet) Hydrotest leaker 49/35 M Overpressurized i NOTE: W-welded M-mechanical 6-
Y V
1.8 Tubes for Spee'ial IEI Considerations
.: A. The following tubes exhibited unusual baseline characteristics.
I. Dents Row / Column Row / Column Rov / Column S.C. 1 3/8 46/43 17/68 33/12 47/43 49/68 25/23 48/43 5/71 42/24 49/43- 37/71 43/24- 48/44 4f,/72 42/25 46/47- 49/72 43/25 47/47 47/73 42/27 49/47 45/74 44/27 30/56 44/75 45/27 41/56 48/75 3/28 36/59 49/75 46/40 37/59 48/79 43/41 40/59 47/80 46/41 41/59 44/84 p 47/41 45/60- 47/84 Q 43/42 46/42 47/62 47/62 49/84 20/88 47/42 49/62 21/90 44/43 47/67- 21/113 45/43 47/68 Row / Column Row / Column Row / Column S.G. 2 12/2 40/19 27/70 27/8 5/49 28/70 8/16 27/59 Row / Column Row / Column Rov / Column S.G. 14/3 49/49 47/73 25/7 43/50 46/74 38/16 45/50 49/74 44/23 47/50 49/75 45/24 48/50 43/76 9/26 49/50 44/76 49/34 45/52 45/76 49/35 47/52 43/77 1
7-1 1
, Ad c
. p- g -
us'
, Rov / Column Row / Column Rov / Column S.G. 3 24/38 49/52 49/77 49/38 47/53 49/78 49/39 48/55 42/80 (cont.) 43/42 49/62 146/80 47/44 46/67 . 44/81 f
43/49 46/68 17/104 45/49 48/72 3/113 47/49 Row / Column Rov / Column Row / Column S.C. 4 2/1 48/3 33/102 2/2 49/38 2/105 34/13 47/71 4/114 47/35 35/101 II. Indications <40% Thru-Wall Row / Column 4 Thru-Wall S.G. 1 37/21 < 20
.O 38/21 49/36
< 20 35 39/56 < 20 49/67 31 45/78 < 20 11/82 < 20-46/87 (3) < 20 S.C. 2 16/8 < 20 32/16 < 20 46/34 < 20 2/35 < 20 15/71 < 20 49/79 < 20 44/85 < 20 16/91 < 20 25/104 (1) < 20 &
(1) < 25 S.C. 3 36/32 < 20 33/34 < 20 2/45 < 20 48/67 33 32/70 (2) < 20 22/83 < 20
< 20
. () 26/105
-8
~
1,; >
f lj . .
1:$) ;
Row / Column 4 Thru-Wall 2- 'S.G. 4' 12/6 < 20 20/10 20 l .12/25 < 20 11/27 . < 20' 17/28 (2) < 20 17/29 < 20 39/29 < 20
?
37/30 < 20-15/31 < 20 28/31. < 20 20/36 < 20-l 45/41 < 20 ~~
44/42 < 20 10/45 < 20 34/46 < 20 43/49- < 20 33/50 < 20 24/52 (2) < 20 i 49/53 < 20. ,
43/65 < 20 49/65 < 20
< 20 0 13/70 36/73 49/73
< 20
< 20 49/74 < 20 32/75 < 20 17/86 < 20 4/87 < 20 32/87 < 20 16/95 < 20 7/107 < 20 B. The following tubes exhibited unusual characteristics during the post-shotpeening and heat treatment eddy current which were not detected during the original baseline.
Row / Column Comment S.C. 2 2/23 Dent 2/59 Dent S.G. 3 1/114 Metallic substance (Ref. Section 1.5)
S.C. 4 2/28 Dent O 9
- - - - - - w --- - - . ..-- - - - , _ __ _
I AFPENDIX B 1
1 4-1 i
(
- . EXAMINATION
SUMMARY
LEGEND f ') ASME G SEC. XI NE SUM"ARY EXAMINATION AREA CATGY EXAM NRRD REMARKS NUMEE: IDENTIr1C ATIDN ITEM ND METHDD PROCEDUPE ,j,..M * *C ALIFF ATID+. F LDCr *
- REMARKS RELATIVE TD THE EXAM UT REFLECTDRS DF A GEDMETRIC DRIGIN NO REPORT AB.E ' INDICATIONS (e.g. ND EVALUAT!DN REQUIRED)
REPORTABLE INDICATIONS (EVALUATIDN REQUIRED)
ND INDICAT!DNS NDE PROCEDURE UTILIZFT)
NDE METHDD CFDR UT ANGLE L VAVE MDDE ARE PROVIDED VMERE AUT=AUTDMATED UT & M.J= MANUAL L~
ASME SECTIDN x1 REFERENCES UN10UE IDENTIFICATION OF THE EXAM AREA, INCLUDING ISI DRAVING No. t, IDENTIFIE; AREA DESCRIPTION & BRP DRAVING No. (IF APPLICABLE), VITH THE TAG DR LINE No.
PROVIDED IN THE HEADER UNIQUE No. ASSIGNED TO THE EXMINATIDN AREA FOR DATABASE PURPDSES ONLY I
N___-______________
4 DATE: 06/30/89 ' COMANCHE PEAK UNIT 1 PAGE: 1 REVis!ON: 1 PRESERVICE IkSDECTION
SUMMARY
g OUT AGE O (1964), PERIOD,' BASELINE INTERVAL i I CLAs$ 1 COMPONENTS i REAC70E g 3f1 f I
ASNE. C
- $EC. x1 kE
'CUMMARY EXAMINAfl0N AREA CATCT EXAM NRR0 REMARKS ;
NUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE I11M " CALIBRATION BLOCK" l
....... .............................. ....... .......... ............... .... ..................................u....
TRx RCPCRV 01 000100 TBK 1 1100-1 B-A AUT*0L ist*tS4 R1 x EXAMINED FROM ID Us!NG 0,45 & 60 AND RV FLANGE TO SHELL WELD B1.30 AUT 6L !$1 154 R1 x FROM THE FLANGE SEAL SURFACE U$1NG-AUT 12L 151 154 R1 x 0,6,12 8 16. MULTIPLE NRl *5 FROM ID.
' AUT*16L !$1 154 R1 x AUT 45$ Is! 154 R1 x **RV 1" AUT 60s !$1 154 R1 x 000200 TBx 1 1100-2 BA AUT OL 151 154 R1 x RV UPPER TO INTERMEDIATE SHELL B1,11 AUT 45s 151 154 R1 x WELD AUT 60$ 161 154 R1 x e py.ree 000300 TBx-1 1100 3 B-A AUT OL 151 154 R1 x NEAR suRFAct EXAM P!EFORMED uslNG 604 RV INTERMEDIATE TO LOWER SHELL B1.11 AUT 455 151 154 R1 k RI 15 SPOT LAM!kATich (ACCEPTABLE)
WELD AUT 605 1s!-154 R1 x AUT-60L ISI-1$4 R1 x 000400 TBx 1 1100-4 B-A AUT OL 151 154 R1 x LIMITED Ex4M!NAT10N DJi TO CORE $UPPORT RV LOWER $ HELL TO BOTTOM HEAD B1.11 AUT 455 151 154 R1 x LUCS, SEE RR B 9.
WELD AUT-60s ISI 154 R1 x "RV 2** 1 l
l 000500 TBx 1 1100-5 BA an-OL 15147 R3 x WELD EXAMINED FROM OD AS INSTRUMEkTAfl0N Rv LOWER HEAD c!ReuMrERENTIAL B1.21 Mut 45s Is! 47 R3 x Tusts RErotR ID INACCESSIBLE. 25x or l
WELD MUT-60s 151 47 R3 x WELD NOT EXAMINED.SEE RR B 16.
i "TBX 26"
(
(
\
1 I
_ _ _ _ _ _ _ _ = _ _ - _ _ _ _ _ - _ . _ ._
1i DATER 06/30/89 . COMANCHE PEAK UNIT 1 PAGE: 2 REVISION: 1 PRESERVICE INSPECTION SUMMART OUTAGE D (1984), PERIOD, BASELINE INTERVAL ,
[, _, CLASS 1 COMPONENTS l b' REACTOR COOLANT ASME G
- SEC. x! NE
- f.
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS l WUMBER . IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
l- 'TBx-PCPCRV-01 000600 TBx-1 1100-6 BA AUT OL 151-154 R1 X RI REFERS 70 SEVERAL SMALL LAMINATIONS RV UPPER SHELL LONGITUDINAL B1.12 AUT 45$ 151 154 R1 X (ACCEPTABLE).
WELD 'AUT 60S 151 154 R1 X
..py.t..
000700 TBX 1 1100-7 B-A AUF OL ISI 154 R1 X RI IS ACCEPTABLE RV U NER SHELL LONGITUDINAL B1.12 AUT 45S 151-154 R1 x WELD AUT-60s !$1 154 R1 x X
..py.1..
O 000800 TBx 1 1100 8 B-A AUT OL 151 154 R1 x
% RV UPPER SHELL LONGITUDINAL B1.12 AUT 455 15! 154 R1 x WELD AUT 60s 151 154 R1 x
..gy. j u 000900 TBx 1 1100 9 BA AUT OL 151 154 R1 X NEAR SURFACE EXAM PERFORMED USING 60L.
RV INTERMEDIATE SHELL B1.12 AUT 45S 151-154 R1 . OL RI REFERS TO 3 LAmtNAR AREAS LONGITUDINAL WELD AUT 60s 151 154 R1 X (ACCEPTABLE). 60S R!'S (2) WERE AUT 60L 151-154 R1 X ACCEPTABLE.
..ny. p.
001000 TBx 1 1100 10 BA AUT OL 151 154 R1 X NEAR SURFACE EXAM PERFORMED USING 60L.
CV INTERMEDIATE SHELL 81.12 AUT 458 151 154 R1 X OL RI REFERS TO 2 LAMINAR AREAS LONGITUDINAL WELD AUT 60S IS! 154 R1 X (ACCEPTABLE). 60L R1 WAS DETECTED AUT-60L !$!-154 R1 X WITHIN CLADDING (ACCEPTABLE).
"RV2" I
- - - _ _ _ _ _ - _ - _ _ _ _ . _ _ ]
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 3)
REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1984), PERIOD, BASELINE INTERVAL 7 CLASS 1 COMPOWENTS
.lV} REACTO# COOLANT ASME G
.- SEC. XI NE SUMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM **CALIBRtitDN BLOCK" TBX RCDCRV-01 001100 TBX 1 1100 11 BA AUT OL 151 154 R1 'X NEAR SURFACE EXAM PERFORMED USING 60L.
RV IN'ERMEDIATF SMELL B1.12 AUT 455 It! 154 R1 X OL R! REFERS To 2 LAMINAR AREA)
LONGITUDINAL WELD AUT-60s 151-154 R1 X (ACPEPTABLE). 60L RI WAS ACCEPTABLE.
AUT-60L 151 154 R1 X
- gy. gee 001200 TBX 1 1100-12 BA AUT 0L IS! 154 R1 X P" . SURFACE EXAM PERFORMED USING 60L.
RV LOWER SHELL LONGITUDINAL B1.12 AUT 45$ It! 154 R1 X OL RI REFERS TO LAMINAR AREA WELD AUT 60$ ISI 154 R1 X (ACCEPTABLE).
AUT-60L ISI 154 R1 X
- gy.2**
b} /
301300 TBX 1-1100-13 RV LOWER SHELL LONGITUDINAL B-A B1.12 AUT-OL AUT-45$
151-154 R1 l$1-154 R1 X X NEAR SURFACE EXAM PERFORMED USING 60L.
OL R1 REFERS 70 LAMINAR AREA WELD AUT 60$ 151 154 R1 X (ACCEPTABLE).
AUT 60L IS!*154 R1 X e.gy.2*e 001400 TBX 1 1100 14 B-A AUT OL 131 154 R1 X NEAR SURFACE EXAM PERFORMED USING 60L.
RY LOWER SHELL LONGITUDINAL 81.12 AUT 455 151-154 R1 X 2 60L INDICATIONS RECORDiD (ACCEPTABLE).
WELD AUT 60s ISI 154 R1 X AL,%60L 151 154 R1 X e.gy.2**
001500 TBX 1 1100 15 BA AUT OL !$1 154 R1 X EXAMINATION FROM THE ID PERFORMED TO TP!
RV BOTTOM HEAD MERIDIONAL WELD B1.22 AUT 45$ ISI 154 R1 X EXTENT POS$1BLE. EXAMINTION FROM 00 15 AUT 60s 151 154 R1 X 100%. 45$ RI 1$ ACCEPTABLE.
MUT L.L !$1 47 R3 X MUT 455 IS! 47 R3 X **RV 3**
MUT-60$ ISI 47 R3 X 1
O
(,.
1 i
DATE: 06/30/89 CDMANCHE PEAX UNIT 1 PAGE: 4 ',
REvlslON: 1 PRESERVICE IWSPECTION
SUMMARY
CUTAGE O (1984), PERIOD, BASELINE INTERVAL class 1 COMPONENTS
[
V REACTOR COOLANT I
ASME G
_- SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM kRR0 REMARKS NUhBER IDENTIFICATION ITEM NO METHOD PROCEDURE I11M ** CALIBRATION BLOCK **
l TBW-RCPCRV-01 001600 TBX 1 1100 16 BA AUT OL !$1-154 R1 X EXAMINATION FROM THE ID PERFORMED 10 THE-RV BOTTOM HEAD MERIDIONAL WELD B1.22 AUT 455 151 154 R1 X EXTENT POSSIBLE. EXAMINATION FROM OD IS AtlT-60S 151 154 R1 X 100%.
MUT-0L 15147 R3 X MUT 455 151 47 R3 X **RW3**
MUT 605 151-47 R3 X 001700 dM 1 1100 17 B-A AUT-OL ISI 154 R1 y EXAMINATION FROM THE ID PERFORMED 10 THE RV BOTTOM HEAD MERIDIONAL WELD B1.22 AUT 455 151 154 Ri X EXTENT POSSIBLE. EXAMINATION FROM AUT 605 151 154 R1 X 00 !$ 100%.
MUT OL 151 47 R3 X MUT-455 15147 R3 X **RV-3**
MUT 60S 151 47 R3 X 001800 TBX 1 1100 18 BA AUT-0L 151 154 R1 X EXAMINATION FROM THE ID PERFORMED TO THE RV BOTTOM HEAD MERIDIONAL WELD 81.22 AUT 455 !$1-154 R1 X EXTENT POSSIBLE. EXAMINATION FROM AUT 60s 151-154 R1 X 00 IS 100%.
MUT-OL 15147 R3 X MUT 455 IS! 47 R3 X **RV 3**
IRJT-60s 151-47 R3 X 001900 TBX-1 1100A 19 B-D AUT-OL ISI 154 R1 X MANUAL UT (PARTIAL) FROM THE ID USED TO RV OUTLET N0ZZLE TO Y!SSEL B3.90 AUT-6L 151 154 R1 X SUPPLEMENT AUTOMATED.
WELD MUT OL 151 47 R3FC1 X MUT 455 151 47 R3FC1 X MUT 60s '51-47 R3FC1 X **RV-7**
001910 TBX 1 1100A 19 BD AUT 605 ISI 154 R1 X MANUAL UT (PARTIAL) FROM THE ID USED TO Rv OUTLET N0ZZLE INNER RADIUS B3.100 MUT-70L 151-155 R0FC1 X SUPPLEMENT AUTOMATED.
v.Ry.je.
O
l.
'DATE: 06/30/89 COMANCHE PEAK UNIT 1 PACE: 5 1.
} REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1984), PERIOD, BASELINE INTERVAL
/ CLASS 1 COMPONENTS V REACTom COOLANT ASME G
- SEC. XI NE
SUMMARY
EXAM!hATION AREA CATGY EXAN NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE I!!M ** CALIBRATION BLOCK'*
TBN RCPCRV 01 002000 TBX 1 1100A 20 BD AUT-6L !st 154 R1 MANUAL UT (PARTAIL) FROM THE ID USED TO RV INLET N0ZZLE TO VESSEL WELD B3.90 AUT 20L 151 154 R1 X SUPPLEMENT AUTOMATED.
AUT-455 151 154 R1 X MUT OL 151 47 R3FC1 X MUT 458 Is! 47 R3FC1 X **RV 7'*
MUT-605 151 47 R3FC1 X 002010 TBX 1 1100A 20 BD AUT-60s 151 154 R1 X MANUAL UT (PARTIAL) FROM THE 10 USED TO RV INLET N0ZZLE INNER RADIUS B3.100 MUT 70L 181 155 RDFC1 X SUPPLEMENT AUTOMATED.
- RV 1**
[' 002100 TBX 1 1100A 21 BD AUT 6L !$1-1M 11 X MANUAL UT (PARTIAL) FROM THE ID USED T0
( RV INLET N0ZZLE TO VESSEL WELD B3.90 AUT 20L 151 154 R1 X SUPPLEMENT AUTOMATED.
AUT 45s 151 154 R1 X MUT 60$ ISI 47 R3FC1 X MUT-455 151-47 R3FC1 X **RV-7'*
MUT 605 ISI-47 R3FC1 X 002110 TBX 1 1100A-21 B-D AUT 60s !s! 154 R1 X MANUAL UT (PART!AL) FROM THE ID USED TO RV INLET N0ZZLE INNER RADIUS B3.100 MUT 70L !st 155 A0FC1 X SUPPLEMENT AUTOMATED.
eery.jee 00,100 TBX 1 1100A 22 BD Atri-0L 151 154 R1 X MANUAL UT (PARTIAL) FROM THE ID USED TO RV OUTLET N0ZZLE TO VESSEL B3.90 AUT 6L ISI-154 R1 X SUPPLEMENT AUTOMATED.
WELD MUT-OL 181 47 R3FC1 X MUT 45$ 181 47 R3FC1 X MUT 60s Is! 47 R3FC1 X **RV 7**
\
l
r___ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ . . _ _ _. _ _ . _ _ _ _ __ __
DATE: 06/30/89 COMANCHE TEAK UNIT 1 PAGE: 6 REVis10N: 1 PRESERVICE INSPECTION
SUMMARY
DUTAGE 0 (1964), PERIOD, BASELINE INTERVAL
- n l I' class 1 COMPONENTS REACTOR COOLANT ASME G
.: SEC. XI NE
SUMMARY
EXAMINATION AREA CATCY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE 11IM CALIBRATION BLOCK **
TBX RCPCRV 01 002210 TBX 1 1100A 22 BD AUT 60s 151 154 R1 X MANUAL UT (PARTIAL) FROM THE ID USED TO RV CUTLET N0ZZLE INNER RADIUS 83.100 MUT 70L 1s1 155 R0FC1 X SUPPLEMENT AUTOMATED.
..py. j u 002300 TBM 1 1100A-23 B-D AUT OL 151 154 R1 X MANUAL UT (PARTIAL) FROM THE ID USED TO RV OUTLET N0ZZLE TO VEstEL B3.90 AUT 6L !st-154 R1 X SUPPLEMENT AUTOMATED.
WELD MUT OL 1s!-47 R3FC1 X MUT 455 Is!-47 R3FC1 X MUT 60s Is! 47 R3FC1 X **RV 7" 002310 TBM 1 1100A-23 BD AUT 60s 151 154 R1 X MANUAL UT (PART!AL) FROM THE ID USED 70
[V) RV CUTLET N02ZLE INNER RADIUS B3.100 MUT 70L !$1-155 ROFC1 X SUPPLEMENT AUTOMATED.
..RV.3..
002400 TBX 1 1100A 24 BD AUT 6L !st-154 R1 X MANUAL UT (PART!AL) FROM THE 10 USED TO RV INLET N0ZZLE TO VESSEL WELD B3.90 AUT 20L 151 154 R1 X SUPPLEMENT AUTOMATED.
AUT 455 151-154 R1 X MUT OL 151 47 R3FC1 X l
MUT 455 151 47 R3FC1 X **RV 7**
MUT 60s 151 47 R3FC1 X 002410 TBX 1-1100A 24 B-D AUT 60s 1s1 154 R1 X MANUAL UT (PARTIAL) FROM THE ID USED TO RV INLET N0ZZLE INNER RADIUS 83.100 MUT 70L !$1 155 RDFC1 X SUPPLEMENT AUTOMATED.
1 1 nRV 1" 002500 TBX 1 1100A 25 BD AUT 6L 131-154 R1 X MANUAL UT (PARTIAL) FROM THE ID USED TO RV INLET N0ZZLE TO VESSEL WELD B3.90 AUT 20L !$1 154 R1 X SUPPLEMENT AUTOMATED.
AUT 45s 151 154 R1 X MJT OL !st 47 R3FC1 X
- RV 7"
~
MUT 45$ Is! 47 R3FC3 X MUT 60s 151-47 R3FC1 X l
(
l
t'.
DATE: D6/30/89 COMANCHE PEAK UNIT 1 PAGE: 7 REVIS10N: 1 PRESERVICE INSPECTION SUMMART OUTAGE D (1984), PER100, BASELINE INTERVAL CLASS 1 COMPONENTS
['(_, /}
REACTOR COOLANT AME G SEC. XI NE
SUMMARY
EXAMINATION AREA CATCY EXAM NRR0 REMARKS NJMBER IDENT!FICAT10N ITEM N0 METHOD PROCEDURE IIIM ** CALIBRATION BLOCK" TBX-RCPCRV-01 002510 TBX-1 1100A 25 BD AUT 60S ISt 154 R1 ~X KANUAL UT (PART!AL) FROM THE ID USED 70 RV INLET N0ZZLE INNER RADIUS B3.100 MUT 70L !$1 155 ROFC1 X SUPPLEMENT AUTOMATED.
WELD MUT-OL 151 47 R3FC1 X MUT-455 151 47 R3FC1 X MUT 60$ !$1 47 R3FC1 X **RV 7**
002610 TBX 1-1100A 26 BD AUT-60S 151-154 R1 X MANUAL UT (PARTI AL) FROM THE ID USE; 10
/ RV DUTLET N0ZZLE INNER RADIUS B3.100 MUT-70L 151 155 ROFC1 X SUPPLEMENT AUTOMATED.
V) serv.1ee 002700 TBX 1 1100A BG1 AUT-0L 151 154 R1 X EXAMINED FROM FLANGE SURFACE.
RV FLANGE LICAMENTS (1/54) B6.40
- py.$e.
00Z?00 TBK 1-1200 1 BN1 X SHOP V!BUALS UTP .2ED, SEE RR B-15.
RV INTERNALS (UPPER SUPPORT B13.10 PLATE) 002810 TBK 1 1200-2 BN1 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV INTERNALS (INTERNALS B13.10 SUPPORT LEDGE)
/~
l j
U..
I L- DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 8
- l. REVISION: 1 PRESERVICE INSPECTION
SUMMARY
(l OUTAGE D (1984), PER100, BASELINE INTERVAL
, '[~h CLASS 1 COMPONENTS l jd REACTOR C00LANI lI ASME G SEC. XI NE
SUMMARY
EXAMINATIONfiREA' CATCY EXAM NRR0 REMARKS l
NUMBER IDENTit! CAT!DN ITEM '40 METHOD PROCEDURE !!IM ** CALIBRATION BLOCK'*
l l
TBX RCPCRV 01 002820 TBX 1 1200 3 BW1 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV INTERNALS (CORE BARREL) 813.10 002830 TBX 1 1200 4 BN1 X $NOP VISUALS UTILIZED, CEE RR.5 15.
RV INTERNALS (SUPPORT COLUMN) B13.10 002840 TBX 1-1200 5 B-N 1 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV !NTERNALS (UPPER CORE B13.10 PLATE)
/
002850 TBX 1 1200-6 B-N 1 X SHOP VISUALS UTILI2ED, SEE RR B-15.
RV INTERNALS (OUTLET N0ZZLES) B13.10 002860 TBX 1 1200-7 BN1 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV INTERNALS (BAFFLE RADIAL 813.10 SUPPORT) 002870 TBX 1 1200-8 BN1 X SHOP YlSUALS UTILIZES, SEE RR B 15.
RV INTERNALS (BAFFLE) B13.10 002880 TBX 1 1200 9 BN1 X Sh0* VISUALS UTILI2ED, SEE RR B-15.
RV INTERNALS (INSTRU. THIMBLE B13.10 GUIDES)
/~'
d
I t.
L DATE: 06/30/89 COMANCHE PEAK UNIT i PAGE: 9
- REVIS10N
- 1. - PRESERVICE INSPECTION
SUMMARY
i' OUTAGE O (1984), PERIOD, BASELINE INTERVAL-
[ A CLASS 1 COMPONENT $
REACTOR COOLANT I ASME G l -
SEC. XI. NE
SUMMARY
EXAMINATION AREA CATGY EXAM- NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE IIIM- " CALIBRATION BLOCK **
TBX-RCPCRV.01 002890 TBX-1 1200 10 B-N 1 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV INTERNALS (HOLD-DOWN 813.10 SPRING) 002900. TBX 1 1200 11 5-N 1 X SHOP VISUALS UTILIZED, SEE RR B 15.
l RV INTFRNALS (CONTROL ROD B13.10 GUICc TUBE) 002919 TBX 1 1200 12 B N-1 X SHOP VISUALS UTILIZED, SEE RR B-15.
RV INTERNALS (CONTROL ROD B13.10 DRIVE SHAFT) sd 002920 TBX-1 1200 13 B N-1 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV INTERNALS (INLET N0ZZLES) B13.10 002930 TBX 1-1200-14 3N1 X SHOP VISUALS UTILIZED, SEE RR B-15.
RV INTERNALS (CONT. ROD CLUSTER 513.10
-WITHDRAWN) 002940 TBX 1 1200-15 B-N 1 X SHOP V 3UALS UTILIZED, SEE RR B 15.
RV INTERNALS (ACCESS PORT) B13.10 002950 TBX 1 1200-16 BN1 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV INTERNALS (REACT 0k VESSEL) 813.10 0
N l, DATE: 1 06/30/B9 COMA 2 CME-PEAK' UNIT (1 PAGE: 10
/ REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL
/ . CLASS 1 COMP 0NENTS yG} REACTOR COOLANT ASME G
!' . SEC. XI NE i
SUMMARY
EXAMINATION REA CATGY EXAM NRR0 REMARKS-
' NUMBER' IDENTIFICATION ITEM NO METHOD PROCEDURE .!I!M ** CALIBRATION BLOCK" TBX RCPcRV 01 002960 TBX 1 1200 17 BN1 X SHOP V!BUALS UTILIZED, SEE RR B-15.
RV INTERNALS (LOWER CORE B13.10 PLATE) 002970 TBX 1 1200 1B B-N 1 I SKOP VISUALS UTILIZEDi SEE RR B 15.
RV INTERNALS (THERMAL SHIELD) B13.10 L
002980 TBX 1 1200 19 BN1 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV INTERNALS (IRRADIATION 813.10 SPEC. QUIDES) v 002990 TBX-1 1200 20 B N-1 X SHOP VISUALS UTILIZED, SEf RR B 15.
RV INTERNALS (DIFFUSER PLATE) B13.10
- 003000 TBX-1 1200 21 BN1 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV INTERNALS (FORMER) 813.10 003010 TBX 1-1200 22 BN1 I SHOP VISUALS UTILIZED, SiE RR B-15.
RV INTERNALS (INSTRU. THIMBLE B13.10 GUIDES) 003020 TBX 1-1200 23 BN3 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV CORE SUP. STRUCT. (CORE B13.30 SUP. COLUMNS)
I
.us--------.,-nx-___.a_.--.--.-
DATE: 06/30/89'. COMANCHE PEAK UNIT 1 -PAGE: . 11 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (19B4), PERIOD, BASELINE INTERVAL
-1 [4)k,/
8 E ACTOR COOL ANT CLASS 1 COMPONENTS ASME G
- SEC. XI NE
SUMMARY
EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER IDENT!FICAfl0N ITEM No METHOD PROCEDURE 111M ** CALIBRATION BLOCK'*
TBX-RCPCRV 01 003030 TBX 1 1200-24 B N-3 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV CORE SUP. STRUCT. (RADIAL 'B13.30 SUPPORT) 003040 TBX 1 1200 25 BN3 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV CORE SUP. STRUCT. (BOT. B13.30 SUP. CASTING)
-003050 TBX 1 1200 26 B-N 3 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV CORE SUP. STRUCT. (SECOND. B13.30
[ s SUP. ASS.)
003060 TBX 1 1200-27 BN3 X SHOP VISUALS UTILIZED, SEE RR B 15.
RV CORE SUP. STRUCT. (CORE B13.30 SUP. FORGING) 003100 TBX 1 1300 1 BA MT !$1 70 R2FC1,2 X 38% NOT EXAMINED WITH 45$ AND 60$ DUE 10 RV CLOSURE HEAD TO FLANGE WELD B1.40 UT OL 151 47 R3FC1 X FLANGE AND LIFTING LUGS, SEE RR B 16.
UT 455 151 47 R3FC1 X UT 605 ISI 47 R3FC1 X
- TBX 29'*
003200 TBX-1 1300 2 BA UT OL 15147 R3FC1 X 71 NOT EXAMINED WITH 455 AND 60$ DUE TO RV CLOSURE HEAD RING TO DISC Bl.21 UT 45$ ISI 47 R3FC1 X CRDM's AND LIFT!NG LUGS, SEE RR B-16.
WELD UT 605 !$1 47 R3FC1 X GE0ME1RT ORIGIN IS HEAD CONNECTIONS (CRDM's, THERMOCCUPLES, ETC.).
- TBX 29**
.g
(
7 1
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PACE: 12 REVISION: 1 PRESERVICE INSPECTION SUMMART DUTAGEOI1984)/ PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS
.f.
v '< RfACTo# COOLANT ASME G
- SEC. XI NE
SUMMARY
EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER .!DENTIFICAfl0N ! TEM NO METHOD PROCEDURE IIIM **CALIBRAfl0N BLOCK'*
TBX-RCPCRV 01-003300 TBX 1 1300 3 B-A UT OL 151 47 R3FC1 X RV CLOSURE HEAD MERID10NAL B1.22 UT 455 151 47 R3FC1 X WELD UT 60s. 151 47 R3FC1 X
- TBM 29'*
~
003400 ' TBX 1 1300 4 BA UT OL ISI 47 R3FC1 X RV CLOSURE HEAD MERIDIONAL B1.22 UT-455 !$1 47 R3FC1 X WELD UT-605 ISI 47 R3FC1 X
- TBx 29'*
/ 003500 TBX 1-1300 5 B-A UT-OL 151-47 R3FC1 X
\ RV CLOSURE HEAD NER!DIONAL B1.22 UT 45$ ISI-47 R3FC1 X WELD UT-60$ ISI 47 R3FC1 X
- TBX 29**
003600 TBX 1 1300-6 BA UT OL 151-47 R3FC1 X RV CLOSURE HEAD MERIDIONAL B1.22 UT 455 15147 R3FC1 X WELO UT 60s 151 47 R3FC1 X
- TBX 29'*
003700 TBX 1 1300-75 BG2 VT 1 ISI 8 R8FC1 X CONOSEAL BOLT!NG B7.10 003800 TBX 1 1300 76 BG2 VT 1 ISI 8 R8FC1 W CONOSEAL BOLTING B7.10 Lb i
\
\
's
\ __ - - _ _
y... , ._ __ . . _ _ _ . _-.___ . _ _ _ _ _ _ __
l? ,
l f
- l. ...DATE:'06/30/89 COMANCHE PEAK UNIT 1 PAGE: 13 l: REVIS!Out' 1 PRESERVICE INSPECTION
SUMMARY
l OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL 4m\
'f CLASS 1 CCMPONENTS (k h . REACTOR COOLANT AME -G
~.
SEC. xl NE-
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE 1IIM ** CALIBRATION OLOCK'*
TBx RCPCRV 01 003900 TBx 1 1300 77 BG2 VT 1 181 8 R8FC1 X-
. CONOSEAL BOLTING- B7.10 004000 TBX 1 1300-78 B-G 2 VT 1 151 8 R8FC1 X
.' CON 0 SEAL BOLTING B7.10 -
004100 TBx 1 1300A 50 B0' PT ISI 11 R10 X CONTROL ROD DRIVE' B14.10
- V 004150' Tex 1 1300A 51 B0 PT 151-11 Rio X CONTROL ROD DRIVE B14.10 004200 Tax 1 1300# 52 B0 PT ISI 11 R10 x COW 1ROL ROD DRIVE .B14.10 004250 TBX 1-1300A*$3 30 PT ISI 11 R10 X CONTROL RCD DRIVE- 314.10 004300 TBx 1-1300A 54 B-0 - PT 151 11 Rio X CONTROL RCD DRIVE B14.10
4
.i
- , ~DATE: ' D6/30/89 COMANCNE PEAK UWlf 1 PAGE:. 14 1
- REVISION: 1' PRESERVICE INSPECTION SUMMART'
[' OUTAGE O (1984),- PERIOD, BASELINE INTERVAL
'N- CLASS 1 COMPONENTS;
-; 'RLACTOR COOLANT ASME .G
- SEC. xt- NE
SUMMARY
EXAMINATION AREA CATGY' < EXAM NRR0 REMARKS.
.NUMSER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM " CALIBRATION BLOCK **
TRX RCPCRV-01
'004350' Tex N1300A 56 B-0 PT !$1-11 RIO. x
. CONTROL' RCD DRIVE B14.10' l
- 004400: Tex 1 13004-58 B-0 PT !Slett R10 x' CONTROL RCD DRIVE 014.10 004450 Tex 1 1300A 60 g-0 PT 151 11 Rio x
~ CONTROL ROD DRIVE B14.10 l
.s 004500 Tex-1 1300A 62 B0 PT 151 11 Rio x CONTROL 900 DRIVE 814.10
,004550 Tax 1 1300A-63 B-0 PT ISI 11 Rio X CONTROL ROD DRIVE 814.10-004600 TBx 1-1300A-64 80 PT 151 11 R10 x CONTROL Re DRIVE B14.10 004650 Tex 1 1300A 65 s0 PT 151-11 Rio X CONTROL RCD DRIVE B14.10
_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ . ___.___m.__._ _ ________.__
DATE: 06/30/89 -COMANCHE TEAK UNIT 1. PAGE: '15 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, SASELINE INTERVAL
/g CLASS 1 COMPONENTS
)
ASME' G
.- - SEC, x! NE SUMMART EXAMINATION AREA ' CATGY. EXAM NRR0 REMARKS WUMBER IDENTIFICATION. ITEM NO. METHOD PROCEDURE. IIIM ** CALIBRATION BLOCK **
TBX-RCPCRV 01
~004700 Tax 1 1300A 66 B0 PT 151 11 Ei0 N CONTROL ROD DRIVE B14.10 s
004750 Tex 1 1300A-67 B0 PT !$1 11 Rio x CONTROL ROD DRIVE B14.10 004800 Tex-1 1300A 68 B-0 PT 151 11 Rio x CONTROL' ROD DRIVE B14.10
[%
'g, 004850 Tex-1 1300A 69 B0 PT ISI-11 Rio X
' CONTROL ROD DRIVE B14.10 004900 Tex 1 1300A 70 B0 PT 151 11 Rio X CONTROL ROD DRIVE B14.10 004950 Tax 1 1300A 71 B-0 PT ISI 11 R10 X CONTROL ROD DRIVE R14.10
[
I 005000 Tex-1 1300A 72 30 PT ISI 11 R10 x CONTROL ROD DRIVE B14.10 l
.g
( i i
_____-_-.__._m.-_-- - - - . -- --__.m --.----
DATE: 06/30/89 COMA 2CN! PEAK UNIT 1 PAGE: 16 '
- . REVISION: 1 PRESERVICE INSPECTION
SUMMARY
DUTAGE D (1984), ~PER100, BASEllWE INTERVAL CLASS 1 COMPONENTS
- /]:
k /- REACTOR COOLANT l+
ASME G SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDEhflflCATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
TBX-PCPCRV-01 005050 TBX 1 1300A 73 B0 PT !$1-11 R10 X-CONTROL RCD DRIVE' B14.10' 005100 TBX 1 1300A 74 B-0 PT IS! 11 R10 X CONTROL RCD DRIVE B14.10 005150 TBX 1 1300A-75 B-0 PT IS! 1't R10 X CONTROL ROC DRIVE- B14.10 f*
.( 005200 TBX 1 1300A 76 BO' PT ISI 11 R10 X CONTROL ROD DRIVE B14.10 005250 TBx t 1300A 77 B-0 PT !$1 11 R10 X CONTkOL ROD DRIVE B14.10 005300 TBX 1 1300A 78 B-0 PT !$1 11 R10 X CO W . RCD DRIVE B14.10 005400 TBX 1 1400 1 BG1 UT OL 131 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STLC B6.30 MT ISI 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B-6.
- TBx-25**
(
DATE: 06/30/89 COMA %CHE PEAK UNIT 1 PAGE: '17 i; ' REVISION:- 'l ' PRESERv!CE INSPECTION
SUMMARY
OUTAGE 0 (1984),- PERIOD, BASELINE INTERVAL
- '"j REAtt0R COOLANT CLASS 1 COMP 0hENTS ASME C 2 SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE II1M ** CALIBRATION BLOCK" TBX RCPCRV-01 005420 TBX 1 1400 2 B-G 1 UT-OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA..
RV STlc B6.30 MT ISI 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY -
VT '!$1 8 R7A1 X AS UT FROM TOP SUkFACE IS NOT FEASIBLE, SEE RR B 6.
RV STLs 86.30 MT 151-70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151-8 R7A1 X As UT FROM THE TOP SURFACE l$ NOT FEASIBLE, SEE RR B 6.
"TCX 25" i 005460 TBX 1 1400 4 B-G-1 UT OL ts!-15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
k RV STUD B6.30 MT !$1-70 R1A0 X. TRANSDUCER FROM THE BOTTOM SURFACE'OWLY VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE 15 NOT FEASIBLE, SEE R0 B 6.
- TBX 25**
005480 TBX 1 1400 5 B-G-1 UT OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT ISI.70 R1AD X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT .151 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B-6.
- TBX 25**
005500 TBX 1 1400 6 8C1 UT OL 151 15 R6A2 X UT PERFORMER USING A 1.0" & .5" DIA.
RV STLD B6.30 MT !$1 70 R140 X TRANSDUCEF FROM THE BOTTOM SURFACE ONLY YT 151 8 RTA1 X AS UT FROM THE TOP SURFACE 15 NOT FEASIBLE, SEE RR B 6.
- TBX 25" n
f
(
F:
i-i DATE: 06/30/89 CDMANCHE PF4X UNIT 1 PAGE: it. ,
REVIS!DN: 1 PRESERVICE int /ECTION
SUMMARY
7 ~, . DUTAGE D (1954), PERIOD,' BASELINE INTERVAL CLAS$ 1 COMPONENTS i
( j RE8CTOR COOLANT 1
I. ASME G
.: SEC. XI NE
. SUMKART EXAMINATION AREA CATGY EXAM NAR0 REMARKS.
NUMBER IDENTIFI CATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
TBF RCPCRV-01 005520 .TBX 1-1400-7 B-G 1- .UT OL 11; 15 A6A2 X UT PERFORMED USING A 1.0" & .5" O!A.
RV STUD B6.30 MT 181 70 R1A0 X TRANSDUCER FROM TNE BOTTOM SURFACE ONLY VT 151 8 RTA1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
- TBX 25**
005540 TBX-1 1400 8 B-G-21 UT OL ISI 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 NT !$!-70 R1A0 X TRANSDUCER FROM THE BOTTOM t'RFACE ONLT VT 151 8 R7A1 X AS UT FROM THE TOP SUR8/4CE ls NOT FEASIBLE, SEE RR B-6.
- TBX 25**
/"%
( 005560 TBX 1-1400 9 BG1 UT OL 151-15 R6A2 X UT PERFORMED USING A 1.0" & .5" DI A.
RV STUD B6.30 MT !$1 70 R1&D X TRANSDUCER FROM THE BOTTOM SURFACE ONL-VT ISI-8 R7A1 X AS UT FROM YNE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
- TBX 25**
005580 TBX 1 1400 10 B11 UT OL !$! 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT 151 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLt VT !st 8 R7A1 X AF UT FROM THE TOP SURFACE IS NOT FEAS!BLE, SEE RR B 6.
- TBX 25**
005600 TBX 1 1400-11 BG1 UT OL 1$1 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT 151-70 RIA0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151 8 R7A1 X AS UT FROM THE TOP SURFACE is NOT FEASIBLE, SEE RR B 6.
- TBX 25**
i l
l I
l I
l
- W
n s
'DATE: 06/30/89 COMACHE PEAT UNIT 1 PAGEs- 19 REVISION: 1 PRESERVICE INSPECT!0N
SUMMARY
OUTAGE D (1984), . PERIOD, BASELINE INTERVAL
'[L / ' REACTOR ).
Cof&A,_N_T T CLASS 1 COMPONENTS AME G
- SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS hUMBER IDENTIFICAfl0N ITEM NO PETHOD PROCEDURE IIIM ** CALIBRATION BLOCX**
TBX RCPCRV 01 005620 TBX 1 1400 12 BG1 UT 0L 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DlA.
RV STLD B6.30 MT !$1-70 R1AD X TRANSOUCER FROM THE BOTTOM EURFACE ONLY VT ISI 8 R7A1 X Af UT FRou THE TOP SURFACE IS NOT FEASIBLE, SEE RR B-6.
- TBX 25**
005640 TBX 1 1400 13 B-G 1 UT OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 . MT !$1 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT ISI 8 R7A1 X At UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
- TBX 25** .
005660 TBX 1 1400 14 B G-1 UT OL 151 15 R6A2 X UT PERFORMED USING A 1.0a & .5" DI A.
V RV STUD B6.30 MT 151 70 R1A0 X TRANSOUCER FROM THE BOTTOM SURFACE OhtY .
VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B-6.
- TBX 25**
005680 TBX 1 1400 15 BG1 UT OL ISI 15 R6A2 X UT PIRFORMED USING A 1.0" & .5" DI A.
RV STUD B6.30 MT ISI 70 R1A0 X TRANS0JCER FROM THE BOTTOM SURFACE ONLY VT 181-8 R7A1 X AS UT FLOM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
- TBX 25**
005700 TBX 1 1400-16 8G1 UT-OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV Stim 86.30 MT 15! 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT !$l 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
- TBX 25**
l-o_
7 b;
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 20 REVISION: 1 PRESERVICE INSPECT 10h SUMMART =
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
-[D... CLASS 1 COMPONENTS i k) REACTOR COOLANY AME G
. SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY- EXAM NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE I1IM ** CALIBRATION BLOCK'*
TBX-RCPCRV-01 l
005720 TBX 1 1400 17 B-G 1 UT OL 151 15 RCA2 X UT PERFORMED USING A 1.0" 8' .5" DIA.
RV STLD B6.30 MT 151 70 R1A0 X TRANSDUCER F40M THE BOTTOM SURFACE ONLY VT ISI-8 R7A1 X AS UT FROM TdE TOP SURFACE IS NOT FEASIBLE, SEE 9R B 6.
RV STUD B6.30 MT 151-70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY' VT ISI 8 R7A1- X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B-6.
- TBX 25**
'.5" DIA.
f %. 005760 TBX 1 1400 19 B-G 1 UT-OL 151 15 R6A2 X UT PERFORMED US!NG A 1.0" &
( RV STUD B6.30 NT 131 70 R1A0 X TRAK 3DUCER FROM THE BOTTOM SURFACE ONLY VT !$1-8 R7A1 X AS UT FROM THE TOP SURFACE !$ NOT FEASIBLE, SEE RR B-6.
- TBX 25**
005780 TBX 1 1400 20 8G1 UT OL ISI 15 R6A2 V UT PERFORMED USING A 1.0" & .5" DIA.
RV STLE B6.30 MT 151*70 R1A0 TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 1$1 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEAS!BLE, SEE RR B 6.
- TBX 25**
005800 TBX 1 1400 21 3-G 1 UT OL !$1 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STLS B6.30 MT 181 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
- TBX 25**
\
o I DATE: 06/30/89 COMAXCHE PEAK UNIT 1 PA'E:
G 21 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL l1 .
~
4L CLASS 1 COMPONENTS
/' REACTOR COOLANT ASME G
,. SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EKAM NRR0 REMARKS WUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE II!M " CAL!BRATION BLOCK" TEX-etPCav-01 095820 TBX 1 1400 22 BG1 UT OL 151-15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT 151 70 RIA0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLT VT 151 8 R7A1 X AS UT FROM THE TOP SURFACE 15 NOT FEASIBLE, SEE RR B-6.
- ygX.25**
005840 TBX 1 1400 23 B G-1 UT OL IS! 15 R6A2 X UT *ERFORMED U$ LNG A 1.0" & .5" DIA.
RV STUD B6.30 MT ISI 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151 8 R7A1 X AS UT FROM THE TOP OURFACE IS NOT FEASIBLE, SEE RR B 6.
. **TBX 25**
005860 TBX 1 1400 24 BG1 UT OL 181-15 R6A2 X UT PERFORMED USING A 1.D :. 5" La A.
.V- RV STUD B6.30 MT ISI 70 R1A0 X TRANSDUCER FROM T C OLTTOM SURFACE ONLY VT 151-8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B-6.
RV STUD B6.30 MT !$1 70 RIA0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
- TBX 25**
005900 TBX 1 1400 26 B G-1 UT OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" 01A.
RV STUD B6.30 MT !$1-70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
" TBX - 25 **
i (v
DATE: 06/30/89 CDMANCHE PEAX UNIT 1 PAGE: 22 l
REVISION: 1 PRESERVICE INSPECTION
SUMMARY
l~. DUTAGE D (1964), PERIOD, BASELINE INTERVAL
[, CLASS 1 COMPONENTS M REAtt0e C00LANl l
AmE G
_. SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM " CALIBRATION BLOCK **
TBX RCPCRV-01 005920. TBX 1-1400-27 BG1 Li OL ISI 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DI A.
RV STLD B6.30 MT 151 70 RIA0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
"TBX 25**
i 005940 TBX 1 1400 28 B-G-1 UT OL ISI 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DI A.
RV STUD B6.30 MT 151 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151 8 RTA1 X AS UT FROM THE TOP SURFACE !$ NOT FEASIBLE, SEE RR B 6.
- TBx 25" -
' O 005960 TBX 1 1400 29 BG1 UT-OL 151-15 R6A2 X UT PERFORMED USING A 1.0" & .5" DI A.
- d - RV STLD B6.30 MT 151 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
RV STUD B6.30 MT ISI 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151-8 RTA1 X AS UT FROM THE TOP SURFACE !$ NOT FEASIBLE, SEE RR B 6.
"TBX 25**
l 006000 TBX-1 1400 31 BG1 UT OL 151 15 R6A2 X UT PERFORNED USING A 1.0" & .5" DI A.
RV STLD B6.30 MT !$1 70 R1A0 X TRANSD'JCER FROM THE BOTTOM SURFACE ONLY VT !$1 8 R7A1 X As UT FROM THE TOP SURFACE IS NOT I FEASIBLE, SEE RR B 6.
- TBX-25** j i
l
?
\
i
V DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 23
. REVISION: 1 PRESERVICE INSPECTION
SUMMARY
g OUTAGE O (1984), PERIOD, BASEL!hE INTERVAL l.
l' [ \: class 1 COMPONENTS REACTOR COOLANT ASME G SEC. X1 NE
SUMMARY
EXAMINAT!ON AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METi0D PROCEDURE II1M " CALIBRATION BLOCK **
l ,
1 1 TRY RCPCRV-01 006020 TBX 1 1400-32 BG1 UT OL 181 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT is! 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151 8 R7A1 X AS UT FROM THE 10P SURFACE IS NOT FEASIBLE, SEE RR B-6.
- TBX 25**
006040 TBX 1 1400-33 BG1 UT-0L ISI 15 R6A2 X UT PERFORMED US]NG A 1.0" & .5" DIA.
RV STte 86.30 MT !$1 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURF ACE ONLT VT !$1-8 R7A1 X As UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
"TBX 25" 006060 TBX-1 1400-34 BG1 UT-OL 181 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DI A.
\ RV STUD B6.30 MT 151-70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE OND .
VT 151 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
"TBX 25**
006080 TBX 1 1400 35 BG1 UT.0L 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DI A.
RV STUD B6.30 MT ISI 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT !$l 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEAS!B'.E, SEE RR B 6.
"T BX - 25 **
006100 TBX 1 1400-36 BG1 UT OL ISI 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT 151 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE OWO VT !$1 8 R7A1 X As UT FROM THE TOP SURFACE IS NOT l FEASIBLE, SEE RR B 6. l "TBX 25" l i
/ l kJ
_ _ _ _ - _ _ - _ _ - _ _ _ . - _ _ . I
l l DATE: 06/30/B9 COMANCHE PEAK UNIT 1 PAGE: 24 l' REVISION: - 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL
(] CLASS 1 COMPONENTS
, - (j REACTOR COOLANT l
ASME G
- SEC. XI NE
SUMMARY
EXAMINAfl0NiREA CATGY EXAM NRR0 REMARKS NUMBER IDEWilFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK" TBx RCPCRV-01 006120 TBX 1 1400-37 B G-1 UT OL 151 15 R6A2 X UT PERFORMED'OSING A 1.0" & .5" DIA.
RV Stim B6.30 MT IS! 70 R1A0 X TRANSDUCER FROM THE 30TTOM SURFACE ONLT VT 151-8 A7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
"TBX 25" 006140 TBX 1 1400 38 B G-1 UT OL 151-15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STLE B6.30 MT IS! 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FLAS!BLF, SEE RR B-6.
"TBX 25**
,f % 006160 tux-1 1400 39 BG1 UT OL 151-15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
j RV STUD B6.30 MT !st 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT !$1-8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
"TBX 25" 006180 T8X 1-1400 40 B G-1 UT OL ISI 15 RSA2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT !$1 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT !$18 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEAS!BLE, SEE RR B 6. ,
RV STUD B6.30 MT !$1 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY l YT 151-8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE SEE RR B 6. i eeTBX 25" v
l j
p .-
p DATE: ' 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 25 REVISION: 'i PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (19B4), PERIOD, BASELINE INTERVAL
/O CLASS 1 COMPONENTS l fs. . REACTOR COOLANT ASME G
_ SEC. XI NE
SUMMARY
EXAMINATION REA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE I1IM ** CALIBRATION BLOCK **
TBX RCPCRV 01
- 006220 TBX-1 1400-42 B G-1 UT OL 181 15 R6A2 .X UT PERFORMED USING A 1.0" 8 .5" DIA.
RV STUD B6.30 MT 151 7D R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
- TBX 25**
006240 TBX 1 1400-43 BG? UT 0L 151 15 R6A2 X Lif PERFORMED USING A 1.0* & .5" DIA.
RV STUD- B6.30 MT 151 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY -
VT 151 8 R7A1 X AS UT FROM THE TOP SURFACE 18 NOT FEASIBLE, SEE RR B-6.
RV STUD B6.30 MT 181 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
RV STUD B6.30 MT 151-70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT !$1-8 R7A1 X AS UT IicCM THE TOP SURFACE l$ NOT FEASIBLE, SEE RR B-6.
- TBX 25**
006300 TBX 1 1400 46 B-G 1 UT-OL ISI 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA-.
RV STUD B6.30 MT !$1 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT ISI 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6,
- TBX-25**
/
r um _ _ _ . - . -_._m_ - _ _ - _ - _. _ _ _ _ _ _ _ _ .
\ '.
DATE: 06/30/89 COMANCHE PEAX UNIT 1 PAGE: 26 REVISION: 1 ' PRESERVICE INSPECTION SUMMART GUTAGE D (1984), PERIOD, BASELINE INTERVAL FN CLASS 1 COMPONENT $
k REACTop COOLANT ASME G SEC. XI NE
SUMMARY
EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICAT10N ITEM NO METHOD PROCEDUPE IIIM " CALIBRATION BLOCL" TBx RCPcRV-01 006320 TBx-1 1400 47 B G-1 UT 0L 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT !$1 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLT VT 15! 8 R7A1 X AS UT FROM THE TOP SURFACE l$ NOT FEASIBLE, SEE RR B-6.
eeigx.25" 006340 TBx 1-1400 48 B-G 1 UT-OL 151 15 R6A2 X L'T PERFORMED USING A 1.0" & .5" DI A.
RV STUD B6.30 MT !$1 70 R1A0 X. TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT IS! 8 R7A1 X AS UT FROM THE TOP SURFACE !$ NOT FEASIBLE, SEE RR B 6.
eetgx.25**
006360 TBx 1 1400-49 B G-1 UT-OL !$1 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT 151 70 R1A0 X TRAkSDUCER FROM THE BOTTOM SURFACE Ch;Y VT 151-8 R7A1 X AS UT FROM THE TOP SURFACE 15 NOT FEASIBLE, SEE RR B 6.
"TBx 25**
006380 TBx 1-1400-50 B G-1 UT-OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT 151 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151 8 R7A1 X AS UT FROM THE TOP SURFACE !$ NOT FEASIBLE, $EE RR B 6.
- TBX 25**
006400 TBX 1 1400 51 B-G 1 UT OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STUD B6.30 MT 151 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE OWLT VT 15! 8 R7Al X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B 6.
- TBX 25" r
(
s l
- _ _ _ _ - _ _ i
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 27 REVISION: 1 PRESERVICE INSPECT!DN SUMMART GUTAGE D (1984), PERIOD, SASELINE INTERVAL
{
CLASS 1 COMPONENTS
%, -RFACYOR COOLANT f
ASME G
. SEC. XI NE
[$UMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM " CALIBRATION BLOCK **
TBX-RCPCRV-01 006420 TBX 1-1400-52 B-G 1 UT-OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STts 96.30 MT 151 70 RIA0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT !$1 8 R7A1 X AS UT FROM THE TOP SURFACE 15 NOT FEASIBLE, SEE RR B-6.
- TBX 25**
006440 TBX 1 1400 53 B G-1 UT OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STLE B6.30 MT 15170 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT IS! 8 R7A1 X AS UT FROM THE TOP SURFACE IS NOT FEASIBLE, SEE RR B-6.
"TBX 25**
/' 006460 TBX-1 1400-54 B-G-1 UT-OL 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
k RV STLc B6.30 MT 151 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151 8 R7A1 X AS UT FROM THE TOP SURFACE !$ NOT FEASIBLE, SEE RR B 6,
- TBX-25**
l 006480 TBX 1-1400 $ 1 B G-1 UT-0L 151 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STLD B6.30 MT 151-70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT 151 8 R7A1 X AS UT FROM THE TOP SURFACE 15 NOT FEASIBLE, SEE RR B 6.
l **TBX 25**
1 I
006500 TBX 1 1400-S-2 B-G 1 UT OL !$1 15 R6A2 X UT PERFORMED USING A 1.0" & .5" DIA.
RV STLD B6.30 MT 151 70 R1A0 X TRANSDUCER FROM THE BOTTOM SURFACE ONLY VT !$1 8 R7A1 X AS UT FROM THE TOP SURFACE !$ NOT FEASIBLE, SEE RR B-6.
- TBX-25**
l p
5 s
l '.
DATE: 06/30/89 CDMA7CHE PEAK UNIT 1 PAGE: 28 REVISJON: 1 PRESERVICE INSPECTION SUMMART OUTAGE D (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS
.(s REACTOR C00tytLT ASME G
. SEC. XI NE SUMMART C%AMINAT!DN AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICAT' ON ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'"
TBx-RCPCRV fd 006600 Tax 1 1400 1 BG1 MT 181 70 RfA0 X RV NUT B6.10 VT 151 8 R7A1 X 006620 TBM 1 1400-2 8-G 1 MT 181 70 R1A0 X RV NUT B6.10 VT ISI 8 A7A1 X 006640 TBx 1-1400-3 BG1 MT !$170 R1A0 x RV NUT B6.10 VT ' 151 8 R7A1 x
.( 006660 Tex-1 1400-4 BG1 B6.10 MT VT 151 70 R1 A0 '
ISI 8 R7A1 x
X RV NUT 006680 Tax 1 1400 5 B-G 1 MT !$1 70 R1A0 x RV NUT B6.10 VT !$1 8 R7A1 x 006700 TBX 1 1400 6 BG1 MT ISI-70 R1A0 X RV NUT B6.10 VT ISI 8 R7At X 006720 ftX 1 1400-7 BG1 MT ISI 70 R1A0 X ,
RV NUT B6.10 VT ISI 8 R7A1 X b
l.
- - - - - . _ . _ _ _ m..___ _.-_ ____ _ _m_ _ __,_,__
t l
'DATE: ' 06/30/8V' COMANCNE PEAK UNIT 1- PAGE: 29 J
REVISION: 1 . PRESERVICE INSPECTION SUMMRY OUTAGE D (1984), PERIOD, BASELINE INTERVAL
' CLAS$ 1 COMPONENTS REActos COOLANT ASME G
_ SEC. XI NE
SUMMARY
EXAMINATIONdREA CATGY EXAM NRR0 REMARKS I NUMBER ' IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM' ** CALIBRATION BLOCK **
l tax-RCPcRv-01 006740 TBX 1 1400 8 BG1 MT 181 70 R1A0 X RV NUT B6.10 VT 151 8 RFA1 X 006760 TBX-1 1400-9 B-G 1 MT ISI 70 R1A0 x RV NUT B6.10 VT !$1 8 R7A1 X 006780 TBX 1 1400 10 BG1 MT 151 70 R1A0 K RV NUT B6.10 VT 181 8 R7A1 X 006800 TBX 1 1400-11 .BG1 MT !$1 70 R1A0 X RV NUT B6.10 VT ISI-8 R7A1 X 006820 TBX-1 1400 12 BG1 MT I$1 70 R1A0 X RV NUT B6.10 vi 151 8 R7A1 X 006840 73r 1 1400-13 3G1 MT 151 70 R1A0 X RV NUT B6.10 VT !$1 8 R7A1 X 006B60 TBX 1 1400-14 BG1 MT ISI 70 R1A0 X RV NUT B6.10 VT 151 8 R7A1 x s
_ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ . _ _ . _m .__
. .j .
- OATE: 06'/30/89 COMANCHE PEAK UNIT 1 PACE: 30 g REV1510Ns? 1 PRESERVICE INSPECTION SUMMART
' 00TAGE D (1984),- PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS j^f > REACT 0e c00 TANT
, 1 ASME G SEC. XI NE
SUMMARY
EXAMINATION REA CATGT .. EXAM NRR0 REMARKS
. NUMBER IDENTIFICATION- ITEM NO METHOD PROCEDURE I11M ** CAL 19RAfl0N BLOCK
IlxRCPcRV-01 006880 TBx 1-1400 t$. BG1 MT !st 70 R1A0 x RV NUT B6.10 'VT Is! 8 R7A1 x 006900 TBx 1 1400 16 B'*G 1 MT !st 70 R1A0 x RV NUT B6.10 VT !$1 8 R7A1 x
. 006920 TBM 1 1400 17 B-G 1 MT !$1 70 R1A0 x RV NUT B6.10 VT 151 8 R7A1 x
. j 006940 TBx 1 1400 18 B G-1 MT 151 70 R1A0 X RV NUT B6.10 VT !$1 8 R7A1 x 006960 Tex 1 1400 19 BG1 MT Is!-70 R1A0 X RV NUT B6.10 VT !$1 8 87A1 x 006980 Tex 1 1400-20 BG1 MT 151 70 R1A0 x RV NUT B6.10 VT 151 8 R7A1 x 0071)00 TBx 1 1400 21 B G-1 MT Is! 70 R1A0 X RV NUT B6.10 VT 151 8 RFA1 x
J DATE:j'06/30/89 COMANCHE PEAK UNIT 1 race 3' REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1984), PERIOD, BASELINE -!NTERVAL j ,
CLASS 1 COMPONENTS k.L REACTOR COOLANT ASME C
.- .SEC. x! NE
SUMMARY
ExAMINATich AREA CATCT. EXAM NRR0 REMARKS
. NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE- 111M " CALIBRATION BLOCK" TBX-RCPCRV 01 007020 TBM 1 1400 22 BG1 MT 151 70 R1A0- X RV NUT- 86.10 VT 181 8 R7A1 'x 007040 TBx 1 1400 23 BG1 MT 151 70 RfA0 x
'2V NUT B6.10 VT ~ ISI 8 R7A1 x 007060 Tex 1 1400 24 B-G 1 MT 151 70 R1A0 x RV NUT B6.10 VT 151-8 R7A1 x i
r
-007080 TBx 1-1400 25 BG1 MT !$1-70 R1A0 x RV NUT B6.10 VT ISI 8 R7A1 x 007100 TBx 1 1400 26 BG1 MT ISI 70 R1A0 X RV NUT B6.10 VT ISI 8 RTA1 x 007120 TBX 1 1400 27 B-G 1 MT 151 70 R1A0 x RV NUT B6.10 VT ISI 8 R7A1 x 007140 TBx 1 1400 28 BC1 MT ISI 70 R1A0 x RV NUT B6.10 VT !st 8 R7A1 x 4
o l l
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 32-REV!510N: 1 PRESERVICE INSPECT!0W SUMMART DUT AGE 0 (1984 ), ' PERIOD, BASELINE INTERVAL CLAS$ 1 COMPONENT $ -
~[
M/ ' REACTOR' COOLANT ASME G
. SEC. x1' rE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
....... .............................. ....... .......... ............... .s ... ........................................
TBX-RCPCRV-01 007160 TEX 1 1400-29 BG1 MT 151 70 RIA0 X RV NUT B6.10 VT !$1 8 R7A1 X 007180 TBX 1 1400 30 EG1 MT 151 70 R1A0 x
- RV NUT B6.10 VT 151 8 R7A1 X 007200 TBx-1 1400 31 BG1 MT 151 70 RI A0 X RV NUT B6.10 VT 151 8 R7A1 x lf) 007220 TBx 1 1400 32 B-G 1 MT !$1 70 R1A0 x RV NUT B6.10 vi ISI 8 R7A1 x 007240 TBx 1 1400 33 B G-1 MT 1s1 70 R1A0 X RV NUT B6.10 VT 151 8 RTA1 x 007260 TBx 1 1400 34 BG1 NT ISI 70 R1A0 X RV MUT B6.10 VT 151 8 R7A1 X 007280 TBX 1 1400-35 BG1 MT 151-70 R1AD X RV NUT B6.10 VT 151-8 RTA1 X l
l
DATES. 06/30/89 CDMANCHE PEAK UNIT 1 PAGE: .33 REV!$10N: 1 PRESERVICE IVSPECTION SLMMARY -
DUTAGE D (1984), PERIOD, BASELINE INTERVAL
, I class 1 COMPONENTS ~
N- ? . RE ACTOR COOL ANT ASME G SEC. X1 NE SUlmARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS-NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE II!M " CALIBRATION BLOCK
Tex RCPCRV 01 007300 TBM 1 1400 36 BG1 MT 151 70 R1A0 X RV NUT B6.10 VT ISI 8 R7A1 X 007320 TBX 1 1400-37 BG1 MT 151 70 R1A0 X RV NUT B6.10 VT !st 8 RTA1 X 007340 TBx 1 1400 38 BG1 MT ISI 70 R1A0 X RV NUT B6.10 VT 151-8 R7A1 X Or.
007360 TBx 1 1400-39 BG1 MT ISI 70 RIA0 ISI-8 R7A1 X
RV NUT B6.10 VT X 007380 TBX 1 1400 40 B G-1 NT 151 70 R1A0 X RV NUT B6.10 VT ISI 8 R7A1 X.
007400 TBM 1 1400 41 BG1 MT ISI 70 R1A0 X RV NUT B6.10 VT 151 8 RFA1 X 1
007420 TBX 1 1400-42 BG1 MT 151 70 R1A0 X RV NUT B6.10 VT ISI 8 R7A1 X l '
5 DATE: 06/30/89 CDMANC;;E PEAx UNIT 1 FAGE: 34 '
REVISION: 1 PRESERVICE INSPEC110N
SUMMARY
OUTAGE D (1984), PERIOD, BASELINE INTERVAL
, CLASS 1 COMPONENTS b- REACTOR C00 TANT AME G SEC. XI NE
' K4 MARY EXAMINATION AREA CATGY EXAM NRR0 AEMARx5 NLMER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
TBx RCPCRV-01 007440 TBX 1 1400 43 5G1 MT !$1 70 RIA0' X RV WT B6.10 VT !$1 8 R7A1 X 007440 TBK-1 1400 44 BG1 MT 151 70 R1A0 X RV WT B6.10 VT 151 8 R7A1 X 007480 TBx 1-1400 45 5G1 MT 15170 R1A0 X RV NUT B6.10 VT 151 8 R7A1 X f
\ '007500 TBx 1 1400-46 BG1 MT ISI-70 R1AD X RV NUT B6.10 VT 151-8 R7Al X 007520 TBx 11400 47 BG1 MT !$1 70 R1A0 X RV NUT B6.10 VT !$1 8 R7A1 X 007540 TBx 1 1400 48 BG1 MT 151 70 R1A0 X RV NUT B6.10 YT !$1 8 R7A1 X 007560 TBX 1 1400 49 BG1 MT ISt 70 R1A0 X RV NUT B6.10 vi ISI 8 R7A1 X
(1 )
DATE: 06/30/09 COMANCNE PEAK UNif 1 PAGE: 35 REVISION: 1 J PRESERVICE INSPECTION S'MMART
. ., .'0UTAGE D (1984), PERIOD, BASELINE INTERVAL i j
'O . CLASS 1 COMPONENTS
' ( -
~ RACTOR COOLA?T ASME G
_. SEC. x! NE SUMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS
' NUMBER IDENTIFICAT10N ITEM NO METHOD PROCEDURE II!M " CALIBRATION BLOCK **
TEX RCPCRV-01 007580 Tex 1 1400 50 3G1 . MT '151 70 R1A0 x RV WT B6.10 VT 151 8 R7A1 x 007600 Tax 1 1400-51 sG1 MT !$1 70 R1A0 x RV WT B6.10 - VT 151 8 R7A1 x 007620 Tex 1 1400 52 B-G 1 MT ISI 70 RIA0 'x RV NUT B6.10 VT 151 8 27A1 x 007640 tax-1 1400 53 BG1 MT 151 70 R1A0 X RV NUT B6.10 VT ISI 8 R7A1 x 007660 TBx 1 1400 54 BG1 MT 151 70 R1A0 x RV NUT B6.10 VT IS! 8 R7A1 x 007680 TBx 1 1400 8 1 3G1 MT !$1 70 R1A0 x RV NUT' B6.10 VT !$1 8 R7A1 X 007700 TBx 1 1400 $ 2 8-C 1 MT ISI 70 R1A0 X .
RV NUT B6.10 VT !$l 8 R7A1 x
[
T
l, h' ,
T . DATE: 06/30/89 COMANCHE PEAX UNIT 1 FAGE 36 -
REVISION: 1 PRESERVICE lhSPECTION SUMMART
%. DUTAGE D (1984), PERIOD, BASELINE INTERVAL (i (
, CLASS 1 COMPONENTS REACTOR COOLANT ASME G J SEC. XI WE
SUMMARY
EXAMINATION AREA CAIGY EXAM- NRR0 REMARKS WUMBER IDENTif1 CATION ITEM No METHOD PROCEDURE !!!M ** CALIBRATION BLOCK **
TBX-RCPCRV 01 e 007800 ~TBX 1 1400 1 3G1 VT ISI 8 R7A1 X RV WASMER 66.50 007520 TBK 1 1400-2 3G1 VT ISI-8 R7A1 X RV WASHER 86.50 007840 TBX-1 1400 3 BG1 VT ISI 8 R7A1 X RV WASHER B6.50 007860 TBx 1 1400-4 B G-1 VT ISI B R7A1 X RV WASHER 86.50 007880 TBx 1 1400 5 BG1 VT ISI 8 R7A1 X RV WASHER 86.50 007900 TBK 1 1400-6 B G-1 VT 151 8 R7A1 X RV WASHER B6.50 007920 TBX 1 1400 7 BG1 VT 161 8 R7A1 X RV WASHER 86.50 g
..;; DATE : 06/30/89 CDMANC::E PEAK UNIT 1 PAGE:- 37 i l$ REVISION: 1 PRESERVICE IN$PECT:
- SUMMART DUTAGE 0 (1984), PERIOD, f ASELINE INTERVAL y .
CLASS 1 COMPT.9ENTS
,.% ) REACTOR COOLANT ASME- G I .: -SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM .NRR0 REMARKS NUMBER'IDENTIFICAfl0N ITEM No METHOD PROCEDURE I11M ** CALIBRATION BLOCK" TBF RCPCRV-01 007940 T3X 1 1400 8- BG1 VT !$1 8 R7A1 X RY WASNER 56.50 007960 T3X 1-1400 9 BG1 VT ISI 5 R7A1 X RV WASHER B6.50 007980 TBX 1 1400 10 9G1 VT ISI-8 RTA) X RV WASHER 86.50 O-
- 008000 TBX 1 1400 11 B G-1 VT ISI 8 k7A1 X RV WASHER B6.50 008020 1BK 1-1400 12 BG1 VT .51 8 R7A1 X RV WASHER B6.50 008040 TBM 1 1400 13 BG1 VT 'ISI 8 R7A1 X RV WASHER B6.50 008060 TBX 1 1400 14 BG1 VT ISI 8 R7A1 X kV WASHER B6.50
r_. _ _ _ - _
l.
I DATE: 06/30/89 COMA 2CHE PEAK c;If 1 PAGEi 38-REVISION: 1 PRESERVICE INtocr lDN SUMMART
/g OUTAGE O (1984), PEk , BASELINE INTERVAL t CLASS 1 COMPONENTS -
l l react 0R COOLANT ASME G SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER -IDENTIFICATION ITEM NO METHOD PROCEDURE I11M ** CALIBRATION BLOCK **-
l l
TBX RCPCav-01 008080 TsX 1 1400 15 BG1 VT ISI 8 R7A1- X-RV WASMER 36.50 006100 TBM 1 1400-16 BG1 VT 151-8 R7A1 X RV WASMER- 36.50 008120 TBX 1 1400 17 BG1 VT ISI 8 R7A1 X RV WASMER- B6.50 -
ft 008140 TBX 1 1400 18 B-G 1 VT 151 8 R7A1 X RV WASMER 86.50 l
008160 TBx 1 1400 19 BG1 VT ISI 8 R7A1 X RV WASMER 86.50 i
?
008180 T5X 1 1400 20 3-G 1 VT 151 8 R7A1 X RV WASNER 86.50 008200 TBX 1 1400 21 BG1 VT ISI 8 R7A1 X .li I
RV WASMER 56.50 O
i i
DATE: D'.,30/89 COMANCHE PEAK UNIT 1 PAGE: 39 -
REVISION: 1 PRESERVICE INSPECTION SUMMART OUTAGE D (1984), PERICO, BASEL!kE INTERVAL l]'.,
- CLASS 1 COMPONENTS
-(f., REACTOR COOLANT ASME G
. SEC. XI NE SUMMART EXAMINAfl0N AREA CATGT' EXAM NRRs REMARKS WUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE I1,M " CALIBRATION BLOCK" TBX-RCPCRV-01 008220 TBX 1 1400-22 3G1 VT 151 8 R7A1 X RV WASMER B6.50 008240 TBK 1-1400 23 BG1 VT 151-9 R7A1 X-
- RV WASMER B6.50 008260 TBX 1 1400-24 B-G-1 VT 151 8 R7A1 X RV WASHER B6.50 t
( 008280 TBX 1 1400-25 RV WASHER PG1 B6.50 VT 151 8 R7A1 X 008300 TBX 1 1400 26 BG1 vi ISI 8 R7A1 X RV WASHER B6.50 008320 TBK 1 1400-27 B G-1 VT 151 8 R7A1 X RV WASHER B6.50 008340 TBX 1 1400 28 B-G-1 VT !$1 8 R7A1 X RV WASHER B6.50
, t
.m_ - . . . _ _ _ _ . - - - - - - --- - - - - - - - - - ' - - - ' - - - - - - - - - - - - - - - - - - - " - - - - ' ' - - - " " - - " " ^ " " - - - - ^ ^ - - -
DATE: 06/30/89 COMANCHE PEAX UNIT 1 'TAGE: 40 REVISION: 1 PRESERVICE INSPECT!DN SUMMART OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
'M- . CLASS 1 COMPOWENTS
'( REACTOR COOLANT ASME .G
. SEC. X1 NE
SUMMARY
EXAMINATIONIREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE !!!M **CA'.!BRATION BLOCK" TBX RCPCRV-01 008360 TBX 1 1400 29 B G-1 VT 151 8 R7A1 X RV WASMER B6.50 008380 TEX 1*1400 30 BG1 VT 151 8 R7A1 X
- RV WASHER B6.50 1
008400 TBX 1 1400 31 B G-1 VT 151-8 R7A1 X RV WASHER B6.50 008420 TBX 1 1400-32 BG1 VT ISI-8 R7A1 X RV WASHER B6.50 008440 TBX 1 1400-33 BG1 VT 151 8 R7A1 X RV VASMER B6.50 008460 TBX 1 1400-34 B-G-1 VT 151 8 R7A1 X RV WASNER 96.50 !
1 1
008480 TBX 1 1400 35 BG1 VT ISI 8 R7A1 X RV WASHER B6.50 '
I
)
i 1
- ____-__- _ _ _ _ _ __ .__ .__ _ __ _ __ _. __ J
I DATE: 06/30/89 COMANCHE PEAK UNIT 1 FAGE: 41 REVIS10N: 1: PRESERvlCE INSPECTION SUMMART
. . , OUTAGE D (1984), PERIOD, BASELINE INTERVAL
.t . CLASS 1 CCMPONENTS
' , REACTOR COOLANT ASME G
- SEC. x1 NE
SUMMARY
EXAMINATION ARFA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE. I11M - ** CALIBRATION BLOCK'*
TRx RCPCRV-01 008500 ftX 1 1400 36 B G-1 VT ISI 8 R7A1 x RV WASMER 86.50 008520 TBM 1 1400 37 tG1 VT 151 8 RTA1 X RV WASHER B6.50 008540 Tex-1 1400 38 s-G 1 VT 151-8 R7A1 x RV WASHER 86.50 O
'008560 Tax 1 1400-39 s G-1 VT 151 8 R7A1 X j RV WA3HER 86.50 008580 TBx 1 1400-40 BG1 VT 151 8 RTA1 X RV WASHER 56.50 008600 Tex 1 1400-41 BG1 VT 15! 8 R7A1 X EV WASMER 86.50 008620 tex 1 1400 42 BG1 VT 151 8 R7A1 X l RV WASHER 86.50
/* '
k l
l1 'DATE: 06/30/89' ' COMANCHE PEAK UNIT 1 PAGE: 42 Iq l REVISION: . . 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1984), PERICD, BASELINE INTERVAL
_7 ,
l i ( 4- CLASS 1 COMPONENTS N- PIACTOR COOLANT l- )
I I,
ASME o 2 SEC. x! NE 1
SUMMARY
EXAMINATION AREA. CATGY EXAM NRR0 . REMARKS !
NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE Ii1M " CALIBRATION BLOCK"
....... ..................... ........ ....... .......... ............... .... ........................................ 1 TBx RCPCRV 01 !
008640 TBx 1 1400 43 BG1 VT ISI 8 R7A1 X RV WASMER 86.50 1
008660 TBx 1 1400-44 BG1 VT !$1*8 R7A1 X RV WASNER 86.50 008680 TBx-1 1400 45 BG1 VT 181 8 R7A1 x RV WASNER 86.50 008700 TBx 1 1400-46 BG1 VT IS! 8 R7A1 x RV WASHER 86.50 008720 TBx 1 1400-47 BG1 VT ICl 8 R7A1 X RV WASHER B6.50 Ob87&D TBx 1 1400 48 B- .1 VT 181 8 R7A1 X RV WASMER 86.50 008760 TBX 1 1400-49 B-G 1 VT !$1 8 R7A1 X RV nsASMER B6.50 i
1 I
DATE: 06/30/89 'CDMANCHE PEAK UNIT.1 PAGE: 43 REV!$10N: 1 PRESERVICE INSPECTION SUMMART
, -sy. . DUTAGE D (1984),' PER100, BASELINE INTERVAL CLASS 1 COMPONENTS
(* .
.: SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRRO REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE I11M **CALIBRAT10N BLOCX**
TBX RCPCRV 01 008780 TBX 1 1400 50 BG1 VT 151 8 R7A1 X RV WASMER Bd .F 008800 iBX.1 1400-51 BG1 VT ISI 8 R7A1 X RV WASMER B6.50 008820 TBX 1 1400 52 BG1 VT ISI 8 RTA1 X RV WASHER B6.50 C
?
008840 TBX-1 1400 53 t31 VT 151 8 R7A1 X EV WASMER 's.50 00B860 TBX 1 1400 54 B-G 1 VT ISI 8 R7A1 X RV WASHER B6.50 008880 TBX 1 1400 51 BG1 VT 151 8 K741 X RV WASHER B6.50 008000 TBX 1 1400 8 2 BG1 VT 151 8 RTA1 X RV WASKER B6.50 b
s
- - - - - - - - - - - - - - _ - _ - _ _ _ _ - _ _ _ _ _ _ - i
- DATE: 06/30/09 CDMA CHE PEAK UNIT 1 PAGE: 41 -
REVis10N: 1 PRESERVICE INSPECTION SUMMART DUTAGE 0 (1984), PERIOD, BASELINE INTERVAL 7 '
CLASS 1 COMPONENTS REACTOR COOLANT ASME C
- SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMGER IDENTIFICAT]QN ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
TBX RCPCPR-01 009000 TBX 1 2100-1 BB UT OL 151 47 R2A6 X' PARTI AL GAM VITH OL & 605, SEE RR B 12.
PRESSURIZER LOWER HEAD TO B2.11 UT-45$ ist 47 R2A6 X SHELL WELD UT-605 !$1 47 R2A6 X VT 151 8 R7A1 X
- TBX 1**
00902$ TBX 1 2100-2 UT OL ist 47 R2A6 X PARTIAL EXAM WITH OL & 60$. LXTRA EXAM, ,
PRESSURIZER INTERMEDIATE SHELL UT-455 !$1 47 R2A6 X. NOT REQUIRED. I WELD UT 60s 181 47 R2A6 x )
}
(,/ PRESSURIZED INTERMEDIATE SHELL UT 455 ISI 47 F2A6 X NOT REQUIRED. '
WE") UT-60s 151 47 R2A6 X YT 151 8 R7A1 X f
"TBX 1** q i
009075 T8X 1 2100 4 UT OL 151 47 R2A6 X PARTI AL EXAM WITH OL & 60$. EXTRA EXAM, i PRESSURIZER INTERMEDIATE SHELL UT 45$ 151 47 R2A6 X- NOT REQUIRED.
WELD UT 605 ISI 47 R2A6 X VT 151 8 R7A1 X
- TBX 1**
009100 TBX 1 2100 5 BB VT OL 15147 R2A6 x PARTIAL EnM WITH OL & 60s, SEE RR I 12.
PRESSUR!ZER UPPER ltEAD TO B2.11 UT 458 ISt 47 R2A6 X f SHELL WELD UT 605 ISI 47 R2A6 X VT ISI 8 R7A1 X "TBX 1** j l [
i U
.DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 45 RFVis10N: 1 PRESERV!CE INSPECTION
SUMMARY
OUTAGE D (1984), PERIG), BAsfLINE INTERVAL
'[
' 'NM ' REACTOR COOLANT CLAs3 1 COMPONENTS AsME G sEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIN ** CALIBRATION BLOCK'*-
TBX RCPCPR 01 009200 TBX 1 2100-6 BB UT OL 151 47 R2A6 X EXAMINED 100% OF WELD LENGTH, sEE RR B PRESSURIZER LONG. WELD (1FT B2.12 UT 455 1s! 47 R2A6 X -12.
ADJ. WELD 1) UT 60s Is! 47 R2A6 X VT Is!*8 R7A1 X "TBX 1**
009230 TBX 1 2100 7 UT OL 151 47 R2A6 x. EXAMINED 100% OF WELD LENGTH. EXTRA PRESSURIZER LONG. WELD UT-455 15147 R2A6 X EXAM, NOT REQUIRED.
UT 60s Is! 47 R2A6 X VT ls! 8 R7A1 X
( PRESSURIZER LONG. WELO UT 45s Is! 47 R2A6 X EXAM, NOT REQUIRED.
UT-60s Is! 47 R2A6 x VT 151 8 R7A1 X
I PREssuR12ER SURGE N0ZZLE To B3.110 UT 45s Is! 47 R2A6 X VESSEL WELD UT 60s 151 47 RZA6 X
]
- TBX 1" lVn i i
)
i
_ -________--____-_A
.g
\
l DATE: D6/30/89 CDMANCNE PEAR UNIT 1 PAGE: 46 i REVIS!DN: 1 PRESERVICE INSPECT!DN
SUMMARY
' 0UTAGE D (1984), PERIOD, BASELINE INTERVAL js l~ .( ) CLASS 1 COMPONENTS l
\- REACTOR COOLANT l
ASME G
_- SEC. XI NE
SUMMARY
EXAMINAT10N AREA CATGY EKAM -NRR0 REMARKS NUMBER IDENTIFICAT10N- ITEM NO ME'f MOD PROCEDURE Ii1M **CAllBRAfl00 BLOCK'*
TBX-RCPCPR 01 009550 TBX 1 2100 11 80 SEE RR B 14 PRES $URIZER SURGE N0ZZLE INNER B3.120 RADIUS eetsg.jee 009600 TBX 1 2100 12 BD UT OL 151 47 R2A6 X PARTIAL UT EXAMINATION, SEE RR B 7.
PRESSURIZER SPRAY N0ZZLE To B3.110 UT 455 !$1 47 REA6 X VESSEL WELD VT 60$ 181-47 RZA6 X VT 151 8 R7A1 X
- TBX 1**
. 009650 YBx 1 2100-12 B*D VT 1 151 8 R8FC1 X ACCES$1BLE AREAS EKANINED, SEE ER 5 14
\x- ,~
PRES $URIZER SPRAY a322LE INNER B3.120 R ADIUS I
- TBX 1**
009700 TBX 1 2100 13 BD UT OL !$1-47 R2A6 X PARTIAL UT EXAMINATION, SEE RR B 7.
PRESSURIZER SAFETY N0ZZLE To 33.110 UT 455 IS! 47 R2A6 X
' VESSEL WELD UT-60s ISI 47 R2A6 X VT 151 8 R7A1 X
- TBX 1**
009750 TBX 1 2100 13 BD VT 1 151 8 R8FC1 X SEE RR B 14 PRESSURIZER SAFETf N0ZZLE B3.120 INNER RADIUS
- TBX 1**
DATE: ~06/30/89 COMANCHE PEAK UNIT 1 PAGE: 47-
-REVIS10Nt 1 PRESERVICE INSPECT 10N
SUMMARY
f t. OUTAGE D (1984), PERIOD, BASELINE INTERVAL
-( CLASS 1 COMPONENTS REACTOR COOLANT n ASME G
. SEC XI aE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS-NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE 111M " CALIBRATION BLOCK" TBX RCPCPR 01 009800 TBX 1-2100 14 BD UT OL ISI-47 R2.6 X PARTIAL UT EXAMINATION, SEE RR B 7.
PRESSURIZER RELIEF N0ZZLE TD B3.110- UT 458 151 47 R2A5 X
.VE$$EL WELD UT-60$ ISI 47 R2A6 X VT 181 8 R7A1 X igx. g u 009850 TBX 1 2100 14 BD VT 1 ISI 8 R8FC1 X SET RR 3-li..
' PRESSURIZER RELIEF N0ZZLE B3.120 INNER RADIUS
- TBX 1" (Q
\
009900 TBK 1 2100-15
' PRESSURIZER SAFETY N0ZZLE TO B3.110 BD UT OL UT-458 151 47 R2A6 151-47 R2A6 X
X PARTIAL UT EXAMINA110h, SEE RR B-7.
VESSEL WELD U1 60$ 151 47 R2A6 X
- !T 101 8 R7A1 X "TBX 1**
i 009950 TBX-1 2100 15 BD VT 1 151 8 R8FC1 X SEE RR B 14 PRESSURIZER 6AFETY N0ZZLE B3.120 INNER RADIUS
..ygg . t u 010000 TBX 1 2100 16 80 UT 0L 181 47 R2A6 X PARTI AL UT EXAMINA110N, SEE RR B 7.
PRESS'IRIZER SAFETY N0ZZLt To B3.110 UT 458 151-47 R2A6 X I
VESSEL WELD UT 60$ 158-47 R2A6 X VT 151 8 R7A1 X
. 1,,.1.. f o l l
q
___ _ __ __ _ _ ____d
f COMANCHE PEAK UNIT 1 PAGE: 48
'DATE: 06/30/89'
. ~ REVISION:. 1 PRESERVICE IN$PECTION
SUMMARY
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL j
J CLASS 1 COMPONENTS
-(/ .
~,
SEC. XI NE SLM4ARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM NO METNOD PROCEDURE IIIM ** CALIBRATION SLOCK**
TBx RcPCPR-01 010050 TBX 1 2100-16 BD VT 1 !$1-8 R8FC1 X SEE RR B 14.
PRESSURIZER SAFETY N0ZlLE B3.120 INNER RADIUS
\-
- TBX 1**
i 010100 TBX 1 2100 B G-2 VT 1 NQA 3.09 8.52R0 X VT 1 PERFORMED FOLLOWING BOLTING CHANGE.
PRESSURIZER MANWAY BOLTS B7.20 (31/B16)
TBA RcPcSG-01 V B-B UT OL !st-47 R3 X 30% NOT EXAMINED WITH 45$ AND 35% NOT 010200 TBX 1 3100 1 1 UT 45$ !$1 47 R3 X EXAMINED WITH 605 DUE TO SUPPORT SG1 CHANNEL HEAD 70 TUBESHEET B2.40 UT 60$ 151 47 R3 X ColtMNS, SEE RR B 4 WELD
- TBX 28**
BD SEE RR B 14.
010300 TBX 1 3100 1A SG1 INLET N0ZZLE INNER RADIUS B3.140
- TBX 28**
BD SEE RR B 14 010400 TBX 1 3100 13 SG1 OUTLET N0ZZLE INNER RADIUS B3.140
- TBX 28**
BG2 VT 1 NQA 3.09 8.52RO X VT 1 PERFORMED FOLLOWING BOLT!NG CHANGE.
010500 TBX 1 3100 SG1 HOTLEG MANWAT BOLTING (1 B7.30 B1/1-B16) {
l O 1 J
1
_ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ . . )
i..
PAGE: 49 ,
DATE: 06/30/$9 COMAWCNE PEAK UNIT 1 i REVISION: 1 PRESERVICE INSPECTION
SUMMARY
GUTAGE O (1984), PERIOD, BASELINE INTERVAL
- [ .
CLASS 1 COMPONENTS L-
~,
SEC. XI NE CATGY EXAM NRR0 REMARKS
. SLDO4ARY EXAMINAfl0N AREA ITEM NO METNOD PROCEDURE II1M *'* CALIBRATION BLOCK **
8424BER IDENTIFICAT10N TBX RCPCSG 01 NQA 3.09 8.52RD X VT*1 PERFORMED FOLLOWING BOLTING CHANGE.
010600 TBM 1 3100 BG2 VT 1 SG1 COLDLEG MANWAT BOLT!NG (1 BT.30
-B17/1 B32) tex RcPcSC 02 151 47 R3 X 301 NOT EXAMINED WITH 45S AND 35% NOT 010700 TBX 1 3100 2 1 BB UT OL UT.455 ISI-47 R3 X EXAMINED WITH 60$ DUE TO SUPPORT SG2 tWANNEL NEAD TO TUBESMEET B2.40 ISI 47 R3 X COLUMNS, SEE RR B 4.
WLD UT 60$
- TBX 20**
/
t
( SEE RR B 14.
010000 TBM 1 3100 2A BD SG2 INLET N0ZZLE INNER RADIUS B3.140
- TBX 28**
-SEE RR B 14.
010900 TBX 1 3100 28 BD SG2 OUTLET NOZZLE INNER RADIUS B3.140
- TBM 28**
BG2 VT 1 WQA 3.09 8,52RO X VT 1 PERFORMED FOLLOWING BOLTlWG CHANGE.
011000 TBX 1 3100 SG2 HOTLEG MANWAY BOLTING (2 87.30 81/2 816)
NoA 3.09 8.52k3 X VT 1 PERFORMED FOLLOWING BOLTING CHANCE.
011100 TBX 1 3100 BG2 YT 1 SG2 COLDLEG MANWAT BOLTING (2 87.30 B17/2-532) l
.w l
Xi DATE: 06/3C/89 COMANCHE PEAK UNIT 1 PAGE: 50-REVISION: 1 PRESERVICE INSPECTION SubMARY -
,$ 3 OUTAGE D (1984), PERItX), BASELINE INTERVAL CLASS 1 COMP 0HENTS
(
ASME G J SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS
-NLMBER IDENTIFICATION- ITEM NO METHOD PROCEDURE II1M **CALIBRAfl0N $ LOCK **
.TBX RCM 011200 TBX-1 3100 3 1 BB UT OL 151-47 R3 X 301 NOT EXAMINED WITH 45$ AND 35% NOT SG3 CHANNEL HEAD 70 TUBESHEET B2.40 UT 45$ ist.47 R3 X EXAMINCD WITH 605 DUE To SUPPORT UT 60s 'S! 67 R3 X COLUMNS, SEE RR B 4.
- T BX - 28" 011300 TBX 1 3100 3A BD SEE RR B 14 SG3 INLET N0ZZLE INNER RADIUS B3.140 "TBX 28**
'11400 TBX 1 3130 38 BD SEE RR B 14.
SG3 OUTLET N0ZZLE INNER RADIUS 83.140
SG3 MOTLEC MANWAY BOLTING (3 87.30 B1/3 B16) 011600 TBX 1 3100 BG2 VT 1 NOA 3.09-8.52RO X VT-1 PERFORMED FOLLOWING BOLTING CHANGE.
SG3 COLDLEG MANWAY BOLT!NG (3 B7.30 B17/3 832)
TBX mercSG-Q4, BB UT OL 15147 R3 X 30% NOT EXAMINED WITH 455 AND 35% NOT 011700 78X 1 3100-4 1 SG4 C W NEL HEAD TO TUBESHEET B2.40 UT 455 151 47 R3 X EXAMINED WITH 605 DUE TO SUPPORT UT 605 ISI-47 R3 X COLUMNS, SEE RR B 4.
WELD l **TBX 28**
l
PAGE: 51 "DATE: 06/30/89 COMANCHE PEAR UNIT 1
(> PRESERVICE INSPECT.'ON SLMMART C . REVISION: 1' QUTAGE 0 (1984)i PERIOD, BASELINE INTEtvAL
- /
l; _( : CLASS 1 COMPONENTS REACTOR COOLANT AWME G
SEC. XI NE SLmMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS IRmRER IDENT!FICAfl0N ITEM MD METMCD PROCEDURE IIIM ** CALIBRATION BLOCK **
.e.. ........................................
TBX-RCPCSG 04 BD BEE RR B 14.
011800 TBM 1 3100-4A 3G4 INLET N0ZZLE INNER RADIUS- B3.140
- TBX-28**
B0 SEE RR B 14 011900 TBX-1 3100-4B SG4 OUTLET N0ZZLE INNER RADIUS B3.140
- TBX 28**
012000 TBX 1 3100 5G2 VT-1 NoA 3.09 8.52R0 X VT 1 PERFORMED FOLLOWING BOLTING CHANGE.
A' SG4 HOTLEG MANWAY SOLT!NG (4 B7.30 81/4 B16)
B-G-2 VT 1 NQA 3.09-8.52R0 X VT 1 PERFORMED FOLLOWING BOLT!NG CHANCE.
012100 TBK 1 3100 SG4 COLDLEG MAWJAT BOLTING (4 B7.30
-B17/4-B32) 29 RC-001-)g31-j, MUT 41L 60s NOT EXAMINED, SUPPLEMENTED 012200 TBK 1 4100-1 B-F NUT OL ISI-154 R1 X B5.10 WT 41L 181 154 R1 X WITH AUTOMATED FROM THE ID TO ACHIEVE RPV N0ZZLE TO SAFE END
.a7-0L ISI 206 RD X 100% COVERAGE, SEE RR B 5.
RC 1 520-001 V 4JT 41L ISI 206 R0 X PT ISI 11 R10 X **TBX 2** f 151 206 RD X 40% NOT EXAMINED WITH 41L, SEE RR B 10 l 012300 TBX 1 4100 2 B-J UT OL SAFE END 70 PIPE B9.11 UT 41L ISI 206 R0 X RC 1 520 001 1 PT ISI 11 Rio X
- TBX 2**
PAGE: 52 i DATE: 06/30/89 COMANCNE PEAK UNIT 1 REVIS!ON: 1 PRESERVICE INSPECTION
SUMMARY
DUTADE D (1964), PERIOD, BASELINE INTERVt.L
/ }.
N%/- CLASS 1 COMPONENTS REACTOR COOLANT ASME G
~
SEC. XI N E'
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0: REMARKS l NLMBER IDENT]FICATION ITEM NO METHOD PRf4EDURE I I I M' ** CALIBRATION BLOCK **
29 RC 001 WEST-1 l
012100 TBX 1 4100-3 BJ UT OL 151 206 R0 X P8PE TO REDUCING ELBOW B9.11 UT-41L 351 206 R0 X RC 1 520-001 v PT ISI 11 Rio X ;
- TBX 2**
151 206 R0 10X NOT EXAMINED WITN 41L, SEE RR P ,
012500 TBX 1 4100 4 BF UT OL X B5.30 UT 41L 151 206 PD X REDUCING ELB0W TO SG N0ZZLE SAFE END PT 151 11 R10 X
- RC 1 520 001 2 "TBX 2**
1
'31-ac 1-002-WEST-1 B-F UT OL 151 206 R0 X 012600 TBX 1 4100 5 l B5.30 UT 41L 151 206 R0 X
'SC N0ZZLE SAFE END TO ELBOW PT 151-11 R10 X l RC 1 520-001 3
- TBX 2**
ISI 206 RD X PT BY TU FOLLOWING REWORK.
012700 TBX 14100-6 5J UT OL 09.11 UT 41L X ELBOW TO PIPE .lSt 206 RD PT WDE 300 R2 X RC 1520 0014 "TBX 2**
f l
012800 TEX 1 4100-7 BJ UT 'JL ISI 206 RD X {
PIPE 10 ELBOW B9.11 UT 41L 151 206 R0 X gC.1 520 001 V PT ISI 11 Rio X
" T BX - 2**
1 151 206 R0 X 012900 TBK 1 4100-8 BJ UT OL 89.11 UT 41L 151 206 RD %
ELBOW TO PIPE RC 1 520-001 5 PT 1$1 11 Rio X "TBX 2"
)
r !
( l L
1
)
1 1
. _ _ _ _ _ _ _ _ _ _ _ _ _. l
PAGE: 53 COMANCHE' PEAK UNIT 1 DATE: 06/30/89 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1984), PERIOD, BASELINE INTERVAL
{' X *EYlS10N: CLASS 1 COMPONENTS REACTOR C00 LAG ASME G SEC. XI NE CATGY EXAM NRR0 REMARKS SLD94ARY EXAMINATION AREA ITEM NO METNOD PROCEDURE IIIM ** CALIBRATION BLOCK **
NLMBER IDENTIFICATION ........................................
31 RC-1-002 WEST 1 BJ UT OL !$1 206 RD X 013000 TBM 1 4100 9 PIPE 10 ELBOW 39.11 UT-41L 181 2M R0 X RC 1 520 001 v PT 151 11 Rio X
- TBX-2**
151 206 R0 X 013180 TBX.1 4100 10 BJ UT OL B9.11 UT 41L 151 206 R0 X ELBOW TO RC PUMP SUCTION N0ZZLE PT I 11 R10 X l
RC*1 520 001 6
- TBX 2**
27.5 RC 1-003 WEST 1
) -
B-J UT-OL ISI-206 R0 X 013200 TBX 1 4100-11 09.11 UT 41L 151 206 R0 X RC PUMP OISCHARGE N0ZZLE TO PT ISt-11 R10 X PIPE RC 1 520 001 7
- TBX 2**
151 206 R0 X 013300 TBX 1 4100-12 BJ UT OL PIPE TO ELBOW 39.11 UT 41L ISI 206 R0 X PT 151 11 R10 X RC 1 520-001 V
- TBX 2**
X 50% NOT EXAMINED WITH 41L, SEE RR B 10.
013400 TBX 1-4100 13 BJ UT OL 151 206 RD UT 41L 151 206 RD X ELBOW TO SAFE END 39.11 PT ISI 11 R10 X RC 1 520 001 8
- TBX 2**
x MUT 41L 60% XOT EXAMINED, SUPPLEMENTED 013500 TBX 1 4100 14 B-F AUT OL ISI-154 R1 AUT-41L ISI 154 21 X WITN AUTOMATED FROM THE ID TO ACHIEVE SAFE END TO RV N0ZZLE B5.10 l X 100% COVERAGE, SEE RR B 5. PT PERFORMED RC 1 520 001 V MUT 41L 151 206 R0 151 206 R0 X BY TU FOLLOWING REWORK.
MUT 41L PT NQA 3. 09-8.10R0 X **TBX-2**
u f
L_
COMANCHE PEAK UNIT i PAGE: 54 DATE: 06/30/09 REVISION: 1 PREGERVICE INSPECTION
SUMMARY
G.f1 AGE O (1984)i PERIOD, BA!!LINE INTERVAL j/
CLASS 1 COMPOWENTS
(/
REACTOR COOLANT ASME C SEC. Il NE
SUMMARY
EMAMINAT10N AREA CATGY EXAM NRR0 REMARKS WUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIN **CALIBRAfl0N BLOCK **
29-RC 1 001 W ST-1 BJ PT 181 11 Rio X SEE RR B 10.
013600 .YtK 1 4100 15 PIPE 10 BRANCH CONNECTION 99.31 RC 1 520 001 v 31-RC 1-002 w tT 1 013700 TBM 1 4100 16 B .I PT 151 11 R10 X PIPE TO BRANCH CONNECTION 99.32 RC 1-520-001 v BJ PT 151 11 R10 X SEE RR B 10.
013800 TBK 1 4100 17 09.31 p PIPE TO BRANCN CONNECTION (j RC 1 520-001-v 27.5 RC 1-003- W ST 1 BJ PT 151 11 R10 X 013900 TBX-1 4100 18 P!PE To BRANCH CONNECTIDH 39.12 RC 1 520 001 v BJ PT 151 11 R10 X SEE RR B 10.
014000 TBM 1 4100 19 PIPE TO BRANCH CONNECTION 39.31 RC 1-520-001 v BJ PT 151 11 R10 X SEE RR B 10.
014100 TBX 1-4100 20 PIPE To BRANCH CONNECTION 39.31 RC 1 520 001-v X 50% NOT EXAMINED WITH 41L, SEE RR B 10.
014200 TBx 1 4100 21 BJ UT UL 151 206 RD B9.31 UT 41L 151 206 R0 x l P!PE To BRANCH CONNECTION RC 1 520 001 V PT ISI 11 RIO X
- TBX 2**
s N
1 l
j L _ _ _ _ _ _ _ _ _ _ _ _ .
l-i COMANCHE PEAK UNIT 1 PAGE: 55 DATE:' 06/30/B9 REVIS10N 1 PRESERVICE INSPECTION
SUMMARY
.,F QUTAGE O (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS i
REACTOR COOLANT g l
ASME G
~
SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATI0W ITEM No METH00 PROCEDURE IIIM ** CALIBRATION BLOCK **
27.5 RC i 00342ST 1 014300 TBX 1 4100 22 BJ PT !$1 11 R10 X SEE RR B 10.
P!PE TO BRANCN CONNEC' ION 39.31 AC 1 5'20-001 V 12 RC 1-007-2501R 1 BJ UT OL 151 206 RO X PT PERFORMED BY TU FOLLOWING REWORK.
014400 TBK 1 4101 1 BRANCH CONNECTION TO P!PE 89.11 UT 455 181 206 R0 X RC 1 RB 005 1 PT N0A 3.09 8.10R0 X
- TBX-12**
BJ UT OL 181 206 RO X PT PERFORMED BY TU FOLLOWING REWORK.
111500 TBx 1 4101 2 PIPE TO ELBOW 89.11 UT 455 l$1 206 R0 ,
X RC 1 RB 005 V PT NQA 3.09-8.10R0 X
- TBX 12**
014600 TBK 1 4101 3 BJ UT*0L 181 206 A0 X ELBOW TO PIPE 89.11 UT 455 151 206 to X RC 1 RB 005 2 1 PT 151 11 R10 X
- TBX 12**
BJ UT OL 151 206 R0 X PT PERFORMED BY TU FOLLOWING REWORK. q 014700 TBM 1 4101-4 PIPE TD P!PE B9.11 UT 455 151 206 R0 X RC 1*RB 005 2 2 PT WQA 3.09-8.10R0 X
- TBX 12**
I 014800 TBK 1 4101 5 BJ UT OL 181 206 R0 X PIPE TO ELBOW 89.11 UT 45$ !$1 206 R0 X X
- TBX 12**
l t
N
__-_-_-_--___-_-__-__._.____-_-_-__-__.__---___---__---___-_._-____w
1 COMAuCNE PEAK UNIT 1 PAGE : 56 DATE: 06/30/89
- . REVltl0N
- 1 PRESERVICE INSPECTION SulmARY .
O' OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS k,/ '
REACTOR CDDLANT ASME G
~
$EC. El NE suMMdJtY [XAMINAT10N AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METNOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
12-ac 1 007 2501R 1 014900 TBK 1 4101 6 BJ UT OL ist 206 R0 X ELBOW TO PIPE 39.11 UT 455 Is! 206 to X RC 1 RS 005-V PT 181 11 R10 X
- TBK 12**
BJ UT OL- 151 206 RO X 20% NOT EXAMINED WITH 45$, stE RR B 10.
015000 TsK+1 4101 7 PIPE TO VALVE B9.11 UT.458 151 206 RD X RM 1-RS 001 1 PT !$1 11 R10 X
- TBK 12**
/
COMANCHE PEAK UWlf 1 PAGE: 57
' DATE: 06/30/89 REVis10N: 1 PRESERVICE INSPECTION
SUMMARY
4
-s OLITAGE D (1964), Petits , BASELINE INTERVAL l.
!~\ '
class 1 CtMPONENTS REstDUAL NEAT REMOVAL AssE C SEC. XI NE SLMMART EXAMINATION . AREA CATGY EXAM NPR0 REMARKS
. WWBER IDENTIFICATION ITEM NO METHOD PROCEDURE II1M " CALIBRATION BLOCK" 12-RH-1 001 2501R 1 BJ UT OL 151 206 R0 K 20% NOT EXAMINED WITH 455, SEE RR 8 10.
015100 TBK-1 4101 8 VALVE TO PIPE 39.11 UT-455 151 206 R0 k PT PERFORMED BY TU FOLLOWING REWORK.
RN 1-RB 001 2 PT WQA 3.09 8.10R0 X
- TBX 12**
8J UT OL 151 206 RD X 015100 tBK 1-4101 10 89.11 UT 45s 151 206 RO X ELBOW TO PIPE
\ RM 1 As 001 3 PT 151 11 R10 K
" Tex 12~
015400 Tex 1 4101 11 3J UT OL 151 206 RO X PIPE TO ELs0W 39.11 UT-45s 151 206 R0 x RH 1 RS 001 V PT 151 11 R10 X "T8x 12" 015500 TBK 1 4101 12 5J UT OL 151 206 RO F ELBOW TO P!PE B9.11 UT 45s 151+206 RD x RM 1 RB 001*V PT 151 11 R10 K "TBX 1?**
151 206 R0 x 20% NOT EXAMINED WITH 455, SEE RR 8 10.
015600 Tex 1 4101 13 BJ UT OL 99.11 UT 455 151 206 R0 X PIPE TO VALVE PT 151 11 R10 X RM 1 RB 001-4
- TRK 12**
58 COMANCHE PEAK UNIT 1 ~PAGE:
DATE 06/30/89 i REVISION: 1 . PRESERVICE INSPECTION SLMMARY DJTAGE O (1984), PERIOD, BASELINE INTERVAL f]
-i j CLASS 1 COMPONENTS REstdUAL HEAT REM 0v4L ASME G
- SEC. XI NE
SUMMARY
EXAMINAfl0N AREA- CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
12-RH-1-001 2501R-1 B-G 2 VT 1 151 8 R8FC1 X 015700 Tex 1 4101-8702A
. VALVE BODY BOLTING B7.70 RH 1 RB 001 1 G702A B.M 2 SHOP RECORD
- USED, SEE RR B-1.
015710 Tex 1 4101 8702A VALVE 80DY INTERAL SURFACES 812.40 RH 1 RB 001 1-8702A 015800 Tex 1 4101 8701A BG2 VT-1 ISI 8 R8FC1 X VALVE BODY SOLTING 87.70 RH 1 RB 001 1 8701A
/'N SHOP RECURDS USED,-SEE R2 8 1 015810 TBx 1 4101 8701A B M-2 VALVE BODY INTERNAL SURFACES B12.40 RN 1 RS-001 1 8701A
. m--_i___. m _ _ _ _ _____--______.____._____m_ _ _
c_ , _. - -- - _ . _ _
t 1
COMANCHE PEAK UNIT 1 PAGE: 59
'DATE: 06/30/89 REVISION: 1 PRESERilCE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL
/
., b. CLASS 1 COMPONENTS
. N., -
REACTOR COOLANT ASME G SEC.'XI NE SUMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
10-RC-1 021 2501R 1 015900 TBX 1 4102 1 8J UT OL 151 206 R0 X BRANCH CONNECTION TO ELBW B9.11 UT 45$ ISI 206 R0 X SI 1-RB 037 20 PT 151 11 R10 X
- TBX 9**
BJ UT OL 181 205 R2A3 X PARTIAL UT, SEE RR B 10.
016000 TBX-1 4102 2 ELBOW TO PIPE 89.11 UT-458 -151 205 R2A3 X PT 151 11 R9A3 X SI 1 RB 037 V VT 151 8 R7A1 X
- TBX a**
,A .16100 TBX 1-4102 3 PIPE TO ELBOW 89,11 UT 45$ !$1 206 R0 X
.k St*1 RB-037 19 1 PT 151 11 R10 X
- TBX-9**
BJ UT OL 151 206 R0 X 016200 TBX 1 4102 4 ELBOW TO PIPE 89.11 UT 45S ISI 206 R0 X PT 151 11 R10 X St 1 RB 037 V
- TBX 9**
ISI 205 R2A3 X PARTIAL UT, SEE RR B 10.
016300 TBX 1 4102 5 BJ UT OL 09.11 UT 455 181 205 R2A3 X PIPE TO ELBOW PT 151 11 R9A3 X SI 1 RE 037 V VT 151 8 R7At X
- TBX-9**
151 205 R2A3 X PARTIAL UT, SEE RR B 10.
016400 TBX 1 4102 6 8J UT-OL UT-455 151 205 R2A3 X ELBOW TO P!PE B9.11
$1 1 RB 037 14 4A PT ISI 11 R9A3 X VT ISI 8 R7A1 X
- TBK 9" 1
1
1 l
COMANCHE PEAK UNIT 1- PAGE: 60
-DATE: 06/30/89 CVISION: 1- PRESERVICE INSPECTION 9UMART i
OUTAGE O (1964), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS ;
l REAC10R COOLANT
- ASME G l
SEC. XI NE I
SumARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS
.NLMBER IDENTIFICAfl0W ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
10.Rc.1-021-2501R.1 tJ UT OL ll! 205 R2A3 X PARTIAL UT, SEE RR 5 10.
016500 TBK 1 4102 7 PIPE TO VALVE ' 39.11 UT 45$ 181 205 R2A3 X
$1 1 Rs.037 14 PT lll.11 R9A3 X VT 181 8 R7A1 X
- TBX.9'* .
4 4
l l
l 9
\ l
li r ,
COMANCHE PEAK UNIT 1 PAGE: 61 DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
DUTAGE D (1964), PERIOD, BASELINE INTERVAL
-[ $
, \s ._ s/ CLASS 1 COMPONENTS SAFETY INJECTION ASME G NE SEC. XI BUMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUNBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
10 st 1 179 2501R-1 i BJ UT-OL 151 205 RZA3 X PARTIAL UT, SEE RR B-10.
016600 TBM 1 4102 8 89.11 UT 455 151 205 R2A3 X VALVE TO PIPE SI-1 RB 037 13 PT 151 11 R9A3 X VT 151 8 R7A1 X
- TBX-9** ,
BJ UT OL 151 205 R2A3 X PARTIAL UT, SEE RR B 10.
016700 TBX 1 4102 9 P!PE To ELBOW 89.11 UT-45$ 151-205 R2A3 X PT 151 22 R9A3 X St t*RB 037 V VT 151-8 R7A1 X
- TBX-9'*
. (O,,),16800 TBX 1 4102-10 BJ UT OL 151205 R2A3 X PARTIAL UT. SEE RR B-10.
ELBOW TO PIPE 09.11 ' UT 455 151205 R2A3 X PT 151 11 R9A3 X SI 1 RB 037*V VT 151 8 R7A1 X eetgx.9..
BJ UT OL !$1 205 R2A3 X PARTIAL UT, SEE RR B 10.
016900 TBX 1 4102 11 89.11 UT-455 !$1 205 RZAY X PIPE TO TEE
$1 1 RB-037 V PT 151 11 R9A3 X VT 151 8 R7A1 X
- TBX 9**
BJ UT OL 151 206 R0 X ACCFPTABLE RI.
017000 TBX 1 4102 12 TEE TO PIPE 89.11 UT-45S 151 206 R0 X SI 1 RB 037 V PT !$1 11 R10 X eeigg.9.e 017100 TBX 1 4102 13 BJ UT OL !st 206 R0 X PIPE TO ELBOW 89.11 UT 455 151 206 R0 X
.*TBX-9**
(-
e I
1 PAGE: 62 COMANCHE PEAK UNIT 1 DATES 06/30/89 PRESERVICE INSPECTION
SUMMARY
,*Q VISION: 1 OUTAGE D (1984), PERIOD, BASELINE INTERVAL l( ' "
CLASS 1 COMPONENTS SAFETY IN,13 ASME G SEC. XI NE CATGY EXAM NRR0 REMARKS
SUMMARY
EXAMINAfl0N AREA ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
NUMBER IDENTIFICATION ........................................
.10-51 1-179 2501R-1 181 206 R0 X 017200 TBX 1410214 BJ UT OL B*.11 UT 455 158-206 R0 E ELBOW TO PIPE PT 151-11 Rio X SI 1 RB 037 V
- TBX 9**
151-206 R0 X 017300 TBx 1 4102 15 BJ UT OL UT 45s 151-206 R0 X P!PE TO VALVE B9.11 SI-1 RB 037 7 PT 151 11 Rio X
- TBX 9**
VT 1 151 8 R8FC1 X B-C-2
_ 017400 TBX-1 4102 8948A VALVE BOOT BOLTING B7.70
017410 TBM 14102 8948A B-M 2 VALVE BODY INTERNAL SURFACES B12.40
$1 1 RB-037 1 8948A VT 1 ISI 8 R8FC1 X 017500 TBx-1 4102-8954A B G-2 VALVE BODT BOLTING B7.70 SI 1 RB 037-1 8956A SHOP RECORDS USED, SEE RR B 1.
017$10 TBI 1 4102 8956A BM2 VALVE BODY INTERNAL SURFACEI B12.40 st 1 RB 037 1 8956A 6-tf 1-089 2501R 1 151 206 R0 X PT BT TU FOLLOWING REWORK.
017600 TBI-1 4103 1 BJ UT OL 151-206 R0 X VALVE TO PIPE B9.11 UT 45s NDE-300 R2 X
/'N
~
l PAGE: 63 COMANCHE PEAX UNIT 1 DATE ' 06/30/89 PRESERVICE INSPECTION SUMMART REVISION: 1 OUTAGE D (1984), PERIOD, BASELINE INTERVAL 4
CLASS 1 COMPONENTS SAFETY INJECTION i
ASME G SEC. XI NE I
CATGY EXAM NRR0 REMARKS SlamARY EXAMINATION AREA NLMBER ~ IDENTIFICATION ITEM Wo METHOD PROCEDURE IIIM ** CALIBRATION BLOCK ** f 6 $1 1 089-2501R 1 BJ UT-0L 1st 206 R0 X 017700 TBx-1-4103 2 PIPE TO ELBOW B9.11 UT 455 ISI 206 R0 X PT 181-11 R10 X-
$1 1 RB 056 4
- TBX 5**
151 206 R0 X
"?800 TBX 1 4103-3 BJ UT-OL UT 455 !$1 206 R0 X ELBCW TO PIPE B9.11 SI 1 RB 056 5 PT 151 11 Rio X
- TBX 5**
151206 RD X 017900 TBX 1 4103-4 BJ UT-OL UT 455 151 206 RD X PIPE To MOMENT RESTRAINT 89.11 PT- 151 11 R10 X N SI 1*RB-056-6
- TBX 5**
018000 TBM 1 4103-5 BJ UT OL ISI 206 R0 X UT 455 181-206 RD X MOMENT RESTRAINT TO ELBOW 89.11 PT 151-11 R10 X
$1 1 R8 056 7
- TBX-5**
B-J UT OL 151 206 R0 k 018100 TBX-1 4103-6 ELBOW TO PIPE B9.11 UT 455 !$1 206 R0 X SI 1 RB 056 8A PT ISI 11 R10 X
- TBK 5**
!$1206 RO X 018200 TBX 1 4103-7 BJ UT*0L UT 455 181 206 R0 X P!PE To ELBOW B9.11
- T B x - 5"
l>
PACE: 64 COMANCHE PEAK UNIT 1 Daft: 06/30/89 REV!SION: 1 PRESERV!CE INSPECTION
SUMMARY
QUTAGE O (1964), PERIOD, SASELINE INTERVAL
,[
CLASS 1 COMPONENTS
\,_,/
SAFETY INJECTION' ASME G SEC. XI NE PTGY EXAM NRR0 REMARKS SLSMART EXAMINATION AREA ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
NUNBER IDENTIFICATION y St.1 089-2501R 1 018300 TBX 1 4103 8 BJ UT OL 15! 206 RO X M9.11 UT 455 181 206 R0 X ELBOW TO P!PE SI 1-RB 056 10 PT 181 11 Rio X
- TBX 5**
B-J UT OL 181 206 R0 X 016400 TBX 1 4103-9 P!PE TO ELBOW 99.11 UT-458 !$1 206 R0 X PT 151-11 R10 X
$1 1 RB-056-11
- TBX 5**
018500 TBX 1 4103 10 5-J UT OL ISI 206 RO X 89.11 UT 455 151 206 R0 X
'N ELBOW to PIPE 151 11 R10 X
-(' SI 1 RB 056 12 PT eeygg.$ee 8J UT OL t$1 206 R0 X 018600 TBX 1 4103 11 UT 458 181 206 R0 X PIPE TO PIPE 89.11 SI 1 RB-D56 12-1 PT 151-11 Rio X
- TBX 5**
018700 TBX 1 4103 12 BJ UT OL !st 206 20 X 151 206 R0 X PIPE TO TEE 89.11 UT 45S PT 151 11 R10 X
$1 1-RB 056-13
- TBX 5**
2 Al 1-063 250it 1
!$1-11 R10 X 018600 TBX 1 4103-13 B*J PT SOCK 0LET TO PIPE 89,32 SI 1 RB 056 15 s
j
l i
I CCMANCHE PEAK UNIT 1 PAGE: 65 DATE: 06/30/89 i
' REVISION: l' PRESERVICE INSPECTION SUMARY i
- i
..D -
'CUTAGE D (1980 , PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS
. SAFETY INJECTION ASME G
- SEC. XI NE SumARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEN NO METHOD PROCEDURE iI!M ** CALIBRATION BLOCK'*
1 j
2-SI-1 063 2501R 1 BJ PT 151 11 R10 X 018900 TBX 1 4103 14 P!PE TO SOCK 0LET 99.40 SI 1 RB 008 43.
019000 TBX 1 4103 15 BJ PT ISI-11'R10 X VALVE TO PIPE 89.40 SI 1 RB 008-42A 6-SI 1-089 2504R 1 019100 TBK 1 4103 8818A BC2 VT 1 181 8 R8FC1 X VALVE BODY BOLTING BT.70 SI 1 RB 056-1 8818A B-M 2 SHOP RECORDS USED, SEE RR B 1.
019110 TBX 1 4103-8818A VALVE 80DY INTERNAL SURFACES B12.40 SI 1 RB 056 1 8818A
.s l
I
i:
4 COMANWE PEAK UNIT 1 .PAGE: 66 DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECTION SUMARY OUTAGE 0 (1984), PER100, BASEllWE INTERVAL l :
(,/ ^ CLASS 1 COMPOWENTS REACTOR COOLANT ASME G i
~
SEC. XI NE CATGY ' EXAM , NRR0 REMARKS
) SU MARY EXAMINATION AREA NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM " CALIBRATION BLOCK **
l ....... .............................. ....... .......... ............... ....
j 4-RC 1 008 2501R 1
'l 8J UT OL 181 206 R0 X 30% NOT EXAMINED WITH 45$ AND 60$ DUE TO
- 019207 T u 1 4104 1 151 206 R0 X CONFIGt> RATION, SEE RR B 10.
Pl?L T'O WELD 0LET 89.31 UT 45S UT 60s 251 206 R0 X RC 1 RB 005 V PT 151 11 Rio X
- TsX 5" .
019300 TBX 1 4104 2 5J UT OL 151 206 20 X WELDCLET TO PIPE 89.11 UT 455 ISI 206 R0 X RC 1 RS 005 2 PT 151 11 Rio X
- TBX 5*-
BJ UT OL ISI 206 R0 X 20% NOT EXAMINED WITH 455 DUE TO WELD M ~g $19400 TBX 1 4104 3
!$12M R0 X CONFIGU uTION, SEE RR B 10.
99.11 UT-455
] PIPE TO ELBOW RC-1 RB 005 3 PT 151 11 Rio X
- TBX 5**
BJ UT OL 151 206 R0 X 15% NOT EXAMINED WITH 45S DUE TO WELD 019500 tsX 1 4104 4 ISI-206 R0 X CONFIGURATION, SEE RR 8 10.
ELBOW TO PIPE 89.11 UT-45S RC 1-RB 005 45 PT ISI 11 Rio X
- TBX-5**
8J UT OL ISI 206 R0 X 15% NOT EXAMINED WITH 45$ DUE TO WELD 019600 78X 1 4104 5 151 206 RO X CONFIGURATION, SEE RR B 10.
P!PE TO ELBOW 89.11 UT 458 RC 1 Ra-005 5 PT !$1 11 R10 X
i<
l.
.COMAPCHE PEAK UNIT 1 'PAGE: 67
-: DATES : 06/30/09 REVISION . 1 PRESERVICE INSPECTION SLAMARY
.['
i; b/.
OUTAGF 0 (1984), PERIOD, BASELINE INTERVAL
. CLASS 1 COMPONENTS .
REACTOR COCLANT ASME G
~,
SEC. XI NE
SUMMARY
EMAMINAfl0N AREA CATGY EXAM N R R O. REMARKS IRMBER IDENTIFICATION ITEM NO METHOD PROCEDURE 1.I I N **CAllBRATIDW SLOCK**
6.RC.1 00B 2501R-1 019800 TBK.1 4104 7 B.J UT OL !$1 206 RO X PIPE TO VALVE 89,11 UT.60S 151 206 R0 X RC.1.RR-005 11 PT 181 11 Rio X
- Tex 5**
4 i
(
r
1 CDMANCHE PEAK UNIT 1 PAGE: 68 '
DATE: 06/30/39 )
REVISION: 1 PRESERVICE INSPECTION
SUMMARY
l
.CUTAGE O (1984), PERIOD, BASELINE INTERVAL l j
'v} .. CLASS 1 COMPONENTS SAFETY INJECTION ASME G
~
SEC. XI NE EUMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PRUCEDURE IIIM **CALIBRAT10N BLOCK **
6-81-1 148 2501R 1 BJ UT OL !$1-206 RO X PT PERFORMED BY TU FOLLOWING REWORK.
019900 TBX 1 4104-8 VALVE TO PIPE 89.11 UT 60S ISI 206 R0 X
$1 1 RB 014 5 PT NQA 3.09 8.1040 X
- TBX 5**
B-J UT OL 151 206 R0 X 020000 TBX 1-4104 9 PIPE TO REDUCER 89.11 UT-608 ISI-206 R0 X SI*1 kB 014 4 PT ISI-11 R10 X
- TBX 5**
020100 TBX 1-4104 8949A B G-2 VT 1 ISI 8 R8FC1 X VALVE BODY BOLTING B7.70 SI 1 RB 014 1-8949A SHOP RECORDS USED, SEE RR B 1.
020110 TBX 14104 8949A B-M 2 VALVE BODY INTERNAL SURFACES B12.40 ,
L-in l
1 L
PAGE: 69 DATE' 06/301% COMANCHE PEAK UNIT 1 REVISION:-. 1 PRESERVICE INSPECTION
SUMMARY
- UUTAGE O (1964), PERIOD, BA3ELINE INTERVAL CLASS 1 COMPONENTS-( /'
BLA11E COOLANT AME G
~
SEC. XI NE CATGY EXAM NRR0 REMARKS Stee4ARY EXAMINAfl0N AREA NUMBER IDENTIFICAT!DN ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
l 3-RC 1 019 2501R-_1 020200 T8X 1 4105 1 3J PT ISI 11 Rio X BRANCH CONNECT!DN TO P!PE 89.21 CS 1 Re 026-14 020300 75x 1 4105 2 BJ PT ISI 11 R10 X P!PE To ELBOW 89.21 CS 1-RS 026-13A 020400 Tex 1 4105 3 s-J PT !$1 11 Rio X ELBOW TO PIPE 09.21 CS 1-RS-026 12 .
.I k 020500 Tex 1 4105 4 BJ PT 151-11 R10 X P!PE TO EL90W 99.21 C$.1 Re 026 11A
!$1 11 R10 X 020600 TtX 1 4105 5 8J PT ELBOW To PIPE 89.21 CS 1 RS 026 10A 3J PT !$1-11 R10 X 020700 784 1 4105 6 PIPE TO PIPE 89.21 CS 1 RB 026 9 1 020800 T81 1 4105 7 B-J PT !$l 11 R10 X P!PE TO PIPE 89.21 CS 1 RS 026 9 2 i
f i
N
DATE: 06/30/89 COMANCHE PEAK UNIT!1 PAGE: 70 -
REVISION:- 1 PRESERVICE INSPECTION SU M ARY PERIOD, BASELINE INifRVAL
. -/N CUTAGE O (1984 b
't )- CLASS 1 COMPN ENTS REACTOR COOLANT ASME C
- SEC. XI NE SL8 MARY EXAMINAT!0N ARLA CAYGY EXAM NRR0- REllARKS
. EMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM "CALIBRAt10N BLOCK'*
3-Rc 1 019 2501R-1 020900 TBX 1 4105 8 tJ PT 151 11 R10 X P!PE TO VALVE 49.21 CS 1 R9-026 9 I
1 !
I L_ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _
rr--- 3-.-
CDMANCHE PEAC UNIT 1 PAGE: 71
- DATE: 06/30/89 REVISION' 1 PRESERVICE INSPECTION
SUMMARY
]
~ (/
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS-l - CNEMICAL & VOLtME CONTROL ASME G
~,
SEC. XI NE SW1 MARY EXAMINAfl0N AREA CATGY- EXAM NRR0 ~ REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM **CALIBRAT10N BLOCK **
- .. 3 Cs-1 080 2501R 1 021000 tex 1 4105 9 BJ PT 151 11 R10 X VALVE TO PIPE 39.21 CS 1 Re 026-8 021100 TsX 1 4105-10 s-J PT 151-11 R10 X PIPE TO VALVE 39.21 CS 1-Re 026 7 021200 tex 1 4105 8379A 802 VT 1 151 8 R8FC1 X VALVE 80DT BOLTING B7.70 CS 1-RS 026 1 8379A r'%
021300' TEX 1-4105 83798 BG2 VT 1 ISI 8 R8FC1 X VALVE BODT B0LTING B7.700 CS-1 as 026 1 83795 u
l i
l.
O ,
I f
1 i
PAGE: 72
~ DATES.:06/30/B9 COMANCHE PEAK UNIT 1 REVISION: 1' PRESERVICE INSPECTION aiUMMARY DUTAGE 0 (1964),- PERIOD, BASELINE INTERVAL
'T
[Id . CLASS.1 COMPONENTS REACTOR COOLANT.
ASE G
~~
SEC. XI NE CATGT EXAM NRR0 REMARKS stesWtf EXAMINAfl0N AREA ITEM NO METHOD PROCEDURE I11M ** CALIBRATION BLOCK **
BRMBER 10ENTIFICAtl0N
....... ......................+....... .......
1 RC.1 131 2501R 1 021400 Tex.1 4106 1 BJ PT ISI.11 Rio X
~ BRANCN CONNECTION TO REDUCER- B9.21 RC 1 RS.031 25 1.5 ac 1 020 2501R 1 8J PT 151 11 R10 X
. 021500 - TBM 141071 BRANCN CONNECT 10N TO REDUCER 89.21 St.1 RS 020 16 021600 TBM 1 4107 2 8-J PT Is!.11 R10 X
- 1 REDUCER 70 ELBOW 89.21
$1 1 as 020 15
(
BJ PT 151 11 R10 X 021700 T8X 1 6107 3 ELBOW TO P!PE 89.21
$1 1 RS 020 14 021800 TBK 1 4107 4 BJ PT !st.11 Rio X PIPE TO ELBOW 89.40 SI 1 Rer020 13A 021900 Tex 1 4107 5 BJ PT ISI 11 Rio X El.80W TO PIPE 39,,40 51 1 #8 020-12 BJ PT 151 11 R10 X 022000 TSM 1 4107 6 PIPE TO VALVE B9.40 St.1 RB 020 11
r\!! ..
PAGE: 73 DAiE ; 06/30/09 ' COMANCHE PEAK UNIT 1 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
' OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL 4 l'
\M- CLASS 1 COMPONFNTS SAFETY INJECTION
_ ASME G SEC. XI NE SumARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METM00 PROCEDURE IIIN ** CALIBRATION BLOCK'*
1.5-Slai-199-2501R 1 022100 TBX 1 4107 7 EJ PT 151 11 Rio X VALVE TO PIPE B9.40 St.1 RB-020-10 022200' TBX-1 4107 8 BJ PT 181 11 Rio X PIPE TO ELBOW. B9.40 SI 1 RL 020 9
-BJ PT 151-11 Rio X RE EXAMINED AFTER REWORK.
022300 TBX 1-4107-9 ELBOW TO PIPE 89.40 SI 1 RB 020-8 l'
I
( 151 11 Rio X 022400 TBX 1 4107-10 3J PT P!PE TO ELBOW 39.40 SI 1 RB 020 7A 022500 TBX 1 4107 1' BJ PT 151 11 Rio X ELBOW TO PIPE 89.40 SI 1 RB 020 6A 022600 TBX 1 4107 12 BJ PT !$1 11 R10 X PIPE TO COUPLING B9.40 SI 1 RB 020-$A 022700 TBX 1 4107 13 B.J PT 151 11 R10 .
COUPLING TO P!PE B9.40 SI 1-RB 020 4 l %
l 1
1
7 t
PAGE: - 74
- i, .y .
s DATES 06/30/89' COMANCHE PEAK UNIT 1
- REV!$10N: .1 PRESERVICE INSPECTION SUMMART.
k
,) $']
OUTAGE D (1984), PERICD, BASELINE INTERVAL j CLASS 1 COMPONENTS SAFETY INJECTION' ASME G SEC. XI NE CATGT EXAM NRR0 RE 6 tXS SLBMART EXAMINATION AREA NUMBER IDENTIFICATION ITEM N0 METHOD PROCEDURE II1M ** CALIBRATION BLOCX**
Q SI-1 199-2501R-1 022800 TBX 1410714 BJ PT ISI 11 R10 X PIPE TO ELBOW $9.40
$1 1 RB 020 3 BJ PT 181 11 Rio X 022900 TBX-1 4107 15 ELBOW TO PIPE B9.40 SI 1 RB 020 2 BJ PT !$!-11 R10 -X 023000 TBX 1 4107 16
- PIPE TO ELBOW B9.40
$1 1 RB 020 1 023100 TBX 1 4107 17 BJ PT 151-11 Rio X ELBOW TO PIPE 89.40
$1 1 RB 021 46A 023200 TBX ' 4107 18 BJ PT 181-11 Rio X PIPE TO VALVE 89.40
$1 1 RB 021 45A 1.5 $1 1-025 2501R-1 ,
023300 TBK 1-4107 19 BJ PT IS! 11 R10 X VALVE TO PIPE B9.40
$1 1 RB 021 43 ft23400 TBX 1 4107 20 BJ PT ISI 11 R10 X P!PE TO FLANGE B9.40
$1 1-RB-021 44 i l
i'
(
(
1
'DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 75
. REVISION: 1 PRESERVICE INSPECTION
SUMMARY
p., '
OUTAGE D (1984), PERIOD, BASELINE INTERVAL I CLASS 1 COMPONENTS SAFETY INJECTION' ASME G
~~ SEC. Il NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM **CALIBRAT!0s BLOCK" 1.5 tf 1 025 2501R 1 023500 TBK 1 4 57 21 BJ PT ISI 11 Rio X FLANGE TO PIPE B9.40 SI+1 RB-021 36 023600 TBX 14107-22 BJ PT 151 11 R10 X PIPE To COUPLINC 39.40 SI 1 RB 021-35 2 023700 TBK 1 4107 23 BJ PT 151 11 Rio X COUPLING 70 PIPE 89.40 SI 1 RB 021 35 1-023800 TBX 1 4107 24 BJ PT 151 11 Rio X P!PE TO REDUCER 89.21 SI-1 RB 021 35A 023903 TBX 1 4107 FLANGE #1 B G-2 VT 1 !$1 8 R8FC1 X FLANGE BOLTING B7.50
$1 1-RB 071 FLANGE 1 2-St 1 059 2501R 1 024000 TBX 1 4108 1 BJ PT IS! 11 R10 X REDUCER TO PIPE 89.21
$1 1 RB-014 3 024100 TBX 1*4108 2 BJ PT 151-11 R10 X l P!PE 70 P!PE 89.21
$1 1 RB 014 2 2
\
?
y COMANCHE PEAK UNIT 1' PAGE: 76 DATE: 06/30/89
. REVISION: PRESERVICE INSPECTION SuletARY lf. 1
[ CUTAGE O (1984), PERIOD, BASELINE INTERVAL II_/ CLASS 1 COMPONENTS g[,ETYINJECTION ASME G
~
SEC. XI NE
SUMMARY
EXAMINATION AREA CAIGY EXAM NRR0 REMARKS ITEM No METHOD PROCEDURE IIIM **CA:,IBRATION BLOCK **
NUMEER IDENTIFICATION 2-St i 059 2501R 1 021200 TBX 1 4108 3 8J PT 151 11 R10 X PIPE TO PIPE 89.21
$! 1 RS 014 2 1 021300 TsX 1-4108 4 3J PT 151 11 Rio X PIPE TO P!PE 89.21 SI-1 RB 014 2A 024400 ftX 1 4108 5 BJ PT 151 11 Rio X PIPE TO PIPE 39.21
$1 1 RS 014-1 1 O~ 021500 TsX 1 4108 6 5-J PT ISt 11 Rio X PIPE TO TEE 89.21 SI 1 RS 014 1 024600 TBX 1 4108 7 B-J PT ISI-11 RIO X COUPLING TO RCDUCING INSERT B9.40 SI 1 Re 015 24 024700 TBM 1 4108 8 BJ PT 151 11 RIO X P!PE TO COUPIING 89.40
$1 1 RB 015 U 024800 TBX 1 4108 9 8J PT ISI-11 R10 X TEE 10 PIPE 89.21 Stat RB-015 22 O
COMINCHE PEAK UNIT 1 PAGE: TT DATE: .06/30/09' REVISION: 1 PRESEkVICE INSPECT 10N
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL f <N
'h )
CLASS 1 COMPONENTS g!1TY fMJECTION ASME- G
. SEC. XI NE
SUMMARY
EXAMINAfl0N AREA CATGY EXAM NRRO' REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM **CALIBRAftoW BLOCK **
2 SI-1 059-2501R-1 024900 TBX 1 4103-10 BJ PT 151-11 R10 X PIPE TO TEE 39.21 SI 1 Re 015 21 025000 TEX 1-410811 5J PT 151-11 R10 X TEE TO PIPE 09.21 St 1 RS-015 20 025100 ftX 1 4108 12 BJ PT ISI 11 R10' X REDUCER TO COUPLING B9.40 51 1 R8 015 16 o
(
\
\ 025200 TBX 1 4108-13 BJ PT NQA 3.09 8.10R0 X- PT PERFORMED BY TU FOLLOWING REWORK.
' CL1JPLING TO P!PE B9.40
$1-1 RS 015 15 025300 TBX 1 4108 14 $*J PT ISI-11 R10 X PIPE TO TEE 89.21
$1-1 R8 015 14 025400 TBX 1410815 BJ PT ISt 11 R10 X T[E TO PIPE 89.21 SI 1 as 015 13 025500 TBM 1 4108*16 8J PT ISI-11 R10 X PIPE TO MONENT RESTRAINT 99.21 51-1 te 015 61 l
l f'
L - - - - - - - - - - - - _
,.g__.___ . _ _ _ _ _ _ _ _ _ _ _ _ . _ .
COMANCHE PEAC UNIT 1 PAGE: 76 DATE: 06/30/99
- REVISION: 1 PRESERVICE INSPECT 10N
SUMMARY
i
/m \ OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
CLASS 1 COMPONENTS l
l SAFETY INJECT g ASE - G SEC. XI NE SLSetARY EXAMINAT!DN AREA CATGY EXAM NRR0 REMARXS NLp4BER IDEN11FICAT10N ITEM NO METHOD PROCEDURE I1IN ** CALIBRATION BLOCK **
2 81-1-059 2501R 1 025600 TEX-1 4106 17 BJ PT 151 11 rio X MOMENT RESTRAINT TO P!PE 89.21 SI 1 as-015-60 BJ PT 151 11 Rio X EXAMINED NEW WELD AFTER CUT 0VT.
025700 TBX 1-4106 16 PIPE 10 FLANGE 89.40 St.1 Re 015 11 3 025800 tex 1-4106-19 BJ PT 151 11 R10 X FLANGE TO PIPE 39.40
$1-1 Re 015 11-2
- /
s 025900 TBX 1 4106 20 BJ PT 181-11 Rio X PIPE TO VALVE 09.40 SI 1 RS 015-11 1 026000 TBX 1 4106 FLANGE #1 B.G 2 VT 1 !$1 6 R6FC1 X FLANGE BOLTING B7.50
$1 1 Re 015 FLANGE 3 l
1
-1 1
4 k
4
~h v
i l
4
I DATE: 06/30/B9 COMANCHE PEAK UW 71 PAGE: 79 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
PJTAGE 0 (1964), PERIOD, BASELINE INTERVAL Q^
-, )
! CLASS 1 COMPONENTS REAff0R COOLANT ASME C J SEC. XI NE SUMMART EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
2-RC-1-015 2501R-1' 026100 TBX 1 4109 1 BJ F1 ISI 11 Rio X BRANCH CONNECTION TO PIPE B9.40 RC 1 RB-010 1 026200 TBX 1-4109 2 BJ PT !$1 11 R10 X PIPE TO ELBOW B9.40 RC 1 RB 010-2 026300 TBX-1 4109 3 BJ PT 151 11 210 X ELBOW 70 PIPE B9.40 RC-1 RB-010 3 l
026400 TBX 1 4109 4 BJ PT ISI-11 R10 X PIPE TO COUPLING 89.40 RC 1 RB 010 3 4 026500 TBX 1 4109-5 B-J PT !$1 11 R10 X COUPLING 70 PIPE B9.40 RC-1 RB 010 3 3 026600 TBX 1 4109 6 8J PT 151 11 Rt.0 X PIPE TO ELBOW 89.40 RC 1 RB 010 4A 026700 TBX 1 4109 7 BJ PT ISI-11 R10 X ELBOW 70 PIPE B9.40 RC 1 RB 010-5
l l
l l
l COMANCHE PEAC UNIT 1 PAGE: 80 IDATEs~ 06/30/89
' REVISION:- 1 PRESERVICE INSPECTION
SUMMARY
CUTAGE O (1984), PERIOD, BASELINE INTERVAL
.! CLASS 1 COMPCNENTS l: - REACTOR COOLANT ASME G
-~ SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM NO METE 00 PROCEDURE IIIM ** CALIBRATION BLOCK'*
2-Rc 1 015-2501R-1' 026800 TBX 1 4109 8 BJ PT 181 11 R10 X PIPE 70 ELBOW 09.40 RC 1 RB 010 6 026900 TBX 1 4109-9 BJ PT 181 11 R10 X ELBOW TO PIPE 89.40 RC 1 AB 010 7A
-027000 TBX 1 4109 10- BJ PT IS! 11 R10 X PIPE 70 COUPLING 89.40 RC 1 RB-010 7 3 027100 TBX 1 4109 11 3J PT 151 11 R10 X COUPLING TO PIPE $9.40 RC 1 RB 010 7-4 027200 TBX 1 4109 12 BJ PT ISI 11 Rio X PIPE TO TEE 89.40 RC 1 RB 010 8 027300 TBX 1 4109 13 B-J PT !$1 11 Rio X TEE TO REDUCER 89.40 RC 1 RC 010 14 BJ PT 151 11 R10 X 027400 TBX 1 4109 14 TEE TO P!PE B9.40 RC 1 RB 010 9
COMANCHE PEAK UNIT 1 PAGE: 81 DATE: 06/30/89-REVISION: 1 PRESERVICE INSPECTION
SUMMARY
/ .CUTAGE 0 (1964), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS l REACTOR COOLANT l.
ASME G SEC. XI- NE l- SismARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS ,
NLsISER IDENTIFICATION ITEM NO METNOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
2.RC 1-015 2501R-1 !
027500 Tex 1 4109 15 BJ PT 151-11 Rio X PIPE TO VALVE 39.40 RC 1 R$ 010 10 027600 TBK 1 4109 16 BJ PT . 151-11 Rio X VALVE TO P!PE 99.40 RC 1 Re 010 11 027700 Tex i 4109 17 5J ' PT 151-11 Rio X PIPE TO VALVE 89.40 RC 1 RB 010 12 D
( 27.5-RC-i 003-WEST 1 027800 Tex 141101 s.J PT 151 11 R10 x SRANCN CONNECTION TO PLUG 09.40 RC 1 520 001 41 r
L _-_- __ - .
j :1 l
! PAGE: 82 COMANCHE PEAK UNIT 1:
- i. ,
.DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1984), PERIOD, BASELINE INTERVAL l ' f'% :
CLASS 1 COMPONENTS I CNENICAL & VOLtME CONTROL ASME G SEC. XI NE CATGT. EXAM NRR0 REMARKS Su MARY EXAMINATION AREA IAMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM " CALIBRATION BLOCX" 1.5-CS 1 242 2501R-1 BJ PT 181 11 R10 X 027900 TBX 1 4111 1 RC PUMP N0ZZLE TO FLANGE B9.21 CS 1 RS-0378 V BJ PT 181 11 R10 X 028000 TBX 1 4111 2 FLANGE TO PIPE 89.21 CS 1 RS 0375 8
.028100 TBX 1 4111 4 BJ PT 101 11 R10 X P!PE TO PIPE 99.21 CS 1 RB 037B 9A 028200 TBX 1-4111 5 5J PT ISI 11 R10 X PIPE TO REDUCER 89.21 CS 1 RB 0375 3A 2 CS i 103 2501R-1 8J PT !$1 11 R10 X 028300 TBX 1 4111 6 REDUCER TO PIPE B9.21 CS 1 RB 0375 2 028400 TBX 1 4111 7 BJ PT IS!-11 Rio X PIPE TO ELBOW B9.21 CS 1-RS 0375 1 BJ PT !$1 11 R10 X 028500 TBX 1 4111 8 ELBOW TO PIPE 89.21 CS 1 RS 037A 12
7 .. . . .
l.i l
L. .e
' COMANCHE PEAK UNIT 1 .PAGE: 83 i:. '
DATE:: 06/30/09 REVISION: ' ~1. PRESERVICE INSPECT!0N
SUMMARY
l' OUTAGE 0 (1984),' PERIOD, BASELINE INTERVAL'
' CLASS 1 COMPONENTS l-- : A CNEMICAL 8 VOLLME CONTROL ASME G
^,
.SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM - N R R 0 . REMARKS NLMBER IDENTIFICATION. ITEM No METHOD PROCEDURE Ii1M ** CALIBRATION BLOCK **
2 CS 1 103 2501R-1
'028600 -TBX 1 4111-9 BJ PT ISI 11 RIO X PIPE TO TEE 89.21 CS 1 RB-037A 11 BJ PT 151-11 R10 X RE EXAMINED AFTER REWORK.
028700 TBX 1 4111 10' TEE TO PIPE. 39.21 CS 1 RB 037A 10A BJ PT 151-11 R10 X RE EXAMINED AFTER REWORK.
028800 TBX 1 4111 11 PIPE TO VALVE B9.21 CE 1 RB 037A 9A
(_ .
BJ 151-11 R10 X RE-EXAMINED AFTER REWORK.
028900 TBX 1 4111 12 PT .
- VIAVE TO PIPE 99.21 CS-1 Ke 037A 8A ISI 11.R10 X RE EXAMINED AFTER AEWORK.
029000 TBX 1 4111 13 5-J PT PIPE TO VALVE 89.21 CS 1 RB 037A 7 1
'029100 TBX 1 4111 FLANGE #1 BG2 VT 1 ' ISI 8 RSFC1 X FLANGE BOLTING 57.50 CS 1 RB 0375 FLG.1
1 PAGE: 84 COMANCHE PEAK UNIT 1 DATE: 06/30/89 I REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1964), PERIOD, BASELINE INTERVAL
'g
-;( [j ' CLASS 1 COMPONENTS REACTOR COOLANT ASME G
- SEC. XI NE CATGY. EXAM NRR0 REMARKS SLAMARY EXAMINATION AREA ITEM No METHOD PROCEDURE IIIM " CALIBRATION BLOCK'*
IRMBER IDENTIFICATION ........................................
29 Rc 1-023 WEST 1
'BF AUT OL 151 154 R1 X 2 ACCEP1ABLE Al's DETECTED WITH AUT-41L.
029200 TBX 1 4200 1 MUT 41L 60% NOT EXAMINED, SUPPLEMENTED AUT 41L 151 154 R1 X RPV N0ZZLE TO SAFE END B5.10 MUT DL 151 206 R0 X WITH AUTOMATED FROM THE ID TO ACHIEVE RC 1-520-001 v X 1001 COVERAGE, SEE RR B 5. PT PERFORMED MUT 41L 151 206 R0 PT NQA 3.09 8.10R0 X BY TU FOLLOWING REWORK.
SAFE END TO PIPE 89.11 NQA 3.09-8.10R0 X RC 1-520 001 9 PT "T BX - 2" ,
029400 TBX 1 4200 BJ UT OL !$1 206 R0 X UT 41L 151 206 R0 X PIPE TO REDUCING ELBOW B9.11 PT 151-11 R10 X RC 1 520 001 V
- TBX 2**
X 15% NOT EXAMINED WITH 41L, SEE RR B 8.
029500 TBX 1 4200 4 BF UT OL 151 206 R0 151 206 RD X PT PERFORMED BY TU.
REDUCING ELBOW TO SG N0ZZLE B5.30 UT 41L PT NDE 300 R2 X SAFE END RC 1 520 001 10
- TBX 2**
31 RC 1 024-WEST 1 X 15% NOT EXAMINED WITH 41L, SEE RR B 8.
029600 TBX 1 4200 5 BF UT-OL 151 206 R0 UT 41 151 206 R0 X SG WOZ2LE SAFE END TO ELBOW 85.30 RC 1 520 001 11 PT IS! 11 R10 X
- TBX 2**
0
F.,
v DATE: 06/30/89' COMANCHE PEAK UNIT 1 PAGE: 85 l-REV!$10N: 1 PREC!RVICE INSPECT 10N suMMART y^N CUTAGE D (1984), PERIOD, BASELINE INTERVAL
.; n
.( ): CLAtt 1 COMPONENTS REACTOR COOLANT -
l l
Awl G J SEC. XI NE SUMMART EXAMINATION AREA CATCY EXAM NRR0 REMARKS NUMBER !LENTIFICAfl0N ITEM NO METHOD PROCEDURE IIIN **CALIBRAT10N BLOCK" 31 Rc 1 024- w st-1 l 029700 TBx 1 4200 6 BJ UT OL 151 206 R0 K l
ELBOW TO PIPE B9.11 UT 41L ISI 206 R0 x RC 1-520-001 12 PT 151 11 R10 X
- TBx 2**
029800 TBM 1-4200-7 BJ UT OL !st 206 RD X PT RE EKAMINED AFTER REWORK.
PIPE TO ELBOW B9.11 UT 41L !$1 206 RD X RC 1-520 001 V PT l Is! 11 R10 X
- TBK 2**
029900 TBX 1 4200 8 BJ UT OL 151 206 R0 X PT PERFORMED BY TU FOLLOWING REWORK.
ELBOW TO PIPE B9.11 UT 41L !$1 206 R0 X
! RC-1 520 001 13 PT NQA 3.09 8.10R0 K v ,,,.,..
030000 TBX 1 4200-9 BJ U1 OL 151 206 R0 X PT PERFORMED FOLLOWING REWORK.
PIPE TO ELBOW B9.11 UT 41L 151 206 R0 X RC-1520 001 V PT ISI 11 R10 X
- TBK 2**
030100 TBX 1 4200 10 B-J UT OL 151 206 R0 A PT PERFORMEC BT TU FOLLOWING REWORK.
ELBOW TO RC PUMP SUCTION 09.11 UT-41L 15! 206 R0 x N0ZZLE PT NoA 3.09-8.10R0 X RC 1 523-001 14
- TBK 2**
27.5 Re 1-025-WST-1 030200 TBK 1-4200 11 BJ UT OL ISI 206 R0 x 5% NOT EKAMINED WITH 41L, $EE RR B 10.
RC PUMP DISCHARGE N0ZZLE TO B9.11 UT-41L 151 206 RD X PIPE PT 151 11 R10 X RC 1 520 001 15
- TBx 2**
(-
i l-
~
PAGE: 86 I ~ DATE: 06/30/89 COMANCHE PEAK UNIT i' REVISION: 1 PRESERVICE INSPECTION SUMMART OUTAGE O (1984), PERICO, BASELIFE INTERVAL i
l
~ f) , CLASS 1 CONPONENTS RE ACTOR COOLANT ASME G T SEC. XI NE CATCT- EXAM NRR0 REMARKS SwetARY EXAMINATION AREA NWBER IDENTIFICATION ITEM N0 METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
27.5 RC 1 025 WEST-1 BJ UT OL 151 206 R0 x 030300 TBX 1 4200 12 PIPE TO ELBOW B9.11 UT 41L !st 206 R0 X RC 1 520-001 V PT 151 11 R10 X
- TBX-2**
151 206 R0 x 501 NOT EKAMINED WITH 41L, SEE RR B 10.
d30400 TBX 1 4200 13 8J UT OL 39.11 UT 41L 151 206 R0 X PT PERFORMED BT TU FOLLOWING REWORK.
ELBOW TO SAFE EMD PT NoA 3.09-8.10R0 x RC 1 520 001 16
- TBx 2**
X MUT-41L 60s NOT EXAMINED, SUPPLEMENTED 030500 TBX 1 4200 14 BF AUT-OL 151 154 R1 AUT-41L 151 154 R1 X WITH AUTOMATED FROM THE ID TO ACHIEVE SAFE END TO RPV NQZZLE B5.10 151-206 R0 X 100% COVERAGE, SEE RR B 5.
RC 1 520 001 V MUT OL
(' MUT 41L 151-206 R0 X PT *51
. 11 P',o X **TBx 2**
' 29-RC-1 023-WEST 1 Bs PT !$1 11 R10 X SEE RR B 10.
030600 TBx-i 4200 15 PIPE TD BRANCH CONNECTION 39.31 RC-1 520 001 V
}jeRC 1-024-WEST 1 B*J PT 151 11 Rio K SEE RR B 10.
030700 TBx 1420016 P1PE TO BRANCH CONNECTION 89.31 RC 1 520 f'.1 V 030800 TBX 1 4200 17 BJ PT ISI-11 R10 K BRANCH CONNECTION 10 PIPE P9.32 RC 1 520-001 V s
PAGE: 87
-DATE: 06/30/89 COMANCHE PEAK UNIT 1 REVISION: 1 PRESERVICE INSPECTION SUMMART
' (^
j -
OUTAGE O (1964), PERIOD, BASELINE INTERVAL CLASS 1 COMP 0NENTS REACTOR COOLANT ASME G
~
SEC. XI NE
'R8 MART EXAMINATION AREA CATGT EXAM NRR0 REMARKS IRMBER ' IDENTIFICATION' ITEM NO METHOD PROCEDURE IIIM **CALIBRAfl0N BLOCK" g.5RC1025-WEST-1 030900 TBX-1*4200 18 BJ PT 15! 11 R10 X PIPE TO BRANCH CONNECTION 39.32 RC 1 520-001 v UT OL ISI 206 R0 X 30X NOT EXAMINED WITH 41L, SEE RR B 10.
031000 TBX 1 4200 19 BJ P!PE TO BRANCH CONNECTION 39.31 UT 41L 151 206 R0 X RC 1 520 001 V PT !$l 11 R10 X
- T8X 2**
BJ PT 181 11 R10 X SEE RR B 10.
031100 TBK 1 4200-20 BRANCH CONNECTION TO PIPE B9 31 RC 1 520 001 v 10 RC-1037 2501R 1 031200 TBX-1 4201 1 B-J UT OL !st 206 RD X BRANCH CONNECTION TO ELBOW B9.11 LTf 455 ISI-206 to X SI 1 RB 059-4 PT 181 11 R10 X
- TBX 9'*
BJ UT AL ISI 205 R2A3 X PARTIAL UT, SEE RR B 10 & RR B 2.
031300 TBX 1 4201 2 ELBOW TO PIPE B9.11 UT 45$ ISI 205 R2A3 X SI 1 RB 059 3 1 PT ISI-11 R9A3 X Yi ISI 8 R7At X
- TBX 9'*
031400 TBX 1 4201 3 8J UT OL !st 206 R0 X P!PE TO ELBOW B9.11 UT 458 ISI 206 RO X SI 1 RB 059 v PT 181 11 Rio X
- TBX 9'*
l l I f
I
(
COMANCHE PEAK UNIT 1 PAGEt 88 DATE: 06/30/89 REY!$10N3' 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL f]/ '. CLASS 1 COMPONENTS REACTOR COOL ANT ASME G
- SEC. XI NE SLMMARY EXAMINAfl0N AREA . CATCY EXAM NRR0 REMa'3 WUMBER IDENTIFICATION ITEM No METHUD PROCEDURE IIIM '**CALIBR> TION BLOCK'*
10-RC i 037 2501R 1
' 031500 TBX-1 4201 4 BJ UT OL 151 206 R0 X ELBOW TO P!PE B9.11 UT 455 !$1 206 RO X SI-1 RB 059-V PT 151 11 R10 X
- TBX 9'*
BJ UT OL ISI 205 R2A3 X PART!AL UT, SEE RR B-10.
031600 TBX 1 4201 5 PIPE TO ELBOW 89.11 UT 458 151 205 R2A3 X
$1 1 RB 059 V PT ISI 11 R9A3 X YT 151 8 R7At X
- TBX 9
8J UT OL !$1 205 R2A5 X PART!AL UT, SEE RR B 10.
f 11700 TBX 1 4201 6 99.11 UT 455 ISI 205 R2A3 X
( ELBOW TO PIPE SI 1 RB 059 V PT IS! 11 Gr9A3 X VT !$1 8 R7A1 X
- TBX 9**
BJ UT OL ISI 205 R2A3 X PARTIAL UT, SEE RR B 10.
031800 TBX 1 4201 7 PIPE TO VALVE B9.11 UT 455 151 205 R2A3 X
$1 1 RB 059 3 PT ISI-11 R9A3 X VT 151 8 R7A1 X
- TBX-9'*
/
~
CDMANCHE PEAd UNIT i iAGE: 89 DATE: 06/30/89 REVIS10N: 1 PRESERVICE INSPECT 70N
SUMMARY
OUTAGE O (1984), PERIOD, B.SELINE INTERVAL r'%
,I CLASS 1 COMPOMsNTS SAFETY INJECTION t ASME- G
~
- SEC. XI NE l SLp04ARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLp4BER IDENTIFICATION. ITEM NO METHOD PROCEDURE Il1M ** CALIBRATION BLOCK'*
I 10-SI 1 180-2501R-1 BJ UT OL 151 205 R2A3 X PARTIAL UT, SEE At B 10.
031900 TBX 1 4201 8 89.11 UT 455 151 205 R2A3 X VALVE TO PIPE PT 151 11 R9A3 X SI 1-RB 0$9 2 VT 151 8 R7A1 X
- TBX 9**
032000 TBX 1 4201-9 BJ UT OL 15! 205 R2A3 X PIPE TO ELBOU 39.11 UT 455 ISI 205 R2A3 X PT 151 11 R9A3 X SI 1-RB-059 V ifT 151-8 R7A1 X
- TBX 9**
BJ UT OL 151-205 R2A3 X J32100 TBX 1 4201 10 b- Elbow TO PIPE B9.11 UT-455 151 205 R2A' X PT 151 11 R9A3 X SI-1 RB 059 V VT 151 8 RTA1 %
- TBX-9*?
8-J UT OL 151 205 R2A3 X PARTIAL UT, SEE RR B 10.
032200 TBX 1 4201 11 PIPE TO TEE B9.11 UT*455 ISI 205 R2A3 X PT 151 11 R7A1 X
- TBX 9**
032300 TBX 1 4201 12 BJ UT-OL 151 206 RO X TEE TO PIPE B9.11 UT 45S 151 206 R0 X SI 1 RB 059-V PT 151-11 R10 X
- TBX 9**
032400 TBX-1 4201-13 BJ UT OL 151 206 R0 X PIPE TO ELBOW 89.11 UT 45$ 151 206 R0 X
$1 1 RB 059-1 1A PT 151 11 Rio X
- TBX 9'*
O
BATE: 06/30/89' COMANCHE PEAX UNIT.1 PAGE: 90 REVISION: l' PRESERVICE INSPECTION SUMMART-
'(]j
( :
1AFfff INJECTION
' CUTAGE D (1984), _ PERIOD, BASELINE INTERVAL-
-CLASS 1 COMPONENTS -
ASME G I SEC. XI NE EMMART EXAMINATION AREA . CATGT EXAM NRR0 REMARKS IBMBER IDENTIFICATION ITEM No MdTHOD PROCEDURE I11M ** CALIBRATION BLOCK" 10 $1 1 180-2501R 1-032500' TBM 1 4201 14 BJ UT OL 151206 R0 X ELBOW TO PIPE 99.11 UT 455 151 206 R0 X
VALVE BODT INTERNAL SURFACES B12.40
$1 1 RB 059 1 8948B 032800 TBM-1 4201 8956B B G-2 VT 1 ISI 8 R8FC1 X VALVE BODT BOLTING B7.70
$1 1 RB 059 1 8956B G32810 TBX 1 4201 8956B BG2 SHOP RECORD $ USED, SEE RR B 1.
VALVE BOOT INTERNAL SURFACES 87.70
$1 1 RB 059 1 8956B 6 St 1 328 2501R 1 G32900 TBX 1 4202 1 BJ UT 0L ist 206 R0 K VALVE TO PIPE B9.11 UT-60$ !$1 206 R0 X
$1 1 RB-054 3 PT 151 11 R10 X "TBX 5" w
_ _ _ _ _ _ _ . _ _ _ _ _ _______.____________________.__m._____ . _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ . . _ _ _ _ . _ . __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _
COMANCHE PEAK UNIT 1 PAGE: 91 DATE:. 06/30/89' REVISION: 1' PRESERVICE INSPECT 10N
SUMMARY
'O - CUTAGF 0 (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS SAFETY INJECTION ASME G 2 SEC. XI NE' SLRetART EXAMINATION AREA -CATGY EXAM NRR0- REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6 $1 1 328-2501R 1 0330C TBM 1 4202 2 3J UT-OL ISI 206 R0 X PIPE To REDUCER B9.11 UT 60s !$1 206 R0 X
$!-1 RB 054 4A PT 151 11 R10 X
- TBX-5**-
8 $1 1 090-2501R 1 BJ UT OL ISI 206 R0 X PT *ERFORMED BY TU FOLLOWING REWORK.
033100 TBx 1-4202 3
-REDUCER 70 PIPE B9.11 UT 455 151 206 R0 X SI-1 RB 054 V PY NQA 3.09 8.10R0 X
- Tex 18**
A
.33200 TBx-1 4202-4 BJ UT OL ISI-206 R0 X B9.11 UT 455 181-206 R0 X P!PE TO ELBOW SI 1 RB 054 V PT ISI 11 R10 X
- TBx 18**
UT 0L !st 206 R0 X 101 NOT EXAMINED WITH 45S, SEE RR B 10.
C33M0 TBM 1 4202-5 B-J ELBOW TO MOMENT RESTRAINT B9.11 UT 45$ ISI 206 R0 X SI 1 RB 054 V pi ISI 11 R10 X
- TBx 18**
033400 TBX 1 4202 6 BJ UT OL !$1 206 R0 X MOMENT RESTRAINT TO ELBOW 89.11 UT 455 181 206 R0 X SI 1-RS 054-6 PT 151 11 R10 X -
"TBK 18**
033500 TBx 1 4202*7 BJ UT-OL ISI 206 R0 X ,
ELBOW TO PIPE B9.11 UT 45S 151 206 R0 X
- TBx-18**
O I 1
E_-_________. _ I
\
O COMANCHE PEAK UNIT 1 PAGE: 92 DATE: 06/30/89 REVISION: 1 PRESERVICE INSi'ECTION
SUMMARY
OUTAGE O (1984), PER101, BASELINE INTERVAL p CLASS 1 CLMPONENTS Y)SAFETYINJECTION ASME G
.3 SEC. XI NE SUMART EXAMINAfl0N nREA - CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM **CALIBRATIU4 BLOCK **
B $1-1 000-2501R 1 033600 TBX 1-4202 8 B +.J UT Lt 151 206 R0 X PIPE TO ELBOW 89.11 UT 451 1% 206 20 X SI 1 RB 054 6 1A PT *nl 11 R10 X
- TBX 18**
033800 TBX 1 4202 10 B-J UT OL ISI 206 R0 X PIPE TO CLBOW 89.11 UT-455 7$1 106 R0 X
, SI 1 RB 054 V PT ISI 11 Rio X
\ **TBX 18**
033900 TBX 1 4202 11 8-; UT OL ISI 206 R0 X ELBOW TO P!PE B9.11 UT 45S 151 206 R0 X SI 1 RB 054 V PT 151 11 R10 X
"'sX 18**
151 206 R0 X 15% NOT EXAMINED WITil 455, SEE RR B 10.
034000 TBX 1 4202 12 5J UT-OL P!PE TO TEE 89.11 UT 45S ISI 206 R0 X Si 1*RB 054 7 PT 151-11 R10 X
L _ _ _ _ _ _ _ _ -
s DATE: 06/30/89 COMANCHE PEAK UNI 'PAGE: 93 '-
REVIEION: '1 PRESERVICE INSPECTION W aARY A QUTAGE O (1984), PERIOD, BASELINE INTERVAL
. (' SAFETY fMJECTION CLAS$ 1 COMPONENTS ASME G SEC. XI- NE
~ SLSDMRT EXAMINATION AREA CATGY EXAM NRR0 REMARKS EMBER IDENTIFICATION ITEM N0 METHOD PROCEDURE IIIM ** CALIBRATION BLOCK" 2 51 1 065 2501R 1 154200 TBX 1 4202 14 BJ PT !$1 11 R10 X SOCK 0LET TO PIPE 39.40 s! 1 RB-0238-23 C34300 TBX 1 4202 1$ BJ PT 151 11 R10 X PIPE TO ELBOW 39.40 SI 1 RB 0238 10 C34400 TBM 1-4202-16 'BJ PT 151 11 R10 K ELBOW TO PIPE 39.40 s! 1 RB 0238-9 A
C34500 TBM 1 4202-17 B-J PT 181 11 RIO X r!PE TO ELBOW E" 40
$1 1 RB 0238 8 1 C34600 TBX 1 4202 18 BJ PT 151-11 R10 X ELBOW TO PIPE 09.40 SI 1 RB-0238 7A C34700 TBM 1 4201-19 BJ PT' ISI 11 R10 X PIPE TO TEE 89.40 SI 1 RB 0238 6 C34800 TBX 1 4202 20 BJ PT !$1 11 R10 X TEE TO REDUCING INSERT 99.40 s! 1 RB 0238 19 i
DATEt, 06/30/89 COMANCHE PEAK UNIT 1 PAGE:- 94.
REVIS10Nr .1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1984), -PERIOD, BASELINE INTERVAL g
I! CLASS 1 COMPONENTS f
I'% SAFETY INJECTION ASME G
." SEC. XI NE >
SUMMARY
EXAMINATION AREA CATGY - EXAM NRR0 REMARKS NUNBER ! IDENTIFICATION ITEM No METHOD PROCEDURE I!IM ** CALIBRATION BLOCK **
2-St i 065-2501R 1
.034900 TBX 1 4202 21 BJ PT 151 11 R10 X TEE TO PIPE 89.40 Sl 1 RB 0238 5 035000 TBX 14202 22 BJ PT 151 11 R10 X PIPE TO TEE. 39.40 SI 1 RB 0238 4 035100 TBX 1 4202 23 BJ PT 151 11 Rio X TEE 10 REDUCING INSERT 39.40
$1 1 RB 0238 11 6
(
035200 TBX 1 4202 24 BJ PT 151-11 Rio X TEE 70 PIPE B9.40 SI 1 RB-0238 3 035300 TBX 1 4202 25 BJ PT 151 11 RIO X PIPE To VALVE 89.40 fi 1 RB 0238 2 6 SI 1-325 2501R 1 035400 TBX 1 4202 8818B BG2 vi 1 151 8 R8FC1 X VALVE B007 BOLTING B7.70
$1 1 RB 054 1 88188 l.
BN2 SHOP RECORDS USED, SEE RR B 1.
035410 TEI 1 4202 88188 VALVE BODY INTERNAL SURFACES B12.40 S! 1 RB 054ai 88188 i
I l
l 1
L_______-_____________
f.-
i.
O DATE: 06/30/89 COMAhCNE PEAK UNIT 1 PAGE: 95 REVIS! OWL 1 PRESERVICE INSPECTION SumARY
[ .
DUTAGE D (1964), PERIOD, BASELINE INTERVAL
- j - CLASS 1 COMPOWENTS 1 EE,TY INJECT,[gN ASME G SEC. XI NE SumARY EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER IDENT!FICAT!DN ITEM No METHW PROCEDURE Ii1M ** CALIBRATION BLOCK **
6-51-1 101 2501R 1 035500 . Tex 1 4203 1' sJ UT-OL 151 206 R0 x VALVE TO PIPE 89.11 UT 455 151 206 R0 x
$1 1 R8 016 3 PT 151 11 R10 x
'** Tex 5**
035600 TBK 1 4203 2 i-J UT OL 151 206 R0 X PIPE TO MOMEN* RESTRAINT Bs .11 UT 455 !$1 206 R0 X GI 1-RS 016 20 PT 151 11 Rio X
- TBX-5**
035700 TBX 1 4203 3 BJ UT OL 151 206 RO X PT PERFORMED BT TU F06 LOWING REWORK.
% MOMENT RESTRAINT TO PIPE 09.11 UT 455 ISI 206 R0 x
.l $2 1 RS-016 21 PT WQA 3.09 8.10R0 x
- TBx 5**
035800 TBX 1 4203 4 BJ UT OL 151 206 R0 X P!PE TO ELS0W- 89.11 UT 455 151 206 R0 X SI 1 RS 016 7A PT 151 11 R10 x
..ygg.5**
035900 Tax 1 4203 5 sJ UT OL 151 206 R0 x~
ELBOW TO PIPE 89.11 UT 455 151 206 R0 x SI-1 RB C16-8 PT 151 11 Rio X
- TBM 5**
036000 -Tex 1 4203 6 8J UT OL 151-206 RD x PIPE TO EL30W 89.11 UT 45$ 15! 206 R0 x St=1 RB 016 9 PT 151 11 R10 x
- T8X-5**
O
,v4 DATE: 06/30/09 COMANCHE PEAK UNIT 1 PAGE: M' REY!$l0N: 1 PRESERVICE INSPECTION 3JMMARY l \. OUTAGE O (1984), PERIOD, BASELINE INTERVAL I
% CLASS 1 COMPONENTS-ASME G ,
~.
SEC. XI NE SumARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE 'IIIM ** CALIBRATION BLOCK **
6-SI 1 101 2501R 1 036100 TBK 1 4203 7 -BJ UT OL 151 206 R0 x ELBOW TO PIPE 59.11 UT 45$ !$1 206 R0 X SI 1-RB 016 10 PT 151 11 Rio X e.TBx 5**
036200 TBM 1 4203-8 BJ UT OL 151 206 R0 x PT PERFORMED BY TU FOLLOWING REWORK.
P!PE TO VALVE B9.11 UT 455 151 206 R0 x SI 1 RB 016 11 PT NQA 3.09-8.10R0 X eeing.5**
036300 TBX 1 4203 8841A B-G-2 VT 1 !$1 8 R8FC1 x VALVE BODT BOLTING B7.70 4 $1 1 RB 016 1 8841A B-M 2 x SHOP RECORDS USED, SEE RR B 1.
036310 TBX 1 4203 8841A VALVE BODY INTERNAL 11JRFACES 812.40
$1 1 RB 016 1 8841A 036400 TBM 1 4203 89498 BG2 VT 1 !$1 8 R8FC1 x j VALVE BODY BOLTING B7.70
$1 1 RB 016 1 89498 l
BM2 SHOP RECORDS USED, SEE RR B 1 036410 TBX 1 4203-89495 I i
VALVE BODT INTERNAL SURFACES B12.40 51 1-R5 016 1 89498 l
1 b
LJ
COMANCHE PEAK UNIT 1 .PAGE: 97
~DATE:: 06/30/89 REVISIONS.- 1 PEESERVICE INSPECTION
SUMMARY
-c QUTAGE O (1984), PERico, BASELINE INTERVAL
- CLASS 1 COMPONENTS
' ~
- SEC. XI NE SUNMAPY EXAMINAT?t* 1aEA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO ' METHOD -PROCEDURE
. IIIN ** CALIBRATION BLOCK **
6 RC 1 029 2501R 1 036500 TBX 1 4203 9 BJ UT OL ISI 206 RO X
036600 TBX 1 4203 10 - B.J UT OL !$1 206 R0 X P!PE To ELBOW B9.11 UT 455 !$1 206 R0 X
$1 1-RB 016 17 PT 181 11 Rio X
- TBX-5**
036700 TBX 1 4203 11 BJ UT OL !$1 206 R0 X ELBOW TO PIPE 89.11 UT 455 !$l 206 R0 X O !$1 11 R10 PT X
, $1 1 RB 016 18A
- TBX 5**
036800 TBX 1 4203 12 B*J UT-OL 151 206 R0 X PIPE TO BRANCH CONNECTION 09.11 UT 455 151 206 to X SI 1 RB 016-19 PT !$1 11 Rio X
- TBX-$**
i
)
l l
--a- - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _
.l
- J COMANCNE PEAK UNif 1 PAGE:' 98-
- -DATE: 06/30/99:
iREV/SION:- 1J .PRESERVICE INSPECTION StamARY OUTAGE O (1984), . PERIOD, BASELINE INTERVAL i
. r'.
CLASS 1 COMPONENTS SAFETY INJECTION ASME G
- - SEC. X! NE.
EsmARY EXAMINAfl0N AREA - CATGY EXAM' NRR0 REMARKS l
.NLSIBER -IDENTIFICATION . ITEM NO LMETHOD PROCEDURE 'l11M - **CALIBRAfluN BLOCK ** .
2 81 1 301 2501R 1 036900 TBK 1 4203 13' BJ PT ISI 11 R10 X
. PIPE TO 90CKOLET 99.32 SI 1 Re 016-5 037000 -T8K 1 4203 14 8J- PT NQA 3.09 8.10R0 X PT PERFORMED SY TU FOLLOWING REWORK.
SOCKOLET TO PIPE 99.40 SI-1 Re 006 33 037100 Tex 1 4203 15 6J PT 11:1 11 Rio X PIPE TO TEE 89.40 SI-1 RS 006 32 j
037200' TBx 1-4203 16 EJ PT N0A 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
. TEE TO REITING INSERT 99.40
- I-1 RS 006 34 037300 TBX 1 4203 17 BJ PT ISI 11 RIO X TEE TO PIPE 89.40 SI 1 RS 006 31 037400 -TBM 1 4203 18 BJ PT !$3 11 R10 X P!PE TO VALVE B9.40
<- $1 1 RS 006 30 4
M IC COMANCNE PEAK UNIT 1 PAGE: 99
- DATE: 06/30/89 -
I' -REVISION: 1 PRESERVICE INSPECTION SUMMART DUTAGE O (1964), PERIDO, BASELINE INTERVAL 2'~'(
g,,,,/ CLASS 1 COMPONENTS REACTOR COOLANT r-ASME G
SEC. xl NE
SUMMARY
EXAMINATION AREA CATGT EKAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
........ .............................. ....... n......... ............... .. . ........................................
1 RC 1 158-2501R.1 03?500 TBx 1 4204 1 BJ PT !$1 11 Rio X BRANCN CONNECTION TO REDUCER 89.21 RC 1 RB 033-25 1.5 RC 1 0.39-2501R 1 037600 TBX 1 4205 1 BJ PT !$1 11 R10 X BRANCH CONNECTION TO REDUCER 89.21 SI 1 RB 025 28 037700 TBX 1 4235 2 B-J PT 151 11 Rio X REDUCER TO ELBOW 89.21
.i $1 1 RB 025 27 037800 TBx 14205 3 BJ PT ISI 41 Rio x ELBOW TO PIPE 89.21 SI 1 RB 025 26 037900 TBK 1 4205 4 BJ PT GI-QAP 10.2 1R1 X RE EXAMINED BY B&R FOLLOWING REWORK.
PIPE TO ELBOW 89.40 SI 1 RB 025 25A q
i 038000 TBX 1 4205 5 BJ PT NQA 3.09 8.1DRO X PT PERFORMED BT TU FOLLOWING REWORK.
ELBOW TO P!PE 09.40 SI 1 RB 025 24 038100 TBX 14205-6 B, PT 151 11 Rio X PIPE TO VALVE 89. C;
$l 1 R0 025 23
COMANCHE PEAK UNIT 1 PAGE: 100. l
' DATE: 06/30/89 PRESERVICE INSPECTION
SUMMARY
f REVISION: 1
- (N CUTAGE D (1984), PERico, BASELINE INTERVAL i 3 J -- CLASS 1 COMPONENTS SAFETY fMJECTION
'.I ASME G. .. l J SEC. XI NE
SUMMARY
EXAMINATION AREA 'CATGY EXAM ~ NRR0 REMARKS EFRR IDENTIFICATION ITEM Wo- METHOD PROCEDURE IIIM **CALIBRAfl0N BLOCK **
1.5 St.1 200-2501R 1 038200 TBX 1 4205 7 BJ PT ISI 11 R10 X VALVE 10 PIPE B9.40
$1 1 RB 025 22 038300 TBX 1 4205 8 BJ PT NQA 3.09 8.10R0 X PT PERFORhED BY TU FOLLOWING REWuRK.
PIPE 10 ELBOW 89.40 SI t RB 025-20-1 038400 TBX 14205 9 BJ PT ISI-11 410 X ELBOW 70 P!PE B9.40 51 1 RB 025 20 -
v 038 500 TBX 1 4205 10 3J PT ISI 11 Rio X PIPE TO ELBOW. 89.40
$1 1 RB 025 19 038600 .TBX 1 4205 11 BJ PT ISI 11 R10 X ELBOW TO #IPE B9.40
$1 1 RB 025 18 038700 TBX 1 4205 12 BJ PT 151 11 Rio X
' PIPE TO ELBOW
. 89.40
$1 1 RB-025-21 1 038800 TBX 1 4205 13 BJ PT 151 11 R10 X ELBOW TO PIPE 89.40 SI 1 RB 025 21 l
1 1 .
I l 1
e
/
l l
1
COMANCHE PEAK UNIT 1 PAGE ' 101
'DATE: ' 06/30/89 REY!$ ION:- 1 PRESERvlCE INSPECTION
SUMMARY
QuTAGE 0 (1984), PERIOD, BASELINE INTERVAL
. f'"N -
,k CLASS 1 COMPONENTS SAFETT INJECTION ASME G J SEC. XI NE BLMIARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
1,5 $1 1 200 MgjR 1 038900 TBX 1 4205 14 BJ PT 181 11 R10 X PIPE To ELBOW 09.40 SI 1 RB 025 15 3 039000 TBX 1 4205 15 BJ PT !st 11 Rio X ELBOW fo PIPE 89.40 st.1 RB 025 15 2 039100 TBX 1 4205 16 5J PT 01-QAP 10.2 1R1 X RE EXAMINED BY B&R FOLLOWING REWORK.
PIPE To ELBOW B9.40
$1 1 RB 025 15 1A BJ PT NDE 300 R2 X RE EXAMINED BY TU FOLLOWING REWORK.
039200 TBX 1 4205 17 ELBOW TO PIPE 39.40
$1 1 RB-025 14 1A i
039300 TBX 1 4205 18 BJ PT N0A 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
i PIPE 70 VALVE 59.40 51 1 RB 025 138 1.5-st 1 026 2501R 1 039400 1BX 1 4205 19 BJ PT !$1 11 Rio X VALVE TO P!PE 89.40
$1 1 RB 025 128 4
039500 TBX 1 4205 20 BJ PT !$1 11 R10 X PIPE TO FLANGE 39.40 El 1-RB 025 11A I
l l
! b
(
-l
.-j COMANCNE PEAK UNIT 1 PAGE: 102 ]
DATE: 06/30/89 '
REVISIONI. 1 PRESERVICE INSPECTION BUIMART OUTAGE O (1964), PERIOD, BASELINE INTEk/AL CLASS 1 COMPONENTS )
_d )
f SAFETY INJECT 10W I
ASME G
~
SEC. XI NE
-BUMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER ~ IDENTIFICATION ITEM No METHOD PROCEDURE IIIM **CALIBRAT10N BLOCK ** ,
....... .............................. ....... .......... ............... .... ........................................ ]
1.5 51 1-026-2501R-J l1 039600'TBx-1 4205 21 5J' PT ISI-11 Rio 'X - l FLANGE TO PIPE B9.40 SI-1 RB 025 2 BJ PT WQA 3.09 8.10R0 X PTPERFORMEDBYTUFOLLOWINGREW6ta.
039700 TBX 1 4205 22 PIPE TO ELBOW 59.40 SI 1 RB 025 1 BJ PT WQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
039600 TBx 1 4205 23
+
ELBOW TO P!PE 09.40 SI 1 RB-024 16
\ BJ PT WQA 3.09 8.10R0 X PT PERFORMED BT TU FOLLOWING REWORK.
039900 TBX 1 4205 24 PIPE TO ELBOW 59.40 SI-1 RB 024 15 040000 TBx 1 4205 25 BJ PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
ELBOW TO PIPE B9.40 s! 1 RB 024 te 040100 TBM 1 4205 26 BJ PT ISI 11 R10 X P!PE TO COUPLING B9.40 s!-1 RB 024 13 BJ 151 11 R10 X 040200 TBK 1 4205 27 PT COUPLING TO PIFC 59.40 s! 1 RB 024 12
)
i i
l J
.W CDMANCHE PEAK UNIT 1' PAGEs 103 l DATES . 06/30/89 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
gj OUTAGE O (1984), PER,10D, BASELINE INTERVAL ,
f 5 CLASS 1 COMPONENTS SAFETY INJECTig l 1
ASME G l 7 SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS WUMBER IDENT!FICAfl0N ITEM NO METHOD PROCEDURE IIIN **CALIBRAfl0N BLOCK'*
i 1.5 SI 1-026 2501R 1 040300 TBX 1 4205 28 BJ PT ISI-11 R10 X PIPE TO COUPLING 09.40
$1 1 RB 024 11 BJ WQA 3.09-8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
040400 TBX 1 4205 29 .
PT COUPLING TO PIPE B9.40 SI 1 RB 024 10 040500 TBX 1*4205 30 B-J PT !$! 11 R10 X PIPE TO COUPLING 89.40
$1 1 RB 0244 t
0
\ 040600 TBX 1 4205 31 B-J PT 151 11 R10 X COUPLING TO P!PE B9.40
$1 1 RB 024 8A 040700 TBX 1 4205-32 BJ PT ISI 11 R10 X PIPE TO COUPLING B9.40 SI 1 RB 024 7 040800 TBX 1 4205 33 BJ PT 181-11 R10 - X COUPLING TO PIPE 89.40 SI 1 RB 024 6 040900 TBX 1 4205 34 BJ PT NoA 3.09 8.10R0 X PT PERFORMED BY TV FOLLOWING REWORK.
PIPE To ELBOW B9.40 I
$1 1 RB 024 5 h
O l
r PAGE: 104' COMANCNE PEAK UNIT 1
' DATES- 06/30/89 PRESERVICE INSPECTION
SUMMARY
REVISION: 1 QUTAGE O (1984), PERIOD, BASELINE; INTERVAL
~/ $ -
CLASS 1 COMPONENTS p % ~
SAFETY INJECTION ASE G
~
SEC. x! NE NRR0 REMARKS
,W't EXAMINAfl0N AitEA 'CATGY EXAM ITEM No METHOD PROCEDURE IIIM' ** CALIBRATION SLOCK**
NLM8ER. IDENTIFICATIDW ........................................
1.5 St i-026-2501R 1 SJ PT 151 11 R10 X' 041000 Tex 1 4205 35
. ELBOW TO PIPE. 89.40 Sl*1*R8 024 4A
~
NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
041100 TBx 1 4205 36 BJ- PT PIPE TO ELBOW '89.40
$1 1 RI 024 3
!$1 11 R10 X
~041200 Tsx 1 4205'37 8J PT ELBOW TO PIPE 89.40
$! 1 RS 024 2 V !$1 11 Rio X 041300 Tex 1 4205 38- BJ PT PIPE 10 REDUCER 99.21 SI 1 RB 024 1C' 8G2 VT 1 It!-8 R8FC1 X 04'400 TBx 1 4205 h ANGE #1 FLANGE 30LTING B7.50
PAGE:. 105 I COMANCHE PEAK UNIT 1-DATE: 06/30/89 _-
PRESERVICE INSPECTION SUMMART REVISION - 1 CUTAGE 0 (1984), PERIOD, BASELINE INTERVAL ']
4EACTORC00LAKT C
. SEC. XI NE CATCT EXAN . NRR0 REMARKS
'BUMMART EXAMINATION' AREA ITEM NO METHOD PROCEDURE IIIM **CALIBRAfl0N BLOCK"
-NUMBER IDENTIFICATION ........................................
l 2 Rc 1'-035 2501R-1 i
!$1-11 R10 X 041500 T8X 1 4206 1 sJ PT- ,
BRANCH CONNECTION TO P!PE 59.40 WP-1 Re 005A 1 k
15! 11 RfD X 041600 Tex 1 4206 2 0J PT PIPE TO ELBOW 89.40 WP 1 Re 005A 2 041700 .TBx 1 4206-3 BJ PT ISI-11 R10 X ELB0W TO PIPE 89.40-WP 1 RB-005A 3A ISI-11 R10 X 041800 TBX 1>4206-4 BJ PT PIPE TO VALVE 59.40 WP 1 as 005A 4A ISI 11 R10 X 041900 Tex 1 4206 5 SJ PT VALVE TO PIPE 09.40 WP 1 RS 005A 5
~
ISl*11 RIO X 042000 TBX 1 4206 6 BJ PT PIPE TO VALVE 89.40 WP t RB 005A 6A 27.5 Rc 1-025 WEST 1 NDE 300 R2 X RE* EXAMINED BT TU FOLLOWING REWORK.
062100 TBK 1 4207 1 BJ PT BRANCH CONNECTION TO PLUG 89.40 i RC 1 520 001 42 l
l 1
O i 1
COMANCHE PEAK UNIT 1 PAGE: 106 DATE: 06/30/89 REV!s10N: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
/N CLASS 1 COMPONENTS CHEMICAL & VOLUME CONT 90L ASME G SEC. XI NE L90%1tY EXAMINAfl0N AREA CATGY EKAM NRR0 REMARKS.
NUMBER IDENTIFICATION ITEM No METh0D PROCEDURE IIIM ** CALIBRATION BLOCK'*
1.5 Cs 1-249 2501R-1 !
042200 TBx 1 4206 1 3J PT 151 11 R10 X RC PUMP N0ZZLE TO FLANGE 99.21 es 1 RB-0318 V 042300 TBK 1 4208 2 BJ PT 181 11 R10 X FLANGE TO PIPE 89.21 Cb 1 RB 031Ba135 042400 TBK 1 4208-3 BJ PT 181 11 Rio X PIPE TO ELBOW E9.21 CS 1-RB-0318 123 042500 TBX 1 4208-4 BJ PT !$l 11 R10 X ELBOW TO PIPE 89.21 Cs 1-RB 0315 11 042600 TBX 14206 5 BJ PT l$1 11 Rio X PIPE TO REDUCER 89.21 CS 1 RB 031810 l
2 CS-1 105 2501R-1 GI GAP-10.2 1R2 X PT PERFORMED BT B&R FOLLOWING REWOPK.
042700 TBX 1 4208 6 BJ PT REDUCER TO PIPE 89.21 CS 1 RB 031B 9 t
l PT PERFORMED BT B&R FOLLOWING REWORK. l 042800 TBX 1 4208 7 BJ PT 01-QAP 10.2 iR2 X B9.11 l PIPE TO ELBOW CS 1 RB 031B 8
b PAGE: 107 COMANCHE PEAK UNIT 1 DATE: 06/30/89 PRESERVICE INSPECTION SUMMART REVISION: 1 DUTAGE 0 (1954), PERIOD, BASELINE INTERVAL
/^)
k) CNEMICAL & YOLUME CONTROL CLASS 1 COMPONENTS AS8E G SEC. Il NE CATGY EXAM N R R /J REMARKS SiMMART EXAMINATION AREA ITEM NO METHOD PROCEDURE Ii1M ** CALIBRATION BLOCK'*
NLMBER IDENTIFICAfl0W 2 CS 1-105-2501R-1 01 0AP-10.2 1R2 X PT PERFORMED ST B&R FOLLOWING REWORK.
042900 TBX 1 4208 8 BJ PT ELBOW TO PIPE 89.21 CS 1 RB-0318 7 043000 TBX 1 4208 9 B-J PT IS! 11 R10 X PIPE TO TEE 89.21 CS 1 RW 0318*6
!$1 11 Rio X RE EXAMINED AFTER REWORK.
043100 TBX 1 4208-10 BJ PT TEE TO P:PE 89.21 CS 1-RB 0318 5A D i 5
%J 043200 TBX 1 4208 11 BJ PT ,
!$1 11 R10 X RE EXAMINED AFTER REWORK.
PIPE TO VALVE 89.40 CS 1 RB-0318 4 1
!$1-11 RIO X RE EXAMINED AFTER REWORK.
043300 TBX 1 4208-12 BJ PT VALVE TO PIPE 89.40 CS 1 RB 0318 3 1 151 11 R10 X RE EXAMINED AFTER REWORK.
043400 TSV 1 4 W 03 BJ PT P!PE i'O VALVE 39.40 CS 1 RB 0318 2 1 1.5 CS 1 249 2501R-1 RE EXAMINED AFTER REWORK.
043500 TBX 1 4208 FLANGE #1 BG2 VT 1 IS! 8 R8FC1 X FLANGE BOLTING BT.50 CS 1 RB 031B FLC. 1
PAGEt 108 CCMANCHE PEAK UNIT 1 DATE: '06/30/89-PRESERVICE INSPECTION
SUMMARY
- EVISION: 1 OUTAGE 0 (1984), P!RIOD, SASELINE INTERVAL p CLASS 1 COMPONENTS t
-' - SEC. XI NE CATGY EXAM NRR0 REMARKS SLMMARY EXAMINATION AREA ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
NLMBER IDENTIFICATION 29 RC 1 040-WESTM1 X 60% NOT EXAMlWED WITH MUT 41L, 043600 TBX 1-4300 1' BF AUT OL ISt-154 R1 AUT 41L IS! 154 R1 X SUPPLEMENTED WITH AUTOMATED FROM THE ID RPV N0ZZLE TO SAFE END B5.10 X TO ACHIEVE 100% COVERAGE, SEE RR B 5.
RC 1 520 001 V MUT 0L ISI 206 R0 MUT 41L ISI 206 R0 X PT ISI 11 R10 X **TBX 2**
X 40% NOT EXAMINED WITH 41L, SEE RR B 10.
BJ UT OL. 151 206 R0 043700 TBX 1 4300-2 UT-41L !$1 206 R0 X SAFE END TO PIPE 39.11 PT 151 11 R10 X RC 1520 001 17
- TBX 2**
151 206 RO X 1800 TSX 1 4300 3 BJ UT OL UT 41L ISI 206 R0 X PlPE TO REDUCING ELBOW 89.11
\
RC 1520 001 V PT ISI 11 R10 X "TBX 2**
15% NOT EXAMINED WITH 41L, SEE RR B 8.
BF UT OL !$1 206 R0 X 043900 TBX 1 4300-4 151 206 R0 X PT PERFORMED BY TU FOLLOWING REWORK.
REDUCING ELBOW TO SG N0ZZLE B5.30 UT*41L PT NDE 300 R2 X SAFE END RC 1 520 001 18
- TBX 2**
31 RC 1 041 WEST-1 X 15% NOT EXAMINED WITH 41L, SEE RR B 8.
B-F UT OL 151 206 R0 044000 TBX 1 4300-5 UT 41L 1$1 206 R0 X SG N0ZZLE SAFE END To ELB0W B5.30 RC 1 520 001 19 PT 151 11 Rio X
- TBX 2**
BJ UT OL ISI 206 R0 X 044100 TBL 1 4300-6 UT*41L 151 206 R0 X ELBOW TO PIPE B9.11 RC 1520 00120 PT ISI 11 R10 X
- TBX 2" r.
i
.j; COMANCNE PEAK UNIT 1 PAGE: 109 DATE: 06/30/89 REVISION: 1- PRESERVICE INSPECT 10N SUMMART OUTAGE D (1964), PERIOD, BASELINE INTERVAL i CLASS 1 COMPONENTS s~ REACTop COOLANT ASME. G
'~
EEC. XI NE BUMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
31-Rc i 041 WEST 1 044200 TBX 14300-7 BJ UT OL 151-206 R0 X PIPE TO ELBOW 89.11 UT 41L ISI-206 R0 X RC 1 520 001-V PT ISI 11 R10 X
- TBX 2**
044300 TBX 1 4300-8 BJ UT 0L 151206 R0 X ELBOW TO P!PE 89.11 UT 41L !$1 206 R0 X RC 1 520-001 21 PT ISI 11 Rio X
- TBX 2**
044400 TBX 1-4300 9 BJ UT 3L ISI 206 R0 X PIPE TO ELB0W 89.11 UT 41L ISI 206 R0 X f RC 1520-001 V PT 151-11 Rio X
.(/ ..tsg.2**
BJ UT-OL 181-206 R0 X PT PERFORMED BY TU FOLLOWING REWORX.
044500 TBX 1 4300 10 ELBOW TO RC PUMP SUCTION 09.11 UT 41L 151 206 R0 X N0ZZLE PT WQA 3.09 8.10R0 X RC 1 520 001 22
- TBX 2**
27.5 Rc-1 042 WEST 1 151-206 R0 X 5% NOT EXAMINED WITH 41L, SEE RR B-10.
044600 TBX 1 4300 11 BJ UT 0L 89.11 UT 41L 151206 R0 X PT R1 IS ACCEPTABLE.
RC PUMP DISCHARGE N0ZZLE TD PIPE PT ISI 11 R10 X RC 1 520 001 23
- TBX 2**
044700 TBX 1 4300 12 BJ UT OL 151 206 R0 X PIPE TO ELBOW B9.11 UT 41L 151 206 R0 X RC 1520 001 V PT ISI 11 Rio X
.*TBX 2**
f .
L
COMANCHE PEAK UNIT 1 PAGE: 110 DATE: 06/30/89 REVisl0N 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
'(g CLASS 1 COMPONENTS
/
ASME G l
SEC. XI NE SUP94 ART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLDISER IDENTIF! CATION ITEM No METN00 PROCEDURE II1M **CALIBRAT10N BLOCK **
27.5 RC 1 042 WEST-1 181 206 RO 501 NOT EXAMINED WITH 41L, SEE RR B 10.
044800 TBX 1 4300-13 BJ UT OL X ELBOW TO SAFE END 89.11 UT 41L ISI 206 R0 X RC 1 520-001 24 PT ISI 11 Rio X
- TBX 2**
ISI 154 R1 X 601 NOT EXAMINED WITH MUT 41L, 044900 TBX 1 4300 14 BF AUT OL B5.10 AUT-41L 151 154 R1 X SUPPLEMENTED WITH AUTDMATED FROM TNE ID SAFE END TO RPV N0ZZLE MUT OL ISI 206 R0 X TO ACHIEVE 1001 COVERAGE. SEE RR B 5.
RC 1 520 001.V MUT 41L ISI 206 R0 X PT IS! 11 R10 X **TBX 2**
E RC 1 040 WEST 1 b 3J PT IS! 11 R10 X SEE RR B 10.
045000 TBX 1 4300 15 P!PE TO BRANCH CONNECTION 39.21 RC 1 520-001-V "TBX 2**
31 RC 1 041 WEST 1 BJ PT 151 11 Rio X SEE RR B 10.
045100 TBX 1 4300 16 P!PE TO BRANCH CONNECTION 89.31 i
RC 1 520 001 v
- TBX 2**
B-J PT ISI 11 Rio X SEE RR B 10.
D45200 TBX 1 4300-17 P!PE TO BRANCH CONNECTION 89.31 RC 1 520 001 V "TBM 2**
o
t .f 5
COMANCHE PEAK UNIT 1 PAGE: 111 -
sDATE: ' 06/30/89 REVIS!ON: 1- PRESERVICE INSPECTION
SUMMARY
~ ,f OUTAGE O (1984),- PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT ASME C
~~ NE l SEC. XI
' SL884ARY EXAMINATION AREA CATGY EXAM NAR0 REMARKS-NUMBER ' IDENTIFICATION ITEM No METHOD PROCEDURE I11M ** CALIBRATION BLOCK" 27.5-RC 1042 WEST 1
-045300 TBX 1 4300 18 BJ PT 151 11 R10 X PIPE TO BRANCH CONNECTION 39.32 RC 1 520-001 V BJ UT OL ISI 206 R0 X 30% NOT EXAMINED WITH 41L, SEE RR B 10.
045400 TBx 1 4300 19 PIPE TO BRANCH CONNECTION B9.31 UT 41L 151 206 RO X RC 1 520 001 V PT 151 11 R10 X
- TBX 2**
045500 TBX 1 4300 20 BJ 9T 151-11 R10 X SEE RR B 10.
BRANCH CONNECTION TO P!PE B9.31
/ RC 1 520-001 V t **TBx 2**
10 RC 1 055 2901R 1 045600 TBx 1 4301 1 B-J UT OL 151 206 RO X PT PERFORMED BY TU FOLLOWING REWORK.
BRANCN CONNECTION TO ELBOW B9.11 UT 45$ !$1 206 RD X SI 1 RB 060 15 PT NDE 300 R2 X
- TBX 9**
BJ UT OL 151 205 R2A3 X PARTIAL UT, SEE RR B 10.
045700 TBX 1 4301-2 ELBOW TO PIPE 89.11 UT 455 151 205 R2A3 X SI 1 RB 060 V PT 151 11 R9A3 X VT ISI 8 R7A1 X "TBX 9" l
045800 TBK 1 4301 3 BJ UT OL 151 206 R0 X PIPE TO ELBOW B9.11 UT 455 151 206 R0 X SI 1-RB 060 10 1A PT 151 11 Rio X l
" Tex 9" F
1 4
DATE: '06/30/89- COMANCHE PEAK UNIT 1 PAGE: 112
.. REVISION: 1 PRESERVICE INSPECTION SumeART O, OUTAGE D (1964), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS
-[
REACTOR COOLANT ASME G l- .SEC. XI NE SUMMART EXAMINATION AREA CATGT EKAM NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE IIIM **CALIBRAfl0N BLOCK **
<r 10 RC 105'3 2501P-1 045900 TBx 1 4301 4 - BJ UT OL ISI 206 R0 X ELBOW 70 P!PE B9.11 UT 45$ 181 206 R0 X SI 1 RB 060 V PT !$1 11 R10 X
- TBX 9**'
046000 TBK 1 4301 5 BJ UT OL !$1 205 R2A3 X PARTIAL UT, SEE RR B 10.
PIPE To ELBOW 89.11 UT-455 !$l 205 R2A3 .X SI 1 RB 060-V PT 151 11 R9A3 X VT 151 8 RTA1 X
- TBM 9**
046100 Tex 143016 3J UT OL 151 205 R2A3 X PARTIAL UT, SEE RR B 10.
ELBOW TO PIPE B9.11 UT 45$ ISI-205 R2A3 X
{
SI 1 RB-060-V PT ISI 11 R9A3 X VT 151 8 RTA3 X
- TBx 9**
BJ 151 206 A0 X 40% NOT EKAMINED WITH 455, SEE RR B 10.
046200 TBX 1 4301 7 UT-OL PIPE TO VALVE 59.11 UT 455 ISI 206 R0 X UT, PT PERFORMED FOLLOWING REWORK.
- TBM 9'*
~
I
PAGE: 113 CDMANCHE PEAX UNIT 1
.DATE: 06/30/89 CVIS10N: 1 PRESERVA.:E INSPECTION SUWIART OUTAGE D (1984), PERIOD, BASELINE INTERVAL
( )-
(
~ SAFETY INJECTION CLASS 1 COMPONENTS ASME G
-' SEC. XI NE CATCY EXAM NRR0 REMARKS SLMMARY EXAMINATION AREA ITEM NO METHOD PROCEDURE IIIM **CALIBRAfl0N BLOCK'*
IEMBER IDENTIFICATION 10-St i 181 2501R 1 ISI 205 R2A3 x PARTIAL UT, SEE RR 8-10.
046300 TBX 1 4301 8 BJ UT OL 99.11 UT 455 !$1 205 R2A3 x VALVE TO P!PE PT !$1-11 R9A3 x
- TBX 9**
151 205 R2A3 x PARTIAL UT, SEE RR B 10.
066400 78K 1 4301 9 8J UT OL 99.11 UT 455 151 205 R2A3 x PIPE 10 EL90W PT 181 11 R9A3 x El 1*RW 060-V VT 151 8 R7A1 x
- ** Tax-9**
f r 6500 TBK 14301*10 BJ UT OL !$1 205 R2A3 x PARTIAL (JT, SEE RR B 10.
\ 39.11 UT 45$ 151 205 RZA3 x ELBOW TO PIPE PT !$1 11 R9A3 x
$1 1 RB-060-8 1A VT ISI 8 R7A1 x
- TBX 9'*
151 205 R2A3 x PARTIAL UT, SEE RR B 10.
046600 TEX 1 4301 11 BJ UT-OL UT 458 151 205 R2A3 X PIPE 70 TEE 99.11 PT 101-11 R9A3 x
- T5x 9**
151 206 RD X 046700 TBx 1 4301 12 BJ UT OL UT 455 151 206 R0 K TEE TO PIPE 99.11 Sl*1 RB 060-V PT ISI 11 Rio X
- TBX-9**
046800 TBX 1 4301 13 8J UT-OL 151206 RD X 89.11 UT 458 181 206 RD M PIPE To ELBOW PT 151 11 R10 x
$1 1 Rs-060 V
- T8x 9'*
b L __ _ ___ __ __ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l PAGE: 114-DATE: 06/30/89 COMANCHE PEAK UNIT 1 1 'PRESERVICE INSPECTION
SUMMARY
. REV!$10N OUTAGE D (1984), PERIOD, BASELINE I'7'RVAL
/] / CLASS 1 COMPONENTS l' SAFETY INJECTION ASME O SEC. XI NE CATGY EXAM NRR0 REMARKS SLAMARY EXAMINATION AREA NUMBER IDENT!FICAfl0N ITEM NO METHOD PROCEDURE IIIM " CALIBRATION BLOCX**
10-SI-1 181 2501R-1 BJ UT OL- 161 206 R0 X PT PERFORMED BY TU FOLLOWING REWORK.
046900 TBX-1-4301 14 B9.11 UT 455 !$1 206 R0 X ELBOW TO PIPE
$1 1 RB 060 V PT NQA 3.09-8.10R0 X
- TBX-9'*
BJ UT OL 181 206 R0 X 047000 TBX 1 4301 15 89.11 UT 455 151 206 RO X PIPE TO VALVE PT 151 11 R10 X SI 1-RB 060-16
- TBX 9" B+2 VT 1 151 8 R8FC1 X 047100 TBX 1-4301 8948C p VALVE BODT BOLTING B7.70
( SI 1 RB 060 1 8948C SMOP RECORDS USED, SEE RR B 1.
047110 TCX 1 4301 8948C B-M 2 VALVE BODY INTERHAL SURFACES B12.40 SI 1 RB-060 1 8948C B-G 2 VT 1 ISI 8 R8FC1 X 047200 TBX 1 4301 8956C VALVE BODY BOLTING B7.70
$1 1 RB 060 1 8956C SHOP RECORDS USED, SEE RR B 1.
047210 TBX 1 4301 8956C BM2 VALVE SCCY INTERNAL SURFACES B12.40
$1 1 RB-060 1 8956C 6 $1 1 330-2501R-1
!$1 206 R0 X 047300 TBX 1 4302 1 BJ UT OL 89.11 UT 455 !$1 206 R0 X VALVE TO PIPE UT-60$ 151 206 R0 X 11 1 RB-053-2A PT ISI 11 Rio X
..ygx.$..
COMANCHE PEAK UNIT 1 PAGE: 115 DATE: 06/30/89 REVIS10W: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1984), PERIOD, BASELINE thtERVAL f%
'1 CLASS 1 COMPONENTS SAFETY fMJifdl2!
ASME G
~
SEC. XI NE SUM 4ARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM N0 METN00 PROCEDURE IIIM ** CALIBRATION BLOCK **
6-81 1 330-2501R-1 047400 TBX 14302-2 BJ UT OL ISI 206 R0 X PIPE TO REDUCER 39.11 UT-455 151-206 R0 X .
i SI 1 RB 053 3A UT 605 151 206 R0 X PT ISI 11 R10 X
..,8X. ,
1 8-sI 1 091 2501R 1 1
1 047500 TBX-1 4302 3 BJ UT OL 151 206 R0 X REDUCER TO P!PE B9.11 UT 455 151 206 R0 X SI-1-RB 053 V PT ISI 11 R10 X
- TBM 18**
k 151 206 R0 047600 TBX 1 4302 4 BJ UT OL X PIPE TO ELBOW B9.11 UT 455 Ist 206 RD X
- TBX 18**
047700 TBX 1 4302-5 BJ UT GL ISI 206 R0 X ELBOW TO PIPE B9.11 UT 45$ 151 206 R0 X St 1-RB 053 V PT 151 11 R10 X
- TBK 18**
047800 TBX 1 4302-6 BJ UT OL 151 206 R0 X PIPE TO MOMENT RESTRAINT B9.11 UT-455 ISI 206 R0 X
- TBX 18**
047900 TBX 1 4302-7 BJ UT OL 15I 206 R0 X 89.11 UT 45$ 151 206 RO X MOMENT RESTRAINT TO ELB0W SI 1 RB 053-6 PT 151 11 R10 X
- TBK 18**
l O <
l l . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ J
COMANCHE PEAK UNIT 1 PAGE: 116' DATE: 06/30/89 REV!s!ON: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1984), . PERIOD, BASELINE INTERVAL
/]-
\ /. class 1 COMPONENTS sA.(TV INJECTf0N ASME G f SEC. xl NE
SUMMARY
EXAMINATION AREA' CATCY EXAM NRR0 AEMARKs NUMBER' IDENTIFICATION ITEM No METHOD PROCEDURE IIIM " CALIBRATION BLDCX**
8-s f 1 091 2501R 1 048000 TBr 1 4302 8 dJ UT OL 151 206 RD x SLBOW TO P!PE E9.11 UT 45s 181 206 R0 x s! 1-RB 053-V PT 151 11 R10 X
- TBX 18**
048100 TBx-1 4302 9 BJ UT-OL 151-206 RD x P!PE TO ELBOW 89.11 UT 455 151 206 R0 x
$1 1 RB 053-V PT 151 11 Rio x "T Bx- 18**
048200 TBX 1 4302 10 BJ UT 0L 151 206 R0 x B9.11 UT-455 151 206 R0 x g- ELBOW TO PIPE
! SI 1 RB 053 6 1A PT 151 11 R10 x
- TBX 18**
048300 Tex 1 4302 11 BJ UT OL 151 206 R0 x PIPE TO ELBOW B9.11 UT 455 151 206 RD x s! 1-RB-053-V PT 151 11 R10 x
- TBx 18**
045400 TBx 1 4302 12 BJ UT OL 151 206 R0 x ELBOU 70 PIPE 89.11 UT 455 181 206 R0 X SI 1-RB 053 V PT 151 11 R10 x ,
- TBX 18**
i 048500 TBx 1 4302 13 BJ UT OL 151 206 RO X P!PE TO TEE 89.11 UT 455 151 206 R0 x s! 1 RB 053 7 PT 151-11 Rio x
- TBx 18"
[
(
i -
COMANCHE PEAK UNIT 1 PAGE 117 DATE 06/30/09
- i. REVIS10N 1 PRESERVICE sdSPECTION SUMMART OUTAGE O (1984), PERIOD, BASELINE INTERVAL
, D L' \
SAFETY INJECTION CLASS 1 COMPONENTS AME G
- SEC. XI NE StattARY EXAMINATION AREA CATCY EXAM NRR0 REMARKS NLMBER IDENTIFICAfl0N ITEM No METHOD PROCEDURE IIIN ** CALIBRATION BLOCK'*
2 $1 1-067 2501R-1 048600 TBx 1 4302 14 BJ PT !$1 11 R10 X PIPE TO SOCK 0Ltf BG.32
$1 1-RB-053 V 048700 TBx 1 4302 15 BJ PT ISI 11 R10 X SOCK 0LET TO PIPE B9.40
$1 1 RB 053 4 B-J PT . NQA 3.09 8.10R0 X PT PERFORMED BT TU FOLLOWING REWORK.
048800 TBM 1 4302 16 P!PE TO ELBOW 89.40 SI 1 RB-042 41 k' ISI il Rio X 049900 TBx 1430217 BJ PT ELBOW TO P!PE B9.40 SI 1 RB 042 40A 049000 TBX 1 4302 18 BJ PT 181 11 Rio X P!PE To TEE 39.40 SI 1 RB 042 33 23 BJ PT NQA 3.09 S.10R0 X PT PERFORMED BT TU FOLLOWING REWORK.
049100 TBX 1 4302 19 TEE TO REDUCING INSERT B9.40
$1 1 RB 042 33 3 049200 Tax-1 4302 20 3-J PT !$1 11 Rio X TEE TO PIPE B9.40
$1 1 RB 042 33-1 0
COMANCHE PEAK UNIT 1 PAGE: 118 DATE:? 06/30/09 REVIS10N: 1 PRESERVICE IMSPECTION SUWWtf TN QUTAGE 0 (1984), PERICC, BASELINE INTERVAL CLASS 1 COMPONENTS SAFETY INJECTION ASME G J SEC. XI NE
SUMMARY
EXAMINATION AREA ".ATSY EXAM NRR0 REMARKS NUMBER IDENTIFICAT10h ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
2 SI i 067 2501R 1 049300 TBX 1 4302-21 BJ PT ISI-11 Rio X PIPE TO TEE 39.40 SI 1 RB 042-33A 049400 TBX 1 4302-22 BJ PT ISI 11 R10 X TEE TO REDUCING INSERT B9.40
$1 1-RB 042 42 049500 TBX 1 4302 23 BJ PT 151 11 Rio K TEE TO PIPE B9.40
$1 1-RB 042 32 k-049600 TBK 1 4302 24 BJ PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
PIPE TO VALVE B9.40 S! 1 RB 042 31 8 St i 330-2501R 1 B-G 2 VT 1 151 8 R8FC1 X 049700 TBX 1 4302-8818C VALVE BODY BOLTING B7.70
$1 1 RB 053 1 8818C SNOPS RECORDS USED, SEE RR B
- 049710 TBX 1 4302 8818C BM2 VALVE BODY INTERNAL SURFACES B12.40 SI 1 RB 053 1 8818C 6 St-1 102 2501R 1 049800 TBX 1 4303 1 BJ UT OL 151 206 R0 X VALVE TO PIPE B9.11 UT 455 ISI 206 R0 X S! 1 RB 017 4 PT ISI 11 Rio X
- TBK-5**
6
t .,
t COMANCHE PEAK UNIT.1 PAGE: ~119 DATE: 06/30/B9 '
.. REVISION: - 1 PRESERVICE INSPEC(IGW
SUMMARY
'/^'s OUTAGE O (1984), PERIOD, BASELINE INTERVAL
'b j ; CLASS 1 COMPONENTS q
SAFETY INJECTION i ASME G
~.,
SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS PROCEDURE IIIM **CALIBRAtl0N BLOCK'* :
NUMBER IDENTIFICATION ITEM NO METHOD 6 31 1 102 2501R-1 ]
I 049900 TBX 1 4303 2 BJ UT OL 151 206 R0 X PIPE TO MOMENT RESTRINT B9.11 UT 45$ !$1 206 R0 X j SI 1 RB-017 7 PT 151 11 Rio X l
050200 TBM-1 4303 5 BJ UT OL !S1 206 R0 X ELBOW 70 PIPE B9.11 UT 45$ ISI 206 R0 X SI 1 RB 017 10 PT ISI 11 R10 X
.*TBK 5**
COMANCHE PEAK UNIT 1 PAGE: 120 DATE: 06/30/09 PRESERVICE INSPECT 10N SLpMARY REVISION: 1 QUTAGE D (1964), PERIOD, BASELINE INTERVAL
/~~'
CLASS 1 COMPONENTS SAFETY INJECTION ASME G SEC. XI NE ESMART EXAMINAfl0N AREA CATCY EXAM NRR0 REMARKS tamBER IDENTIFICATION ITEM NO METHOD PROCEDURE II1M ** CALIBRATION BLOCK **
b St 1 102 2501R 1 0$0500 TSX 1 43C3 8 i, J UT-OL 151 206 R0 X '
PIPE TO VALVE 89.11 UT*458 IS! 206 A0 X PT 151 11 R10 X
$1 1 R$.017-13
- TBX 5**
j l l l
_ _ _ _ _ l
1 COMANCHE PEAK UNIT 1 PAGEs. 121 DATEtl 06/30/89 1 PRESERVICE INSPECTION
SUMMARY
A REVISION:
OUTAGE O (1984), PERICS, BASELINE INTERVAL
[
- D' ' CLASS 1 COMPONENTS REACTOR COOLANT
. ASME G SEC. x1 NE
.UMARY EXAMINATION AREA CATGY EELM NRR0 REMARKS I NLMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM **CALIBRAY10N BLOCK
6 RC 1-046 2$01R-1 050600 Tex 1 4303 9 's J UT OL 151 206 RO x VALVE TO PIPE 89.11 UT 455 ISI 206 R0 x SI 1 RB 017 14 PT 151-11 RIO x
- TBX-5**
050700 Tex 1430310 BJ UT OL ISI 206 R0 x Pl?E TO ELBOW 89.11 U1 455 !$1 206 R0 x
$1-1 RB 017 19 PT !$l 11 R10 x
- TBx 5**
050600 Tex 1 4303 11 BJ UT OL ISI 206 R0 x PT PERFORMED BY TU FOLLOWING REWORK.
ELBOW TO PIPE B9.11 UT 455 ISI 206 R0 x
$1 1 RS 017 20 PT NQA 3.09 8.10R0 X
- Tex-5**
050900 Tax 1-4303-12 sJ UT OL 181 206 R0 x PIPE TO BRANCH CONNECTION 39.11 UT 455 IS! 206 RO x SI-1 RB 017-21 PT ISI 11 R10 x l ** Tex 5
- l l
l l
v
L COMANCNE PEAK UNIT 1 PAGE: 122-DATC . 06/30/B9 REVISION: .1 PRESERVICE INSPECTION
SUMMARY
CUTAGE 0 (1984),= PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS l- .
. RAFETY INJECTION ,
ASME G
~
~
$EC.' XI- -NE BUMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS IRMBER IDENTIFICATION ITEM NO IETNOD PROCEDURE .IIIM **CALIBRAfl0N BLOCK **
2 si 1 302 2501R 1 051000 TBK 1 4303 13 BJ PT ISI 11 R10 X P!PE 70 BOCK 0LET B9.32 51 1 RB 017 6 051100 TBK 1430314 B-J PT- 151 11 Rio X SOCKOLET TO PIPE B9.40 s! 1 RB 006-33 BJ PT !st 11 R10 x 051200 Tex 1-4303-15 PIPE TO TEE B9.40 s! 1 RB 006-32
'\ 051300 TBX 1 4303 16 BJ PT ISI-11 Rio X TEE TO REDUCING INSERT 89.40
$1-1 RB-006 34 051400 TBK 1430317 BJ PT 151 11 R10 X TEE TO PIPE 39.40 s! 1 RB 006 31 B-J PT 151 11 R10 X 051500 TBK 1 4303 18 PIPE TO VALVE 39.40 51 1 RB 006 30 6-$1 1 102 250ip-1 051600 Tex 14303 8841B BG2 VT 1 151 8 R8FC1 X VALVE BCDY BOLT!NG B7.70
$1 1 RB 017 1 BB41B
COMANCHE PEAC UNIT 1 PAGEs 123 DATE: 06/30/89 reb!FION: 1 PRESERVICE INSPECTION SUMMART QUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
/~~ '
k CLASS 1 COMPONENTS SAFETY INJECTION AM G SEC. XI NE SLMIARY EXAMINATION AREA CATGY EXAM NRR0. REMARKS NLMBER IDENTIFICATION ITEM NO METHOD' PROCEDURE .IIIM **CALIBRAfl0N BLOCK **
6 St.1 102 2501R-1
. 1
$NOP RECORDS USED, SEE RR B 1.
051610 TBK 1 4303 88418 6M2 VALVE INTERNAL BURFACES 812.40 SI 1-RB 017 1 8841B j
051700 TBK 1 4303 8949C B G-2 VT 1 ISI 6 R8FC1 X VALVE BODT BOLTING B7.70
$1 1 RB 017 1 8949C SHOP RECORDS USED, SEE RR B 1.
051710 TBK 1 4303-8949c s-N-2 g
VALVE BODY IETERNAL SURFACES B12.40 .
SI 1 RB-017 1 8949C O i, I
t r
l 1
- _ - _ _ . _ _ _ _ . - _ _ _ - _ _ _ - _ . 1
+
COMANCHE PEAK (JNIT 1 PAGE: 124 DATE: 06/30/B9 REVISION: 1 PRESERVICE INSPECTION SUMMART
.O QUTAGE 0 (1984), PER! 2 , BASELINE INTERVAL N CLASS 1 COMPONENTS REAC10R COOLANT
, ASME G SEC. XI NE SUMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
3-RC 1052 2501R 1 051800 TBx-1 4304 1 BJ PT 151 11 R10 X BRANCH CONNECTION TO P!PE B9.21 RC-1 RB-005 1 051900 TBx 14304 2 BJ PT ISI 11 R10 X
' P!PE TO ELBOW B9.21 RC 1 RB 008 2A 052000 Tex 1 4304 3 3J- P1 151 11 Rio X ELBOW TO P!PE 89.21 RC 1 RB 008 3 k BJ PT 151-11 Rio x 052100 TBx 1 4304 4 PIPE TO ELBOW 89.21 ac-1 RB 008 4 052200 Tex 1-4304 5 BJ PT 151 11 Rio x ELBOW TO P!PE B9.21 RC 1 RB 008-5 052300 TBx 1 4304 6 3J PT ISI 11 R10 X PIPE TO ELBOW 39.21 RC 1 RB 005 6 052400 Tex 1 4304 7 BJ PT ISI 11 R10 x ELBOW TO PIPE B9.21 RC 1 RB 008 7 i l
l 4
l l
1 l
_ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _J
r I
r
-DATE: 06/30/09 COMANCHE PEAK uu!T 1 PAGE: "125 L . .REVISIONf 1 PRESERVICE INSPECTION
SUMMARY
.O QUTAGE O (1964), PER100, BASELINE INTERVAL
> CLASS 1 COMPONENTS REACTOR COOLANT
)
ASME- G l ~
SEC. XI NE SLMMARY EXAMINATION AREA CATGY EXAM NRR0 ' REMARKS NLMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM **CALIBRAT10h BLOCK **
3-RC 1 052-25018 1- j 052500 TBX 1 4304 8 BJ PT ISI 11 R10 X PIPE TO ELBOW 89.21 RC 1 RB 008-8 052600 TBX 1 4304
- BJ PT 151 11 R10 X ELBOW 70 PnPE B9.21 RC 1-RT 008 9 052700 TBX 1 4304 10 3J PT 151 11 R10 X PIPE To TEE 89.21 RC 1 RB 006 10 j r
052800 TBX 1-4304-11 3J PT 151-11 R10 X TEE TO P!PE 89.21 RC 1 RB 006 18 052900 TBX 1 4304 12 B.J PT 131 11 R10 X P!PE TO ELBOW 99.21 RC 1 RB 008 19 053000 TBX 1 4304 13 3J PT 151 11 R10. X ELBOW TO PIPE B9.21 RC 1 RB 006-205 053100 TBX 1 4304 14 BJ PT IS! 11 R10 X P!PE TO VALVE 89 21 RC 1-RB 008 21
. - - _ _ _ _ _ _ _ _ _ - - . - _ = _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ - _ _ -
COMANCHE PEAK UNIT 1 PAGE: 126 DATE: 06/30/B9
' REVISION: 1 PRE 3ERVICE INSPECTION
SUMMARY
i' OUTAGE O (1964), PERIOD, BASELINE INTERVAL
-gj, CLASS 1 COMPONENTS REACTOR COOLANT ASME G
- SEC XI NE SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIN " CALIBRATION BLOCK" 3 Re 1 052-2501R 1 053200 TBX 1 4304-15 BJ PT 151-11 R10 X VALVE TO P!PE 89.21 RC 1 RB 006 22A 053300 TBX 1 4304 16 8J PT 151-11 R10 X PIPE TO ELBOW 09.21 RC-1 RB 008 23A 053400 TBX 14304-17 B*J PT 151 11 R10 X ELBOW TO P!PE 09.21 RC 1 RS 006 26
/**
(
053500 TBX 1430418 ,
BJ PT 151 11 R10 X P!PE TO P!PE 89.21 RC 1 RB 006-25 053600 TBX 1 4304-19 BJ PT 151 11 Rio X PIPE To ELBOW 89.21 CS*1 RB 038A 2 053700 TBX 1 4304 20 BJ PT 151 11 R10 X ELBOW TO P!PE 89.21 CS 1 RB 038A-3 053800 TBX 1 4304 21 8J PT 151+11 R10 X P!PE TO ELB0W 89.21 CS 1 RB 038A 4 i
't s
CCMANCHE PEAK UNIT 1. PAGE: 127
.DATE: 06/30/89 REv!SION: 1 PRESERVICE INSPECTION
SUMMARY
DUTAGE 0 (1984), PERIOD, BASELINE INTERVAL j: ', .
! CLASS 1 COMPONENTS gg87dQR COOLANT ASME G J SEC. XI NE sumARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
3 RC 1-052 2501R.1 053900 TBX.1 4304 22 BJ PT 151 11 R10 X ELBOW TO P!PE B9.21 CS 1 RB 038A 5A 054000 TBX 1 4304 23 . BJ PT 181 11 Rio X PIPE TO ELBOW B9.21 CS 1 RB 038A 6 054100 TBN 1 4304 24 BJ PT !st 11 Rio X ELBOW TO PIPE 89.21 -
CS-1 RB 038A 7
.' 051200 TBX 1 4304 25 BJ PT NDE-300 R2 X PT PERFORMED BY TU FOLLOWING REWORK.
P!PE To VALVE B9.21 CS 1 RB-038A 8 054300 TBX.1 4304 8085 B-G 2 VT ISI-8 R8FC1 X VALVE BODY BOLTING B7.70 RC 1-RB 006 1 8085
.= - _ _ _ _ . - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
l.
COMANCHE PEAK UNIT 1 PAGE: 178 :
DATE:- 06/30/89 REVISION: 1 PRESERVICE IN$PECTION $UMMARY OUTAGE O (1984), PERIOD, BASELINE INTERVAL
/* c l
( .
CHEMICAL 8 VOLUME CONTROL CLASS 1 COMPONENTS ASME C SEC. XI NE Eps4ARY EXAMINATION AREA CATGY EXAM N R R 0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION SLOCK**
l t
3 Cs 1 235-2501R-1 054400 TBX 1 4304 26 ' BJ PT ist 11 R10 X VALVE TO PIPE B9.21-C5 1 RB 038A-9 p-J PT 151 11 R10 -X 054500 tex 1 4304 27 j
PIPE 70 VALVE 89.21 C$ 1 R8 0388 17 054600 TsX 1 4304 LCV 459 0-G-2 VT 1 ISI 8 R8FC1 X VALVE toDY BOLTING B7.70 CS 1 RS-0388 1LCV459 054700 TBX 1 4304 LCV-460 sG2 - VT 1 Is! 8 R8FCi x VALVE BODT BOLTING B7.70 Cs 1 RS 038A-1LCV460 1
a l
l PAGE: 129 DATE: 06/30/89' COMANCHE PEAx UNIT 1 -
PRESERVICE INSPECTION
SUMMARY
. CVIS10N: 1 OUTAGE 0 (19M ), PERIOD, BASELINE INTERVAL
,I class 1 COMPONENTS U
REACTOR C00LAN{
m G
~. NE SEC. x1 CATGY EXAM NRR0 REMARx5 SUMMART EXAMINATION AREA ITEM NO METHOD PROCEDURE Ii1M ** CALIBRATION BLOCx**
NUMBER IDENTIFICATION j;
l 1 RC 1 159-2501R-1 BJ PT !$1 11 R10 x 054800 TBx-1 4305 1 BRANCH CONNECTION TO RCDUCER 39.21 RC 1 RB-032 25 1.5-RC.1 057 2501R-1 BJ PT !$1 11 RIO x 054900 TBx 1-4306 1 BRANCH CONNECT!0W 70 REDUCER 89.21 SI 1 RB-027 12 BJ PT !$t-11 R10 x 055000 TBx+1 4306-2 89.21
'A ' REDUCER TO ELBOW i St.1 RB 027 11 BJ PT !$! 11 R10 x 055100 TBx 1 4306 3 ELB0W TO P!PE 89.21 S! 1 RB-027-10 BJ PT ISI 11 RIO x 055200 TBx 1 4306 4 PIPE TO ELBOW 59.40 SI-1 RB 027 9A BJ PT ISI 11 R10 x 055300 TBx 1 4306 5 ELBOW 70 PIPE 89.40
$! 1 RB 027-8 BJ PT !$! 1. R10 x 055400 TBx 1 4306 6 PIPE TO VALVE 89.40
$1 1 R8 027 7 b
l l
DATE:' 06/30/89. COMANCHE PEAK UNIT 1 PAGE: 130 'I REVISION: 1' PRESERVICE INSPECTION BUMMARY GUTAGE O (1984), PERIOD, BASELINE IP TERVAL g CLASS 1 COMPONENTS .,
)
SAFETY INJECT 10W -
)
I ASME G A SEC. XI. 'NE BLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS !
l NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
1.5 sf 1 201 2501R 1 1 055500 TBX 1 4306 7 BJ PT 181 11 R10 X VALVE TO PIPE 89.40 SI 1 RB 027 6 055600 TBX-1 4306 8 BJ PT ISI 11 R10 X PIPE TO ELBOW B9.40
$1 1 RB-027-5A l
055700 TBX-1 4306 9 BJ PT ISI 11 R10 X ELBOW 70 PIPE B9.40 1
SI 1 RB 027 4 055800 TBX-1 4306 10 BJ PT 151 11 R10 X I
PIPE TO ELBOW 39.40 11 1 RB 027 3 055900 TBX 1-4306 11 BJ PT !$1 11 Rio X ELBOW TO P!PE 39.40 SI 1 RB 027 2 056000 fBX 1 4306 12 BJ PT 151 11 Rio X PIPE TO ELBOW B9.40 SI 1 RB 027 1 4 056100 TBX-1 4306 13 BJ PT 181 11 R10 EL90W TO PIPE B9.40 SI-1 RB 027 1 3 k
O
, DATE: 06/30/B9 COMANCNE PEAK UNIT 1 PAGE: 131 REVISION: ~ 1' PRESERVICE INSPECTION
SUMMARY
- QUTAGE O (1984), PERIOD, BASELINE INTERVAL
.\ CLASS 1 COMPONENTS SAFETY INJECT 10W ASME G
-' SEC. XI NE SIAMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM N0 IETHOD PROCEDURE I!!M ** CALIBRATION BLOCK **
1.5-81 1201-2501R 1 056200 TBX 1 4306 14 3J PT IS! 11 Rio X PIPE TO ELBOW 89.40
$1 1*RB-027 1*2A 056300 TBX 1 4306 15 BJ PT 151-11 R10 X ELBOW 70 PIPE 59.40
$1 1 RB 027 1 1B 056400 TBM 1-4306 16 3J PT 90A 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORC' .
P!PE TO ELB W 89.40 SI 1 RB 027 1A r
f B-J PT NQA 3.09-8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
056500 TBX-1-(306 17 ELBOW 70 PIPE 59.40
$1 1 R8 026 14 056600 TEX 1-4306 18 BJ PT N0A 3.09 8.10R0 X PT PERFORMED BY TQ FOLLOWING REWORK.
PIPE TO ELBOW 59.40 51 1 R8 026 13 2 056700 TBM 1 4306 19 BJ PT 151 11 R10 X ELBOW TO PIPE 59.40
$1 1 RB 026 13 1 BJ PT NQA 3.09-8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
056800 TBX 1 4306 20 P!PE TO VALVE 89.40 SI 1 RB 026 13 .
l
--_--___m. _ _ _ _ _ _ . _ _ _ _
I l PAGE: 132 DATE: 06/30/89 COMANCHE PEAK UNIT 1 l-REVISION: 1 PRESERVICE INSPECTION
SUMMARY
l _
OUTAriE 0 (1984), PERIOD, BASEllWE INTERVAL j [( j]
l .
CLASS 1 COMPONENTS l' - SAFETY INJECTION 1.
ASME G
- SEC. XI NE SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM NO METH00 PROCEDURE IIIM ** CALIBRATION BLOCK" 1.5 $1 1-027 2501R-1 BJ PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
056900 Tex 14306 21 VALVE TO PIPE 89.40 SI 1 RB 026-12 057000 TBx-1 4306-22 B.J PT ISI 11 R10 X PIPE TO FLANGE B9.40
$1 1 RB 026-11 l
057100 TBX 1 4306 23 5J PT !$1 11 R10 X FLANGE TO P!PE 89.40 SI 1 RB 026-4 bi if 057200 TBx 1-A306-24 B-J PT PIPE TO COUPL!NG B9.40
$1 1 Ra 026 3 2A BJ PT NQA 3.09 8.1DRO X PT PERFORMED BY TU FOLLOWING REWORK.
057300 TBM 1 4306 25 COUPLING 70 P!PE 89.40
$1 1 RB 026 3 1 NoA 3.09 8.10R0 X PT PERFORMED BY 1U FOLLOWING REWORK.
057400 TBX 1 4306 26 BJ PT PIPE TO ELBOW 59.40 SI 1 RB 026-38 BJ PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
057500 TBX 1 4306 27 ELBOW TO PIPE B9.40
$1 1 RB 026 1B i
(
COMANCHE PEAK UNIT 1 PAGE: 133
- DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
QUTAGE 6 (1984), PERIOD, BASELINE INTERVAL f~~
( .RAFETY INJECTION CLASS 1 COMPONENTS ASME G
~~
SEC. XI NE CATGY EXAM NRR0 REMARKS CLWiARY EXAMINAfloh AREA NUMBER IDENTIFICAfl0N ITEM No METHOD PROCEDURE IIIM " CALIBRATION BLOCK ** ~
1 1.5 $1-1 027 2501R 1 fi BJ PT NQA 3.09-8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
057600 'TBX 1 4306-28 PIPE TO ELBOW 89.40
$1 1 RB 026 2C I
BJ PT NOA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWo"RK.
057790 TBX 1 4306 29 ELBOW TO PIPE B9.40 SI 1 RB 043 11 BJ PT NQA 3.09 8.10R0 X PT PEKFORME0 BY TU FOLLOWING REWORK.
057800 TBX 1 4306-30 PIPE TO ELBOW 89.40 SI 1 RB-043 10-2 f PT PERFORMED BY TU FOLLOWING REWORK.
057900 .TBX 1 4306-31 BJ PT NoA 3.09-8.10R0 X ELB0W TO P!PE 89.40 SI 1 RB 043 10 1 058000 TBX 1-4306 32 BJ PT NoA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
P!PE TO TEE 89.40 SI 1 RB 043 10 8J PT NQA 3.09 8.10R0 X PT PERF0P.MED SY TU FOLLOWING REWORK.
058100 TBK 1 4306 33 TEE TO REDUCING INSERT 89.40
$1 1 RB-043 12 BJ PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
058200 TBX 1 4306 34 TEE TO PIPE B9.40 SI 1 RB 043 9A
\
COMANCNE PEAK UNIT 1 PAGE: 134
- DATE: ' 06/30/89 REVIS10N: 1 PRESERVICE INSPECTION SUMMART
(~N OUTAGE O (1964), PERIOD, BASELINE INTERVAL I
\, CLASS 1 COMPONENTS PFETY INJECTION A3ME G
~;
SEC. XI NE RSMARY EXAMINATION AREA CATGY. EXAM NRR0 REMARKS EMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
1.5 SI 1-027 2501R 1 058300 TBx-1 4306 35 BJ PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
. PIPE TO COUPLING 89.40
$1 1 RB 043 8A 058400 TBx 1 4306-36 BJ PT IS!*11 R10 X COUPLING TO P!PE B9.40 SI 1 RB 043 7 058500 TBX 1 4306 37 BJ PT ISI 11 R10 X P!PE TO COUPLING 89.40
$1 1 RB 043 6 1
058600 TBx 1 4306-38 BJ PT 181 11 Rio X COUPLING TO PIPE B9.40 SI 1 RB 043 5 058700 TBx 1 4306 39 BJ PT !st 11 Rio X P!PE TO ELBOW 89.40 SI 1 RB 043 4 l 058800 TBx 1*4306 40 BJ PT 181 11 Rio X ELBOW TO P!PE B9.40
$1 1 RB 043 2A
(
t
~
COMANCHE PEAK UNIT 1 PAGE: 135
.a DATES:_06/30/89 REVISION: i ,
PRESERVICE INSPECTION
SUMMARY
CU1'GE 0 (1984), PERIOD, BASELINE INTERVAL
/
() - SAFETY INJECTION CLASS 1 COMPONENTS ASME G SEC. XI NE IlsetART EXAMINATION AREA CATGY EXAM NRR0 REMARKS IRMBER IDENTIFICATION ITEM No METNOD PROCEDURE IIIM ** CAL! BRAT 10N BLOCK'*
7 1.5 St 1 027 2501R 1 059000 TBX 1 4306 42 BJ PT ISI 11 Rio X ELBOW To PIPE 89.C
.$1 1-RB 043 1 059100 TBX 1 4306-43 .8 J PT ISI 11 R10 X PIPE To COUPLING 89.40 SI 1-RB 044-9-2 059200 TBX 1 4306 44 5J PT !$1-11 Rio X COUPLING TO PIPE 89.40
$1 1 RB 044 9 1
/~
l NQA 3.09-8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
059300 TBX 1 4306 45 BJ PT PIPE TO COUPLING 89.40 SI-1 RB 044 9 050400 TBX 1 4306-46 3J PT 151 11 Rio X COUPLING TO PIPE B9.40
$1 1 RB 044 8 059500 TBX 1 4306 47 BJ PT ISI 11 Rio X P!PE TO COUPLING 89.40
$1-1 RB 044 7A 059600 TBX 1 4306 48 BJ PT 151 11 Rio X COUPLING TO PIPE 89.40 SI 1 RB 044 6 2 I
i O
i u . _ _ _ - - - _ _ - _ - - _ - _ _ _ _ - _ _ _ _ _ _ _ _ - _
DATE: 06/30/89 COMANCHE PCAK UNIT 1 ~PAGE: 136 REVIS10N: 1 PRESERVICE INSPECTION SLMMARY OUTAGE O (1984), PERIOD, BASELINE INTERVAL
!/ T CLASS 1 COMPONENTS SAFETY INJECTION ASME C SEC. XI NE SLMMARY EXAMINATION ARE CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICAfl04 ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
1.5-$1 1 027-2501R-1 059700 TBx 1 4306 49 BJ PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
$1 1 RB 044 6-1 059B00 TBx 1 4306 50 BJ PT WQA 3.09-8.10R0 X PT PERFORMED BT TU FOLLOWING RE @RK.
COUPLIMG TO PIPE 89.40 SI 1 RB 044 6 059900 TBX 1 4306-51 BJ PT 151 11 R10 X P!PE TO COUPLING B9.40 SI 1 AB 044 5
( j 060000 TBx 1430652 B*J PT 151 11 Rio X COUPLING TO PIPE B9.40 l 51 1 RB 044 4 060100 TBX 1-430643 BJ PT 151 11 R10 X PIPE TO COUPLING B9.40
$1 1 R8 044 3 060200 TBx 1 4306-54 BJ PT IBI.11 Rio X d
COUPLING TO P!PE 89.40 St.1 RB 044 2 060300 TBx 14306 55 BJ PT 151-11 Rio X PIPE TO CXUPLING B9.40 l' SI 1 RB 044 1 3 ,
1 v
i
- - - - - - - - - - - - . . - - - - _ . _ ._ l
- ) '
COMANCHE PEAK UNIT 1 PAGE: 137 DATE: .06/30/89 l REVISION: 1 PRESERVICE INSPECTION
SUMMARY
l '
OUTAGE D (1984), PER!cD, SASELINE INTERVAL .
l (y: CLASS 1 COMPONENTS SAFETY INJECTION 1
ASME G J I
SEC. XI NE SUMARY EXAMINAT!DN AREA CATGY EXAM NRR0 REMARKS
.NUMOER IDENTIFICATION . ITEM No ME1N00 PROCEDURE IIIM ** CALIBRATION BLOCK **
\
l 1.5 St 1 027 2501R-1 i 1
l 060400 T8X 1 4306 56 8J PT !$1 11 R10 X COUPLING TO PIPE B9.40 SI 1 RS 044 1 2 060500 TBM 1 4306 57 sJ- PT ISI 11 R10 X PIPE TO REDUCER 89.21 SI 1 RB 044 1 1 060600 TBX 1 4306 FLANGE #1 3-G 2 VT 1 151-8 R8FC1 X FLANGE 80LTING B7.50 SI 1 RB 026 FLG 1 ;
f
\
}
I i
4 l
I
(
DATE:'06/30/89 COMANCHE PEAK UNIT 1 PAGE: 138 REVISION: 1 PRESIRVICE INSPECT 10W
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPOWENTS
'. {
b REACTOR COOLANT ASIE G
~
SEC. XI NE SUDMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
2-RC 1 053-2501R 1 060700 TBX 1 4307 1 BJ PT 151 11 Rio X TEE TO P!PE B9.21 RC 1-RB 006-11 060800 TBX 1 4307 2 BJ PT 151 11 R10 X PIPE TO ELBOW B9.40 RC 1 RB 006-12 060900 TBX 1 P 07 3 BJ PT 151 11 R10 X ELBOW TU P!PE 39.40 RC 1 RB 006 13 A
061000 TBX 1 4307 4 BJ PT 151 11 R10 X PIPE To VALVE B9.40 RC 1 RB 006 14 061100 TBM 1 4307 5 BJ PT 151 11 Rio x VALVE TO PIPE B9.40 RC-1 RB 006-15 061200 TBX 1 4307-6 BJ PT ISI 11 R10 X PIPE TO VALVE 89.40 RC 1 RB 006 16A 27.5 RC 1 042 WEST-1 061300 TBX 1 4308-1 3J PT 181 11 R10 X BRANCH CONNECTION 10 PLUG B9.40 RC 1 520 001 43 f
1 I
COMANCHE PEAK UNIT 1 PAGE: 139 DATE: 06/30/89 REVISIOMs. 1 PRESERVICE INSPECTION SUMMART
.-\s [_ ' ,
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS l l
CHEMICAL & VOLUME CONTROL J ASME G SEC. XI NE Sule4 ART EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
1 h};q1-jp43-2501R-1 061400 TBX 143091, BJ PT 151 11 R10 X RC PLMP N0ZZLE TO FLANGE B9.21 CS 1-RB 001 V l
061500 TBX 1-4309 2 BJ PT !$1 11 R10 X FLANGE To P!PE B9.21
-CS 1 RB-001 213 061600 TBX-1 4309 3 3J PT 151 11 R10 X PIPE TO REDUCER 39.21 CS 1 RB 001 20
(
iv =
2 CS-1-107 2501R 1 061700 TBX 1 4309 4 3J PT 151-11 R10 X REDUCER TO ELBOW B9.21 CS 1 RB 001 19 061800 TBX 14309 5 BJ PT 151 11 ato X ELBOW TO PIPE 89.21 CS 1 RB 001 18A 061900 TBX 1 4309 6 5J PT 151 11 R10 X PIPE TO ELBOW 89.21 CS 1 RB 001 17B 062000 TBX 1 4309 7 B*J PT 151-11 Rio X ELBOW TO PIPE 39.21 CS 1 RB 001 16A
COMANCNE PEAK UNIT 1- PAGE: 140 DATE: 06/30/09
. CVISION! 1 PkESERVICE INSPECTION SLSMARY I CUTAGE O (1984), -PERIOD, BASELidE INTERVAL
\ class 1 COMPONENTS CNEMICAL & VOLtME CONTROL ASME G
~.
SEC. XI NE SemART EXAMINATION AREA CATGY EXAM NRR0 REMARKS tIIM **CALIBAAtl0N BLOCK'*
gamBER c 3 IDENTIFICATION ITEM No METMOD PROCEDUR[
2 C$-1 107-2501R-1 062100 TBX 1 4309-8 BJ PT 181 11 R10 X PIPE TO TEE 89.21 Cs 1 RB 001 15-2 062200 .TBX 1 4309-9 BJ PT' 151 11 Rio X TEE TO PIPE 89.21 Cs 1 RB 001 15 1 062300 TBM 1 4309 10 BJ PT ISI-11 Rio X P!PE 70 P!PE B9.21 CS 1 RB 001 15 4
,0
'w) 062400 TBM 1-4309 11 BJ PT ISI-11 R10 X PIPE TO ELBOW B9.21 Cs 1 RB 001 158 062500 TBX 1 4309 12 5J PT. !$1-11 R10 X PIPE TO TEE 39.21 CS 1 RB 001 13 BJ PT 151 11 R10 X EXAMINED AFTER REWORK.
l 062600 TBX 1 4309 13 TEE TO PIPE 89.21 CS 1 RB 001 12A 062700 TBM 1 4309 14 BJ PT ISI-11 Rio X EXAMINED AFTER REWORK.
P!PE TO VALVE 89.40 l
l
{ . _ - - __ - _-_______
PAGE: 141 COMANCHE PEAK UNIT 1 DATE: 06/30/89 PRESERVICE INSPECT 10N
SUMMARY
REVIS10N: 1 73 I OUTAGE 0 (1984), PERs00, BASELINE INTERVAL
(
CLASS 1 COMPONENTS ENICAL 8 VOLtME CONTROL ASME G
~_
SEC. XI NE CATGY EXAM NRR0 REMARKS StMARY EXAMINATION AREA ITEM NO METHOD PROCEDURE IIIN ** CALIBRATION BLOCK **
NLMBER IDENTIFICAT!DN -........................................
2 cS 1 107 2501R 1 151 11 R10 X EXAMINED AFTER REWORK.
062800 TBM 1 4309 15 BJ PT VALVE TO PIPE 89.40 CS 1 RB 001 10A ISI*11 RfD X EXAMINED AFTER REWORK.
062900 TBX 1 4309 16 B.J PT PIPE TO VALVE BT.40 CS 1 RB 001 9 1 151 11 Rio X EMAMIMED AFTER REWORK.
063000 TBM 1 4309-17 BJ PT ELBOW TO PIPE 89.21 CS-1 RB 001-148 pm iN Ist 8 RAFC1 X 063100 TBK 1-4309 FLANGE #1 BG2 VT 1 FLANGE BOLTING B7.50 CS 1 RB 001 FLG. 1 r
f
..g PAGE: 142 DATE: 06/30/89 COMANCHE PEAK UNIT 1 REVISION: 1 PRESERVICE INSPECT!uN IA8 MARY QUTAGE D (1984), PERIOD, BASELINE INTERVAL jA CLASS 1 COMPONENTS
}
REAtt0R COOLANT ASME G
-~ SEC. XI NE
SUMMARY
EXAMINAT!0N AREA CATGY EXAM N R R 0 ' RE%RKS NLMBER IDENTIFICATION ITEM N0 METHOD PROCEDURE II1M " CALIBRATION BLOCK" 29-RC-1 058 WEST 1 BF AUT*0L 151 154 R1 X 601 NOT EXAMINED WITH AUT 41L, 063200 TBX 1 4400 1-RPV N0Z2LE TO SAFE END B5.10 AUT 41L 151 154 R1 X SUPPLEMENTED WITH AUTOMi.TED FROM INE ID MUT OL ISI 206 RO X TO ACN! EVE 100% COVERAGE, SEE RR B 5. 2 RC 1 520 001 V IRJT 41L ISI 206 R0 X Al'8 DETECTED WITH AUT 41L (ACCEPTABLE).
5J UT OL ISt 206 R0 X IEK NOT EXAMINED WITN 41L, SEE RRB 10 063300 TBK 1 4400-2 SAFE END TO PIPE 59.11 UT 41L .151 206 R0 X RC 1 520 001 25 PT 151 11 R10 X
- TBK 2**
_ fi 063400 TBK 1 4400-3 i PIPE TO REDUCING ELBOW 89.11 UT 41L 151 206 Rfi X RC 1 520 001 V PT 151 11 R10 X "TBX 2**
BF UT OL 151 206 RD X 51 NOT EXAMINED WITH 41L, SEE RR B 8.
063500 TBX 1 4400-4 B5.30 UT 41L !$1 206 RD X ?T PERFORMED BY TU FOLLOWING REWORK.
REDUCING ELBOW TO SG N0ZZLE PT NDE 300 R2 X SAFE END RC 1 520-001 26 "TBX 2" '
31 RC 1-059-WEST 1
$1 NOT EXAMINED WITH 41L, SEE RR B 8.
063600 TBK 1 4400 5 BF UT OL 151-206 RD X B5.30 UT 41L 151 206 R0 X PT PERFORMED BY TU F% LOWING REWORK.
SG N0ZZLE SAFE END TO ELBOW PT NDE-300 R2 X RC-1 520 001-27
- TBX 2**
l I
063700 TBX-1 4400-6 BJ UT OL 151 206 R0 X B9.11 UT 41L 151 206 R0 X ELBOW TO PIPE RC 1 520-001 28 PT !$1-11 Rio X "TBX 2"
i 3
PAGE: 143 DA7El' 06/30/89 COMANCHE PEAK UNIT 1' I
-REVISION: 1 PRESERVICE INSPECTION SUSIARY' OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
\[*) _ CLASS 1 COMP 0MENTS REACTOR COOLANT ASME G
~
~
SEC. XI NE sapIART EXAMINAT!DN AREA CATGY EXAM KRR0 REMAAXS ESSEk IDENTIFICAfl0N ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
31-Re t-059-WEST 1 BJ UT OL 151 206 RO X 0636tl0 TBK 14400 7 PIPE TO ELBOW 89.11 UT-41L 151 206 R0 X PT 151 11 R10 X RC 1 520 001 v "TBK 2**
063900 TBK-1 4400 8 BJ UT OL 151 206 R0 X ELBOW TO P!PE 89.11 UT 41L !st 206 RD X RC 1520-00129 PT 151 11 R10 X
- TBK-2**
064000 TBX 1 4400 9 BJ UT OL 151 206 R0 X P!PE TO ELBOW B9.11 UT 41L 151 206 R0 X RC 1 520 001.V PT 151 11 R10 X
- TBK 2**
06410D TBX 1*4400 10 BJ UT OL ISI 206 R0 X B9.11 UT 41L 151 206 RD X ELBOW To RC PUMP SUCTION PT 151 11 R10 X N0ZZLE RC-1 520 001 30 "TBM2" 27.5-Rc 1 060-WEST-1 BJ UT OL 151 206 R0 X 064200 TBX 1 4400 11 59.11 UT 41L 151 206 R0 X RC PUMP DISCHAGE N0ZZLE TO P!PE PT 151 11 Rio X RC 1 520 001 31
..ygx .2" UT OL 151 206 R0 X 064300 TBK 1 4400 12 B.J UT 41L !$1 206 RD X
- 1PE TO ELN)W B9.11 PT 151 11 R10 X RC 1 520-001 V
- TBX 2**
N l
DATE:.06/30/89 COMANCNE PEAK UNIT 1 PAGE: 144 REVIS10N 1 PRESERvlCE INSPECTION SUIMARY
[ N[ OUTAGE D (1984), PERIOD, BASELINE INTERVAL
(/ CLASS 1 COMPONENTS flEACIDE .CQDLANT ASME C
""~
SEC. XI NE SLMMARY EXAMINATION AREA CATGT EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIN ** CALIBRATION BLOCK **
27.5 RC-i-060 WEST 1 5-J UT OL ISI 206 RD X 501 NOT EXAMINED WITH 41L, SEE RR B 10.
064400 TBX-1 4400 13 89.11 UT 41L !$1 206 RO X PT PERFORMED ST TU FOLLOWING REWORK.
ELBOW TO SAFE END RC 1 520-001 32 PT NQA 3.09 8.10R0 X
- TBX 2**
B-F Auf 0L ISI 154 R1 X 601 NOT EXAMINED WITH MUT 41L, 064500 TBK 1 4400 14 B5.10 AUT 41L ISI 154 R1 X SUPPLEMENTED VITH AUTOMATED FR34 THE ID SAFE END TO RPV N0ZZLE MUT OL !$1 206 R0 X To ACNIEVE 100% COVERAGE, SEE RR B 5.
RC 1 520 001 V MUT 41L 181 206 R0 X PT 151 11 R10 X **TBK 2**
p 29-RC i-058 WEST _1 064600 TBK 1 4400 15 B*J PT s41 11 R10 X SEE RR B 10.
P!PE TO BRANCH CONNECTION 39.31 RC 1 520 001 V 064700 TBX 1 4400 16 5J PT 181 11 R10 X SEE RR B 10.
BRANCH CONNECTION TO PIPE 89.31 RC 1 520-001 V 1
31.RC 1 059 WEST-1 BJ PT 181 11 R10 X SEE RR B 10.
064800 TBX 1 4400 17 PIPE TO BRANCH CONNECTION 39.31 RC-1 520 001 V 064900 TBX 1 4400 18 BJ PT ISI 11 R10 X PIPE TO BRANCH CONNECTION 39.32 RC 1 520-001 V l l
1 V
E DATE: ~06/30/89 COMANCHE PEAK UNIT 1 PAGE: 145 (
. CVISION: 1 PRESERv!CE INSPECTION BL9 MARY ;
m.
OUTAGE O (1984), PERIOD, BASELINE INTERVAL j l/ '
V CLASS 1 COMPONENTS PEACTOR COOLANT AM G SEC kl NE BUMMARY EXAMINATION AREA CATGY EXAN. NRR0 REMARKS NLMBER IDENTIFICAT10W ITEM NO METHOD PROCEDURE I I'l M ** CALIBRATION BLOCK **
27.5 RC-1 060 WEST 1 065000 TBK 1440019 BJ PT ISI 11 Rio X PIPE TO BRANCH C3NNECT10N 09.32 RC 1 520 001 v 065100 TBK 1 4400 20 BJ PT 151 11 R10 X SEE RR B 10.
PIPE TO BRANCH CONNECTION 39.31 RC 1 520-001 V 065200 TBX 1 4400 21 BJ PT 151 11 Rio X SEE RR B 10.
PIPE TO BRANCH CONNECTION 09.31 RC 1 520-001 V f
(
b D65300 TBX 1 4400 22 BJ UT OL 151 206 R0 X 40% NOT EXAMINED WITH 41L, SEE RR B 10.
PIPE TO BRANCH CONNECTION 39.31 UT*41L ISI 206 R0 X RC 1 520 001 V PT 151 11 Rio X eeigg.2**
065400 TBX 1 4400-23 BJ PT 151 11 R10 X SEE RR B-10.
P!PE TO BRANCH CONNECTICN 39.31 RC 1 520-001 v 12 Re 1 069 2501R 1 065500 TBK 1 4401 1 BJ UT OL 151 206 R0 X BRANCH CONNECTION TO PIPE B9.11 UT-45s 151 206 R0 X RC 1 RB 006 1 PT ICl 11 Rio X
- TBM 12**
065600 TBK 1 4401 2 BJ UT OL 151 206 R0 X PIPE TO ELBOW 89.11 UT 455 181 206 R0 X RC 1 RB-006 V PT 151 11 R10 X
- TBX 12**
l I
l
7, l
PAGE: 146 DATE: 06/30/fl9 - COMANCHE PEAK UNIT 1 PRESERVICE INSPECTION SU N ,RT REVISION: 1 OUTAGE O (1984), PERIOD, BASELINE INTERVAL
- /N. -
o , 1
.( /
CLAS$ 1 COMPOWENTS REACTOR COOLANT l.
ASME G
! SEC. XI NE CATGY EXAM NRR0 REMARKS SLReuRT EXAMINATION AREA NLRGER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE IIIM **CAllDRAil0N BLOCK **
17 RC i-069 2501R 1 065700 TBX 1-4401 3 BJ UT OL !st 206 R0 X ELBOW TO PIPE 59.11 UT 455 ist 206 R0 X PT 181 11 R10 X RC 1 RB 006 V
- TBX 12**
151 206 R0 X PT PERFORMED B1 TU FOLLOWING REWORK.
065800 TBX 1 4401-4 BJ UT OL UT 45s 151 206 RO X P!PE TO ELBOW 59.11 PT WQA 3.09-8.10R0 X RC 1 RB 006-V
- TBX 12**
065900 TBX 1 4401 5 B.J UT OL !$l 206 RO X 89.11 UT-455 151 206 R0 X g ELBOW TO PIPE PT ISI 11 R10 X RC 1 RB 006 V
-( **TBX 12**
25% NOT EXAMINED WITH 455, SEE RR B 10.
066000 TBX 1 4401 6 8J UT OL !$l 206 R0 X UT 45s 151 206 R0 X PIPE To VALVE 59.11 PT 151 11 R10 X RM-1 RB-002 1
- TBX-12**
COMANCHE PEAK UNIT 1 PAGE: 147 DATE: 06/30/89 PRESERVICE INSPECTION
SUMMARY
, Q REvill0W: 1 DUTAGE D (1984), PERIOD, BASELINE INTERVAL
,[ .
CLASS 1 COMPONENTS V
RESIOUAL NEAT REMOVAL ASME G
~_
SEC. XI NE CATGY EXAM NRR0 REMARKS
' BusetART EXAMINATION AREA ITEM NO METHQ PROCEDURE II1M ** CALIBRATION BLOCK **
IRaSER IDENTIFICATION ........................................
12-RM-1-002-2501R 1 X 251 wof EXAMINED WITH 45$, SEE RR B 10.
BJ UT OL 151 206 R0 066100 TBK 1-4401 7 VALVE TO PIPE 89.11 UT 458 ISI 206 R0 X PT 151 11 R10 X RM 1 RB 002 2
- TBX 12**
151 206 R0 X 066200 TBX-1 4401 8 BJ UT OL P!PE TO ELBOW 89.11 UT 45S ISI 206 R0 X PT 181 11 Rio X RM-1 RB 002 2 1
- TBK 12**
151 206 R0 X 066400 TBX 1-4401 10 BJ UT OL UT 455 151 206 R0 X P!PE TO ELBOW 89.11 RM-1 R9 002 V PT ISI 11 R10 X
- TBX 12"
?11 206 R0 X 066500 TBX 1 4401 11 BJ UT OL UT 455 181 206 R0 X ELBOW TO PIPE B9.11 RM 1 RB 002 V PT ISI 11 R10 X
- TBX 12**
l X 25% NOT EXAMINED WITH 45S, SEE RR B-10.
BJ UT OL 151 206 R0 066600 TBX 1 4401 12 l PIPE TO VALVE 59.11 UT 455 ISI 206 R0 X RM 1 RB 002 5A PT ISI 11 R10 X
- TBX 12**
l
(
l L -- -- __
COMANCHE PEAK UNIT 1 ~ PAGE: 148 DATE: 06/30/09
'REV1810N: 1 PRESERVICE INSPECTION
SUMMARY
,r ;
OUTAGE O (1984), PERIOD, BASELINE INTERVAL
' CLASS 1 COMPONENTS
.s V .REllDUAL MEAT REMOVAL ASME G'
-' SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRRO REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE I.1 I N ** CALIBRATION BLOCK **
17 RM-1 002-2501R 1 B G-2 VT-1 151 8 R8FC1 X 066700 TBX 1 4401 87018 VALVE BODY BOLTING B7.70 RM 1 RB 002 1 87015
~
B-M 2 SHOP RECORDS USED, SEE RR B 1.
066710 TBX 1 4401 8701B VALVE BODY INTERNAL SURFACES B12.40 RM 1*RB 002 1 8701B 066800 TBM 1 4401 87028 BG2 VT 1 ISI 8 R8FC1 X VALVE BCDY BOLTING B7.70 RM 1 RB 002 1 8702B -
0 066810 TBX 1 4401 87025
' VALVE BODY INTERNAL SURFACES 812.40 BM2 SHOP RECORDS USED, SEE RR B 1.
RM 1 RB-002 1 8702B I
k L_ _ _ _ _ _ _ _ _ _ _ .
i COMANCNE PEAK UNIT 1 PAGE: 149
'DATE: 06/30/89
. REVISION: 1 PRESERVICE INSPECTION
SUMMARY
QUTADE O (1964), PERIOD, BASELINE INTERVAL j
CLASS 1 COMPONENTS g
- SEC. XI NE SubMART EXAMINATION AREA CATOY EXAM NRR0 REMARKS NLMBER IDENTIFICATION' ITEM Wo METN00 PROCEDURE IIIM ** CALIBRATION BLOCK'*
10-RC i 078-250iR 1 066900 TBX 1 4402 1 BJ UT OL 151 206 RO X' BRANCN CONNECTION TO ELBOW 89.11 UT 45S ISI 206 R0 X SI 1 RB 0388 17 PT !$1 11 R10 X
- TBX 9**
067000 TBK 1 4402 2 BJ UT OL 151 205 R2A3 X PART3AL UT, SEE RR B-10.
ELBOW TO PIPE B9.11 UT 455 !$1 205 R2A3 X SI-1 RB 0388 V PT !$1 11 R9A3 X VT !$1 8 R7A1 X
- TBX-9**
, g 067100 TBX 1 4402 3 3-J UT-OL 151 206 R0 X i PIPE TO ELBOW 89.11 UT 455 151 206 R0 X SI 1*RB 0385-V PT !$1 11 R10 X
- TBK 9**
067200 TBX 1 4402 4 BJ UT-OL 151 206 R0 X ELBOW TO PIPE 59.11 UT-455 !$1 206 RD X SI 1 RB 0388 V PT !$1 11 R10 X
- TBX 9**
BJ UT OL 151 205 R2A3 X PARTIAL UT, SEE RR B 10.
067300 TBX 1 4402 5 P!PE TO ELBOW 89.11 UT 455 !$1 205 R2A3 X SI 1 RB 0388 V PT ISI 11 R9A3 X VT ISI 8 R7At X
- TBX 9**
067400 TBX 1 4402-6 BJ UT OL !st 205 R2A3 X PARTIAL UT, SEE RR B 10.
ELBOW TO PIPE 89.11 UT 45$ ISI 205 RZA3 X l $1-1 RB-0388-V PT ISI 11 R9A3 X l VT !$1 8 R7A1 X i
- TBX 9** I L 1 s
\ _ _ _ - - -
COMANCHE PEAK UNIT 1 PAGE: 150 DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
TA - 00TAGE D (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS PEACTOR COOLANT ASME G
-' SEC. XI NE SUMARY EXAMINAfl0N AREA CATGY EXAM NRR0 REMARKS NLSIBER IDENTIFICATION ITEM NO METN00 PROCEDURE IIIM ** CALIBRATION BLOCK **
10 RC 1 078-2501R.1 -
BJ UT OL 1S1 205 R2A3 X PARTI AL UT, SEE RR B 10.
067500 TBX 1 4402 7 PIPE TO VALVE B9.11 UT 45S 151 205 R2A3 X SI 1 RB 0385 11 PT ISI 11 R9A3 X VT 151 8 R7A1 X
- TBX-9** .
l l
l i
l l
b t
COMANCHE PEAK UNIT 1 PAGE: 151 DATE: 06/30/89 REVIS10N: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL p
CLASS 1 COMPONENTS D')SAFETYINJECTION ASME G
- SEC. XI NE
~
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS kUMBER IDENTIFICATION ITEM No ' METHOD PROCEDURE IIIN **CALIBRAT!0M BLOCK **
10 St 1 182 250141 B-J UT OL 151 205 R2A3 X PARTIAL UT, SEE RR B 10.
067600 TBX 1 4402-8 VALVE TO PIPE 89.11 UT 45S ISI 205 R2A3 X
$1-1 RB 0380 10 PT ISI 11 R9A3 X VT ISI 8 R7A1 X
$1 1 RB-038B v PT !$1-11 R9A3 X VT ISI 8 R7A1 X
. **TBX 9**
BJ 151 205 R2A3 X PARTIAL UT, SEE RR B 10.
/ s*7800 TBX 1-4402 10 UT OL ISI 205 R2A3 X ELBOW TO PIPE 89.11 UT-45S S! 1 RB-038B V PT ISI 11 R9A3 X VT ISI 8 R7A1 X
067900 TBX 1 4402 11 PIPE TO TEE B9.11 UT 455 !$1 205 R2A3 X SI 1-RB-038B v PT ISI 11 R9A3 X i
VT ISI-8 RA71 X
- TBX 9" )
068100 TBX 1 4402-13 BJ UT OL 131206 R0 X PIPE TO ELBOU B9.11 UT 455 151206 R0 X
$1-1 RB-038B V PT ISI 11 Rio X "TBX 9" r
r j
l l
l l
l 1
- - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ w
PAGE: 152 DATE:' 06/30/89 COMANCHE PEAK UNIT 1 REVIS10N,1 1 PRESERVICE INSPECTION SUMMART OUTAGE O (1984), PERIOD, BASELINE INTERVAL
('] CLASS 1 COMPONENTS
(./ '
- SAFETY INJECTION ASME C
~,
SEC. XI NE SL.DIMARY EXAMINATION AREA . CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
10-SI 1 182 2501R_1 BJ UT OL 151 206 RO X 068?00 TBX 1 4402-14 ELBOW TO PIPE 89.11 UT-455 151 206 R0 X SI 1 Re 0388 V PT Isl.11 R10 X
- TBX 9**
06830', TsX 1 4402 15 8-J UT OL 151 206 R0 X P!PE TO VALVE 89.;1 UT 455 151 206 RD X St.1 RB 0385 9 PT !$1-11 R10 X
- T8X 9'*
s G-2 VT 1 151 8 R8FC1 X 068400 tex 1-4402 8948D A VALVE BODY BOLTING B7.70
) S!-1 RB-0388 1 89480 X SHOP RECORDS USED, SEE RR B 1.
068410 TBX 1 4402 8948D B-M ?
VALVE BODY INTERNAL SURFACES 817.40 SI-1-Re 0388 1 8948D 3-G 2 151 8 R8FC1 X 068500 tex 1 4402 8956D VALVE BODY BOLTING B7.70
$1 1 RS 0388 1 89560
$NOP RECORDS USED,SEE RR B 1.
068510 TBX 1 4402 89560 3M2 VALVE BODY INTERNAL SURFACES 512.40 51 1 Re 0388 1'89560 -
1 6-Sf 1 092 2501R 1 068600 TBX 1 4403 1 3J UT-OL 151-206 R0 X VALVE TO PIPE B9.11 UT 45$ 15! 206 R0 X
$1 1 RB 033 4 PT 151-11 Rio X eeygg.$e.
- y
- a J
PAGE: 153 i
-DATE: 06/30/89 COMANCHE PEAx UNIT 1 REVIs!ON: 1 PRESEkVICE INSPECTION
SUMMARY
PERIOD, BASELINE INTERVAL 1 j OUTAGE O (1984),
class 1 COMPONENTS
. (7~ $AFETT INJECTION
-j 1
J AsME G '
"' SEC. XI NE simMARY EXAMINATION AREA CATCY EXAM NRR0 REMARKS NUMBER ~ IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6 sf 1-092-2501R-1 068700 TBX 1 4403 2 BJ UT OL 151 206 R0 x PIPE TO MOMENT RESTRAINT 89.11 UT 45s 151 206 R0 x
$1 1 RB 033-12 PT !s! 11 R10 x eeigx.$n 068800 TBM 1 4403 3 BJ UT OL Is! 206 R0 x MOMENT RESTRAINT To ELBOW 89.11 UT 45s 181 206 R0 x
$1 1 R8-033 13 PT 151 11 R10 X
- TBx 5**
068900 TBX 1 4403 4 BJ UT OL 151 206 R0 x ELBOW TO PIPE 89.11 UT 45$ 181 206 R0 x s!-1 RB 033-14 PT 151 11 R10 x 4 ~TBx-5**
v 069000 TBx 1 4403 5 B-J UT OL 151 206 to x P!PE To ELBOW B9.11 UT 45s Is! 206 R0 x s! 1 RB 033 15 PT 151 11 R10 x
.**TBx 5**
069100 TBx 1-4403 6 B-J UT OL ISI 206 R0 X ELBOW TO PIPE 09.11 UT 45$ 151 206 R0 X s!*1 RB-033 16 PT Is! 11 R10 X eeigg.$u BJ IEl 206 R0 X 10% NOT EXAMINED WITH 455, SEE RR B 10.
069200 TBx 1-4403 7 UT OL PIPE TO ELBOW 89.11 UT 458 151 206 RD X s! 1 RB 033 17 PT !st 11 R10 x
- TBx 5"
COMANCHE PEAK UNIT 1 PAGE: 154 DATE L 06/30/89 REVISION: ~1 PRESERVICE INSPECTION
SUMMARY
, [~} OUTAGE O (1984), PERIOD, BASEllWE INTERVAL class 1 COMPONENTS
'()
SAFFTY INJECTION AME C SEC. X1 NE submARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METH00 PROCEDURE IIIM " CALIBRATION BLOCK **
6-51 1 092 2501R 1 069300 TBX 1 4403 8 B-J UT OL 151 206 R0 X ELBOW TO PIPE 89.11 UT-45s 1s1 206 R0 X s! 1 RB 033 18 PT 151 11 R10 X
069600 TBX 1 4403 11 BJ UT OL 151 206 R0 X PIPE TO ELBOW 89.11 UT 45$ 181 206 R0 X s! 1 RE 0385 2 PT 181 11 Rio X
- TBX 5" 069700 TBX 1 4403 12 BJ UT-OL 1s! 206 R0 X i
ELBOW TO P!PE 89.11 UT 455 !$1 206 80 X
$1 1 RB 0388 3 PT Is! 11 R10 X
. 1BX.5..
BJ UT OL !$1 206 RO X PT PERFORMED BY TU FOLLOWING REWORK.
069800 TBX 1 4403 13 PIPE TO P!PE B9.11 UT 45s 1st 206 R0 X
$1 1 RB 038B 3 1 PT NDE 300 R2 X
- TBX-5" O
. ._ _ _ _ _ _ _ _ _ _ - . . _ . _ _ - _ . - - - _ _ _ - . _ - _ - = - . - _ _ . - - -. - . _ _ . _ -. - - - . -_ _
DATE: 06/30/09 COMANCHE PEAK UNIT 1 PAGE: 155 REVI510N: 1 PRESERv!CE INSPECTION SUM ART OUTAGE O (1984), PERICS, BASELINE INTERVAL CLASS 1 COMPONENTS
(% SAFETY INJECTION ASIE G
- SEC. x1 NE
SUMMARY
ExAMINAfl0N AREA CATCY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METH00 PROCEDURE IIIM **CALIBRATIDH BLOCK'*
6-sf 1 092 2501R-1 069900 TBx-1 4403 14 BJ UT OL ISI-206 R0 x PT PERFORMED BY B&R FOLLOW!Nis REWORK.
PIPE TO TEE 99.11 UT 45s 151-206 R0 x SI 1 RB 038B 4A PT QI eAP 10.2 1R1 x l
- TBK-5** {
2-s! 1 069 2501R 1 070000 TBx 1 4403 15 B-J PT 151 11 R10 X P!Pi TO SOCK 0LET B9.32 SI 1-RB 033 11 070100 TBx 1 4403 16 0J PT 151 11 R10 x
$0CKOLET TO P!PE B9.40
$1 1 RB 008 27 070200 TBx 1 4403 17 BJ PT 151-11 Rio X PIPE TO ELBOW 59.40
$1 1 RB-008 47 070300 TBX 1 4403 18 BJ PT ISI-11 R10 X ELBOW TO P!PE B9.40
$1 1 RB-008 46 070400 TBX 1 4403 19 BJ PT 151 11 R10 x PIPE TO ELBOW 89.40
$I 1 RB 008 45 070500 TBx-1 4403 20 BJ PT ISI 11 R10 x ELBOW TO PIPE B9.40 St 1 RB 008 44
COMANCHE PEAK UNIT 1 PAGE: 156 DATE: 06/30/89-REVIS!0Ns ,1 PRESERvlCE INSPECTION
SUMMARY
QUTAGE O (1984), PERIOD, BASELINE INTERVAL j
y ASME G
.: SEC. XI NE SlastARY EXAMINAfl0N AREA CATGY EXAM NRR0 REMARKS NLpqBER IDENTIFICATION ITEM No METHOD PROCEDURE. IIIM ** CALIBRATION BLOCK'*
2 $1 1 069-2501R 1 BJ PT 151 11 R10 X 070600 TBX 1 4403 21 PIPE TO ELBOW 89.40 St.1 RB 006-48
+
BJ PT 151 11 R10 X 070700 TBX 1-4403 22 ELBOW TO P!PE 59.40 SI 1-RS 000 49 070800 TBX 1 4403 23 5-J PT 151 11 R10 X PIPE TO VALVE $9.40
$1 1 R6 006 24 O
f 6 St 1 092 2501R 1
~070900 TBX 1-4403 8810D BG2 VT 1 NQA 3.09-8.52R0 X VALVE BODY BOLTING B7.70
$1 1 RS 033 1 88180 SHOP RECORDS USED, SEE RR B 1.
070910 TBX 1 4403-88180 B M-2 VALVE BODY IKTERNAL SURFACES B12.40 SI 1 RB-033 1 88180 l
COMANCHE PEAK UNIT 1 PAGE 157
.DATE: 06/30/89' REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL Ad class 1 COMPONENTS REACTOR COOLANT
. ASME C SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER' 10ENTIFICATION ITEM No METHOD PROCEDURE IIIM " CALIBRATION BLOCK
6 RC i 070 2501R 1 071000 TBx t 'd41 BJ PT 151 11 Rio x SEE RR B 10.
PIPE TO WELDOLET B9.31 RC 1 RB 006 V
V
. _ _ = - _ _ - . ._ -.___ -____-_ _
C(MANCHE PEAK UNIT 1 -PAGE: 158 DATE:. 06/30/B9
' REVISION:- 1~ PRESERVICE INSPECT 10N
SUMMARY
CUTAGE D (1984), PERICD, BASELINE INTERVAL
[4. _ f
- 1 1 COMPONENTS
- b. REACTOR COOLANT ASME C
.,- SEC. XI. NE
SUMMARY
EXAMihAfl0N AREA CATCY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No MET!G PROCEDURE IIIM **CAllBRAfl0N BLOCK **
6-Rc.1-070 2501R 1 071600 TBN 14404 7 .. B J UT OL 151 206 R0 X PIPE To VALVE 39.11 UT-45s 151-206 R0 X RC 1 RS 006 11A PT !$1-11 R10 X
- TBx-5**
g COMANCHE PEAK UNIT 1 PAGE:' 159
-DATE:. 06/30/B9 REVISION: 1 PRESERv!CE INSPECTION
SUMMARY
OUTAGE O (1964), PERIOD, BASELINE INTERVAL
[] CLASS 1 COMPONENTS
(/ SAFETY' INJECTION ASME G
- ' SEC. XI NE Su MARY EXAMINAT!ON AREA CATGY EXAM NRR0 REERKS NUMBER IDENTIFICATION ITEN No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6-SI 1-172 2501R 1 071700 TBX 1 4404 8 BJ UT 0L 151-206 RD X VALVE TO PIPE B9.11 UT 45$ 181 206 R0 X PT 151-11 R10 X
$1 1 RB-013 4 e TBX 5**
BJ UT OL 151 206 RD X 071800 TBX 1 4404-9 PIPE To REDUCER 59.11 UT 455 151-206 R0 X S! 1 RB-013 3 PT 151 11 Rio X
- eigx.5**
2 SI 1 066 2501R-1 C BJ ISI 11 R10 X i J71900 TBX 1*4404 10 PT REDUCER TO PIPE 09.21
$1-1 RB 013 2A 072000 TBX 1 4404 11 BJ PT 151 11 Rio X PIPE TO PIPE B9.21 SI-1 RB 013 1 4 BJ PT 151 11 R10 X l 072100 TBX 1 4404 12 PIPE TO PIPE B9.21 SI 1 RB 013 1 3 072200 TBX 1 4404 13 B-J PT I$1 11 R10 X PIPE TO PIPE B9.21 Sl 1 RB 013 1 l l
072300 TBX 1 4404 14 BJ PT 151 11 R10 X PIPE TO PIPE 89.21 SI 1 RB-013 1 2 i l
-"--------.-m___-___m___ _ _ _ _ _ _ _ _ _
i s
j i
DATEt 06/30/89 COMANCNE PEAK UNIT 1 PAGE: 160 REVISION: l' PRESERVICE INSPECTION
SUMMARY
f OUTAGE O (1984), PERIOD, BASELINE INTERVAL _l
. X
.$ CLASS 1 COMPONENTS SMETY INJECTION ASME G I SEC. XI NE SuletARY EXAMINAfl0N AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEN NO METN00 PROCEDURE IIIM ** CALIBRATION BLOCK **
1 2-SI 1-086 2501R 1 072400 TBx 1 4404 15 BJ PT ISI-11 R10 X PIPE 10 P!PE B9.21 SI 1-RB 013 1 1A 072500 TBx-1 4404 16. BJ PT ISI 11 Rio X PIPE TO TEE 89.21 SI 1 AB 013-44A 072600 TBx 1 4404 17 BJ PT ISI 11 R10 X REDUCING INSERT TO COUPLING 89.40 SI 1 RB 015 47 l
k 072700 TBx 1 4404-18 B-J PT 151 11 R10 X COUPLING TO PIPE 89.40 St-1 RB 01$ 46 072800 TBX-1 4404-19 B-J PT ISI 11 R10 X PIPE TO TEE 89.21 SI 1 RB 015 45 072900 TBx 1 4404 20 BJ PT 151 11 Rio X TEE TO PIPE 89.21 SI-1 RB 015 43 073000 TBx 14404 21 5J PT 151-11 R10 X PIPE TO TEE 89.21
$1 1*RB 015-42 l
l 1
l t___________ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ . _
1.
' COMANCHE PEAK UNIT 1 PAGE: 161 DATES: 0640/89-REVISION: ' 1 PRESERVICE INSPECTION SUDMART I OUTAGE O (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS
(_/
SAFETY INJECTION ASME G
- SEC. XI NE.
SUMMART EXAMINAfl0N AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
2 SI 1 086 2501R.1 073100 Tex 1 4404-22 3J PT ISI.11 R10 X REDUCING INSERT TO COUPLING 39.40 St.1 RB 015 38 5J PT 181 11 R10 X 073200 TBX 1-4404-23 COUPLING TO P!PE B9.40 St.1 Re 015 37 073300 TBx 1 4404 24 B-J PT 151 11 Rio X PIPE TO TEE 89.21 St.1-Re 015 36 h
A. BJ PT 151 11 R10 X 073400 Tex.1-4404 25 TEE TO P!PE B9.21 SI 1 as 015 35A 073500 'TBX 1 4404 26 sJ PT ISI.11 R10 X PIPE TO MOMENT RESTRAINT' B9.40
$1 1-R8 015 63 073600 TBM 1 4414 27 BJ PT ISI.11 R10 X MOMENT RESTRAINT TO P!PE B9.40
$1 1 RS 015 62A 8J PT 151 11 RIO X 073700 TBX 1-4404 28 PIPE TO VALVE B9.40
$1 1 RB 015 33 1
- l. -
- r. j
.\
COMANCHE PEAK UNIT 1 PAGE: 162
- DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECT!0N SLMMART DUTAGE D (1984),- PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS
,(
% SAFETY INJECTION -4 ASME G l
- SEC. XI NE
SUMMARY
EXAMINAfl0N AREA CATGY EMAM NNR0 REMARKS NLMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
6 SI 1 172 2$01R 1 ,'
073800 TBX 1 4404 89490 .BG2 VT 1 IS! 8 R8FC1 X VALVE BCDY BOLTING '37.70 SI 1 RB 013 1 89490 I
B-M 2 SHOP RECORDS USED, SEE RR B 1.
- 073810 Tax 1 4404 89490 VALVE BODY INTERNAL SURFACES B12.40
$1 1 RB 013 1 89490
(
1
)
E DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE:: 163 REVISIONI 1 PRESERVICE INSPECTION SUMMART IN OUTAGE D (1984),_ PERIOD, BASELINE INTERVAL k CLASS 1 COMPONENTS
' REACTOR COOLANT ASME G SEC. XI NE SL884 ART EKAMINAft, UtEA CATGT EXAM NRR0 REMARKS i NLMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
....... .............................. ....... .......... ............... .... ........................................ i 3-RC 1 076 250 g;1 073900 TBK-1 4405-1 BJ PT ISI-11 Rio X BRANCH CONNECTION TO PIPE W.21 CS 1 RB 023 22 074000 TBX-1 4405 2 3J PT 131 11 Rio X PIPE TO ELBOW B9.21 CS-1-RB 023 21 074100 TBX 1 4405 3 BJ PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
ELBOW TO PIPE 89.21 CS 1 RB 023 20
(' 074200 TBK 1 4405 4 3J PT 151-11 Rio X P!PE TO ELBOW 89.21 CS 1 RB 02319 074300 73x 1 4405 5 BJ PT Ist 11 R10 X ELBOW TO PIPE 89.21 CS-1 RB 023 18 074400 TBK 1 4405-6 8J PT 151-11 R10 X PIPE TO VALVE 89.21 CS 1 RS 023 13 c
k
-. DATES' 06/30/B9 - ' COMANCHE PEAK UN!T 1- PAGE:' in g
REVISION: 1 PRESERVICE INS *ECTION
SUMMARY
,P. MITAGE O (1964), PER'. % BASELINE INTERVAL CLASS 1 COMPONENTS
- CMEM! CAL & VOLtME CONTROL ASME G
-* SEC. x1 NE SL8 MARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS
. NLMBER IDENTIFICATION 1iEN No METHOD PROCEDURE' IIIM **CALIBRAT10N 3 LOCK'*
3 CS 108131gja:1
-074500 Tex 1 4 05 7 BJ PT NGA 3.09 8.10a0 x PT PERFORMED BY TU FOLLOWING REWORK.
VALVE TO PIPE . 39.21 CS 1 RB-023 12 074600 78x 1405 8 BJ PT !$1 11 210 x P!PE TO VALVE B9.21 l
CS 1 RB-023 11
' 074700 . Tex 1 uo5-85784 BG2 VT 1 ISI 8 R8FC1 x VALVE Bet BOLTING B7.70 CS 1 RB 023 1 8378A A
i -1
-V 074a00 TBx 1 u05 as70B BG2 vt 1 181-6 RarC1 x i
VALVE BW T BOLTING B7.70 CS 1 RB 023 1 8370s 1
i i
1 l
f j
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: ' 165 C V!SION: 1 PRESERVICE INSPECTION
SUMMARY
CUTAGE O (1984), PERIOD, BASELINE INTERVAL
~ /N -
'( CLASS 1 COMPONENTS f.'
.: SEC. XI NE SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS WUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM "CALiptATION BLOCK **
1 RC 1 160 2501R 1 074900 TBX 1 4406 1 8J PT !$1 11 R10 X BRANCH CONJ'CTION TO REDUCER 89.21 RC 1 RB 030 13 1.5-RC 1 079-2501R-1 075000 TBX 1 4407 1 BJ PT 151 11 R10 X BRANCH CONNECTION TO REDUCEt 89.21 SI 1 se-022 16 075100 TBX 1 4407 2 BJ PT ISI 11 Rio X REDUCER 70 EL90W 89.21
$1 1 RB 022 15
)
i 075200 TBX 1 4407 3 B-J PT 151 11 Rio X ELBOW TO PIPE B9.21 St-1 Re 022 14 075300 TsX 1 4407 4 BJ PT 151 11 Rio X 39.40 l PIPE TO ELB0W
$1 1 RB 022 13A l
075400 TBX 1 4407 5 sJ PT NQA 3.09 8.10RO X PT PERfDRMED BY TU FOLLOWING REWORK.
ELBOW TO PIPE B9.40 l I
SI 1 RB 022 12 075500 TsX 1 4407 6 sJ PT ISI-11 R10 X P!PE TO VALVE B9.40
$1 1 R8 022 11 i
N.
5 4 s) l l
l l
l
____m____ _ _ _ _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _
DATE: 06/30/89' COMANCHE PEAK UNIT 1 PAGE: '166 I
g . .. REVISION! 1 PRESERVICE INSPECTION SUPMARY 5)O'. %.j .
DUTAGE V (1984), PER100, BASELINE INTERVAL CLASS 1 COMPONENTS SAFETY INJECTION ASME G
- NE SEC. XI
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS INMBER IDENTIFICATION ITEM No METHOD PROCEDURE 111M ** CALIBRATION BLOCK **
i 1.5-St.1-202 2501R-1 075600 TBX 1 4407 7 B-J PT ISI 11 R10 X VALVE TO PIPE 89.40 SI 1-RB-022 10 I
^
075700 TBX 1 4407-8 BJ PT I$!.11 Rio X j PIPE TO ELBOW 89.40
$1 1-RB 022-9 1 075800 TBX 1 4407-9 B-J PT !$1-11 R10 X ELBOW TO PIPE B9.40 .
$1 1 RB 022 8 k
075900 TBX 1-4407-10 BJ PT ISI 11 Rio X ,
PIPE TO ELBOW B9.40
$1 1 RB 022 7 076000 TBX 1 4407 11 BJ PT 151 11 R10 X ELBOW 70 P!PE 89.40
$1-1 RB 022 6.
076100 TBM 1 4407 12 BJ PT ISI-11 Rio X PIPE TO COUPLING B9.40 SI 1 RB 022 5 076200 TBX 1 4407 13 BJ PT !$1 11 R10 X COUPLING TO P!PE B9.40 SI 1 RB-022 4 1
v l
t
COMANCHE PEAK UNIT 1 PAGE: 167 DATE: 06/30/89
' REVIE10N: PRESERVICE INSPECTION
SUMMARY
p 1 jj -
g
\
SAFETY INJECTION OUTAGE O (1984), PERICO, BASELINE INTERVAL.
CLA$$ 1 00MPONENTS
- 1. O
- AsME
..- SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM' NRR0 REMARKS NUMBER.-IDENTIFICATION ITEM NO METHOD PROCEDURE- 1IIM ** CALIBRATION BLOCK **
1.5 s! 1-207-2501R.1 076300 1BX 1-4407 14 - BJ PT 151-11 R10 X PIPE TO ELBOW 99.40 s! 1 RB 022-3 076400 TBX 1 4407-15 BJ PT 151 11 R10 X ELBOW TD PIPE B9.40
$1-1 RB 022 076500 TBX 1 4407-16 Il J PT !$l*11 R10 X P!PE TO ELBOW 39.40
$1 1 RB 022-1 9
( 076600 TBX 1-4407 17 B-J PT 151 11 R10 X ELBOW TO PIPE 89.40 SI-1 RB 021 238 076700 TBX 1 4407 18 BJ PT Ist 11 R10 X PIPE TO VALVE B9.40 st 1 RB 021 24A 1.5 sf-1 028-2501R 1 076800 TBX 1 4407 19 3J PT 151 11 R10 X VALVE TO PIPE 89.40 SI 1 RB 021 29A 0'16900 TBX 1 4407 20 3J PT 151 11 R10 X PIPE TO FLAWGE B9.40 51-1 RB 021 28A O
rs m.
PAGE: 168 DATE:,06/30/89 COMANCHE PEAK UNIT 1 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
DUTAGE O (1984), PERIOD, BASELINE INTERVAL
-/ .
b, CLASS 1 COMPONENTS i
SHETY INJECTION. .I i
1 ASME G i
SEC. XI NE 1 SubMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM NO ETHOD PROCEDURE 11IM ** CALIBRATION BLOCK **
1.5 $1 1 028-2501R 1 077000 TBX 1 4407 21 BJ ' PT NQA 1.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK. 1 FLANGE TO PIPE B9.40
$1 1-RB 021 30 077100 T9x-1 4407 22 B-J PT 151-11 R10 X P!PE TO REDUCER 89.21 SI 1 RB 021 34 077200 TBX 1-4407 FLANGE #1 8G2 VT 1 !$1 8 R8FC1 X FLANGE BOLTING B7.50 SI 1 RB 021 FLG.1 UlD.
__ ___________._._________________.____m_ _ _ _ . . _ _ _ . . . _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . . _ _ . _ . _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _
DATE: 06/30/09 COMANCHE PEAK UNIT 1 PAGE: 169 REvls!ON:- 1 PRESERYlCE INSPECTION SUMMART DUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLA$$ 1 COMPONENT 5
[ V REACTOR COOLANT ABME G SEC. XI NE BLMMARY EXAMINATION AREA'. CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATI0t ITEM No METHOD PROCEDURE I1IN "CALIBRAfl0N BLOCK" 2-RC 1 072-250it 1 077300 TBK-1 4408-1 BJ PT 151 11 R10 X BOCK 0LET TO PIPE 89.40 WP 1.RB 003-14 077400 TBK 1 4408-2 BJ PT 151 11 R10 X P!PE TO ELBOW 99.40 WP-1 RB-003 15 CTT500 TBX 1 4408 3 B+J PT 181 11 R10 X ELBOW TO P!PE 89.40 WP 1 RB 003 16A
(
\ 077600 TBK 1-4408-4 BJ PT I$1 11 Rio X PIPE TO ELBOW B9.40 WP 1 RB-003 16 1 077700 TOX 1 4406-5 BJ PT 151 11 R10 X ELGOW 10 PIPE 189. 4 0 WP.1.RB 003 16-2 077800 TBK 1 4408 6 6J PT IEl 11 R10 X PIPE 70 VALVE 99.40
. WP 1 RB-003-17 077900 TBK 1 4408 7 BJ PT 7$l-11 R10 X VALVE TO P!PE B9.40 WP 1 RB-003 18
\
i
)
COMANCHE PEAK UNIT 1 PACE: 170 DATE: 06/30/89 REVislON: 1- PRESERVICE INSPECTION SUMMART OUTAGE 's (1984), PERICO, BASELINE INTERVAL G aEACTOR COOLANT CLASS 1 COMPONENTS ASME G
~
SEC. XI NE CATCY EXAM NRR0 REMARKS
SUMMARY
EXAMINATION AREA ITEM NO METHOD PROCEDURE I11M ** CALIBRATION BLOCK ** j NUMBER' IDENTIFICATION l
2-cC 1 07c' -dO1R-1 l i
NDE 300 R2 X PT PERFORMFS BY TU FOLLOWING REWORK.
078000 TBx 1 4408 8 B-J PT l
PIPE TO ELBOW B9.40 WP-1 RB-003 18 1 151 11 R10 X 078100 TBx 1 4408-9 BJ PT ELBOW TO PIPE B9.40 WP 1 RB 003 18 2 078200 Tax 1 4408 10 B-J PT ISI 11 Rio X PIPE To TEE 89.40 WP-1 RB-003-19A 90 07830 TBX-1 4408 11 TEE 10 REDUCING INSERT B-J 89.40 PT NQA 3.09-8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
WP 1 RB 003 23 078400 TBx 1-4408 12 BJ PT 151-11 Rio X TEE TO PIPE 89.40 WP 1-RB 003 20A 078500 TBX 1 4408 13 BJ PT 151 11 Rio X PIPE To ELBOW 09.40 WP 1 RB 003-20-1 B-J PT 151 11 R10 X 078600 TBx 1 4408 14 ELBOW TO PIPE B9.40 WP-1 RB 000 20 2 0
_ . ~ ~ - - - - - - - - - - - - _ _ _ _ _ _ _ _ ____
4 i ,
PAGE: 171-COMANCHE PEAK UNIT 1
- DATE: 06/30/89
- ~1 PRESERVICE INSPECTION
SUMMARY
REVISION:
QUTAGE O (1984), . PERIOD, BASELINE INTERVAL i .-
. CLASS 1 COMPONENTS.
D '#EACTOR. COOL M 1 ASME G
- - SEC. XI NE
-CATGY OUW NRR0 REMARKS
SUMMARY
EXAMINAfl0N AREA ITEM Wo ETHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
NLMBER IDENTIFICAflee 2 RC-1 072-2501R 1
~ ~
.8 J PT 15I 11 R10 X.
' 078700. TSX 1 4408 15 P!PE TO VALVE- 89.40 WP 1 RS-003 21-27.5 Rc i-060-WEST 1 078800 TBR 1-4409 1 8J PT Ist 11'R10 X 3 RANCH CONNECTION TO PLUG 89.40 RC 1 520 001 44 1
I 1
i
.m. .. _.________.______;
COMANCHE PEAK UNIT 1 FAGE 172 DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL i
(N 1' CLASS 1 COMPONENTS.
.tv-CHEN! CAL & VOLUME CONTROL '
ASME G
~
SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EKAM NRR0 REMARKS NLMBER' IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
1.5 CS 1-244 2501R-1 078900 TBM 1-4410 1 B-J PT 151 11 Rio X PUMP N0Z2LE TO FLANGE B9.21 CS 1 RB 003-v 079000 TBX 1 4410-2 BJ PT ISI 11 Rio .- X FLANGE TO PIPE 39.21 CS 1 RB 003 18 079100 TBM 1 4410-3 BJ PT ISI-11 Rio X PIPE TO ELBOW B9.21 CS 1-RB 003 17 0 079200 Tex 1 4410 4 ELBOW TO PIPE B-J B9.21 PT 151-11 Rio X CS 1 RB-003 16 079300 TBx 1 4410-5 BJ PT 151-11 R10 x PIPE TO ELBOW B9.21 CS 1-RB 003 15A 079400 TBX ,1 4410-6 5-J PT 151 11 R10 X ELBOW TO PIPE 89.21 CS 1 RB 003 14A 079500 TBK 1 4610 7 B-J PT 151 11 R10 x PIPE To REDUCER B9.21 CS 1 AB 003 13 l-
[
1 \s
Yl l
!. DATE: 06/30/89 - COMANCHE PEAK UNIT 1 PAGE: 1 73
. REVIS10N: 1 PRESERVICE INSPECTION
SUMMARY
CUTAGE O (1984), PERIOD, BASELINE INTERVAL
}-
l-- ( f' CLASS 1 COMPONENTS I CNENICAL & VOLUME CONTROL ASME G
- NE SEC. XI'
SUMMARY
EXAMINAfl0N AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE !!IM ** CALIBRATION BLOCK **
2 CS 1 109 2501R 1 079600 TBX 1 4410 8 2J PT- 151 11 R10 X REDUCER TO P!PE B9.21 CS 1 RB-003 12 079700 TBX 1 4410 9 BJ PT ISI 11 R10 X PIPE To TEE B9.21 .
i CS 1 RB-003 11 ;
079800 TBX 1 4410 10- B*J PT ISI 11 R10 X RE EXAMINED AFTER PEWORK.
TEE TO PIPE B9.21 CS*1 RB 003 10A i
m 079900 TBX 1 4410-11 B-J PT 151 11 R10 X RE EXAMINED AFTER REWORK. j P!PE TO VALVE 89.40 ;
080000 TBX 1 4410 12 BJ PT ISI 11 Rio X RE EXAMINED AFTER REWORK.
VALVE TO PIPE B9.40 :
C1 1 RB-003 8C 1
080100 TBX 1 4410 13 BJ PT 151 11 R10 X RE EXAMINED AFTER REWORK.
PIPE TO VALVE B9.40 CS 1 RB 003 5C j l
1.5 CS-1 244-2501R 1 1 1
080200 TBX 14410 FLANGEf1 BG2 VT 1 151 8 R8FC1 X FLANGE BOLTING B7.50 CS 1 RB 003 1-FLG 81 r
- l k
_ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ __ _ _ _ J
COMANCHE PEAK UNIT 1 PAGE: 174
!DATE: 06/30/89 REY!s10N 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL p) .
\ CLASS 1 COMPONENTS
"' REACTOR COOLANT ASME G SEC. XI NE SUIMARY EXAMINATION AREA CATGY EXAM NAR0 REMARKS NUMBER IDENTIFICATION ITEM NO E THOD PROCEDURE IIIM ** CALIBRATION BLO'".K" 14 RC-1 135 250iR 1 080300 TBX 1 4500-1 BJ UT OL ISI 206 R0 X BRANCH CONNECTION TO PIPE B9.11 UT 455 ISI 206 R0 X PT 151 11 R10 X RC 1 RB-026 5
- TBX 19**
BJ UT OL !$1 206 R0 X PT PERFORMED BY B&R FOLLOWING REWORK.
080400 TBR 1 4500 2 PIPE To PIPE 89.11 UT 455 IS! 206 RD X RC 1 RB-026 V PT Cl-QAP-10.2 1R1 X
RC 1 R5 026-4 PT !$1*11 R10 X
- TBX 13**
080600 TBX 1-4500-4 BJ UT 0L ISI 206 R0 X PlPE TO PIPE B9.11 UT 45$ ISI 206 R0 X RC-1 RB 026 3 1 PT !$1 11 R10 X
- TBX 13**
080700 TBX 1 4500 5 BJ UT OL 151 206 20 X PIPE TO PIPE 89.11 UT-45S 15! 206 R0 X RC 1 RB 026 3A PT !$1 11 R10 X
- TBX-19**
080600 TBX 1 4500 6 BJ UT-OL 151 206 R0 X PIPE TO P!PE 89.11 UT 45S 151 206 R0 X RC 1 RB-026-2 PT 151 11 Rio X l
- TBX-19'*
l l
l
(%
( .
.._m_______ _ _ _ m. ________. .m_ _ _ _ . _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PME: - 175' REVIs!0N: 1 PRESERVICE INSPECTION SUMMART GUTAGE D (1984), PERIOD, BASELINE INTERVAL class 1 COMPONENTS y,
REACTOR COOLANT AME G
-' SEC. XI NE SUIMART EXAMINATION AREA CATCT EXAM NRR0 REMARKS NLMBER ' IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
14-RC 1 135 2501R 1 080900 TBx 1 4500 7 BJ UT 0L 151 206 R0 X PIPE To SAFE END 89.11 UT-45s 151 206 R0 X RC 1 RB 026 1 PT 151 11 Rio X
- TBX 19'*
081000 TBx 1 4500 8 BF UT 0L 151 206 R0 X
$AFE END TO PRESSURIZER N0ZZLE B5.20 UT 455 151 206 R0 X RC 1 RB-026-V PT 151 11 Rio X
- TBx 19**
6 RC 1-096 2501R-1 f' 151 206 R0 10% NOT EXAMINED WITN 455, SEE RR B 8.
i e81100 TBM 1-4501 1 BF UT OL X
\ PRESSURIZER N0ZZLE TO SAFE END B5.20 UT 455 151 206 R0 X RC 1 RB 0288 V PT 151-11 R10 X
- TBx 5**
081200 TBX 1 4501 2 BJ UT OL 181 206 R0 X SAFE END TO PIPE 89.11 UT 455 !st 206 R0 X RC-1 RB 0288 1 PT 151 11 Rio X
- TBx 5**
081300 TBx 1 4501 3 BJ UT OL 151 206 R0 X PIPE TO ELBOW 89.11 UT 455 !st 206 R0 X RC 1 RB 0288 2 PT 181-11 Rio X eetex.$ee 151 206 R0 4
BJ UT 0L X 081400 TBx 1 4501 4 ELBOW To PIPE B9.11 UT-45s ISI 206 RD X RC 1 RB 0288 3 PT 151 11 R10 X
- Tex 5**
t
!- 4 L- "i E i COMANCHE PEAK UNIT 1 PAGE: 176
'DATE: -06/30/89
'REV!s10N: .1 PRESERVICE INSPECTION SUMMART l
OUTAGE D (1984), PERIOD, BASELINE INTERVAL
/
!]
G class 1 COMPONENTS i REACTOR C00 LAM ASME C
- SEC. XI NE NRR0 REMARKS I
SUMMARY
EXAMINATION AREA CATGY EXAM NUMBER IDENT!FICAfl0N ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
6-RC-1 096 2501R 1 081500 TBx 1 4501 5 BJ UT OL 151 206 RD X
. PIPE TO ELBOW B9.11 UT 45s 151 206 R0 X RC*1 RB 0288-4 PT Is! 11 Rio X eeigx.$*e h
081600 TBX 1 4501 6 8J UT 0L 181 206 R0 X ELBOW TO P!PE 89.11 UT 45s 1s1 206 R0 X PT 1s1 11 Rio X !
RC 1 RB 02 ?-5
..TBx.5..
081700 Tex 1 4501 7. B-J UT OL 1s1 206 R0 X PIPE TO ELBOW 89.11 UT 45s 151-206 R0 X RC 1 RB-0288 6 PT 151 11 R10 X
( **TBX 5 *
'081800 TBX 1-4501-8 BJ UT OL 1s1 206 RD X ELBOW fo PIPE' 39.11 UT 45s 151 206 R0 X RC 1 RB 0288-7 PT !st 11 R10 X
- TBx 5**
081900 TBX 1 4501 9 BJ UT OL !st 206 R0 X PIPE TO ELBOW 89.11 UT-45s 151 206 R0 X RC 1 RB 0288 8 PT 151 11 R10 X eergx.5**
082000 TBX 1 4501 70 BJ UT OL 1s1 206 R0 X ELBOU T0 P!PE 89.11 UT 45s 181 206 R0 X RC 1-RB 0288 13 PT !st 11 R10 X eeTBx 5**
\
COMANCHE PEAK UNIT 1 PAGE: 177 DATES 06/30/89' REVISION: ' 1- PRESERVICE IWSPECTION
SUMMARY
QUTAGE O (1964), PERIOD, BASELINE INTERVAL
/
kj .
CLASS 1 COMPONENTS REACTCR C0(K ANT ASME G SEC. XI WE CATGY EXAM' NRR0 REMARKS SL8 MARY EXAMINATION AREA lamber IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6 RC 1 006-2501R 1 062100 TBX 1 4501 11 BJ UT OL 151 206 R0 X PIPE TO VALVE (FLANGED) B9.11 UT 455 .181 206 R0 X RC 1-RB-0288 14 PT ISI 11 Rio X
- TBX-5**
6-RC 1-098 2501R-1 X 10% NOT EXAMINED WITH 455, SEE RR B 8.
082200 TBX 1 4501 12 BF UT OL 151 206 RO PRESSURIZER N0ZZLE TO SAFE END B5.20- UT 45$ ISt 206 R0 X RC 1 RB 0288 V PT 151 11 Rio X
- TBK 5**
D 8J UT OL ISI 206 RO X 32300 'TBX 1-4501 13 SAFE END TO PIPE 89.11 UT 455 !$! 206 R0 X RC 1 RB 0280 15 PT IS! 11 R10 X
- TBX 5**
082400 TBX 1 4501 14 BJ UT-OL !st 206 R0 X UT 455 151-206 R0 X P!PE To ELBOW B9.11 RC 1 RB 0288-16 PT ISI-11 R10 X "TBX 5" 082500 TBK 1 4501 15 BJ UT OL ISI 206 R0 X UT-455 151-206 R0 X ELBOW TO PIPE 89.11 RC 1 RB 0280 17 PT !$1 11 R10 X
- TBX 5**
082600 TBX 1 4501 16 BJ UT 0L 151 206 R0 X P!PE TO ELBOW 39.11 UT 45$ ISI 206 R0 X RC 1 RB 0280 18 PT ISI-11 Rio X
.*TBK 5" D
I
COMANCHE PEAK UNIT 1 PAGE: 178 DATE: :06/30/B9 REVISION! 1 PRESERVICE INSPECTION
SUMMARY
^
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL V CLASS 1 COMPONENTS REACTOR COOLANT ASME G SEC. XI NE BLMMARY EXAMINATION AREA CATGY EXAM NRRO REMARKS NLABER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6 RC 1-098 2501R-1 BJ UT OL 151 206 R0 X 082700 TBX 1-4501 17 89.11 UT 45$ 151 206 R0 X ELBOW TO PIPE RC 1 RB 0288 19 PT ISI 11 Rio X eeigx.5**
082800 TBX 1 4501 18 BJ UT OL 151 206 R0 X PIPE TO ELBOW - 89.11 UT 45S !$1 206 R0 X RC 1-RB-0288-20 PT ISI 11 Rio X
- TBX 5**
082900 TBX 1 4501 19 B-J UT OL 151 206 R0 X
-O 89.11 UT 455 151 206 R0 X ELBOW TO PIPE
~( RC 1 RB 02BB-21' PT ISI 11 R10 X eergx.5**
RI EVALUATED AS ACCEPTABLE, SEE TAB F OF 083000 TBX 1 4501 20 BJ UT OL ISI 206 RD X B9.11 UT 60s 1$1 206 R0 X PSI FINAL REPORT.
P!PE TO ELBOW PT 151-11 R10 X RC 1 RB 0288 22
- ergx.5**
tl EVALUATED AS ACCEPTABLE, SEE TAB F OF 083100 TBX 1 4501-21 B-J UT OL 151 206 R0 X L9.11 UT 60$ 151 206 R0 X PSI FINAL REPORT.
ELBOW TO PIPE PT 151-11 R10 X RC 1 AB 02BB 27 eergx.$ee 10% NOT EXAMINED WITH 455, SEE RK B 10.
083200 TBX 1 4501 22 BJ UT OL ISI 206 R0 X PIPE TO VALVE (FLANGED) 89.11 UT 455 ISI 206 R0 X PT ISI 11 RIO X RC 1 RB-0288 28
- TBX 5" l'
l O
l COMANCHE PEAK UNIT 1 PAGE: 179 DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL 9- REACTop C00Lf,NT CLASS 1 COMPONENTS ASME G
~
SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK" 6 RC-1-100-2501R-1 BF UT OL 151 206 R0 X PT PERFORMED BY TU FOLLOWING REWORK.
083300 TBX 1 4501 23 PRESSURIZER NOZZLE TO SAFE END B5.20 UT 45S 151 206 R0 X RC 1-RB 028A V PT NQA 3.09 8.10R0 X
- TBX 5**
083400 TBX 1 4501 24 B.J UT-OL 151-206 R0 X SAFE END TO PIPE 89.11 UT 45S 151 206 R0 X RC 1 RB-028A-4 PT 181 11 R10 X
- TBX-5**
083500 TBX 1 4501 25 BJ UT OL ISI 206 R0 X PT PERFORMED BY TU FOLLOWING REWORK.
PIPE TO ELBOW 89.11 UT 45S 151 206 R0 X G RC-1 RB 028A 5 PT WQA 3.09-8.10R0 X
- TBX 5**
083600 TBX-1 4501 26 B-J UT OL 151-206 R0 X ELBOW TO PIPE B9.11 UT-45S !$1 206 RO X RC-1 RB 028A 6 PT !$1 11 R10 X
083800 TBX 1 4501 28 BJ UT-OL 151 206 R0 X ELBOW TO PIPE 89.11 UT-455 151 206 R0 X RC 1-RB 028A-8 PT 151 11 R10 X
- TBX 5" O
COMANCHE PEAK UNIT 1 PAGE: 180 DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL'
/N k REACTOR COOL ANT CLASS 1 COMPONENTS ASME G
- SEC. x1 NE SLMMARY EXAMINAT]QN AREA CATGY EXAM NRR0 REMARKS EMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
6 RC-1 100 2501R 1 083900 TBx 1 4501 29 BJ UT OL 151 206 R0 X PIPE TO P!PE 89.11 UT 45S 151-206 R0 x RC 1 RB 028A 8-1 PT IS! 11 Rio x
.. igx.5**
BJ UT OL ISI 206 R0 x RI EVALUATED AS ACCEPTABLE, SEE TAB F OF 084000 TBx 1 4501-30 PIPE TO ELBOW 99.11 UT 458 ISI 206 RO X PSI FINAL REPORT. PT PERFORMED BY TU RC 1 RB-028A 9 PT NDE 300 R2 x FOLLOWIvi 67. WORK.
- TBx-5**
084100 TBx 1 4501 31 BJ UT OL 15! 206 R0 x ELBOW To PIPE B9.11 UT 455 !$1 206 R0 x f RC 1 RB-028A 10 PT ISI-11 R10 x V ..T,x.5..
084200 TBX 1 4501 32 BJ UT 0L ISI 206 R0 x PIPE TO ELBOW B9.11 UT 455 161 206 R0 x RC 1 RB 028A 11 PT ISI 11 R10 x
- TBx 5**
084300 TBx 1 4501 33 BJ UT OL 151 206 R0 x ELBOW TO PIPE B9.11 UT-455 ISI 206 R0 x RC 1 RB 028A 16 PT 151 11 R10 x
..tgx.5**
l 084400 TBx 1 4501 34 BJ UT OL 151 206 R0 X P!PE TO VALVE (FLANGED) 99.11 UT 45S 151 206 RO x ,
RC 1-RB 028A 17 PT 151-11 R10 x 1 O
f' L
l' DATE: 06/30/89 COMANCHE PEAK UNIT 1 : PAGEs. 181 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
l OUTAGE 0 (1984),. PERIOD, BASELINE INTERVAL
[ CLASS 1 COMPONENTS
- \,y REACTOR COOLANT ASME G SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ' ITEM No METHOD PROCEDURE 111M **CALIBRAfl0N BLOCK'*
6-RC-1 006 2501R-1' 084500 TBX 1 4501 FLANGE #1 8-G 2 VT 1 ISI 8 R8FC1. X FLANGE BOLTING B7.50 RC 1-RB 0288 FLG. 1 6 RC-1 098 2501R 1 084600 TBK 1 4501 FLANGE #2' B-G 2 VT 1 Isl-8 R8FC1 X FLANGE BOLTING B7.50 RC 1 RB 0288 FLG. 2 6-RC i 100-2501R-1
'i
/^ 084700 TBK 1 4501 FLANGE #3 B-G-2 VT 1 ISI 8 R8FC1 x FLANGE BOLTING B7.50 RC-1-RB 028A FLG. 1 6-RC 1 096 2501R 1 084800 TBX 1 4501 8010A B-G-2 VT 1 151 8 R8FC1 X VALVE BODY BOLTING B7.7C RC 1 RB 0438 1 8010A 084810 TBX-1 4501 8010A B-84 SHOP RECORDS USED, SEE RR B 1.
VALVE BODY INTERNAL SURFACES B12.40 RC 1 RB 0438 1 8010A 6-RC 1 008 2501R 1 084900 TBX 1 4501 8010B BG2 VT 1 151 8 R8FC1 X VALVE BODY BOLTING B7.70 RC 1 RB 0438 1-80108 U
p-I 1
1 I l CDMANCHE PEAK UNIT 1 PAGE: 182 DATES. 06/30/89
- l. , aEVill0N: 1 PRESERVICE INSPECT!0W
SUMMARY
QUTAGE D (1984), PERIOD, BASELINE !NTERVAL l ,/ :
CLASS 1 COMPONENTS ]
Q: .j REACTOR COOLANT AME G i
- l SEC. x1 NE SL30tARY EXAMINATION AREA CATGY EXAM Nr REMARKS il ITEM NO METHOD PROCEDURE M ** CALIBRATION BLOCK **
IRMBER IDENTIFICATION 6-RC-1 098 2501R 1 1
l BM2 SHOP RECORDS USED, SEE RR B 1, 084910 TBX 1 4501 8010B l
VALVE BODY INTERNAL SURFACES- 812.40 RC 1 RB 0438 1 80108 6-RC-1 100 2501R ,1 085000 TBx 1 4501 8010C BG2 VT 1 151 8 R8FC1 x VALVE BODY BOLTING B7.70 RC 1 RB-0438 1 8010C SHOP RECORDS USED, SEE RR B 1.
085010 TBX 1 4501 8010C BN2
,' VALVE BODY INTERNAL SURFACES B12.40 I RC-1 RB 0438 1 8010C .
6-RC 1 108-2501R-1 151 206 R0 x 10% NOT EXAMINED WITN 455, SEE RR B 3.
085100 TBx 1 4502 1 BF UT-0L PRES $URIZER N0ZZLE To SAFE END B5.20 UT 455 151 206 R0 x RC 1 RB-028A-V PT 151 11 R10 x
.. igx.$e.
0J5200 TBx 1 4502 2 BJ UT OL !$1 206 R0 x SAFE END TO PIPE 89.11 UT 455 151 206 R0 X PT 181 11 R10 x j RC 1 RB 028A 1 e.TBx.5..
0*5300 TBX 1 4502-3 BJ UT-OL 151 206 RO X B9.11 UT 45$ 151 206 R0 x PIPE TO ELBOW PT 151 11 R10 x RC-1-RB 028A 2
- TBx 5**
(
COMANCHE PEAK UNIT 1 PAGE: 183
.DATE: 06/30/89-REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE C (1984), PERIOD, SASELINE INTERVAL
)
CLASS 1 COMPONENTS
-( f REACTOR COOLANT ASME G
~
~
SEC. XI NE SUMARY EXAMINAfl0N AREA CATCY - EXAM NRR0 REMARKS IRMBER 10ENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6 RC-1-108-2501R-1 085400 TBX 1-4502 4 B.J UT OL 151 206 R0 X ELBOW TO PIPE B9.11 UT 45S !$1 206 R0 X RC 1 RB 028A 3A PT 151 11 Rio X
- TBX 5**
085500 TBX 1 4502-5 BJ UT OL 151 206 R0 X PIPE To ELBOW B9.11 UT 45S 151 206 R0 X RC-1-RB-015 1 PT 151 11 R10 X seigx.$ee 085600 TBX 1 4502 6 BJ- UT 0L 151 206 R0 X 89.11 UT-455 151 206 R0 X
(- ELBOW TO PIPE PT ISI-11 R10 X i RC-1 RB 015 2
-(' eeTBX4 25700 TBX 1-4502-7 BJ UT OL 151 206 R0 X PIPE TO ELBOW 99.11 UT 455 151 206 R0 X RC 1 RB 01512 PT ISI 11 R10 X
- TBX 5**
5% NOT EXAMINED WITH 45S, SEE RR B 10.
085800 TBX 1-4502 .8 BJ UT OL ISI 206 R0 X B9.11 UT 45$ 151 206 R0 X PT PERFORMED BY TU FOLLOWING REWORK.
ELBOW TO PIPE RC 1 RB 015 13A PT NQA 3.09 8.10R0 X
- ygx.5 e i
l BJ UT OL ISI 206 R0 X l C85900 TBX 1 4502 9 PIPE TO REDUCER 89.11 UT 45S ISI 206 R0 X RC 1 RB 015 31 PT 151 11 R10 X
- TBX 5**
l I
f
7_--.
l.
184 COMANCHE PEAK UNIT 1 PAGE:
1 0A1E:- 06/30/89 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
CUTAGE O (1984),. PERIOD, BASELINE INTERVAL l ; (e?. .
- j CLASS 1 COMPONENTS REACTOR C00QET.
ASME G
- NE
'SEC. XI SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMaER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM " CALIBRATION BLOCK **
3 RC 1-111 2501R 1 014000 TBK 1 4502 10 BJ PT 181 11 R10 X VALVE TO PIPE B9.21 RC 1 RB*015 24 086100 TBx 1 4502-11 BJ PT 181 11 Rio X PIPE To VALVE- .39.21 RC 1 RB-015 25
[
I' 014300 TBK 1 4502 13 3J PT !$1 11 R10 X PIPE TO PIPE 89.21 RC-1 RB 015 19-1 086400 TBX 1 4502 14 3J PT !$1 11 Rio X FIPE TO ELBOW 89.21 RC 1 RB-015 19 086500 TBX-1 4502 15 BJ PT ISI 11 RIO X ELBOW TO PIPE 89.21 RL 1 RB-015 18 086600 TBX 1 4502 ;S BJ- PT NQA 3.09 8.10R0 X PT PERFORMED BT TU FOLLOWING REWORK.
PIPE TO ELBOW 89.21 RC 1 RB 015 17 0 .
l
l t
COMANCHE PEAK UNIT 1 PAGE: 185 DATE: 06/30/89 cREV!sION: 1 PRESERVICE INSPECTION
SUMMARY
M OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS REACTOR COOLANT ASME G J SEC. XI NE RLRMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER 10ENTIFICAfl0N ITEM NO METN00 PROCEDURE IIIM **CALIBRAfl0N BLOCK **
3-RC 1-111 2501 M BJ FT NDE 300 R2 X PERFORMED BY TU FOLLOWING REWORK.
086700 TBX 1 4502 17 ELBOW TO PIPE 89.21 RC 1-RB-015 16 086800 TBX 1 4502 18 B.J PT 151 11 R10 X PIPE TO WELDOLET 89.21 RC 1 RB-015 15 BJ NQA 3.09 8.10R0 X PT PERFORMED BY TU f0LLOWING 086900 TBX 1 4502 19 PT 39.31 REWORK.
WELDOLET TO PIPt RC 1 RB 01',
I
\ 3 RC-1 146 2501R-1 087000 TBX 1 4502-20 B-J PT 151 11 RIO X REDUCER TO PIPF 89.21 RC 1 RB-015 32 BJ NDE 300 R2 X PERFORMED BY TU FOLLOWING REWORK.
067100 TBX 1 4502 21 PT PIPE To ELBOW 89.21 RC i-RB 015 33 087200 TBX 1 4502 22 BJ PT !$1 11 R10 X ELBOW TO P!PE 89.21 RC 1 RB 015 34 087300 TBX 1 4502 23 BJ PT 151 11 Rio X PIPE TO ELBOW 89.21 RC 1-RB 015 35 O
f' (0:
COMANCRE PEAK UNIT 1 PAGE: 186 DATE:. 06/30/89 REVISION: 1 PRESERVICE INSPECT!ON SLM4ARY OUTAGE O-(1984), PERIOD, BASEL'INE INTERVAL
.'. f]
(j REACTOR COOLANT CLASS 1 COMPONENTS ASME C
~
SEC. XI 'NE
SUMMARY
EXAMlWAfl0N AREA - CATGY EXAM NRR0 REMARKS NLsIBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM **CALIBRAfl0N BLOCK **
l 3-RC-1 146 250te 1
.087400 TBX 1 4502 24 BJ PT .151 11 Rio X ELBOW TO P!PE 89.21 RC 1 RB 015 36 087500 - TBX 14502 25 BJ PT !$!-11 Rio X P!PE TO ELBOW 89.21 RC 1 RB 015 37.
C7600 TBX 1 4502 26 BJ PT 151 11 Rio ELBOW 70 PIPE 89.21 RC 1 RB 015-38 087700 TBX 1 4502 27 BJ PT ISt-11 R10 X P!PE TO PIPE B9.21 RC 1-RB 015 38 1 087800 TBX 1-4502 28 BJ PT ISI 11 Rio X P!PE TO VALVE B9.21 RC 1 RB 015 38 2A 087900 TBX 1 4502 29 BJ PT !SI 11 R10 X VALVE TO PIPE 89.21 RC 1 RB 015 42 088000 TBX 1 4502 30 BJ PT 01 0AP 10.2-1R1 X PERFORMED ST B&R FOLLOWING REWORK.
PIPE TO VALVE 39.21 RC 1 RB 015-43
PAGE: 187 A1. DATES- 06/30/89 COMANCHE PEAK UNIT 1 N ' KV! BION: .1 PRESERVICE INSPECTION SUMMART.
QUTAGE O (1984),. PERIOD, BASELINE INTERVAL
/]- CLASS 1 COMPONENTS
, " I.' )f, REACTOR COOLANT ASME G
- SEC. XI NE CATGY EXAM NRR0 REMARKS msMART EXAMINATION AREA ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
IRMBER IDENTIFICATION 3 RC 1-146 2501R 1 088100 TBX 1 4502 80008 BG2 VT 1 ISf 8 R8FC1 X VALVE BODT BOLTING B7.70 RC 1 RB-015 1 80003 088200 TBX 1 4502-PCV 456 BG2 VT 1 ISI 8 R8FC1 X VALVE BCDT BOLTING B7.70 RC 1 RB 015 1 PCV456 3-RC 1 111 2501R 1 B G-2 VT 1 151 8 R8FC1 X 088300 . TBX 14502 8000A
- . VALVE B00Y BOLTING B7.70 7 ) RC 1 RB 015 1 8000A v
B-G 2 VT 1 151 8 R8FC1 X 088400 TBX 1 4502 PCV 455A VALVE BODY BOLTING B7.70 RC 1 RB 015 1PCV455A 4 RC 1 075 2501R 1 088500 TBX 1 4503 1 BJ UT OL !st 206 R0 X BRANCH CONNECTION TO PIPE B9.11 UT-455 !$1 206 R0 X RC 1 RB 020 1 PT ISI 11 Rio X
- TBX 4**
BJ UT*0L 151 206 R0 X 088600 TBX 1 4503 2 99.11 UT-455 111 206 R0 X P!PE TO PIPE PT 151-11 R10 X RC 1 RB 020 2
- TBX 4**
O
COMANCHE PEAX UNIT 1 PAGE: 188 -
DATE: ~06/30/89 REVISION: 1 PRESERVICE INSPCCTION SLMMARY OUTAGE O (1984), PERIOD, BASELINE INTERVAL j
CLASS 1 COMPONENTS
(/ _
ASME G i
l SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*'
4-RC 1 075-2501R 1 088700 TBX 1 4503 3 8J UT OL ISt 206 R0 X l PIPE TO P!PE B9.11 UT 455 151 206 R0 X RC 1 RB 020-3 PT ISta11 Rio X
- TBX-4**
088800 TBX 1 4503 4 B-J UT OL IS1 206 R0 X
' PIPE TO PIPE B9.11 UT 455 151 206 R0 X RC 1 RB 020-4 PT 151-11 R10 X
- TBX-4**
088900 TBX 1 4503 5 BJ UT OL 151 206 RD X PIPE 70 PIPE 89.11 UT-455 151 206 R0 X i RC 1 RB-020 5 PT 151 11 Rio X
. **TBX 4**
089000 TBX 1 4503-6 8J UT OL !$1 206 RO X P!PE TO P!PE B9.11 UT 45$ 151 206 R0 X RC 1 RB-020 Y PT 1$1 11 R10 X eeigx.4ee 089100 TBX 1 4503 7 B-J UT OL ISt 206 R0 X PIPE TO PIPE B9.11 UT 45S 151 206 R0 X RC 1 RB 020 V PT IS! 11 R10 X esigx.4.*
-089200 TBX 1 4503-8 BJ UT OL !$1 206 R0 X P!PE TO P!PE B9.11 UT*45$ 151-206 RO X RC-1 RB-020-V PT ISI-11 R10 X eeigg.4ee
.m
d..
COMANCNE PEAK UNIT 1 PAGE: .189 DATE: 06/30/09 REVISION: 1 PRESERVICE INSPECT!DN SUMMART cuTAGE O (1984), PERIOD, BASELINE INTERVAL TO PEACTOR C00LNT CLASS 1 COMP 0NENTS ASME G
~'
SEC. XI NE BLamARY EXAMINATION AREA CATGY EXAM - NRR0 REMARKS
'NLMBER IDENTIFICATION ITEM NO MET O PROCEDURE II1M ** CALIBRATION BLOCK'*
4-RC i 075 2501R 1 0B9300 TBX 1 4503-9 BJ UT 0L 151 206 R0 ~X
. PIPE TD PIPE 89.11 UT 455 151 206 RO -X RC 1-RB 020 6 PT .- Isl.11 Rio .X
- TBx-4**
0B9400 TBX 1 4503 10. 'BJ UT OL 151 206 R0 x.
P!PE TO REDUCER 89.11 UT 455 - :151 206 RO -X RC 1 RB D20-6 15 PT 151 11 Rio X
- TBX 4**
6-RC 1 161 2501R 1-BJ UT OL 151 206 R0 h 10% NOT EXAMINER WITH 455, SEE RR B 10.
.99500 TBx 1 4503 11 REDUCER TO PIPE B9.11 UT 455 ISI 206 k0 x RC 1 RB-020 6 28 PT 151 11 Rio x eeigg.5**
151 206 R0 x 20% NOT EXAMINED WITN 455, SEE RR B 10.
0B9600 TBx 1 4503 12 BJ UT OL PIPE TO PIPE 89.11 UT 455 151 206 R0 x RC 1 RB 020 V PT 151 11 RIO X
- TBx 5**
0B9700 TBM 14,503 13 BJ UT OL 151 206 RO X 20% NOT EXAMINED WITN 455, SEE RR B-10.
PIPE TO PIPE 89.11 UT 455 151 206 R0 x RC 1 RB 020 V PT 181 11 R10 x
- Tex 5**
l-151 206 RO X 10% NOT EXAMINED WITN 455, SEE RR B 10.
0B9800 .TBx 1 4503 14 BJ UT OL PIPE TO REDUCER- B9.11 UT 45$ ISI 206 20 X RC 1*RB 020 6 38 PT !st 11 R10 x l
I
..ygg.$e.
l
COMANCHE PEAK UNIT 1 PAGE: 190 DATE: 06/30/89 PRESERVICE INSPECTION SUMMART ;
REVISION 1 e
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
' kj CLASS 1 COMPONENTS REACTOR COOLANT ASME G SEC. XI~ NE SL8 MART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMGER IDENTIFICATION ITEM M0 METHOD PROCEDURE 1.I I M " CALIBRATION BLOCK **
4-RC 1 162-2501R 1 BJ UT OL 151 206 R0 X 15% NOT EXAMINED WITM 45S, SEE RR B 10.'
089900 TBX 1 4503 15 REDUCER TO P!PE 89.11 UT 455 !$1 206 R0 X RC 1-RB-017 1A PT ISI-11 R10 X
- TBX-4**
BJ UT OL 181 206 R0 X PT PERFORMED BY TU FOLLOWING REWORK.
090000 TBX 1450316 PIPE TO P!PE 99.11 UT-45$ 181 206 R0 X RC 1 RB 017 V PT NQA 3.09-P.10R0' X j
- TBX 4**
090100 TBX 1 4503 17 BJ UT OL 151 206 R0 X B9.11 UT 458 151 206 RD X P!PE TO PIPE 151 11 R10 X Q RC 1-RB 017 V PT
- TBX 4**
BJ UT OL ISI 206 R0 X 20% NOT EXAMINED UITH 45$, SEE RR B-10.
090200 TBX 1 4503 18 P!PE TO VALVE 89.11 UT 455 ISI 206 R0 X RC 1 RB 017-2 PT ISI 11 R10 X estBx.4ee 4 RC 1 088 2501R-1 UT 0L ISI 206 R0 X 20% NOT EXAMINED WITH 45$, SEE RR B-10.
090300 TBX 1 4503 19 B-J VALVE TO PIPE B9.11 UT 45$ !$1 206 R0 X RC 1 RB-017-3 PT !$1 11 R10 X
- TBX 4**
09d 0) TBX-1 4503 20 BJ UT OL ISI 206 R0 X PIPE TO P!PE 89.11 UT 458 !$1 206 R0 X RC 1 RB 017 V PT !$1 11 Rio X
- TBX 4" l
1
m.
DATE: 06/30/B9 - CDMANCHE PEAX UNIT 1 PAGE: 191 REVIS10N: 1 PRESERVICE INSPECTION SUMMART CUTAGE 0 (1984), PERIOD, BASELINE INTERVAL i
(3 l- CLASS 1 COMPONENTS REACTOR COOLANT ASME G J SEC. XI NE SUMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS WUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCX**
4-RC-i 088-2501R-1 D90500 TBX 1 4503 21 3J UT OL 151 206 R0 X 20% NOT EXAMINED WITH 458, SEE RR B 10.
P]PE TO REDUCER 89,11 UT 45S 151 206 RD X RC-1 RB 017-4 PT ISt 11 Rio X
- TBX 4**
(;RE:1 147-2501R 1 090000 TBX 14533 22 B-J UT OL 151 206 R0 X 15% NOT EXAMINED WITH 455, EEE RR B 10.
REDUCEP TO PIPE B9.11 UT-455 151 206 R0 X RC i kB 016-1 PT 151 11 Rio X
- TBX-5**
r ;90700 TBX 1 4503 23 BJ UT OL 151206 R0 X 20% NOT EXAMINED WITH 455, SEE RR B-10.
[' 151 206 R0 PIPE TO TEE B9.11 UT 455 X RC 1 RB 016 2 PT 181 11 R10 X
- TBX*5**
D90800 TBX 1 4503 24 BJ UT OL IS! 206 R0 X 20% NOT EXAMINED WITH 455, SEE RR B 10.
TEE TO PIPE 89.11 UT 455 151 206 R0 X PT PERFORMED BY S&R FOLLOWING REWORK.
RC 1*RB-016 3 PT Cl-QAP 10.2 1R2 X
- TBX 5**
090900 TBX 1 4503-25 BJ UT OL ISI 206 R0 X 10% NOT EXAMINED WITH 45$, SEE RR B 10.
PIPE T0 REDUCER #9.11 UT 45S 151 2G6 RC X RC 1 RB 016-3 1 PT ISI 11 R10 X
- TBX 5**
4-RC 1 D91 2501R 1 BJ ISI 2D6 R0 X 15% NOT EKAMINED WITH 45S, SEE RR B-10.
091000 TBX 1-4503 26 UT OL REDUCER TO PIPE B9.11 UT 455 ]$1 206 R0 X RC 1 RB 016 3 2 PT ISI 11 R10 X
- TBX 4**
7"~s
\
CCMANCHE PEAK UNIT 1 PAGE: 192 DATE ' 06/30/89s REVISION:- 1 ' PRESERVICE INSPECTION
SUMMARY
[f]
OUTAGE D (1984),- PERIOD, BASELINE INTERVAL
\j CLASS 1 COMPONENTS REACTOR COOLANT ASM G
- ~ NE SEC. XI
SUMMARY
EXAMINATION AREA CATGY' EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM No METHOD PROCEDURE I11M ** CALIBRATION BLOCK **
4_ RC 1 091 2501R 1
'091100 TBX-1 4503 27 BJ UT OL ISI 206 RD X P!PE TO PIPE 89.11 UT 45S 151 206 R0 X RC 1 RB-016-3 3 PT ISI-11 R10 X
- TBX 4**
091200 TBX 1-4503 28 BJ UT 4L ISI 206 R0 X PT PERFORMED OY TU FOLLOWING REWORK.
PIPE TO P!PE 89.11 UT-45$ ISI 206 R0 X RC 1 RB 016 3-5 PT NQA 3.09 8.10R0 X igx.4ee 091300 TBX 1 4503 29 BJ UT-OL !$1 206 R0 X y P!PE To PIPE 89.11 UT 45S l$1 206 R0 X RC 1 RB 016 3 4A- PT !$1 11 R10 X "TBx4" 5-J UT 0L 1$1 206 R0 X 20% NOT EXAMINED WITH 45S, SEE RR B-10.
091400 TBX 1 4503-30 P!PE To SAFE END 09.11 UT 455 ISI 206 R0 X RC 1 RB 016-4 PT ISI 11 R10 X "TBX4" 8-F 151 206 R0 X 25% NOT EXAMINED WITH 455, SEE RR B 8.
091500 TBX 1 4503 31 UT OL SAFE END TO PRESSURIZER WOZZLE B5.20 UT 45S ISt 206 R0 X RC 1 RB 016 V PT ISI 11 Rio X "TBX4" 4 #c 1 162 2501R 1 091600 TBX 1*4503*PCV 455C BG2 VT 1 ISI 8 R8FC1 X VALVE BODY BOLTING B7.70 RC 1 AB 017 1PCV455C
\
COMANCHE PEAK UNIT 1 PAGE: 193 r
L DAl'( 06/30/89' 1 PRESERVICE INSPECT 10N
SUMMARY
. p._q : REV,$10N
. j QUTAGE O (1984),- PERIOD, BASELINE INTERVAL
~~\ _.
CLASS 1 COMP 0NENTS REACTOR COOLANT.
ASME G SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMBER ' IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
4-RC 1 018 2501R 1 091700 >TBX 1 4534 1 ~BJ- UT OL 151-206 R0 X BRANCH CON 4CT10N TO P!PE 89.11 UT 45S 151 206 R0 X RC 1 RB 022 1 PT !$1 11 R10 X
- TBX-4**
091900 TBX 1 4504 3 .BJ. UT OL 151 206 R0 X PIPE TO PIPE 89.11 UT-45$ 1S1 206 R0 X O* RC-1 RB-022 2 PT ISI 11 Rio X
- TBX-4**
092000 TBX 1 4504 4 B-J . UT OL 1S1 206 R0 X PIPE TO P!PE 89.11 UT-45$ 1S1 206 R0 X RC 1-RB 022 V PT 151 11 R10 X
- TBM 4**
092100 TBX 1-4504 5 BJ UT OL ISI 206 R0 X PIPE TO P!PE 89.11 UT 45S ISI 206 R0 X RC 1 RB 022 3 PT 151 11 Rio X
t COMANCNE PEAK UNIT 1 PAGE: 194' DATE: 06/30/89 REVISION: 1 PRESERVICE INSPECTION SUMART -
PERIOD, BASELINE INTERVAL
[^
.(
OUTAGE O (1984),
CLASS 1 COMPONENTS REACTOR COOLANT ASME G
~
SEC. XI NE CATCT EXAM NRR0' REMARKS SUMMART EXAMINATION AREA NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
....7, .............................. ....... .......... ...............
4-RC-1 018-2501R 1 D92300 TBX 1 4504 7 B-J UT OL 151 206 R0 X 89.11 UT 45$ 151 206 R0 X PIPE TO PIPE RC 1 RB 022 4-1 PT ISI-11 Rio X
- TBX-4**
092400 TBX 1 4504 8 BJ UT OL 181 206 R0 X PIPE TO PIPE 89.11 UT 455 ISI 206 R0 X RC 1 RB 021 1 PT !$l 11 R10 X
('
5 RC 1 RB 021 2A PT 151 11 R10 X
- TBX 4**
092600 TBX 1 4504 10 BJ UT OL ISI 206 R0 X PIPE TO PIPE 89.11 UT 455 ISI 206 R0 X RC 1 RB 021-V PT 151 11 Rio X
- TBX 4**
BJ UT OL ISI 206 R0 X PT PERFORMED BT TU FOLLOWING REWORK.
092700 TBX 1450411 PIPE To P!PE 89.11 UT-455 151206 R0 X RC-1 RB-021 3 PT WQA 3.09 8.10R0 X
- TBX 4**
B-J UT*0L 151 206 R0 X 092800 TBX 1 4504 12 B9.11 UT 45$ 151-206 R0 X P!PE TO PIPE RC 1 RB 021 V PT 151 11 R10 X "TBX 4" r
s
-- n _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l l
l DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 19$
REV!sl0N: 1 PRCSERYlCE IN$PECTION
SUMMARY
QUTAGE O (1984), PERIOD, BASELINE INTERVAL I /' %
!, class 1 COMPONENTS REACTop COOLANT ASME G
- SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM' NRR0 REMARKS NLMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIN ** CALIBRATION BLOCK **
A RC 1 018-2501R 1 092900 TBX 1 4504 13 BJ UT OL 151 206 R0 X PT PERFORMED BY TU FOLLOWING REWORK.
PIPE TO PlPE 59.11 UT 455 151-206 R0 X PT NDE 300 R2 X RC 1 RB 021 V
- TBX 4**
093000 TBX 1 4504 14 B-J UT OL 1st 206 R0 X PIPE TO PIPE 89.11 UT-45s 151 206 R0 X RC 1-AB 021 V PT Is! 11 Rio X
- TBX-4**
093100 TBX-1 4504 15 BJ UT-OL 151 206 R0 X P!PE TO PIPE 89.11 , UT 455 151 206 R0 X RC 1 RB 021 V PT 151 11 R10 X (J ..TBX.4..
093200 TBX 1 4504 16 BJ UT OL 151 206 R0 X PIPE TO REDUCER 89.11 UT 455 ISI 206 R0 X RC 1-RB 021 4A PT Is! 11 RIO X
- TBX-4**
6 RC 1-163-2501R 1 093300 TBX 1 4504 17 BJ UT OL 151 206 R0 X REDUCER TO PlPE 89.11 UT-45s 151 206 R0 X RC 1 RB 021 4 1 PT !st 11 Rio X
.eygx 5**
C93400 TBX 1 4504 18 BJ UT OL 151 206 R0 X PIPE TO PIPE 89.11 UT 45$ 151 206 R0 X RC 1 RB 021 V PT Ist 11 R10 X
- TBX-5"
(
(
l
!=
COMANCHE PEAK UNIT 1' PAGE: 196 l'ATEs. 06/30/89-C',V!s!ON: ' 1 PRESERVICE INSPECTION BUMMARY CUTAGE O (1984), PERICB, BASELINE INTERVAL l )A-I class 1 COMPONENTS
- 'i
!" - pfACTOR COOLANT AsME C
.: BEC. XI NE
' CJMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM~ ** CALIBRATION BLOCK **
r 6-RC 1 163 2501R 1 1
093500 TBX 1 4504 19 BJ UT OL 151 206 R0 X l
l P!PE TO P!PE B9.11 UT 45s 151 206 R0 X RC 1 Re 021 V PT 151 11 210 X
-PIPE TO REDUCER 89.11 UT 458 151 206 R0 X z RC 1 Re 021 4 2 PT 151 11 R10 X 1
- Tex-5**
4-AC 1 164 2501R 1 93700' TBM 1 4504-21 3J UT 0L 151 206 R0 .X
.. [
-L -
REDUCER TO P!PE B9.11 UT 458 151 206 R0 X i RC 1 Re 018 1 PT 151-11 Rio X !
- TBX-4** f I
i 1
'093800 ftX 1 4504 22 BJ UT OL 151 206 R0 X P!PE TO VALVE B9.11 UT 45s 151-206 RO X RC 1 RB-018 2 PT 151 11 R10 X
..T,X.4 I 4 Ac i 087 2501R 1 093900 TBX 1 4504 23 sJ UT OL 151 206 R0 X VALVE TO P!PE 89.11 UT 45s ISI 206 R0 X RC 1 RB 018 3 PT 151 11 R10 X
- T BM - 4" l
I 4
j i
u _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _
COMANCHE PEAK UNIT'1 PAGE: 197 DATE: 06/30/B9
'REYl$10Ns, 1 PdESER'flCE INSPECTION SCAMARY PERIOD, BA$ELINE INTERVAL h OUTAGE D (1984),
CLASS 1 CJMPONENTS REACTOR COOLANT ASME C SEC. XI NE
$UMMARY EXAMINATION AREA CATGY EXAM 'N R R 0 REW.RLC NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
4 RC 1 087 2501R-1 094100 Tex 1 4504 25 BJ UT 0L 158 206 R0 x PIPE 10 P!PE B9.11 UT 455 181-206 R0 x RC 1 RB 018-V PT !!! 11 Rio X "TBx 4**
3J UT DL. 151 206 R0 x 094200 TBM 1 4504 26 PIPE TO TEE 89.11 UT 455 !st 206 R0 x RC 1 RB 018 4 PT 181 11 Rio X
- TBK 4**
BG2 VT 1 ISI 8 R8FC1 x 094300 TBX 1 4504 PCV 4558 VALVE BODY BOLTING B7.70 f
{ RC 1 RB 018 1PCV4558
\
2 RC 1-132-2501R-1 BJ PT 151 11 Rio x 094400 Tex 1 4505-1 PIPE TO WELD 0LET 89.32 RC 1 RB-016-V 3J PT 151 11 R10 x 094500 Tex 1-4505 2 WELD 0LET TO PIPE B9.21 RC 1 RB 016 5A B-J PT 151 11 Rio x 094600 TBM 1 4505 3 PIPE To ELBOW 89.21 RC 1 RB 016 6 BJ PT 151 11 Rio x 094700 Tex 1 4505 4 ELBOW TO PIPE B9.21 RC 1-RB 016-7 r
1 i
COMARCME PEAK UNIT 1 PAGE: 198 DATE: 06/30/89 REVISION: 1 PRCSERVICE INSPECTION
SUMMARY
OUTAGE 0 (1964), PERIOD, BASELINE IN1ERVAL O ECTOR CCOL8WT CLASS 1 COMPONENTS ASME G
- SEC. XI NE SLMMART EXAMINATION AREA CATCY EXAM NRRO REMARKS NLMBER IDENTIF] CATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
2#C12132-2501Pd 094800 T3X-1 4505-5 BJ PT ISI 11 R10 X PIPE TO ALVE 89.40 RC 1 RB 016-12 O
O
DATE: 06/30/B9 CDMANCHE PEAK UNIT 1 ~ PAGE: 199 REVISION:-. 1 PRESERVICE INSPECTION
SUMMARY
- ("% DUTAGE O (1984), PERIOD, BASELINE INTERVAL
~
CLASS 1 COMPONENTS CNEMICAL & VOLUME CONTROL ASME G
~
. SEC. XI NE
. SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM No METHOD PROCEDURE I11M ** CALIBRATION BLOCK'*
2 CS 1 112 2501R 1 096900 TBX 1 4505 6 BJ PT !$1 11 R10 X VALYC To P!PE B9.40 CS 1 RB-029 14 095 M TBM 1 4505 7 BJ PT 151 11 Rio X PIPE TO ELBOW 89.21 CS 1 RB-029 13A 095100' TBX 1 4505 8 BJ PT 151 11 R10 X ELBOW TO PIPE B9.21 CS 1 RB 029 12 R
095200 TBX 1 4505 9 BJ FT ISI 11 R10 X PIPE TO PIPE B9.21 CS 1 RB-029 10 095300 TBX 1 4505 10 BJ PT . !$1 11 R10 X P!PE To PIPE B9.21 CS 1 RB 029 4 095400 TBX 1-4505 *1 BJ PT 151 11 Rio X PIPE TO PIPE B9.21 CS 1 RB 029 3 095500 TBX 1 4505 12 BJ P! 151 11 R10 X PIPE TO PIPE B9.21 CS 1-RB 029 2 1
1 F
-DATE: 06/30/89- COMANCHE PEAK UNIT 1 PAGE:- 200 REVISION: 1 PRESERVICE IN$PECT10N
SUMMARY
-- CUTAGE 0 (1984), PERIOD, BASELINE INTERVAL l( CHEMICAL & VOLUME CONTRg CLA$$ 1 COMPONENTS ASME G SEC. El NE-
' EUMMARY EXAMINATION AREA CATCY EXAM NRR0 REMARKS NLMBER' IDENTIFICATION ITEM No METHOD PROCEDURE IIIM "CALIBRAT10W BLOCK" 2-es.1 112-2501R 1 1
095600 TBx 1 4505 13 BJ PT !st 11 Rio X PIPE TO PIPE 89.21
. Cs 1 RB 029 2 095700 TBx 1 4505 14 5J PT IS! 11 R10 X PIPE To ELBOW 89.21 CS 1-As-029 1 095800 TBW 1 4505 15 BJ PT 151 11 R10 x ELBOW TO P!PE 39.21 CS 1 RB-028-13
\ 095900 TBK 1 4505 16 BJ PT 151 11 Rio X P!PE TO PIPE B9.21 CS 1 RB 028 8 096000 TBx 1 4505 17 BJ PT l$1 11 R10 X P!PE TO PIPE B9.21 Cs 1-RB-028 78 096100 TBx 1 4505 18 BJ PT !$1 11 Rio X PIPE TO PIPE 89.21 CS 1 RB 028 6 1 096200 TBx 1 4505 19 BJ PT ISI 11 R10 X PIPE 10 PIPE 39.21 Cs 1 RB 028 5 2 O -
r-(
l l DATE: 05/30/09 COMANCHE PEAK UNIT 1 PAGE ' 201 REVIS!DN '1 PRESERVICE INSPECTION
SUMMARY
.,~ OUTAGE O (1984), PERIOD, BASELINE INTERVAL f CLAS$ 1 COMPONENTS f . :D .NEMf CAL & VOLLME CONTROL l
ASME G SEC. XI NE SLMMART EXAMINAfl0N AREA CATGY EXAM NdR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD : PROCEDURE IIIM "CALIBRAfl0N BLOCK" 2-Cs 1 112 2501R 1 096300 T8X 1 4505 20 BJ PT 151 11 R10 X P!PE TO PIPE 89.21 CS 1 RB 028-5 3 096400 TBX 1 4505 21 BJ PT 151 11 R10 X PIPE TO PIPE 89.21 Cs 1 Re 028 5 1 096500 TBM 1 4505 22 eJ PT 151 11 Rio X PIPE TO ELBOW 39.21 Cs 1 RB 028 2A
-s s96600 tex 1 4505 23 5J PT 151 11 Rio X
^ 39.21 ELBOW TO PlPE CS 1 RB 028 3 096700 tsX 1 4505 24 BJ PT 151 11 R1D X
' PE TO ELBOW 39.21 C$ 1 RB 028-4 096800 TBM 1 4505 25 B.J PT NDE 300 R2 X PT PERFORMED BT TU FOLLOWING REWORK.
ELBat! TO PIPE B9.21 CS 1 RB-028 5 096900 TsM 1 4505 26 sJ PT !$1 11 Rio X PIPE To PIPE 89.21 C5 1 RB 028 1A
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE:- 202 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
f N '
QUTAGE 0 (1984), PERIOD, SASELINE INTERVAL d CLASS 1 COMPONENTS CNEMICAL & VOLUME CONTROL ASME G
-' SEC. XI NE-
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 : tEMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCFDURE IIIM *
- CALIBRATION BLOCK" 2-CS 1 112 2501R 1 097000 'TBX 1 4505 27 BJ PT ISI 11 Rio X PIPE TO ELBOW 89.21 CS 1 RB 027 28 097100 TBX 1 4505 28 BJ PT 151 11 Rio X ELBOW TO PIPE B9.21 CS 1 RB 027 27A 097200 TEX 1 4505 29 BJ PT 151 11 R10 X PIPE TO VALVE B9.21 CS 1-RS 027-26 097300 TBX 1 4505-8145 B G-2 VT 1 IS! 8 R8FC1 X VALVI BODY BOLTING B7.70 CS-1 RB ;027 1 8145 l
l l
l
p l'.
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 203 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
..I% QUTAGE O (1984), PERIOD, BASELINE INTERVAL k,'
CLASS 1 COMPONENTS M Y INJECTION-ASME G
~
~
SEC. x1 NE SUMMART ExAMINAT!(el AREA CATGY EXAM NRR0 REMARKS IRMBER IDENTIFICAT!ON ITEM No METHOD PROCEDURE IIIM- ** CALIBRATION BLOCK **'
3-SI-1 303 2501R 1 097400 TBx 1 4600 1 BJ PT 15! 11 R10 x VALVE TO PIPE B9.21
,SI 1 RB 021 3 097500 TBM 1 4600 2 ' B.J PT 151 11 R10 x PIPE TO MOMENT RESTRAINT 89.21 SI 1 RB 021 4-1
-097600 TBX 1 4600 3 BJ PT 151 11 R10 x
. MOMENT RESTRAINT TO PIPE 09.21 SI 1 RB 021 4 2
.097700 TBx-1 4600 4 B-J PT ISI 11 R10 x PIPE 70 ELBOW B9.21 SI 1 RB 021 5 097800 TBx 1 4600 5 BJ PT !$1 11 R10) x ELB0W TO PIPE B9.21
$1 1 AB 021-6 097900 TBx 1 4600 6 BJ PT 151 11 R10 x t
PIPE TO TEE B9.21 SI 1-RB-021-7A 3-51 1 033 2501R 1 098000 TBM 1 4600 7 BJ PT !$l-11 R10 x RtDUCER 10 PIPE B9.21 SI 1-Rn 021 10 1
I
- DATE:=06/30/B9 COMA' HE PEAK UNIT 1 PAGE: 204 REVISION: 1 PRESERV!CE INSPECTION SLMMARY CUTAGE O (1984), PER100, BASELINE INTERVAL O
$ CLASS 1 COMPONENTS SAFtTY INJECTION ASME G
- SEC. XI NE BLBMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE II1M ** CALIBRATION BLOCK **
3-St 1 033 2501R-1 098100 TBX 1-4600-8 B-J PT ISI-11 R10 X PIPE TO TEE B9.21 SI 1 RB 021 9 098200 TBX 1-4600 9 BJ PT 151-11 R10 X TEE TO PIPE B9.21
$1 1 RB-021 8 098300 TBX 1-4600 10 3J PT ISI 11 R10 X PIPE 70 TEE ' 59.21
$1 1 RB 021 11 098400 TBX 1 460bM1 BJ PT ISI-11 R10 X TEE TO PIPE 59.21 SI+1-RB 021 12 098500 TBX 1460012 BJ PT NDE 300 R2 X PERFORMED BY TU 70LL0 DING REWORK.
PIPE TO REDUCER 39.21 SI 1 RB-021 13A 3 St 1 339 2501R 1 096600 TBX 1-4600 13 BJ PT 151 11 R10 X TEE To P!PE B9.21 SI 1 RB 021 148 1
098700 TEX 1 4600 14 BJ PT 151-11 Rio X i I
PIPE TO ELBOW 99.21 SI 1-RB-021 15A O
(
l C. _ _ _ - _ _ _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
}
DATE ' 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 205-
.REVlll0N 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOL,' BASELINE INTERVAL
'[ )-- CLASS 1 COMPONENTS 1 V :' SAFETY INJECTION ASME G J' SEC. XI NE RamARY EXAMINATION AREA. CATCY. EXAM NRR0 REMARKS NUMBER' IDENTIFICATION ITEM N0' METHOD PROCEDURE IIIM- ** CALIBRATION BLOCK **
3-8f.1 339-2501R 1 096800 TBx 1 4600 15 BJ PT ISI 11 R10 X ELBOW TO P!PE B9.21 S!-1 RB 021 16A 096900 TBx 1 4600 16 BJ PT 181-11 R10 X P!PE TO TEE B9.21 S! 1 RB 021 17A 099000 TBX 1 4600 t7 BJ PT IS!-11 Rio X REDUCER 70 PIPE B9.21 SI 1 RB 021 19A
% 099100 TBX 1 4600-18 BJ PT ISI-11 R10 X PIPE TO TEE B9.21 SI 1 RB 021 184 099200 TBX 1 4600 19 BJ PT ISI 11 R10 X TEE TO PIPE 99.21 SI 1 RB 021 20A 099300 TBX 1 4600-20 BJ PT !$1 11 Rio X P!PE TO REDUCER 89.21 53 1 RB 021 21A 3-St 1 303 2501R 1
! 099400 TBX 1 4600 8815 B G-2 VT 1 ISI 8 RBFC1 X VALVE BODY BOLTING B7.70 i
l :.
. COMANCHE PEAK UNIT 1 PAGE: 206-DATE: 06/30/89
- REVISION:~ 1 PRESERVICE INSPECTION Su m ART OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
,t i CLASS 1 COMPONENTS EACTOR' COOLANT ASME G J SEC. XI NE lJ
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
TBX-RCPCPC 01 099500 TBX-1 5100A B-G 2 VT 1 151 8 R8FC1 X
, RCPUMP 1 #1 SEAL BOLTING (131/157.60 B12)
TBK RCPCPC-02 099600 TBX 1 5100A BG2 VT 1 151-8 R8FC1 X RCPUMP 2 #1 SEAL BOLT!NG (2' B7.60 81/2*B12)
( TBX RCPCPC-03 O
099700 TBX 1 5100A BG2 VT 1 151 8 R8FC1 X RCPUMP 3 #1 SEAL BOLT!NG (3 57.60 81/3 312) e TBX-RCPCPC 04 099800 TBX 1 5100A B-G 2 VT 1 151 8 R8FC1 X RCPUMP 4 #1 SEAL BOLTING (4 87.60 81/4 B12)
TBX-RCPCPC-01 B G-1 UT SHOP RECORDS USED.
099900 TBX 1 5100A RCPUMP1 MAIN FLANGE BOLTING (1 B6.190 MT
-81/1 B24)
- TBX 25**
1
\
_ _ _ _ _ _ _ _ _ . . _ _ ___ _ _ . _ _ _ 1
COMANCHE PEAK UNIT 1 PAGE: 207 DATE: 06/10/89 NEVIS10N: 1 PRESERVICE INSPECTION SUMMART GUTAGE D (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS REACTOR COX ANT ASME G J SEC. El NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
TBX RCPCPC.02 B-G 1 UT SHOP RECORDS USED.
100000 TBX 1 5100A RCPUMP2 MAIN FLANGE BOLTING (2 B6.190 MT
-B1/2 824)
..ygx.25**
TBr-RCPCPC 03 B-G 1 UT SHOP RECORDS USED.
100100 TBx 1 5100A RCPUMP3 MAIN FLANGE BOLTING (3 B6.190 MT
-B1/3 824)
- **TBX 25**
TBx RCPCPC-04 100200 TBx-1 5100A BG1 UT SHOP RECORDS USED.
RCPLMP4 MA!N FLANGE BOL11NG (4 B6.190 MT
.B1/4 B24)
- TBK 25**
TBY RCPCPC-01 100300 TBx 1 5100A BG1 VT SHOP RECORDS USED.
RCP(MP1 MAIN FLANGE BOLTING (186.200
-B1/1-824)
TBr PCPCPC-02 l
l 100400 TBx 1 5100A B G-1 VT SHOP RECORDS USED.
RCPUMP2 MAIN FLANGE BOLT!NG (2 B6.200 81/2-824) 1
DATE: 06/30/89 COMANCNE PEAC UNIT 1 PAGE: -208 REVISION: 1 PRESERVICE INSPECTION SulmARY
- /- CUTAGE O (1984), PERIOD, BASEL!*; INTERVAL CLASS 1 COMPONENTS
( Rf4CTOR COOLANT ASME &
J SEC. XI NE SUMARY EXAMINATION AREA CATCY EXAM NkR0 REMARKS NUMBER IDEllTIFICAfl0N ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION Bloct:**
TBX RCPCPC 03 100500 TBX-1 5100A- BG1 VT SHOP RECORDS USED.
RCMMP3 MAIN FLANGE BOLTING (3 B6.200 B1/3 B24)
TBW-RCPCPC 04-100600 TBK 1 5100A BG1 VT SHOP RECORDS US!D.
RCPUMP4 MAIN FLANGE BOLTING (4 86.200 B1/4 824)
TBN RCPCPC-01 3-L-1 RT SHOP RECORDS USED.
100700 TBX 1 5100C 1 1 RC PUMP 1 CASING WELD B12.10 TBX RCPCPC-02 BL1 RT SNOP R! CORDS USED.
100800 TBX-1 5100C 2 1 RC PUMP 2 CASING WELD B12.10 TBX RCPCPC 03 SHOP RECORDS USED.
100900 TBK 1 5100C 3 1 B-L 1 RT RC PUMP 5 CASING WELD B12.10 A
l
{ .' .___ -
)
. COMANCHE PEAK UNIT 1 iAGE: 209- 1
- DATE: 06/30/89 REVIS10Ms 1 PRESERVICE INSPECTION
SUMMARY
(11TAGE O (1984), PERIOD, BASELINE INTERVAL CLASS 1 COMPONENTS
-%e wEACTOR C00LAlfT ASME G NE i SEC. XI SL80%RY EXAMINATION AREA ~. CATGY EXAM NRR0 REMARKS 398ER IDENTIFICATION ITEM No METHOD PROCEDURE IIIN ** CALIBRATION BLOCK **
Ily;1CPCPC-04 101000 -TBX 1 5100C 4 1 sL1 RT SNOP RECORDS USED.
RC PUMP 4 CASING WELD B12.10 TBX-RCPCPC-01 BL2 VT Sf t1P RECORDS USED.
101100 TBX-1-5100C RC PUMP 1 CASING B12.20 l
l TBX-RCPCPC 02-l 8-L*2 SMOP RECORDS USED.
C 11200 tex 1 5100C VT k, RC PUMP 2 CASING B12.20 i
TEX RCPCPC-03 eL2 SHOP RECORDS USED.
101300 tex 1 5100C VT RC PUMP 3 CASING B12.20 i TBX RCPCPC 04 1
1 1 SHOP RECORDS U$ED.
101400 TBX 1 5100C BL2 VT RC PUMP 4 CASING B12.20 l
l 1
m L -__
}
DATE: '06/30/09 CDMANCHE PEAK UNIT 1 PAGE: 210 !
~ REVISION: 1 PRESERVICE ' INSPECTION
SUMMARY
DUTAGE D (1984), PERIOD, BASELINE INTERVAL
{q.
\-
CLASS 2 COMPONENTS MAIN STEAM ASME G SEC. XI NE Su m ARY EXAMINATIDW AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
TEX RCPCSG-03
- 101500 tex 2 1100 2 CA UT OL !$1 47 R3 X 1% NOT EXAMINED WITH 455 & 60s. SEE RR C -
SG3 TueESNEET TO SHELL WELD C1.30 UT 45$ ISI 47 R3 X -6. 'i UT-60S 151 47 R3 X
- TBX 2P*
101700 78X 2c1100 5 CA UT 0L !$1 47 R3 X SG3 TRANSITION CONE TO LOWER C1.10 UT 455 151 47 R3 X b SNELL WELD UT 60s !st 47 R3 X
- TBX 27**
101800 TBX 2 1100 6 CA UT OL 151 47 R3 X SG3 UPPER $NELL TO TRANSITION C1.10 UT 45S 151 47 R3 X CONE WELD UT 60$ 15147 R3 1
UT 60S 151 47 R? X
- TBX 2P*
102000 tex 2 1100 9 C-8 UT OL ISI.47 R3 X 30% NOT EXAMINED WITH 455 & 60s. SEE RR SC3 FCEDWATER N022LE TO VESSEL C2.21 UT 45$ 151 47 R3 X C-8.
WELD UT-60$ ISI 47 R3 X MT 151 70 R2 X
- TBX 2P*
l 1
COMANCHE PEAC tJNIT 1 PAGE: 211 DATE:- 06/30/89.'
- REYl$10N: 1- PRESERVICE INSPECTION SuletARY C. < DUTAGE 0 (1964), PER100, BASELINE INTERVAL CLiASS 2 COMPONENTS M1N STEAM r
ASME G
~
SEC. XI N E' SuletARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM No METHOD PROCEDURE II1M ** CALIBRATION BLOCK ** .l TsX-RCPcSG-03 1
102050 TBX 2 1100 9-CB SEE RR C-4. l SG3 FEEDWATER N0ZZLE INNER C2.22 RADIUS ,
- TBM 27'*
102100 TBX 2 1100 10 C8 UT OL 151-47 R3 X 35% NOT EXAMINED WITH 455 & 60s. SEE RR SG3 AUX. FEEDWATER N0ZZLE To C2.21 UT 455 151 47 R3 X C 8.
VESSEL WELD UT 60$ 151-47 R3 X MT 151 70 R2 X
- TBX 27**
02200 TBX 2 1100 11 t: B UT-OL 15147 R3 X 30% NOT EXAMINED WITH 455 & 605. SEE RR SG3 MAIN STEAM N0ZZLE To C2.21 UT 455 ISI-47 R3 X C 8.
VESSEL WELD UT 60$ ISI 47 R3 X MT !$1-70 R2 X
- TBX 27**
102250'TBX-2 1100 11- C.B SEE RR C 4.
SG3 MAIN STEAM N0ZZLE INNER C2.22 RADIUS
- TBX 27'*
e
DATE: 06/30/B9 COMANCHE PEAK UNIT 1 PAGE: 212
. REVISION: 1 PRESERVICE INSPECTION SUMARY
- j ] OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS
(] CHEMICAL $ VOLUME CONTROL ASME G J SEC. XI 'NE SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICAT!aN ITEM No METHOD PROCEDURE IIIN ** CALIBRATION BLOCK **
TBN CSAMEL-01 102300 TBX-2 1110 1 CA UT OL ISI-206 R0 X 50% NOT EXAMINED WITN 455, SEE RR C 1 &
EXCESS LETDOWN NX HEAD TO C1.20 UT 458 181 206 R0 X C 6.
- TBX 8**
l 102400- TBX 2 1100-2 C.A UT OL ISI 206 RD X 51 NOT EXAMINED WITH 453, SEE RR C-6.
EXCESS LETDOWN MX SHELL TO C1.10 UT 45$ 151 206 R0 X FLANGE WELD
- TBK 42**
0250's TBK 2 1100-3 CA UT OL 151 206 R0 X EXCESS LETDOWN MX HEAD TO C1.20 UT 455 IS{ 206 R0 X SHELL WELD
- TBX 42**
O
,.I.
~~ DATES. 06/30/89 COMANCHE PEAK UNIT 1 'PAGE: 213 REV!$10N: - 1 PRESERVICE INSPECTION SU MART GUTAGE O (1984), PERIOD, BASELINE INTERVAL
-(
- CLASS 2 COMPONENTS l '- RESIDUAL NEAT REMOVAL l'
l ASME G J SEC. XI NE Su m ART EXAMINATION AREA CATGT EXAM NRR0 REMARKS NLMBER IDENTIFICAfl0N ITEM No METHOD PROCEDURE Ii1M ** CAL 10 RATION BLOCK **
l' TBX-RNAMRS-01 l
102600 T8X 2 1120*1 1 C*A UT OL 151 206 RD X 211 NOT EXAMINED WITH 455, SEE RR C 1 8.
RNR NX1 NEAD TO SHELL WELD C1.20 UT 455 181206 R0 X C 6.
'"TBX 30**
102700 f tX 211201 2 CA UT OL 181 206 R0 X 421 NOT EXAMINED WITH 455, SEE RR C 1 &"
RNA 10(1 $NELL TO FLANGE WELD C1.10 UT 455 151-206 R0 X C 6.
- TBX 30**
102800 "BX 2 1120 1 3 C-8 UT-OL ISI 206 R0 X 51 NOT EXAMINED WITH 455, SEE RR C 6.
RNR 10(1 INLET N0ZZLE 10 SHELL C2.21 UT 45S 151 206 R0 X WELD PT 151-11 R10 X
- TtX 30**
102C50 TBX 2 1120 1 3 C3 SEE RR C 4.
RNR 10(1 INLET N0ZZLE INNER C2.22 RADIUS
- TBX 30**
C5 !$1 206 R0 X SE NOT EXAMINED WITH 45$, SEE RR C-6.
102900 T4X 2 1120 1 4 UT OL RNR loti r'*LET N0ZZLE TO SPILL C2.21 UT 455 151 206 R0 X WELD PT 151 11 RIO X
- TBX 30**
102950 TBX 2 1120 1 4 Cg SEE RR C 4.
RNR 10(1 QUTLET N0ZZLE INNER C2.22 RADIUS
- TEX 30**
v l
DATES 06/30/89- COMANCHE PEAK UNIT 1 PACE: 214 REVISION:- 1 PRESERV!CE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, SASELINE INTERVAL CLASS 2 COMPONENTS REstDUAL NEAT REMOVAL ASME G 2 SEC. XI. NE
SUMMARY
EXAMINATION AREA-' CATGY EXAM NRR0 REMARKS NUMRER IDENTIFICATION ITEM NO ETHOD PROCEDURE IIIM ** CAL!BRATION BLOCK **
....... .............................. ....... .......... ............... .... .................................... ... i 1
TRX RMAHRS-01 103000 TBX 2 1120 1*1WS CC PT 151 11 R10 X RE* EXAMINED AFTER REWORK.
RHR HX1 WELDED SUPPORT C3.10 103100 TsX 2-1120 1 2WS CC PT !s! 11 R10 X RE-EXAMINED AFTER REWORK.
RNR HX1 W LDED SUPPORT C3.10
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 215 REVISION: 1 PRESERVICE INSPECTION SUMMART
,% OUTAGE D (1984), PERIOD, BASELINE INTERVAL CMENICAL & VOLUME CONTROL ASME G
-~ SEC. XI NE SUMMART EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD- PROCEDURE I11M ** CALIBRATION BLOCK **
TBX CSAMSW-01 103200 TBX 2 1130 1 CA PT 151 11 Rio X RI !$ ACCEPTABLE, SEE TAB F 0F PSI FINAL SEAL WATER HX HEAD TO SHELL C1.20 VT 1 NQA 3.09-8.52R0 X REPORT. SEE RR C-2.
- NA**
'.03210 TBX 2 1130 2 CA PT ISI 11 R10 X RE EXAMINED AFTER REWORK. SEE RR C 2.
SEAL WATER HX SHELL TO FLANGE C1.10 VT 1 NQA 3.09 8.52R0 X WELD
- NA**
r~
( TBX CSAMLD 01 C-A VT 0L 151 206 R0 X 20% NOT EXAMINED WITH 455, SEE RR C 1/C 103300 TBX-2 1140 1 HORZ. LETDOWN MX NEAD TO C1.20 UT 455 151 206 R0 X 6.
- TBX 31**
TBX CSANRG-01 103400 TBX-2 1150 1 CA UT OL 151 206 R0 X REGENERATIVE MX HEAD TO TEE C1.20 UT-45$ ISI 206 R0 X WELD
- TBX 9**
103500 TBX 2 1150 2 CA UT OL !$l 206 R0 X REGENERATIVE HX HEAD TO TEE C1.20 UT 455 IS! 206 R0 X WELD
- TBX-9**
1
(
l
[
COMANCHE PEAK UNIT 1 PAGE: 216
~DATE: 06/30/89-REVISION: 1 PRESERVICE INSPECTION
SUMMARY
- QUTAGE D (1984), PERIOD, BASELINE INTERVAL
/]
' xj CLASS 2 COMPONENTS CMEMICAL & WOLUME CONTROL ASME G
~,
SEC. XI NE
SUMMARY
EXAMIMil0N AREA CATGY EXAM NAR0 REMARrs NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE 'IIIM " CALIBRATION BLOCK **
TRX-etAMRC-01 103600 TBM 2 1150-3 CA UT OL 151 206 R0 F REGENERATIVE NX SHELL TO TEE C1.10 UT 45S 151 206 R0 X WELD
- TBX 8** ,
CA UT OL 151 206 R0 X RI IS ACCEPTABLE, SEE TAB F 0F PSI FINAL 103700 TBX 2 1150 4 C1.10 UT 455 151 206 R0 X REPORT. 2% NOT EXAMINED WITH 455, SEE REGENERATIVE MX SHELL TO TEE WELD RR C-6.
eeygg.ges CA UT CL 151 206 RD X 8% NOT EXAMINED WITH 455, SEE RR C 6.
380^ TBX 2 1t50 5 REGENERATIVE MX SHELL TO TEE C1.10 UT 455 151 206 R0 X WELD
- TBX 8**
151 206 RO 8% NOT EXAMINED WITH 455, SEE RR C 6.
103900 T8X 2 1150 6 CA UT 0L X REGENERATIVE XX SHELL 70 TEE C1.10 UT-455 151-206 R0 X WELD
- TBX 8**
151 206 RD 22% NOT EXAMINED WITH 45$, SEE RR C 6.
104000 TBX 2 1150 7 CA UT OL X REGENERATIVE HX REDUCER TO C1.10 UT 45$ 151 206 R0 X SNELL nELD
- TBX 9"
s
.DATE: 06/30/09 ' COMANCHE PEAK UNIT 1 PAGE: 217
- REVISION - 1 PRESERVICE INSPECTION SumART
. ym QUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS i ~j CNENICAL & VOLLM CONTROL ASME G J SEC. XI NE SWOIART EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER -IDENTIFICATION ITEM No METHOD PROCEDURf IIIM " CALIBRATION BLOCK **
TBK C$AMAG-01 CA UT-OL ISI 206 R0 X 22% NOT EXAMINED WITH 458, SEE RR C-6.
104100 TBK 2 1150 8 REGENERATIVE MX REDUCER TO C1.10 UT 45S ISI 206 R0 X SHELL WELD "TBX-9" TBX TRAHLR-01 104200 TBX 2 1160 1 C-A PT ISI 11 Rio X SEE RR C-2.
LETDOWN REHEAT MX HEAD TO C1.20 VT 1 NQA 3.09 8.52n0 X SHELL WELD
- TBX-7**
/"%
U .104300 TBX 2 1160 2 CA PT ISI 11 Rio X SEE RR C 2.
LETDOWN REHEAT HX SHELL TO C1.10 VT 1 NQA 3.09 8.52RD X
l l
l r
i l
)
\
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 218 REVISION: 1 PRESERVICE INSPECTION SUMMART 0UTAGE O (1984), PERIOD, BASELINE INTERVAL c
/ .
CLASS 2 COMPONENTS
\
ASTE PROCEssf$
ASME G SEC. XI NE RMMART EXAMINAft0N AREA CATGT. EXAM NRR0 REMARKS IRMBER ' IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **-
TBN-WPAMRD 01 104400 TBX 211701 CA UT OL 151 206 R0 X 10% NOT EXAMINED WITH 455.
'RC DRAIN TANK MX HEAD T0 SHELL C1.23 UT 455 151 206 to X WELD
RC DRAIN TANK MX SHELL TO C1.10 UT 45s 151 206 R0 X FLANGE WELD
~
"TBX 43**
/ 4420 TBX 2 1170-3 CA UT-OL I$1 206 R0 X RC DRAIN TANK HX FLANGE TO C1.10 UT-455 151 206 RD X sHELL WELD
- TBX-41**
104430 TBM 2 1170-4 CA UT OL 151 206 R0 X RC DRAIN TANK NX SHELL TG HEAD C1.20 UT 45s 151 206 R0 X WELD "TBX 41**
l k
7 '
l
'DATE: 06/30/89 COMANCHE PEAX UNIT 1 PAGE: 219
-REVIS!f% - 1 PRESERVICE INSPECTION
SUMMARY
CUTAGE O (1984), PERIOD, BASELINE INTERVAL
,. CLASS 2 COMPONENTS (v# CONTAINMENT SPRAY ASME G ,
SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEN No METHOD PROCEDURE IIIM ** CALIBRATION BLOCX**
CP1 CTANCS-02 104500 TBX 2 1180 1 CA UT OL 151 206 R0 X 40% NOT EXAMINED WITH 45$.
CT MX2 NEAD TO SHELL WELD C1.20 UT 45$ Is! 206 R0 X
- TBK 31**
104603 TBK 2 1180 2 CA UT OL !$1 206 R0 X 271 NOT EXAMINED WITH 45$.
CT NX2 SHELL TO FLANGE WELD C1.10 UT 45$ 151 206 R0 X
- TBX 31**
104700 TBX 2 1180-3 C-B UT OL 151 206 R0 X CT NX2 INLET N0ZZLE TO SHELL C2.21 UT 45$ IS! 206 R0 X WELD PT ISI-11 Rio X
- TBX 31**
104750 TBX 2 1180 3 CB SEE RR C-4.
CT NX2 INLET N0ZZLE INNER C2.22 RADIUS
- TBX 31**
104900 T8X 2-1180-2 F/3 C-C PT 151 11 Rio X CT MX2 WELCEO SUPPORT C3.10 105000 TBX 2 1180 2 2WS C-C PT 151 11 R10 X CT MX2 WELDED SUPPORT C3.10 0
L COMANCHE PEAK UNIT 1 PAGE: 220 U DATE: 06/30/89 REVISION: 1 PRE $ERVICE INSPECTION SUMMART OUTAGE O (1984), PERIOD, SASELINE INTERVAL
- n:
i I h e CLASS 2 COMPONENTS CHENICAL & VOLtME CONTROL ASME C
.: SEC. XI NE E884ARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS IRMBER IDENTIFICATION ITEM NO E THOD PROCEDURE IIIM ** CALIBRATION BLOCK **
TBN CSATVC 01 105100. TBX 2 1200-1 CA UT OL ISI 206 R0 X VOLLME CONTROL TANK BOTTOM C1.20 UT 45$ !$1 206 RD X
' MEAD TO SMELL r
- TBX 32**
105200 Tex 2 1200 2 CA ttf OL !$1 2C6 R0 X VOLUME CONTROL TANK TOP HEAD C1.20 UT 45$ 181 206 R0 X TO SHELL
- TBX 32**
G CSFLRC 01 105300 TBX 2 1300 1 CA PT 181 11 R10 X RI IS ACCEPTABLE, SEE TAB F 0F PSI FINAL RC FILTER HEAD TO SHELL WELD C1.20 VT 1 NOA 3.09-8.52RO X REPORT. SEE RR C-2.
e.ggee 105310 TBX 2 1300 2 CA PT ISI 11 Rio X RI !$ ACCEPTABLE, SEE TAB F 0F PSI FINAL RC FILTER SHELL TO FLANGE WELD C1.10 VT 1 NOA 3.09-8.52R0 X REPORT. SEE RR C 2.
- NA**
105320 TBX 2 1300 1WS CC PT !$1 11 R10 X RC FILTER VILDED SUPPORT C3.10 105330 TBX 2 1300 2WS CC PT 151 11 Rio X RE EXAMINED AFTER REWORK.
RC FILTER WELDED SUPPORT C3.10 O
1
]
1 h.m __m__m_m.___._m.--_-_ _ _ _ _ - _ _ _ -_
DATE: 06/30/89 COMANCHE PEAE UNIT 1 PAGE:- 221
' REVISION: 1 PRESERVICE INSPECTION SUIMARY
/% CUTAGE O (1984), PERIOD, BASELINE INTERVAL k ,.
CLASS 2 COMPONENTS CHEMICAL 1 VOLUME CONTROL ASME- 'G ,
'~, '
SEC. XI NE SLMMART EXAMINATION AREA CATCT EXAM NRR0- REMARKS NUMBER ' IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION" BLOCK **
TRX-CSFLRC 01 105340 TBX 2 1300 3WS CC PT 151 11 R10 X RC FILTER WELDED SUPPORT C3.10-105350 TBX 2 1300 4WS CC ' PT ISI-11 R10 X RC FILTER WELDED SUPPORT C3.10 ftX-CSFLSW 01 105400 TBX 2 1310 1 CA PT 151 11 R10 X SEE RR C 2.
SEAL WATER RETURN FILTER NEAD C1.20 YT 1 NQA 3.09-8.52RO X j
( TO SHELL 105500 TBX 2 1310-2 CA PT 151 11 R10 X SEE RR C 2.
SEAL WATER RETURN FILTER SHELL C1.10 VT 1 NoA 3.09-8.52R0 X TO FLANGE u
105600 TBX 2 1310 1WS CC PT 151 11 R10 X SEAL WATER RETURN FILTER C3.10 WELDED SUPPORT 105610 TBX 2 1310 2WS CC PT ISI.11 Rio X SEAL WATER RETURN FILTER B3.10 WELDED SUPPORT
pn .
y DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 222 l l REVISION: 1 PRESERVICE INSPECTION
SUMMARY
f CUTAGE O (1984), PERIOD, BASELINE INTERVAL
( .
_CHEMfCAL & V0ttM CONTROL CLASS 2 COMPONENTS ASME G j
- NE !
SEC..X1 Su m ARY EXAMINAfl0N AREA CATGY EXAM . NRR0 REMARKS !
-NUMBER IDENTIFICAfl0N ITEM No METHOD PROCEDtNtE IIIM **CAllBRAfl0N BLOCK'*
TBX CSFLSW-01 105620 TBX 2 1310 3Ws CC PT ISI-11 R10 x SEAL W IR RETURN FILTER C3.10 WELDED PPPORT 105630 TBX-2 1310 4WS CC PT !$1-11 R10 x ,
I SEAL WATER RETURN FILTER C3.10 WELDID SJPPORT
\
O
b DATE: 06/30/89 COMANCHE PEAX UNIT 1 PAGE ' 223 l:
[ . -REVIS'ON:
- 1 PRESERVICE INSPECTION SUMMART l \j-
[] OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS i' MAIN STEAM-l ASME G SEC.'XI NE SUMMART EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
32 Ms 1-001 1303 2 10$700 Tex 2 2100 1- CF UT 0L !$1 206 R0 x 5% NOT EXAMINED WITN 455, SEE RR C 5.
N0ZZLE TO P!PE C5.21 UT 45$ 151 206 RO I MS-) RB 002 1 MT ISI 70 R2 x
- TBX 33**
106300 TBx 2 2100 7 CF UT OL is! 206 R0 x ELBOW TO PIPE C5.21 UT 45S 151 206 R0 x MS 1-RB-002 V MT ISI 70 R2 x
- TBx-33**
106900 TBX 2 2100 13 CF UT 0L 151 206 RD x PIPE TO ELBOW C5.21 UT 455 151 206 R0 x MS-1 RB 002 V MT ISI 70 R2 x
- TBx 33**
107100 TBX 2 2100 15 CF UT 0L 151 206 R0 x P!PE TO PIPE (PENETRATION) C5.21 UT 455 !$1 206 R0 x MS 1 RB-002 14 MT !$1 70 R2 x
- TBx 33**
i 107900 TBX 2 2100 23 CF MT !$1-70 R2 x SWEEP 0LET C5.31 MS 1 SB 016 V 108000 TBx 2 2100 24 CF UT OL 151 206 20 x PIPE 70 VALVE C5.21 UT 455 151 206 R0 x MS 1 SB 016 24 MT 151 70 R2 x
- TBx 33**
i
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 224
, REY!SION: 1 PRESERVICE INSPECTION SumARY
~ QUTAGE O (1984), PERIOD, BASELINE INTERVAL j
CLAS$ 2 COMPONENTS V MAIN STEAM
-ASME G
- SEC. XI NE SU MARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICAT!0N ITEM NO METWOD PROCEDURE IIIM "CALIBRAfl0N BLOCK"
....... v............................. ....... .......... ............... .... ........................................
MS 25 (DRIP POT) 108200 ftX 2 2100 26 CF UT OL 151 206 R0 x 51 NOT EXAMINED, SEE RR C 5.
PIPE TO CAP C5.21 UT 45s 151 206 R0 X MS 1 se-016-V MT 151 70 R2 X
- TBK 22**
8-MS 12571303 2 108500 ftX 2 2100 Ms 026 CG MT 151 70 R2 X VALVE BODT WELD C6.20 MS-1 58 047 1MS-026 108700 TBX 2 2100 30 CF MT 181 70 R2 X PIPE TO ELBOW C5.11
(/ MS 1 St 047 V 108800 TsX-2 2100-31 CF MT 151 70 R2 X PARTIAL MT DUE 10 ADJACENT WELDED EL90W TO P!PE C5.11 ATTACHMENTS. EXTRA EXAMINATION.
MS 1 58-047 V 6-2003-2 CF 151 206 R0 X 88% NOT EXAMINED WITH 455, SEE RR C 5.
109400 ftX 2 2100-37 UT OL BRANCH CONNECTION TO FLANGE C5.21 UT 45$ !$1 206 R0 X PARTIAL MT DUE To CONFIGURATION. EXTRA MS 1 SS 016 V MT !$1 70 R2 X EXAMINATION.
- TBX 36**
32 Ms-1 001 1303 2 109700 TBX 2 2100 40L CT UT OL 151 206 R0 X LONG. SEAM (2.5T ADJ. WELD 7) C5.22 UT 45$ ISI 206 R0 X 161 70 R2 X Ms 1 RB-002 V MT
- TBX-33"
(
w L _ _ _ _ _ ._ _ _ _ . _ _ _ . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _
p l
I DATE: 06/30/09 COMANCHE PEAC UNIT 1 PAGE: 225' REVISION: 1 PREsERVICE INSPECTION suMMART, j~ GUTAGE O (1984), PERIOD, BASELINE INTERVAL
('
class 2 COMPONENTS .
ilA1M..IfEM ABIE G
-~ SEC. XI NE
$UMMART EXAMINATION AREA CATGV' EXAM NRR0 REMARKS NLMBER IDENTIFICAfl0N ITEM NO METN00 PROCEDURE IIIM ** Call 5RAfl0N BLOCK **
}2-Ms 1-001 003 2 110200 fsX 2 2100 43L CF UT OL ls! 206 RO X LONG. SEAM (2.5T ADJ. WLD 13) C5.22 UT 45s 151 206 R0 X Ms 1 RS-002 V MT ISI 70 R2 X
- tex 33**
110400 tex 2 2100-44L CF UT OL. 153 206 R0 X LONG. SEAM (2.5T ADJ. WELD 15) C5.22 UT 45s Ist 206 RD X Ms 1 F.8 002 V MT ISI 70 R2 X
- TBX 33**
110700 T8X 2 2100 46L C-F UT OL 151 206 R0 X LONG. SEAM (2.5T ADJ. W LD 24) C5.22 UT 45s Is! 206 R0 X MS 1 88 016-V MT Is! 70 R2 X v **TBX 33**
110800 TBX 2 2100-47L CF SEE RR C 9.
LONG. SEAM C5.22 Ms 1 R8 002 v
- TBX 33**
111000 TBX 2 2100 48 CF UT OL !st 206 R0 X VALVE TO MOMENT RESTRAINT C5.21 UT 455 181 206 RO X MS 1 58-016 25 MT Isi 73 R2 X
- TRX 33**
.(
PAGE: 226 DATE:-06/30/89 COMANCHE PEAK UNIT 1 f -REV!510N 1 PRESERVICE INSPECTION $UMMARY l ' jr] , OUTAGE D (1984), PERIOD, BASELINE INTERVAL l+~
( ) FEEDWATER CLASS 2 COMPONENTT ASME G f" - SEC. XI NE l ssMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLNBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIN ** CALIBRATION BLOCK" l
16 FW 1 075 1303 2 111100 TBX 2 2101 1 CF .4 0L 151 206 RD X N0Z2LE TO REDUCING ELBOW C5.21. UT 455 ISI 206 R0 X FW 1 RB 002 5 MT 151 70 R2 X "TBX 20" 18 FW 1-019-1303 2 111200 TBX 2 2101 2 CF UT OL 181 206 R0 X REDUCING ELBOW TO PIPE C5.21 UT 45$ ISI 206 R0 X FW-1 RB-002 V MT 151 70 R2 X "TBX-21"
/"
-( 12000 TBX 2 2101 10 CF UT OL 181 206 R0 X
-' PIPE To ELBOW C5.2i UT-45$ ist 206 R0 X FW 1 RB 002 2 1 MT 151 70 R2 X
112600 TBX 2 2101 FW 083 C-G MT 151 70 R2 X VALVE BODT WELD C6.20 FW 1 SB 019 1FW-063 0
~ :p iDATE l 06/30/09 ' COMANCHE PEAK UNIT 1 PAGE: 227
- CVISIONi 1' PRESERVICE INSPECTION SUMMART QUTAGE O (1984), PERIOD, BASELIN! INTERVAL-
- p, CLASS 2 COMPONENTS
' b"j '
- SEC. XI .NE SUBMARY EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER !Z4TIFICAT10N ITEM No METHOD PROCEDURE II1M ** CALIBRATION BLOCK"
....... ....t......................... ....... .......... ............... .... ........................................
Jg FW-1 036-2003 2 l
112700 TEX 2-2101 16 CF UT OL 151 206 RO X VALVE TO P!PE C5.21 UT 455 !$1 206 R0 X FW 1*St 019-10 MT 151-70 R2 X
- TBX 38**
1128')0 TEX 2 2101 17 CF UT OL !$1 206 R0 X 21 NOT EXAMINED
- LITH 4554 SEE RR C 5.
PIPE TO VALVE C5.21 UT-455 151 206 R0 X FW-1-Ss 019 9 MT 151 70 R2 X
- TBX-38**
113030 ftX 2 2101 19 CF UT OL 151 206 R0 X PIPE TO MOMENT RESTRAINT C5.21 UT 45$ 151 206 R0 X
& FW-1 Sa 019-7 MT ISI 70 R2 X
\j . .. Tex.3a..
6 FW-1 091 2003-2 113100 TBX 2 2102 1 CF MT 151 70 R2FC1&2 X RE EXAMINE 0 AFTER REWORK.
BRANCH CONNECTION C5.31 FW 1 58 019 V 113300 TsX 2 2102-3 CF UT OL 15! 206 R0 X l PIPE TO VALVE C5.21 UT-458 151 206 R0 X l
FW 1 58 033-2 MT ISI 70 R2 X l "TBX* 34" 113400 TBM 2 2102 FW-2C4 C0 MT 151 70 R2 X 1'
. VALVE BG)T WELD C6.20 FW 1-SS 033 1FW 204 l'
l l,
l L _ _ _ - _ - - - - - - - - - - - - - - - -
l
[
DATE: 06/30/89 CDMANCHE PEAK UNIT 1 PAGE: 228 REVISION: 1 PRESERVICE INSPECTION SIMMARY
.,--' OUTAGE D (1984), PERIOD, BASELINE INTERVAL l.; CLASS 2 COMPONENTS l ' FEEDWATER ADIE G
.- SEC. XI NE
SUMMARY
EXAMINATION AREA CATCY EXAM NRR0 REMARKS NUN 8ER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIN ** CALIBRATION BLOCK'*
6 FW-1 091 2003 2 113500 Tex 2 2102 4 CF UT OL !$1-206 to X VALVE TO PIPE C5.21 UT 455 ISI-206 R0 X FW-1 SS-033-3 KT ISI 70 R2 x
- TBx-34**
114100 TBX 2-2102 10 CF UT OL 181-206 R0 x VALVE To P!PE C5.21 UT 455 151 206 R0 x FW-1 As 033 9 MT !$1-70 R2 x
..ygg.34..
6-FW 1 095 1303 2
[-
14300 TBX 2-2102 12 P!PE TO VALVE C-F C5.11 MT 151 70 R2 x FW-1 SB 033 15 114400 Tex 2 2107 '192
- CG MT 151-70 R2 X VALVE B00 J C6.20 FW 1 SB 033 1FW-192 111900 TBX 2 2102 17 CF MT !st 70 22 x ELBOW TO PIPE C5.11 FW 1 58 033 20A 115900 TBX 2-2102 27 C-F MT 151 70 R2 X P!PE TO PIPE (PENETRATION) C$.11 FW 1 RR-005A 1A 116600 TBK 2-2102 34 CF MT ISI 70 R2 X PIPE TO VALVE C5.11 FW-1 RS 005A 8 V
COMANCHE PEAK UNIT 1 PAGE: 229 DATE: 06/30/89-REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1984), PERIOD, BASELINE INTERVAL i
[% \ CLASS 2 COMPONENTS gg .
ASME G
.- SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EAAM NRR0' REMARKS NUMBER IDENTIFICAfl0N ITEM #0 METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6 FW 1-095 1303 2 CG MT NDE 400 R2 X PERFORMED IT TU FOLLOWING REWORK.
116700 TBX 2 2102 FW 196 VALVE BG)Y WELD C6.20 FW-1 RB 005A 1FW 196 116800 TBM 2 2102 35 CF MT Ist 70 R2 X VALVE TO P!PE C5.11 FW 1 RB-005A 9 CF MT 151 70 R2 X 117700 TBX 2-2102 44 PIPE TO ELBOW C5.11 FW 1 RB 005A 21 t/^
\ 117800 TBX 2 2102 45 CF MT 181 70 R2 X ELBOW TO PIPE C5.11 FW 1 RB 005A 22 117900 TBX 2-2102 46 CF MT ISI 70 R2 X PIPE T@ ELBCal C5.11 FW 1 >B 005A 23A 118200 TBX 2 2102 49 CF MT 181 70 R2 X ELBOW TO PIPE C5.11 FW 1 RB-005A 26 CF MT 151 70 R2FC1&2 X RE EXAMINED AFTER REWORK.
118300 TBX 2-2102-50 PIPE TO VALVE C5.11 FW 1 RBe005A 30 bO
(;
DATE: 06/30/09 COMANCHE PEAK UNIT 1 PAGE: 230 REVISION: 1 .PRESERVICE INSPECTION
SUMMARY
l y OUTAGE 0 (1984), PERIOD, BASEP.INE INTERVAL
< h. CLASS 2 COMP 0NENTS A M FEEDWATER ASME G
" . SEC. XI NE SWJIARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS
~ RMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIN ** CALIBRATION BLOCK **
6'FW-1 095 1303 2 118400 TBX 2-2102 FW 200 CG MT ISI 70 R2 X VALVE BODY WELO ~ C6.20
-FW-1-RB-005A 1FW-200 118500 TEX 2 2102 51 CF MT 151 70 R2 X VALVE TO PIPE C5.11 FW 1-RB 005A 31
-i18600 TBX 2-2102-52 CF MT !$1 70 R2 -X PIPE To EL20W C5.11 FW 1 Re 005A 35
/
k '118700 Tex 2-2102 53 CF MT 151 70 R2 X ELBOW 70 PIPE C5.11 FW 1 RS 005A 36A 11E300 TBX 2 2102 54 CF MT 151 70 R2FC182 X P!PE To ELBOW C5.11 FW 1 RB 005A 37 118900 TBX 2 2102 55 CF UT OL ISI 206 R0 X ELS0W TO N0ZZLE C5.21 UT 45$ 151 206 R0 X FW-1 RS 005A 38 MT ISI 70 R2 X
- TBX 34**
6 FW 1 099-1303 2 119000 TBX 2 2102 56 CF MT 151 ~/0 R2 X BRANCH CONNECTION C5.31 FW 1 RS 002 11 0
li l
l' 1-
= DATE: 06/30/89 COMANCHE PEAK UNIT 1' PAGE: -231-l; REV1810M 1 PRESERVICE INSPECTt0W SumARY OUTAGE O (1984'), PERIOD, BASELINE INTERVAL
. {q CLASS 2 COMPONENTS
') EDWATER FE ASME G J SEC. XI NE SLMMARY EXAMINATION AREA CATGY EMAM NRR0 REMARKS' NLMBER IDENT!FICAfl0N ITEM NO METNOD PROCEDURE 11IM ** CALIBRATION BLOCK **
M ,1 099 1303-2 119100 TBK 2 2102 57 CF MT 15! 70 R2 X BRANCH CONNECTION TO PIPE C5.11.
FW 1 RB 005A 1 119600 TBM 2 2102 62 C-F MT 151 70 R2FC1&2 X RE-EXAMINED FOLLOWING REWORK.
P!PE 10 VALVE (FLANGED) C5.11 ;
1 FW-1 RB 005A 6A 119700 TBM 2 2102-64 C-F MT 151-70 R2FC1&2 X RE EXAMINED FGLLOWING REWORK.
VALVE (FLANGED) To PIPE C5.11 FW 1 ks UO5A 6-1
[
119800 TBX 2-2102 65' C-F MT 151 70 R2FC182 X RE EXAMINED FOLLOWING REWORK.
. PIPE TO ELBOW C5.11 4
)
I
\
/
(
g.
? DATE: 06/30/09.' COMANCHE PEAK UNIT 1' PAGE:~ 232 REvls10N:. 1' PRESERVICE INSPECTION subO WlY-
% OUTAGE O (1964), .PERICB, BASELINE INTERVAL' class 2 COMPONENTS
,g NAIN STEAM AsME : G J SEC. XI NE SLMMART EXAMINATION ARCA CATGY- EXAM NRR0 REMARKS IRS @ER IDENTIFICATION ITEM No NETHOD PROCEDURE IIIM ** CALIBRATION BLOCK"
....... .............................. w......
32-MS 1 002 1303-2 121100 TBX 122M-1 CF UT OL !st 206 R0 X N0ZZLE TO PIPE C5.21 UT 45; 151 206 R0 X MS 1 Re 004 1 MT 151 70 R2 X
- TBX 33**
121300- TBX 1 2200 3 C F: UT OL 151-206 R0 X ELBOW TO PIPE C5.21- UT 45s 151+206 RO X MS 1 Re 006 V MT 151 70 R7 X
- TBX 33**
122300 TBX 1'2200 12 CF' UT OL 151 206 R0 X PIPE TO ELBOW- C5.21. UT-45s 151 206 R0 X Ms 1 RS 006 V- MT 151 70 R2 X A **TsX 33" -
122500 TtX 1220014 CF UT OL 151 206 R0 X l PIPE TO PIPE (PENETRAfloN) C5.21 UT-45s 151 206 R0 X Ms 1 RS 006 18 MT 151-70 R2 X
. **TBX 33" 122800 TtX 1 2200 17 CF MT 151 70 R2 X SWEEP 0LET C5.31 Ms 1 se 018 V 123400 TBX 1 2200 23 CF UT OL 151 206 R0 X P!PE TO VALVE C5.21 UT 45s 151 206 R0 X l
l Ms i 58 018 4 MT 151 70 R2 X
- TBX 33** i l
I
-- ( l I
s
DATE: 06/30/89 COMANCHE PEAX' UNIT 1 PAGE: 233
~ REVISION: ; PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL t 4 CLASS 2 COMPONENTS Y2AAIN STEAM ASME G
.- SEC. XI NE
SUMMARY
EXAMINATION AREA CATCY EXAM' NRR0 REMARKS.
NUMBER IDENTIFICATION ITEM NO METNOD PROCEDURE IIIM ** CALIBRATION BLOCK **
MS 24 (DRIP POT) 123600 TBX-1 2200 25 CF UT 0L 151 206 R0 X 51 NOT EXAMINED WITH 45$, SEE RR C 5.
PIPE To CAP C5.21 UT 458 !$1 206 R0 X MS 1 SB 018 V MT 151 70 R2 X
- TBX 22**
8 MS 1 240-1303-2 123900 TBX 1 2200-MS 063 C-G MT ISI 70 K2 X VALVE BODY WELD C6.20 MS 1 SB C'.5-1MS 063 124100 TBX 1 2200-29 CF MT 151 70 R2FC182 X RE EXAMINED AFTER REWORK.
fO PIPE TO ELBOW C5.11-d MS 1 SB-045 V 6 2003 2 CF UT OL 151 206 RD X 63% NOT EXAMINED WITN 455, SEE RR C 5.
124400 TBX 2 2200 32 BRANCN CONNECTION TO FLANGE C5.21 UT 455 151 206 R0 X MS 1 SB 018-V MT ISI 70 R2 X
- TBX 36**
32 MS 1 002 1303 2 124900 TBX 2 2200 37L CF UT 0L !$1 206 R0 X LONG. SEAM (2.57 ADJ. WELD 3) C5.22 UT 455 151 206 R0 X MS 1 SB 004 V MT ISI 70 R2 X
- TBX 33**
125600 TBX 2 7200 42L CF UT OL ISI 206 Ru X LONG. SEAM (2.5T ADJ. WELD 12) C5.22 UT 455 ISI 206 R0 X MS 1 RB 004-V MT ISI 70 R2 X
- TBX 33**
l
~
i
n_ _ - _ - - -. _ _ - - ,_ _ . _ _ . . _.
L p:
. COMANCHE PEAK UNIT 1 PAGE: 234 DATE:.Do/20/89 REVISION: .1 PRESERVICE INSPECTION SUMMART OUTAGE O (1984), PERIOD, SASELINE INTERVAL i
/ CLASS 2 COMPONENTS l f J' AAIN STEAM ASME G l .. ~
NE
- SEC. XI SumARY EXAMINATl9I ARE/. CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE I l'I M ** CALIBRATION BLOCK **
32 MS 1 002-1303-2 125800 TBX 2 2200 43L CF UT OL 151 206 R0 x LONG. SEAM (2.5T ADJ. WELD 14) C5.22 UT 455 151 206 R0 x MS 1.RS 004 V MT !$1 70 R2 x
- T8x 33**
126100 TBx 2 2200 45L CF UT 0L ISI 206 R0 x LONG. SEAM (2.5T ADJ. WELD 23) C5.22 UT 455 151 206 R0 x MS 1 ss-018 V MT ISI 70 R2 x
- Tex 33**
C-F SEE RR C 9.
126200 :TBX 2 2200-44L LONG. SEAM C5,22 T MS-1 RS-004 V
-(
'() .
- Tex-33**
126300 TBx 2 2200 47 C-F UT OL 181-206 R0 x VALVE TO MOMENT RESTRAINT c5.21 UT 455 151 206 R0 x MS 1 sa 018 20 PT 151-70 R2FC1&2 x
- TBx 33**
I
.O '
v <
k 1
j
DATE: 06/30/89 COMANCHE PEAX UNIT 1 PAGE: 235
- REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1964), PERIOD, BASELINE INTER.AL 7"
i class 2 COMPOWENTS s
~
FEEDWATER AsME G J SEC..XI NE SLBMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMBER 10ENTIFICAtl0N ITEM WO METHOD PROCEDURE- 1IIM ** CALIBRATION BLOCK **
16 FW-1 074 1303 2 126400 TBX 2 2201 1 -CF UT 0L !$1 206 R0 X N0ZZLE To REDUCING ELBOW C5.21 UT 45s 151 206 R0 - X FW 1 RB-004 12 MT 181 70 R2 X
- TBX-20**
18-FW 1 018 1303-2 151 206 R0 X k 128500 TBX 2 2201 22 C-F UT OL PIPE TO ELBOW C5.21 UT 45$ 1s1 206 R0 X FW 1-RB 004 Y MT 1s1 70 R2 X
- TBX 21**
m
/ % 28700 TBX 2 2201 24 C-F UT-OL 151 206 R0 X PIPE TO PIPE C5.21 UT 45s 151-206 R0 X
' FW 1 RB 004 V MT 151 70 R2 X
- T1X 21**
129000 TBX 2 2201 27 CF UT OL 151 206 R0 X PIPE TO PIPE (PENETRATION) C5.21 UT 45s Is! 206 R0 X FW 1 RB 004 1 MT 151 70 R2 X
..ygx.21**-
18-1 FW-035 2003-2 129300 T8X 2 2201 30 CF UT OL !st 206 R0 X P!PE TO VALVE C5.21 UT 45s 151-206 R0 X FW 1 88 018 11 MT Is! 70 R2 X
.*TBX 38**
129350 TBX 2 2201 FW-077 CG MT 181 70 R2 X VALVE BODY WELD C6.20 FW 1 sB 0181FW-077 f.
'k .
b y
COMANCHE PEAK UNIT 1 PAGE: 236'
! -- DATE: 06/30/89 lj REVISION: 1 PRESERVICE INSPECTION
SUMMARY
QUTAGE O (1984), PERIOD, BASELINE INTERVAL
,q
~
i S CLASS 2 COMPONENTS FEEDWATER ASME G J SEC. XI -NE SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO MtTH00 PROCEDURE IIIM ** CALIBRATION BLOCK **
18 1 FW 035 2003 2 129400' TBx 2 2201 31 CF UT OL !$1 206 R0 x VALVE TO P!PE C5.21 UT 455 ISI 204 R0 x .)
IS! 70 R2 X 1 FW-1 SB 018 10 MT
- TB". 38**
1 5% NOT EXAMINED WITH UT, SEE RR C-5. !
- 129500 TBx 2 2201 32 CF UT 0L 151 206 R0 x P!PE TO VALVE C5.21 UT 455 !$1 206 R0 x FW 1 SB 018 9 MT 151 70 R2 x .i
- Tex-38** l 1
129700 Tex 2-2201 34 C-F UT OL ISI 206 R0- x PIPE TO MOMENT RESTRAtl.T C5.21 UT 455 !$1 206 R0 x 1
[ -
FW-1 SB 018 7 MT ISI 70 R2FC182 x A .. Tex.38..
6-FW-1 092-2003 2 129800 Tex 2 2202 1 cF MT 151 70 R2 x BRANCH CONNECTIDW C5.31 FW 1 SB 018-V 130100 Tex 2-2202 FW 205 CG MT 151 70 R2 X VALVE BODT WELO C6.20 FW 1 SB 031 1FW 205 130300 Tex 2 2202 5 CF UT 0L 151 206 B0 x P!PE TO ELBOW C5.21 UT 455 !$1 206 R0 x FW-1 SB 031*4A MT 151 70 R2 x
- TBX-34" l i
N_
L--__-----__--___-_-__-_____
w- --,-e - - - -
l l
I
- i.
- DATES 06/30/09 COMANCHE PEAK tNf!T 1 PAGE: 237 I . REVISION:: 1 'PRESERVICE INSPECTION SUMMART I' OUTAGE O (1984), PERIOD, BASELINE INTERVAL
,- ,-L CLASS 2 COMPONENTSe
.( }.
N . / FEEDWATER ASME G SEC. XI NE
SUMMARY
EXAMINATIONAR5. CATGY- EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION SLOCK**
g FW 1 092 2003 2 13070'l TBX 2 2202 9 CF UT OL 151 206 RO 1 PIPE TO VALVE B5.21 UT 458 158 206 R0 X FW-1 88 031 8 MT ISI 70 R2 X
[ ..ygg.34 6 FW-1 096 1303-2 131000 T8X 2 2202 12 CF MT 181 70 R2 X PIPE TO VALVE C5.11-FW 1 88-031 15 131050 TBX 2 2202 FW 193 CG MT 181 70 R2 X
[ VALVE BODY WELfr C6.20
\ FW1$s4311FE193 131600 -TBX 2 2202 18 CF MT ISI 70 R2 X
- P!PE TO ELloW C5.11 FW 1 SB 031 24A 132500 TBM 2 2202 27 CF MT ISt 70 R2 X PIPE TO PIPE (PENETRATION) C5.11 FW 1 RS 0068 1
-133000 TEX 2 2202-32 CF MT 151 70 R2 X PIPE TO ELB0W C5.11 FW 1 RS 0068 6
~133100 TBX 2 2202 33 CF MT ISI 70 R2 X ELBOW TO P!PE c5.11 FW 1 Re 0068 7 l
DATE: 06/30/89 COMA CHE PEAK UNIT 1 PAGE: '238 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O ('1984), PERIOD, BASELINE INTERVAL
~
CLASS 2 COMPONENTS (EEDWATER A&ME G
.. SEC. XI NE-
'SL304ARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS IRMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6 FW-1-096-1303 2 133200 78x 2 2202-34 CF MT ISI 70 R2 X PIPE TO VALVE C5.11 FW 1 RS 0068-8 133250 TBK 2 2202 FW 197 CG MT 151 70 R2 X VALVE 80DY WELD C6.70 FW 1 RB 0068 1FW 197 133300 Tex-2 2202 35 C.F MT !$1 70 R2 X-VALVE TO PIPE C5.11 FW 1 RB 0068 9
( 133400 78* 2 2202-34 CF MT !$1 70 R2 X PIPE TO ELBOW C5.11 FW 1 RB 0065 11 133500 TBx 2 2202 37 CF MT 151 70 R2 X EL40W To PIPE C5.11 FW 1 RS 0068 12 133600 Tex 2 2202 38 CF MT 151-70 R2 X PIPE TO EL90W C5.11 FW 1 RB 0068 13 133700 T8X 2 2202 39 CF *f ISI 70 R2 X P!PE TO EL90W C5.11 FW 1 RS 0068 14 j I
l i
l i
t t
l r
1 j
. - _ _ _ _ _ - _ - . ____ ______ - -_ __0
DATE: 06/30/89 COMANCHE PE4.% UNIT 1 , PACE: 239 REVISION: 1 PRESERVICE INSPECTION SupMARY OUTACE O 0984), PERIOD, BASELINE INTERVAL L[ [
\~ i (EEpWAT Q CLASS 2 COMPOWENTS AME G
.. SEC. XI NE SLDNARY EXAMINATION AREA ~ CATGY EXAM NRR0 REMARKS NUMBER 10ENTIFlt.ATION ITEM NO METHOD PROCEDURE I11M ** CALIBRATION BLOCK **
6 FW-1 096 1303 2 136200 TBX 2 2202 63 CF MT ISI 70 R2 X P!PE TO VALVE C5.11 FW-1 RB 009 22 136250 TBX 2 2202-FW 201 CG MT 151 70 R2 X VALVE BODY WELO C6.20 FW-1 RB 009-1FW 201 136300 Tex 2 2202-64 C-F MT !st 70 R2 X VALVE TO P!PE C5.11 FW 1-RB 009-23 T36600 TBX 2 2202 67 CF MT 151 70 R2 X PIPE To ELBOW C5.11 FW 1 RB 009 30 6-FW 1 096-2003-2 136700 TBX-2 2202-68 CF UT OL 151 206 R0 X ELBOW TO N0ZZLE C5.21 UT 453 151 206 R0 X FW-1 $5-RB 009 31 MT 151 70 R2 X enigx.34ee 6 FW 1 100 1303 2 l
l 136800 TBX 2 2202 69 CF MT lE! 70 R2 X
&RANCN CONNECTION C5.31 FW-1 RB 004 14 l
l
I' I
DATE:' 06/30/89' COMANCHE PEAK UNIT 1 PAGE: 240
'. REVISION: '1 ' PRESERVICE INSPECTION St90ERY
. CUTAGE O (1984), PERICXI, BASELINE INTERVAL
'/ - CLASS 2 COMPONENTS
).y .rEEDWATER ASME' C
,. SEC. XI NE l .SUMMART EXAMINATION AREA - CATGY EXAM' NRR0 REMARKS NUMBER IDENTIFICATION ' ITEM No METHOD PROCEDURE; IIIM ** CALIBRATION BLOCE**
6 FW-1 1001303 2 136900 TBX 2-2202 70 CF MT - !st 70 R2 X SRANCH CONNECTION TO PIPE C5.11 FW-1 RB 006A 1 137700 tex 2 2202 78 .C-F MT 151 70 R2FC1&2 X RE-EXAMINED AFTER REWORK.
PIPE 70 VALVE (FLANGED) C5.11 FW-1 RS 006A 9A 137800 TBX 2 2202-80 CF MT IS! 70 R2FC1&2 X RE EXAMINED AFTER REWORK.
' VALVE (FLANGED) 70 PIPE C5.11
.FW 1 RS 006A-9 1 C-F MT !$1-70 R2FC1&2 X
. Q 137900 tex 2 2202-81 P!PE TO ELBOW C5.11 FW-1 RB-006A 12A 138400 TBX 2 2202 86 CF MT 151 70 R2FC182 -X RE EXAM 16ED AFTER REWORK.
PIPE To ELBOW C5.11 FW 1 RB 006A 16 l
~
_- . - - _ _ . _ _ - _ _ . _ - - - _ . - . _ _ _ . _ - _ . . - _ - _ _ - _ - _ , - _ _ . - . -_. - - _ _ . . _ . - . . - _ _ . - - - _ _ _ _ _ _ . - - _ _ - - - - - _ _ ~ . . . _ _ . _ _ _ . . _ . . - J
. ?
I,',
1 DATE: 06/30/89 COMANCNE PEAK UNIT 1 . PAGE: 241 REVISION! l' PRESERVICE INSPECTION
SUMMARY
DUTAGE D (1984), PERIOD, BASELINE INTERVAL t CLASS 2 COMPONENTS
. ( J MAlp STEAM !
ASME G
- SEC. XI NE SLsetARY EXAMINATION AREA ' CATGY EXAM NRR0 REMARKS NL8tBER-. IDENTIFICAtl0N- ITEM NO METHOD PROCEDURE 1IIM ** CALIBRATION BLOCK **
32-MS-1 003 1303 2 L139300 TBx 2 2300 1 CF. UT OL ISI 206 R0' x N022LE 70 PIPE C5.21 UT 45S 151 206 RO X MS 1 RB 003 1 MT 151 7D R2 x
- TBX-33**
139500 TBx 2 2300 3 CF UT OL ISI 206 RO x ELBOW fo P!PE C5.21 UT 455 151 206 R0 x MS-1 RB 003 V MT 151 70 R2 ' x "TBX-33" 141300 TBX 2 2300-21 Cf UT OL 151 206 R0 X
-PIPE TO PlPE. C5.21 UT 455 IS! 206 R0 x MS 1 RB-003 V MT 151 70 R2 x
- TBx 33**
141500 TBx 2 2300 24 CF UT OL 151 206 RO x P!PE TO PIPE (PENETRATION) C5.21 UT 455 !$1 206 20 X MS 1 RB 003 19 MT 151 70 R2 x "TBx-33" 142400 TBX 2 2500 33 CF UT OL ISI 206 R0 X MT PERFORMED BY TU FOLLOWING REWORK.
. PIPE TO VALVE C5.21 UT 45S 151 206 R0 x MS 1 SB-019 25 MT NOA 3.09 B.20R0 x
" Tex 33" MS 023 (DRIP POT) 112700 TBx 2 23(3 35 CF UT 0L 151-206 RD X 5% NOT EXAMINED WITH UT, SEE RR C 5.
PIPE TO AP ' C5.21 UT 455 151 206 R0 x MS 1 St 019 V MT 151 70 R2 x "TBX 22" l
q
-- __ _ _ a
DATE: '06/30/89 COMANCHE PEAX UNIT'I PAGE: 242 REVISION: .1 PRESERVICE INSPECTION
SUMMARY
, /~N OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
' CLASS 2 COMPONENTS
_k MAIN STEAM ASME G
~~ SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM **CALIBRAfl0N BLOCK **
8 MS-1 223 1303-2 112800 TBX 2 2300 36 CF UT-OL NQA 3.09 8.44R0 X UT PERFORMED IN LIEU OF MT.
BRANCN CONNECTION TO PIPE C5.11 UT-455 NQA 3.09-8.44R0 X MS 1 SB 019 V 143000 TBX 2 2300-MS 098 CG MT 151 70 R2 X VALVE BODT WELD. C6.20 MS 1 58 044 1MS 098-32 MS 1 003-1303-2 143950 TBX 2 2300 47L CF UT OL !$1206 R0 X
.LONG. SEAM (2.5 ADJ. WELD 3) C5.22 UT 455 151 206 R0 X i MS 1 RB 003 V~ MT ISI 70 R2 X
- 'w/ **TBX 33**
115400 TBX 2 2300 61L CF UT OL 151 206 R0 X LONG. SEAM (2.5T A0J. WELD 21) C5.22 UT 45$ 151 206 R0 X MS 1 RB 003 v MT 151 70 R2 X
- TBX 33**
145600 TBX 2 2300 63L CF UT OL ISI 206 R0 X LONG. SEAM (2.5T ADJ. WELD 24) C5.22 UT 455 ISI 206 R0 X MS 1 RB-003 V MT IS! 70 R2 X
- TBX 33**
C
_ _ _ _ _ _ _ _ _ _ _ _ _ -. _. )
PAGE: 243-DATE: 06/30/89 CDMANCHE PEAK UNIT.1 1 PRESERVICE INSPECTION
SUMMARY
f : REVISION:
a \ OUTAGE D (1984), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS
' MAIN STEAM l
. ASME G
' SEC XI NE
SUMMARY
EXAMINAfl0N AREA CATGY EXAM NRR0 REMARKS NUMBER, IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
32-MS 1 003 1303 2 CF SEE RR C-9.
116100 TBM 2 2300 67L.
LONG. SEAM C5.22 MS 1 RB-003 V
- TBX-33**
C-F UT-OL 151 206 R0 X 146200 fBM 2 2300 68 C3.21 UT 455 151 206 R0 X VALVE TO MOMENT RESTRAINT MS 1 SB 019 26 MT ISI 70 R2FC1&2 X
- TBX 33**
i ..
(! ,
I COMANCHE PEAK UNIT 1 PAGE: -244
' DATE1 06/30/09
' REVISION: 1 PRESERVICE INSPECTION SU M ARY l
OUTAGE D (1984), PERIOD, BASELINE INTERVAL
-'N CLASS 2 COMPONENTS FEEDWAIER ASIE 4
-~ SEC. XI NE SLA1 MARY e,XJt! NATION AREA CATGY EXAM .NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM No METHOD PROCEDURE. IIIM ** CALIBRATION BLOCK **
16 FW-1 073 1303 2
-116400. TBX 2 2301 1 .CF .UT OL !$l 206 R0 X C5.21 UT 45$ 151 206 R0 X N0ZZLE TO REDUCING EL30W
.FW 1-tB 003 12 MT ISI 70 R2 X
" tex 20**
'(
18 FW-i 017 1303 2 148300 T8X 2 2301 19 CF UT OL '181 206 R0 X P!PE TO ELBOW C5.21 UT 455 151 206 R0 X FW 1-RS-003 2 MT 151 70 R2 X
. e.ggx.21**
'(48400 TBX 2 2301 20 C5.21 UT-45$ 151 206 R0 X ELBOW 70 PIPE-FW-1 RB 003-V MT ISI 70 X "TBX 21" 148700 ftX 2 2301-23 CF UT-OL 151 206 R0 X P!PE TO PIPE (PENE1 RAT 10N) C5.21 UT 45$ 151 206 R0 X FW 1 RS 003 1 MT 151 70 R2 X
- T eX - 21" ja FW 1034-2003 2 119000 TBX 2 2301 26 CF 0L 151 206 R0 X PIPE TO VALVE C5.21 UT 45S 151 206 R0 X FW-1 85 017 13 MT 151 70 R2 X eeigx.33ee 149100 T8X 2 2301 FW-071 CG MT 131 70 R2 X VALVE BODY WELD C6.,20 FW 1 SS 017-1FW-071
F, 1
COMANCHE PEAK UNIT 1 PAGE: 245 DATES. 06/30/89 REV!sION: 1 PRESERVICE INSPECTION SUMMART
' OUTAGE 0 (1984), PERIOD, BASELINE INTEPVAL
/' .
(g CLASS 2 COMPONENTS FEEDWATER ASME G
~
SEC. XI NE SUMMART EXAMINATION AREA CATGT EXAM NRR0 REMARKt' ITEM No METHOD PROCEDURE IIIM ** CALIF, RATION BLOCK **
NUMBER IDENTIFICAT!DN 18 FW-1-034-2003 2 119200 Tex 2 2301-27 CF UT-OL NOA 3.09 8.44RO X VALVE TO PIPE C5.21 UT 455 NQA 3.09 8.44R0 X FW-1 58-017 12 NT ISI 70 R2 X
- TBX-38**
CF UT OL WQA-3.09 8.44RD w 5% WOT EXAMINED WITH 455, SEE RR C 5. MT 149300 Tex 2 2301 28 C5.21 UT 45$ NQA-3.09-8.44R0 X RI 15 OUTSIDE EXAM AREA.'
PIPE TO VALVE MT 151-70 R2 X FW-1 $s-017 11
- TBX 38**
149500 TBx 2 2301 30 CF UT-OL 151 206 R0 X
,< PIPE TO MOMENT RESTRAINT C5.21 UT 455 !$1 206 R0 X ISI 70 R2FC1&2 X
- TBX 38**
6 FW-1 093-2003 2 It9600 Tax-2 2302 1 CF MT 151 70 R2 X SWEEPOLET C5.31 FW 1 S$ 017 V 151 70 R2 X 119850 TBX 2 2302 FW 206 C+G MT VALVE BODT WELD C6.20 FW 1 $8 029 1FW 206 150400 TBX 2 2302 9 CF UT OL 151 206 R0 X C5.21 UT 45$ 151-206 R0 X PIPE TO VALVE 151 70 R2 X FW 1 58 029 8 MT
- TBX 34**
O
s
.o PAGE: 246 COMANCHE PEAK UNIT 1
-DATE: 06/30/89'
'1 'PRESERVICE INSPECTION
SUMMARY
-REVISION:
CUTAGE 0 (1984), PERIOD, SASELINE INTERVAL
/) CLASS 2 COMPONENTS
'-d '
~. NE SEC. XI CATGY . EXAM NNR0 REMARKS SLMMARY EXAMINAfl0N AREA ITEM No METHOD PROCEDURE' !IIM ** CALIBRATION BLOCK **
NLMBER IDENTIFitAftoW ........................................
6 FW-1-093 2003 2 ]
151 206 R0 X 150500 TBX 2 2302 10 CF UT OL C5.21 UT 458 151 206 R0 X .
VALVE TO PIPE '
- TBM 34** j
-1 1 6 FW-1-097-1303-2 C-F MT 181 70 R2 X 150700 TBX 2 2302 12 PIPE 10 VALVE C5.11 .
FW 1 58 029 15 151 70 R2 X
,r TEX 2 2302 FW 194 C-G C6.20 MT
. Q] 50750 VALVE 80DY WELD FW-1 88 029 1FW 194 151 70 R2 X 150800 TBX 2 2302 13 CF MT VALVE 70 PIPE C5.11 FW 1 SB-029 16 MT 151 70 R2 X 151100 T8X 2 2302 16 C-F PIPE TO ELBOW C5.11 FW 1 SE 029 20 151 70 R2 X 151200 TBK-2 2302 17 CF MT EL90W To PIPE C5.11 FW 1 88 029 21 152200 TBX 2 2302 27 CF MT IS! 70 R2 X PIPE TO PIPE (PENETRATION) C5.11 FW 1 RB 007 36 v.
l COMANCHE PEAK UNIT 1 PAGE:- 247 b OATE:! 06/30/89
. REVISION:. 1 iPRESERVICE INSPECTION SUIMARY b_ OUTAGE O (1984), PERIOD, BASELINE INTERVAL i Os [ CLASS 2 COMPONENTS FEEDWATER ASM - G-
~
SEC. XI NE CATGY EXAM NRR0 REMARKS SUIMARY EXAMINATION AREA NUMBER- !DENTIFICAfl0N ITEM NO-METHOD PROCEDURE - ! I'l M ** CALIBRATION BLOCK **
l 6 FW 1 097 1303-2
'152800 I ex T 2 2302 33~ C-F MT IS! 70 R2FC142- X ELB0W 70 PIPE C5.11 FW 1 RS-007 42 4
CF MT. 181 70 R2 X 152900 TBM 2 2302 34 PIPE TO VALVE C5.11 FW*1 RS 007 43 152950 Tex 2 2302 FW-198 CG MT ISI 70 R2 X VALVE BODT WELD C6.20 FW 1 RB 007 1FW 196
.153000 78X 2 2302 35 VALVE 70 PIPE C5.11 FW 1 RS 007 44 155600 Tex 2 2302 61- CF MT 151 70 R2 X P!PE TO ELBOW C5.11 FW 1 RB-010 14A 155700 .TBM 2 2302 62 CF MT 131-70 R2 X EL30W TO P!PE C5.11 FW 1 RS 010 15 155800 TBX 2 2302 63 CF MT 151 70 R2 X P!PE TO VALVE C5.11 FW 1 RS-010 20 r
f I
COMANCHE PEAK UNIT 1 PAGE: 248
.DATE: 06/30/89 REv!$10N:. 1 PRESERVICE INSPECTION
SUMMARY
.g) -
f(
OUTAGE O (1984), PERIOD, BASELINE INTERVAL
\-d . CLASS 2 COMPONENTS FEEDWATER ASME G
~,_
SEC. XI NE CATGY EXAM NRR0 REMARKS SL894ARY EXAMINATION AREA-NUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
6 FW-1 097 1303 2 155850 tex 2 2302 FW 202 CG. MT 181 70 R2 X VALVE BODT WELD C6.20 FW-1 RS 010 1FW 202 155900 TBX 2 2302 64 CF MT 151 70 R2 X VALVE TO PIPE C5.11 FW 1 RS 010-21 156200 10X 2 2302 67 CF MT !$1 70 R2 X PIPE TO ELBOW C5.11 FW 1 RS 010 28A s'%
6-FW-1 97 2003 2 156300 TBM 2 2302-68 CF UT OL is! 206 R0 X C5.21 UT 45S 151 206 R3 X LLBOW TO N0ZZLE FW taRB 010 29 MT 151 70 R2 X
- TBX 34**
6-FW i 101 1303 2 l
CF MT 151 70 R2 X 156400 TBX 2 2302 69 WELD 0LET C5.31 FW 1 RS 003 22 CF MT !$1 70 R2 X i 156500 tex 2 2302 70 SRANCN CONNECTION TO PIPE C5.11 FW 1 RB 007 1
(-
l l
- t. _ - - - . _ - _ - _ - _ . _ - - _ _ _ _ - - - -- _
'PAGE: 249 DATE: 06/30/89 COMANCHE PEAK UNIT 1 REVISION: 1 PRESERVICE INSPECTION SLMMARY -
u . , .-
OUTAGE O (1984)/ PERIOD, BASELINE INTERVAL j .
CLASS 2 COMPONENTS
\ ,:
FEE 0 WATER ASME G SEC. XI NE CATGY EXAM NRR0' REMARKS SLSenRY EXAMINATION AREA NUMBER IDENTIFICAT10N' ITEM No METHOD PROCEDURE 'lIIM ** CALIBRATION BLOCK'*
6-FW-1 101 1503 2 CF MT 151 70 R2 K
'157D00 TBX 2 2302 75 PIPE TO ELBOW C5.11 FV 1 RB 010 6 CF MT 151 70 R2FC1&2 X RE EXAMINED AFTER REWORK.
157400 tex 2 2302 79 PIPE 70 PIPE C5.11 FW-1 RB-010 15 15 CF MT ISI 70 R2FC1&2 X RE EX VINED AFTER RE' WORK.
157500. tex 2 2302 80 PIPE 70 VALVE (FLANGED) C5.11 FW 1*RS 010-16B
. O 151 70 R2FC1&2 X RE EXAMINED AFTER REWORK.
157600 TBX 2 2302 81' CF MT VALVE (FLANGED) TO P!PE C5.11 FW 1 RB 010 16 1B CF MT !$1-7J R2FC1&2 X RE EXAMINED AFTER REWORK.
15T700 TsX 2 2302 82 PIPE To ELBOW C5.11 FW 1 RB 010 19A s
i
o
.. J
(-
COMANCHE PEAK UNIT 1 PAGE: 250 q
. DATE: 06/30/89 "
REVIS!(43 1 PRESERVICE INSPECTION SLMMARY OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL 2\ CLASS 2 COMPONENTS MAfW STEAM
- ASME G SEC. XI- NE CATGY EXAM NRR0 REMARKS
SUMMARY
EXAMINATION AREA ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCA**
l NUMBER IDENTIFICATION l 32 MS 1 004 1303-2 X- 5% NOT EXAMINED WITM UT, SEE RR C 5.
156900 TBx 2-2400 1 CF UT OL !st 206 R0 N0ZZLE TD PIPE C5.21 UT 456 151206 R0 x-MT !$1 70 R2 x MS 1 RB 001 1
- TBx 33**
CF UT DL 151 206 R0 x 159400 TBx 2 2400 6 C5.21 UT 455 151 206 R0 x P!PE TO ELBOW MT ISI 70 R2 x Ms 1 RB-001 v
- TBX-33**
CF UT 0L !$1 206 R0 x 160100 TBx 2-2400 13 UT-455 ISI 206 RO x
[- ELBOW TO PIPE MS 1 RB 001 V C5.21 MT 151 70 R2 x
\
- Tex 33**
151 206 R0 X 160400 TBx 2 2400*17 CF UT OL UT 455 151 206 R0 X PIPE TO PIPE (PENETRATION) C5.21 MT 151-70 R2 x MS 1 RB 001 16
- TBx 33**
CF UT OL !$1 206 R0 x 161300 TBX 2 2400 26 C5.21 UT 45s 151206 R0 x PIPE To VALVE MT 151 70 R2 x MS 1 SB 017 25
- TBx-33**
B MS-1 274 1303 2 CF MT NQA 3.09 8.20R0 x 161600 TBX 2 2400 29 BRANCH CONNECTION TO PIPE C5.11 MS 1 bt 017 V
(
s
q DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 251
< REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL 1
.U CLASS 2 COMPONENTS WIN STEAM
.: ASME G SEC. XI NE
SUMMARY
EXAMINATION AREA PATGY EXAM NRR0 REMARKS l NUMBER IDENTIFICAfl0N ! TEM NO METHOD PROCEDURE I11M ** CALIBRATION BLOCK **
8-hs-1 274-1303 2 161800 TBx 2 2400-MS 134 CG MT !st 70 R2 X VALVE BODY WELD C6.20 MS 1 SS 046 1 32-Ms 1 004-1303-2 162950 Tex 2 2400 41L CF UT OL ISI 206 RD X LONG. SEAM (2.5T ADJ. WELD 6) C5.22 UT 45S 151 206 R0 X MS-1 RS 001 V MT 151 70 R2 X
- Tex 33**
[ % 63300 TBx 2 2400 45L
\ LONG. SEAM (2.5T ADJ. WELD 13) C5.22 UT 455 !$1 206 R0 X MS 1 RB-001 V MT 151 70 R2 X
- Tax 33**
163500 Tex 2 2400 47L CF UT OL 151 206 R0 X LONG. SEAM (2.5T ADJ. WELD 17) C5.22 UT 45S 151 206 R0 X MS 1 RB 001 V MT !$1 70 R2 X
- Tex-33**
163700 Tex 2 2400 49L CF UT OL 151 206 R0 X UT 45$ 151 206 R0 X LONG. SEAM (2.5T ADJ. WELD 26) C5.22 MS 1 RS 001 V MT ISI 70 R2 X
LONG. SEAM C5.22 MS 1 RS 001 v
- T EX -33" v
{' .
1
, PAGE: 252.
COMANCHE PEAK UNIT i.
'DATE :' 06/30/M 1
PRESERVICE INSPECTION
SUMMARY
- p REylSION
- ~ OUTAGE C (1984), PERIOD, BASELINE INTERVAL j
' s ,
CLASS 2 COMPONENTS mme ASag G j
SEC. XI NE l- NRRO . REMARKS l CATGY EXAM l
SUMMARY
EXAMINATION AREA
~
ITEM NO METHOD PROCEDURE Ii1M **CAlltRATION BLOCK'*
NUMBER. IDENTIFICATION ........................................
l .......... ............... ....
l- .. .... .............................. .......
1' 32 MS 10041303 2
!$1-206 R0 X 163900 78X 2 2400 51 CF UT OL 151 206 R0 X PIPE TO VALVE c5.21 UT 45S MT !$1 70 R2FC1&2 X
- MS 1 58 017 26'
- TBX 33**
'I f
0
COMANCHE PEAK UNIT 1 FAGE: 253 DATE: 06/30/89 REVisl0N: 1 PRESERVICE INSPECTION SUl#tARY DUTAGE D (1984), PERIOD, BASELINE INTERVAL
..n}.
{
%/ class 2 COMPONENTS FEEDWATER ASME G
~
SEC. XI NE
SUMMARY
EXAMINATION AREA CATCY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
16 FV 1 076-1303 2 1MD00 TBX 2 2401 1 C+F UT OL ist 206 RD X C5.21 UT 455 151 206 R0 X N0ZZLE TO ELBOW MT 151 70 R2 X FW 1-RB 001-5
- TBX 20**
18-FW 1 020 1303 2 CF UT OL 1s! 206 R0 X RE EXAMINED AFTER REWORK.
1M300 TBX 2-2401 4 C5.21 UT 45s 151 206 R0 X ELBOW TO PIPE MT Is! 70 R2FC1&2 X .
FW-1 RB 001 Y
- TBX 21**
.rs CF UT OL 181 206 R0 X 164700 TBX 2 2401 8 C5.21 UT 45s 151 206 R0 X PIPE TO ELBOW FW-1 RB 001 Y NT 151 70 R2 X
- TBX 21**
164800 TBX 2 2401 9 CF UT OL ist 206 R0 X C5.21 UT 45s 151 206 R0 X ELBOW TO P!PE MT 181 70 R2 X FW 1 RB 001 2
- TBX 21**
151 206 R0 X 164900 TBX 2 2401 10 CF UT OL C5.21 UT 45s 151 206 R0 X PIPE TO PIPE (PENETRATION)
FW-1 RB 001 1 A MT ist 70 R2 X
- TBX 21**
18 FW 1 037 2003 2 151 206 R0 X 165300 TBX 2 2401 13 CF UT OL UT 45s 151 206 R0 X PIPE TO VALVE C5.21 MT 151 70 R2 X FW 1 RB 001 11
- TBX-38**
O i
\
d PACE: 254 CDMANCHE PEAK UNIT 1
- DATE:. 06/30/B9 PRESERVICF. INSPECTION SUMMART REV!sION:- 1 OUTAGE D (1984), PERIOD, BASELINE INTERVAL
[%-
k .
CLASS 2 COMPONENTS FEEDWATER G
~, NE SEC. XI CATGY EXAM NRR0 REMMtKS SU*ARY EXAMINAfl0N AREA ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
NUMBER IDENTIFICATION ........................................
iB-FW-1 037 2003 2 Mt 151-70 R2 X 165350 TBx 2 2401 FW 089 CG VALT., ETY WELD C6.20 FW 1 RB 001 1FW-089 151 206 R0 X
'165400 1BM 2-2401 14 CF UT OL C5.21 UT 455 151 206 R0 x VALVE TO PIPE MT 151 70 92 x FW 1 RB 001 10
- TBX 38**
x 21 NOT EXAMINED WITH UT, SEE RR C 5.
CF UT 0L 1$1 206 R0 165500 TBx 2 2401 15 C5.21 UT 455 ISI-206 R0 x PlPE TO VALVE 151 70 R2 X r" FW 1 RB-001 9 MT
- TBK 38**
i%
CF UT OL 1st 206 RD K 165700 TBx 2 2401 17 C5.21 UT 455 151 206 R0 x PIPE TO MOMENT RESTRAINT MT 151 70 R2FC1&2 X FW 1 RB-001 7
- TBX 38**
6 FW 1-094 20 M 151 70 R2 X 165800 TBM-2 2402 1 CF MT BfANCH CONNECTION C5.31 FW 1 SB 020-V CG MT ISI-70 R2 x 166050 TBx 2 2402 FW 203' VALVE BODY WELD C6.20 FW 1 58 035-1FW 203 l
. / 1 i
_ -- 1
I I' '
i l
DATES ,- 06/30/89 CDMANCHE PEAC l#d!T 1 PAGf 255 REVISION ' 1 PRESERVICE INSPECTION SUMMART k' *g OUTAGE 0 (1964), PERIODi BASELINE INTERVAL
('~'j '. CLASS 2 COMPONENTS FEEDWATER ASME O 1 SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 .REMARCS NUMSER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOLC**
6-FW 1 D94 2003 2 166200 TBK 2 2402 5 CF UT OL 151 2D6 RO x P!PE TO ELBCJ' c5.21 UT 458 151 206 R0 x FW-1 SB-035 4A MT 151 70 P2 x
- TSK 34**
6-FW 1 D98 1303 2 CF MT 151 70 R2 x 166900 Tex 2 2402 12 PIPE TO VALVE C5.11 FW 1 58 035 13 66950 - Tsu 2-2402 FW-191 CG MT 1$1 70 R2 x l' . VALVE BODT WELD C6.20 FW 1 Ss-035 1FW 191 167000 TBx 2 2402 13 CF MT 151 70 R2 X VALVE TO PIPE C5.11 FW-1 88 035 16 168000 T8X 2 2402 23 CF MT 181-70 R2 x ELBOW 70 PIPE C5.11 FW 1 Ss 035 34 l 168100 TBx 2 2402 24 CF MT 151 70 R2 X PIPE To ELBOW C5.11 FW 1 SB 035-35 168200 TBK 2 2402 25 CF MT !$1 70 R2 X ELBOW fo PIPE C5.11 FW 1-58 035 36
/
.\s
e-_-_---__-____ .
~
cm ANCHE PEAK UNIT 1 PAGE: 256
'DATE:_ 06/30/89
- REVIS10N: 1 PaESERVICE INSPECT 10N
SUMMARY
OUTAGE D (1984), PERIOD, BASELINE INTERVAL
'D. CLASS 2 COMPONENTS FEEDWATQ ASME C l, ,.
SEC. XI NE l
EXAM NRR0 REMARKS f' SUW4ARY EXAMINATION IJtEA CATCY I' ITEM NO METHOD PROCEDURE II1M ** CALIBRATION BLOCK **
. NUMBER IDENTIFICATION 6.FW-1-096 1303 2 168300 ftX 2 2402 26 CF MT Ift 70 R2 X P!PE To PIPC C5.11 FW 1 SB-035 40 168400 Tex 2-2402 27 CF MT ISI 70 R2 X PIPE 70 PIPE (PENETRATION) C5.11 FW 1 RS 0088-1 151 70 R2 X 169100 T8X 2 2402 34 CF MT PIPE TO VALVE C5 11 FW 1 RS 0088 8 k
\_ X
'169150 TBM 2 2402 FW C-0 MT 151-70 R2 VALVE BODY WELL C6.20 FW 1 RB-0086-1FW 195 151 70 R2 X 169200 T8X 2 2402 35 CF MT VALVE TO PIPE C5.11 FW 1 RB 0088 9 151-70 R2 X 171100 TBX 2 2402 50 C-F MT P!PE TO VALVE C5.11 FW-1 RS 008A 11 i CG MT 151 70 R2 X 171150 TBX 2 2402 FW-199 VALVE S00Y WELD C6.20 FW 1 RB 008A*1FW-199 O
- _=_____-__________________
. .i i
b.'
1 i--
- DATE:L 06/30/89 ' COMANCHE PEAK UNIT 1 PAGE: 257 REVISION: 1 PRESERVICE INSPECT 10dl
SUMMARY
OUTAGE D (1934),. PERICD, BASELINE INTERVAL
-[] CLASS 2 COMPoufMTS
/
FEEPWaTEW ASME G
^
SEC. XI NC i C mMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS WUMBER IDENTIFICATION ITfM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
( f,Y-1 096 11Q},2 171200 Tex 2 2402 51 CF MT ISI 70 R2 x VALVE TO PIPE C5.11 FW 1 RB 0064 12 171600 Tax 2-2402 55 CF MT ISI 70 R2 x P!PE TO ELBOW C5.11 FW-1 RB 008A 16-A 171700 TBM 2 240. 56 CF UT OL 151 206 R0 x ELBOW 70 N0ZZLE C5.21 UT 455 ISI 206 A0 E FW 1-RS-008A 17 MT !$1 70 R2 x
- TBx-34**
6-FW-1 102-1103-2 171800 TBX 1 *402 57 C-F MT 151 70 P,2 x WEL'WLET C5.31 FWal RB 001 6 171900 TBX 2 2402 58 CF MT 151 70 R2 x BRANCH CONNECTION TO PIPE C5.11 FW-1 RE 008816 172200 TBx 2 2402 61 CF ttf 151 70 R2FC182 x P!PE TO VALVE (FLANGED) C5.11 FW-1 RS 0088 19A 172300 TBK 2 2402 64 C-F MT 151 70 t2FC182 x VALVE (FLANGED) TO PIPE C5.11 FW 1 RB-0088 19 1 O
LJ
l '.
t dd COMANCHE PEAK UNIT 1 PAGE: 258
[DATE: 06/30/89
. , "R3 VISION: '1 PRESERv!CE INSPECTION
SUMMARY
V QUTAGE D (1984), PERIOD, BASELINE INTERVAL
-[ CLASC 2 COMPONENTS
- (
REstDUAL MEAT REse0 VAL 1-ASME G
- SEC. XI NE SLMMART EXAMINATION AREA CATGY EXAM N R R 0- REMARK *.
NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIN **CAlltRATION BLOCK **
....... .............................i ....... .......... ............... .... ................................. 1.....
12 RW 1 901 2501R 2 -
CF UT OL 151 206 R0 X 20% NOT EXAMINED WITH 455, SEE RR C-5.
173500 Tex 2 2500 1 VALVE TO PIPE C5.21 UT-455 151 206 R0 X RN 1 RB 001 5 PT ISI 11 R10 X
- Tex-12**
12 RM 1-003-601R 2 173700 TBX 2 2500 ! CF PT 151 11 R10 X PIPE 70 PIPE </ENETRATION) C5.11 RM 1 RB 001 6 C-F PT ISI 11 R10 X p 174500 TBx-2 2500 11 t ELBOW TO PIPE C5.11 RW 1 tP-002 3s 174600 T8x 2 2500 12 CF PT WQA 3.09-8.10R0 X PIPE TO Ett0W C5.11 RM 1*st 002 V 174700 TBx 2 2500 13 CF PT 15! 11 Rio X ELBOW TO P!PE C5.11 RH 1 58 002 V 175100 TBx 2 2$00 17 CF PT 151 11 R10 X ELS0W TO PIPE C5.11 RN*)*$$ 002 V 16 RM 1 007 601R 2 175600 TBx 2 2500-22 CF PT 151 11 R10 X TEE TO VALVE C5.11 SI 1 $s 019 1A e
f
(
DATES. 06/30/89 COMANCHE PEAK UNIT 1 'PAGE: 259
' REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1964), PERIOD, BASELINE INTERVAL
-q-CLASS 2 COMPONENTS
(
RESIDUAL MEAT REMOVAL ASME G J SEC. M1 NE-
SUMMARY
EXAMINATION AREA CAfGY EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLtCK**
16 RM 1-007-601R 2 175900 TBx 2 2500 25 CF PT 01-QAP 10.2-1R2 X MRFORMED BT B&R FOLLOWING REWORK.
TEE TO FLANGE C5.11 RN-1*$8-015-v 176000 ftx 2 2500 26 CF PT 151 11 Rio X FLANGE TO PIPE C5.11 RM 1-SB 015 V 176700 TBK 2 2500 33 CF PT ISI 11 Rio X REDUCING EL50W To N0ZZLE C5.11 RM 1 SB*015 20 t
I
DATE: 06/30/09 COMANCHE PEAK UNIT 1- PAGE: 260
- REVISION: 1 PRESERVICE INSPECTION
SUMMARY
DUTAf,E 0 (1984), PERIOD, SASELINE INTERVAL 4, j 1 SAFETY INJECTION CLASS 2 COMPONENTS AM G
~~
SEC XI NE BUMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS IRMBER IDENTIFICATION ITEM No METHOD - PROCEDURE IIIN OCALIBRAT10N BLOC D*
& Sf i 076-601R 2 176900 TBX 2 2500-35 CF PT cl-QAP 10.2 122 X PERFORMED BY B&R FOLLOWING REWOPC, PIPE To ELBOW C5.11
$1 1-SB 006 4 17/000 TBX 2 2500-36 Cf PT IS! 11 R1D X ELBOW TO PIPE c5.11 Sl-1-SB-006 V 177900 TBM 2 2500 45 CF PT ISI 11 R10 X ELBOW To PIPE C5.11 S1 1 88 006 1 O
l l
.g I .
J --2_m _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _
l h
,h
[-. ~
PAGE: 261 l '- DATE: 06/30/89. COMANCHE PEAX UNIT 1 l' PRESERVICE INSPECTION SUMMART REY!$10Ns 1 CUTAGE O (1984), PERIOD, BASELINE INTERVAL f~Y
' CLASS 2 COMPONENTS
-l RESIDUAL' HEAT REMOVAL ASME G
~
~-
SEC. XI NE
. .SLMMART EXAMINATION AREA CATGT EXAM NRR0 REMARKS
. NUMBER . IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK" 12 RM 1-003 601R 2 178000 TBX 2 2500-47L CF 'PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 11) C5.12 RM 1 St 002 v .
178050 TBX 2 2500 47L C-F PT IS! 11 R10 X
' LONC. SEAM (2.57 ADJ. WELD 12) C5.12-RH*1 S$*002-V 178100 TBX 2 2500-48L -f~ PT 151 11 R10 X LONG. SEAM (2.51 ADJ. WELO 13) C5.12
, RN 1 58 002 V (h
d 178200 TBX 2 2500 49L, CF PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 17) C5.12 RM 1 88-002 V j 16-RM 1 007 601R 2 CF PT 151 11 R10 X 1F8300 Tex 2 2500 50L LONG. SEAM (2.5T ADJ. WELD 26) C5.12 .
RM 1 58 015 V 178450 T8x 2 2500 51L CF PT !$1-11 R10 X LONG. SEAM (2,5T ADJ. ICLc !$) C5.12 RM 1 58 015 V
DATE: 06/30/89, COMANCHE PEAK UNIT 1 PAGEs- 262
' REVISION:- .1 PRESERVICE INSPECTION
SUMMARY
OUTAGE 0 (1964), PERIOD, BASELINE INTERVAL '
-['. -
( .( CLASS 2 COMPONENTS
..dAFETY INJECTiM ASME C SEC. XI NE SLMMARY EXAMINATION AREA CAICf EXAM NRR0 REMARKS NUMBER . tDCWTiflCATION 'JTEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
............................c,..........,
....... .............................. ......e .......... ............... ,...
16-81 1 076 601R 2 178500 7sx-2 2500 52L CF PT 151 11 R10 .x LONG. SEAM (2.51 ADJ. ELD 36) C5.12
$1 1 St 006 V is
COMANCHE PEAK UNIT 1 PACE: 263 L DATE: '06/30/89-REVISION: 1 PRESERVICE INSPECTION
SUMMARY
/7~ QUTAGE D (1984), PER100, SASELINE INTERVAL
!k
- p. CLASS 2 COMPONENTS RESIDUAL NE{_R[M@fA1 ASME G
~
$20. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS
.lRMBER IDENTIFICATION ITEM N0 !4ETHOD PROCEDURE IIIM **CALIBRAfl0W BLCCK**
12 RN 1 004 601R 2 178800 TBM 2 2501 3 CF PT Cl-QAP 10.2 1R2 X PT PERFORMED BY B&R FOLLOWING REWORK.
. PIPE TO PIPE (PENETRATION) C5.11 RM 1*RS-002-9 179100 T8M-2 2501-6 CF PT 151 11 R10- X PIPE To ELBOW c5.11 RN*1*SS 004 2A 179200 Tax 2 2501 7 CF PT 151 11 R10 X ELBOW TO PIPE C5.11
?H 1 SB 004 2-1
(
)
k 179500 . TBM 2 2501 10 CF PT 151-11 R10 X ELBOW TD PIPE C5.11 RM 1-SS 004 V' 179600 .TBK-2 2501 11 C-F PT 151 11 810 X P!PE TO ELs0W C5.11 RM 1 SS 004 V 179700 TBX 2 2501 12 CF PT IS! 11 R10 X ELBOW TO P!PE C5.11 RM 1 88 004 3 16-RN 1 008 601R 2 180500 TSK 2 2501 20 C? PT 181 11 R10 X REDUCER TO P!PK C5.11 RH 1 $5 005 V b
U
2_
.DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 264 REVIS!DNs 1 PR(SERVICE INSkECTION
SUMMARY
CUTAGE O (1984), PERICE, BASELINE INTERVAL f")
CLASS 2 COMPONENTS f ,
RESIDUAL NYAT REMOVAL ASME- G
- SEC. XI NE SLMMARY EXAMINA110K AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD . PROCEDURE IIIM ** CALIBRATION BLOCK **
I 16-RN 1 008-601R 2 181000 TBX 2 2501 25 CF PT QI-QAP 10.2 1R2 X PERFORMED BY B&R FOLLOWING REWORK.
TEE 70 FLANGE C5.11 RN+1 58 005-Y '
181100 TBX 2 2501 26 CF PT Ql-QAP-10.2 1R2 X PERFORMED BY B&R FOLLOWING REWORK.
FLANGE TO PIPE C5.11 j RH-1-SB 005-V 181500 TBX 2 2501 30 CF PT Ql-QAP 10.2 1R2 X PERFORMED BY B&R FOLLOWING REWORK.
PIPE TO EL90W C5.11 RN-1*SB 005 V l
- 181600 TBX 2 2501 31 CF PT_ cl-QAP 10.2-1R2 X PERFORMED BY B&R FOLLOVING REWDRK.
ELBOW 10 PIPE . CS.11
~RH 1 SB 005 9A 181800 TBX 2 2501 33 CF PT ISI 11 R10 X REDUCING ELBOW TO N0Z2LE C5.11 RH 1 SB 005 17 181900 Tu 2 2501 34 CF PT 01-QAP 10.2 1R2 X PERFORME) BY B&R FOLLOWING REWORK.
VEE TO PIPE C5.11
~RM*1.$8 005 V l
%L DATE: 06/30/89' COMANCNE PEAK UNIT 1 PAGE: 265 REVI$10N:- 1 PRESERVICE INSPECTION
SUMMARY
-g 0UTAGE 0 (1984), PERIOD, BASELINE INTERVAL
! 34FETY INJECTION ASME , G
-* SEC. M1 NE SLM4ARY EXAMINATION AREA CATGY ERAM NRR0 REMARKS-K WUH9ER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION SLOCK**
t ....... .............................. ....... .......... ............... .... ........................................
16-s!-1 0 & 601R 2 182200 TRb 2 2501 37 C-F PT GI-QAP 10.2 1R2 X PERFORMED BY BWt FOLLOWING REWORK.
PIPE TO Ett0W C5.11 s! 1 S8 007 5A 182300 TBX 2 2501 38 CaF PT 01-QAP 10.2 1R2 X PERFORMEDBYB&RFOLLOWINGREWORI.
EL30W TO PIPE C5.11 SI 1 ss 007 V
\
I
3f, h
!c i
' DATES 06/30/89 COMANCHE PEAC UNIT 1 PAGE: 266 REVISION: 1 PRESERVICE INSPECTION AM4 ART OLJTAGE O (1984), PERIOD, SASEllNE INTERVAL
' [_ ,_1- .
CLASS 2 CCMPONEKTS-j ,-
.' %/ RESIDUAL NEAT Rf410 VAL. -)
'r h,
ASME C
'",; , - SEC. XI WE SLMMART EXAMINATION AREA CATGT ,EKAM NRR0 REMARKS WUMBER IDENTIFICATION ITEM WO METHOD PROCEDURE 111M ** CAL 1BRATION BLOCK'*
..'..... a................... ......... ....... .......... ............... .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
jf RM i 004 601R 2 183000 TBK 2 2501 46L CF PT 151 11 R10 X.
LONG. SEM (2.5T ADJ. WLD 10) C5.12 RM 1 SS 004 V-l
.183050 TBX 2 2501 46L CF PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 11) C5.12 RH 1 SS 004 v, 183100 TBM 2 2501-47L CF PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 12) C5.12
. RN 1 SB-004 V V 16 RM 1-008 601R-2 183200 TBF 2 2501 48L C-F PT IS!-11 R10 X LONG. SEAM (2.5T ADJ. WELD 20) C5.12 RM 1 $3 005-V 183400 TBX 2 2501 50L CF PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 26) C5.12 RN 1 58 005 V 183550 TBX 2 2501 51L CF PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 30) C5.12 RN 1 58 005 v 183600 TBK 2 2501 52L CF PT ISI 11 Rio X LONG. SEAM (2.5T ADJ. WELD 31) C5.12 RN 1*SB 005 V
DATE: 06/30/89:- COMANCHE PEAK UNIT 1 PAGE: ~267
. REVISION: . 1. ; FRESERVICE INSPECTION SUMMART
} 4r[] /- CUTAGE D (1954), PERIOD, BASELINE INTERVA',
CLASS 2 COMPONENTS
. %./ . .
SAFETY INJECTl(Ni ASME G
~
SEC. XI WE Sule4 ART EXAMINATION AREA CATGT EMAN NRR0 REMARKS
-IM40ER IDENTIFICATION ITEM No METHOD: PROCEDURE IIIM ** CALIBRATION BLOCK **
16 t1-1 075 601R 2 183700 TSX 2 2501 53L CF , PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. WELD 34) C5.12 51 1 ss 007 V 183850 -78X 2 2501 54L CF PT ISI-11 R10 X LONG. SEAM (2.5T ADJ. WELD 37) C5.12 31 1 58 007 V
'183900 TBx 2 2501 55L C-F PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. WELD 38) C5.12 SI 1 ss 007-V
r --- , - -- , - . - - - - . - - - - . , _ - - - - , , , _ - - . - - - - - - - - - - - . - _ . _ _ _ - - - - - - - - - - - - - , - - . - - - - - . _ - - . , - - - - . _ _ _ , - -
DATE: 06/30/89;- COMANCHE PEAC UNIT i: PAGE: 268 REVISION 1 PRESERVICE INSPECTION SUMMART OUTAGE 0 (1984), PERIOD,' RAST!LINE INTERVAL 7/-y CLASS 2 COMPONENTS
(].- REllDUAL NEAT REMOVAL ASME G
- SEC. x! NE
SUMMARY
EXAMINAfl0N AREA- CATGY EXAM NRRO' REMARKS NUMSER IDENTIFICATION ITEM No' METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
12 RM 1 035 601R 2 184000 TBx-2 2520 1' CF PT 1s1 11 R10 X N0ZILE TO PIPE C5.11 RM 1 St 016 1A
' 10 RM 1-025 601R 2
'185100 TBx 2 2520 12 C-F PT NQA 3.09 8.10R0 'X PIPE TO TEE C5.11 RM 1 58-016-V 185200 TBX 2 2520 13 CF PT NQA 3.09 8.10R0 x .
TEE TO PIPE C5.11 RM 1 SB+016 5A' 8 RM 1 022-601R 2 185400 Tex 2 2520 15 CF PT NQA 3.09 8.10R0 x REDUCING TEE TO PIPE C5.11 RM 1 88 016-V 185500 Tex 2 2520 16 CF PT 151 11 Rio x P!PE TO VALVE (FLANGED) C5.11 RN 1 Sa 016-5 1A 8-RM-1 020 601R-2 185600 TBX 2 2520 17 CF PT 151 11 RIO x VALVE (FLANGED) TO P!PE C5.11 RM 1 8B 016-6 1A j l
l
'A
- i
\
f
.I $.
DATE: 06/30/89 . COMANCHE PEAK UN!T 1 PAGE: 269 REVISION: -1. PRESERVICE INSPECTION SumARY DUTAJE D (1984), ' PERIOD, BASELINE INTERVAL 7
CLASS 2 COMPONENTS-
'Lv ] RESIDUAL NEAT REMDVAL ASME G
.- SEC. XI NE SLMMARY EXAMINATION AREA- CATGY EXAM N R R O REMARKS
' WLMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM " CALIBRATION BLOCK" 8 RH+1 020 601R 2 185700 TBX 2 2520-18 CF PT' !$1-11 R10 X-PIPE To ELBOW- C5.11 RM 1 88 016 V 185800 T5X 2 2520 19 CF PT o! eAP 10.2 1R2 X PERFORMED BY B&R FOLLOWING REWORK.
Ele 0W To PIPE C5.11
. RN 1 $s-016 6 186000 Tex 2 2520 21 CF PT ISI 11 R10 X PIPE 10 EL30W C5.11-RH 1 RS 016 V
.j
( 186100 TBX 2-2520-22 CF PT 151-11 R10 X ELBOW 70 PIPE . C5.11 RM 1-58 016 V 12 RM 1-033 601R 2 186300 TBX 2-2520 24 CF PT 151-11 R10 X N0ZZLE TO PIPE C5.11 RM 1 $5 001 1 10-RM 1 061 601R 2 187300 Tex 2 2520-34 C-F PT ISI 11 Rio X REDUCER TO PIPE C5.11 RM 1 88 017-V 187400 TRX 2 2520 35 CF PT 181-11 RIO X PIPE TO VALVE C5.11 RM 1 H 017 1
- p G
i DATE:- 06/30/89 COMANCHE PEAK UNIT 1- PAGE: 270- 1 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
- g. CUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS
- V)RESIDUALHEATREMOVAL ]
1 I
ASME. G ]
.- SEC. XI NE {
SUMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS j l
NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
10-RM 1 061 601R 2 187500 TBX 2 2520 36 CF PT 151 11 R10 X VALVE TO PIPE C5.11 RM 1 SB 017 2 187600 T8X 2 2520-37 CF PT ISI 11 Rio X P!PE TO REDUCER C5.11 RM 1 88-017 V 8-RM 1 063 601R-2 189900 TBX 2 2520 60 CF PT 151 11 R10 X PIPE TO NOZZLE C5.11 O '
RM 1 88 018 1 12-RN 1-035 601R-2 190600'.TBX 2 2520-67L CF PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 1) C5.12 RM 1 58 016 V 8 RN 1 022 601R-(
190750 TBk 2 2520 68L CF PT 151 11 Rio X LONG. SEAM (2.57 ADJ. WELD 16) C5.12 RN 1 SB 016 V 8-RH+1 020-60it 2 190600 TEX 2 2520 69L C-F PT ISI 11 Rio X LONG. SEAM (2.5T ADJ. WELD 17) C5.12 RN 1 58*016 V l
l \
- l. . = _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
LDATE::06/30/09 COMANCHE PEAK UNIT 1- PAGE:' 271
' REVISION: 1. PRESERVICE INSPECTION SLRNARY N OUTAGE O (1964), PERIOD, BASELINE INTERVAL
/j k CLASS 2 COMPONENTS RESIDUAL NEAT REMOVAL ASME C
~2 SEC. XI NE SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMBER' l'TNTIFICAfl0N ITEM N0' METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
8-RM 1 020 601R 2 190850 TBX 2 2520-69L C-F PT 151 11 R10 X LONG. SEAM (2.57 ADJ. WELD 18) C5.12 RN 1 SS 016 V-190900 ftX 2 2520 70L C-F PT !sI 11 R10 X LONG. SEAM (2.57 ADJ. WELD 19) C5.12 RN 1 58 016 V 191050 TBX 2 2520 71L - CF PT' !$1 11 R10 X LONG. SEAM (2.5T ADJ. WELD 21) C5.12 RN 1 SB 016 V k
^
191100 Tax 2 2520 72L CF PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 22) C5.12 RN 1 SB 016 V 12-RM 1 033-601R-2 191200 TBK 2 2520 73L CF PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 24) C5.12 RN 1 58 001 V 10-RM 1 061 601R 2
'191300 TBX 2 2520 74L CF PT 181 11 R10 X ttAG. SLAM (2.5T ADJ. WELD 34) C5.12 l- RN 1 Se 017 V l 191350 T8x 2 2520 74L CF PT ISI 11 Rio X l LONG. SEAM (2.5T ADJ. WELD 35) C5.12
- l. RM 1 S84017 V s
9 DATE: 06/30/89 COMANCNE PEAK UNIT 1 PAGE: 272' REvls!ON:' 1 PRESERVICE INSPECTION Su MARY
^
CUTAGE 0 (1984), PERIOD, BASELINE INTEtVAL
/ g
' ( i CLASS 2 CCWONENTS JESIDUAL NEAT REMOVAL ASME G
'~
SEC. XI NE SLMMARY EXAMINATION AREA , CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PRor:EDURE IIIM ** CALIBRATION BLOCK **
..........................................v. .......... ............... .... ........................................
10-RM 1 061 601R 2
'191400 TBK-2-2520 75L C*F PT 151 11 R10 X LONG. SEAM (2.5T ADJ. WELD 36) C5.12 RH 1 SB 017 V 191454 TBK 2 2520 75L CF PT 151 11 R10 X LONG. SEAM (2.5T A0J. WELD 37) C5.12 RN 1*SB 017 v-8-RM-1 063 601R-2 191550 TBx 2 2520 76L- CF PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. WELD 60) C5.12 s RH 1 SB+018 V v
12-RM 1 036-601R-2
'191600 TBX 2 2521 1 CF PT QI-QAP 10.2 1R2 X PERFORMED BY B&R FOLLOWING REWORK.
N0ZZLE TO PIPE C5.11 RN 1 r.B 010 1 !
12 RM-1 034-601R 2 193900 TBX 2 2521 24 CF PT QI-QAP 10.2 1R2 X PT PERFORMED BY B&R FOLLOWING REWORK.
N0ZZLE TO PIPE C5.11 RM 1 SB 003 55 8-RN-1 010 60 R 2 194800 TBK 2 2521 33 C-F PT 151 11 Rio X FLANGE TO PlPE C5.11 RH 1 SB 003 V t
O i
[-
l DATE: '06/30/89 COMANCHE PEAK UNIT 1 PAGE: 273
- REVIS!ON:. 1 PRESERVICE INSPECTION SUMMART l T N= OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS
{.- >
' RESIDUAL MEAT REMOVAL ASIE G
-~
SEC. XI NE SimMART EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMSER IDENTIFICATION ITEM No E THOD PROCEDURE IIIM " CALIBRATION BLOCK **
8 RN-1 010-601R 2 194900 TBX 2-2521 34 CF PT ISI 11 RIO X P!PE 10 REDUCER C5.11 RM 1*SS 003 v 8 RN 1 064 601R 2 395400 TBX 2 2521 39 CF PT IS! 11 R10 X REDUCER TO PIPE C5.11 RM 1 SB 003 v 196400 TBX 2-2521 49 CF PT ISl*11 Rio X FLANGE TO EL80W C5.11 RM 1 $s 006 V f
. 196500 TBX 2-2521 50 CF PT ISI-11 R10 X i ELGOW TO P!PE C5.11 RM 1 SS 006 V 196600 TBX 2 2521 51 CF PT ISI 11 R10 X PIPE TO Els0W C5.11 l RM 1 58 006 v 1 % 700 TEX 2 2521 52 CF PT ISI 11 Rio X ELS0W TO PIPE C5.11 RN 1 $3 006 v 197200 TBX 2 2521-$7 CF PT ISI 11 Rio X l PIPE 70 NO22LE C5.11 RM 1 58 006 1 i
i.e
$r DATE: 06/30/89 COMA 2CHE PEAC UNIT 1 PAGE: 274 REVISION:s 1 PRESERv!CE INSPECTION SumART
, . DUTAGE D (1f84), PERIOD, BASELINE INTERVAL
~f . CLASS 2 COMPONENTS k SMETY INJECTION ASME G SEC. XI NE
SUMMARY
EXAMINAfl0N AREA ' CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM WO METHOD PROCEDURE 11!M . ** CALIBRATION BLOCK'*
8 51 1 042 151R 2 197800 T8X 2 2521 63 CF PT ISI 11 R10 X PIPE TO ELB0W C5.11 SI 1 $8 031.V 197900 TBX 2 2521 64 CF PT 181 11 R10 X ELBOW TO PIPE' C5.11
$1 1 SB 031 V 198000 ftX 2 2521*65 C-F PT IS! 11 R10 X PIPE TO VALVE C5.11 .
'SI 1 58 031 2
-f
\
l t
A
DATE:. 06/30/09 COMANCHE PEAK UNIT 1 PAGE: 275
- REVISION: .1 PRESERVICF INSPECTION SUMMART OUTAGE O (1984), 'RIOD, BASELINE INTERVAL
- f. .
i ,- CLASS 2 COMPCNENTS AESIDUAL '. EAT REMOVAL ASME G z SEC. XI NE SUMMART EXAMINAfl0W AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITLM No METHCD PROCEDURE IIIM ** CALIBRATION BLOCK'*
1 12-RN-1 036 601R 2 198100 tex 2 2521 66L CF PT ISI-11 R10 X LONG. SEAM (2.5T ADJ. WELD 1) C5.12 RM 1 $3 010 V 8-RM 1 010 601R 2 198200 T8x 2 2521 67L CF PT ISI 11 Rio X LONG. SEAM (2.5T ADJ. WLD 33) C5.12 RM 1 $s 003 V 198250 Tex 2 2521 67L C-F PT 151 11 R10 X LOF:. SEAM (2.5T ADJ. WELD 34) C5.12 f\
RM 1 58 003 V-8 an 1-064 601R 2 198300 Tex 2 2521 68L CF PT ISI 11 Rio X LONG. SEAM (2.5T ADJ. E LD 39) C5.12 RM 1 58 003 V 198400 T8X 2 2521 69L CF PT 151-11 RIO X LONG. SEAM (2.5T ADJ. WELD 50) C5.12 RM 1-ss orm V 198450 TBx 2-2521 69L CF PT ISI 11 RIO X LONG. SEAM (2.5T ADJ. WELD $1) C5.12 RM 1 58 006 V 198500 TBX 2 2521 70L CF PT !$1-11 R10 X LONG. SEAM (2.5T ADJ. WELD 52) C5.12 RM 1 $8 006 V i
u
l- i l
.. .i i
DATE: 06/30/89- COMANCHE PEAK UNIT 1 PAGE: 276 REVISION: 1 PRESERVICE INSPECTION SUW4ARY
" f.-
. CUTAGE D (1984), PERIOD, BASELINE INTERVAL' CLASS 2 COMPONENTS 1
'R, - REllDUAL NEAT REMDML ASME C SEC. XI- NE i RM4ARY EXAMINATION AREA. CATGY EXAM NRR0. REMARKS IAMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
....... .............................. ....... .......... ............... .... ..................i.....................
8 RM.1 064-601R.2 198600' Tex 2 2521 71L C-F PT 1S1 11 R10 X LONG. SEAM (2.5T ADJ. WELD 57) C5.12 .
RN.1.Ss.006.v -l 1
1
/
t A
)
l
DATE:' 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 277-
,; . REVISION: 1 PRESERVICE INSPECTION
SUMMARY
l . ,m OUTAGE 0 (1984), PERIOD, SASELINE INTERVAL
'( CLASS 2 COMPONENTS
')SAFETYINJECTION l
'ASME G l=
l'- -
SEC. XI NE
SUMMARY
EXAM!NAfl0N AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM NO METHOD PkOCEDURE IIIM **CALIBRAfl0N BLOCK **
10-St 1 119-601R-2 198900 TsW 2 2522 1 CF PT NQA 3.09-8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
N0ZZLE To SAFE END C5.11
$1 1 RS 037 V 199000 TBX 2 2522 2 CF PT GI-QAP 10.2-1R2 X PT PERFORMED BY B&R FOLLOWING REWORK.
SAFE END TO LLBOW C5.11 St-1 RS 037 1 i l
10 SI 1 103 2501R-2 199900 Tex 2-2522 11 C-F UT OL !$1-206 R0 X PIPE TO ELBOW C5.21 UT 455 151 206 R0 X St 1 RB 037 4A PT !$1-11 Rio X
- TBX 9'*
200000 Tex 2 2522 12 CF UT OL 151-206 RD X FT PERFORMED BY TU FOLLOWING REWORK.
ELs0W TO P!Pi C5.21 UT 45$ ISI 206 RD X St 1 RB 037 V PT NOA 3.09-8.10R0 X
- TBx 9**
20020Q ftX 2 2522 14 CF UT OL 151 206 R0 X PIPE 70 VALVE C5.21 UT 45$ 151 206 R0 X
$1 1 R8 037*6 PT !$1-11 R10 X
- Tex P*
10 St 1 120-601R 2 200300 TBx 2 2523 1 CF PT 151 11 R10 X N0ZZLE TO SAFE END C5.11 St 1 Re 039 V O
(
u)
p i
DATE:= 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 275 l REVIS!0N: 1' PRESERVICE. INSPECTION
SUMMARY
~
,f-( . DUTAGE O (1984), PERIOD, BASELINE INTERVAL l- ! CLASS 2 COMPOWENTS
}l , 1 l
' SAFETY fMJECTION ASME G l '. r SEC. XI NE
- . CUMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS j E $. !$$$!!'!$!!$................ !!!$.$$ $ $ $.... E I!!$5...... ! ! ! $ $$$I!!$!!$.!III$$...................
10-SI 1 120-601R 2 200400 TBXa2 2523 2 CF PT !$1 11 R10 X SAFE END TO PIPE C5.11 S! 1-RB 039 1A 10-$1 1 104 2501R 2 200600 TBX 2 2523 6 CF UT-OL ist 206 R0 X P!PE TO VALVE C5.21 UT-45S !st 206 R0 X
$!*1*RS 039 2 PT 151 11 R10 X ,
- TBX-9**
200900 FBX 2 2523 7 CF UT DL ISI 206 R0 X 4% NOT EXAMINED WITH 455, SEE RR C 5.
VALVE TO P!PE C5.21 UT 45S ISI 206 RD X be' S!*1 RB 039 3 PT IS! 11 R10 X
- TBX 9**
201600 TBX 2 2523 14 CF UT OL !$! 206 RO X PT PERFORMED BY TU FOLLOWING REWORK.
P!PE TO VALVE C5.21 UT 45$ Ist 206 R0 X SI 1 RB 039 6 PT NQA 3.09-8.10R0 X
- TBX 9'*
10-St 1 121 601R-2 201700 T3X 2 2524 1 CF PT ISI 11 Rio X NO22LE 70 SAFE Euc C5.11 S!-1 RB 040 V i
201800 TBX 2 2524 2 CF PT 1S1 11 R10 X SAFE END TO ELBOW C5.11 SI 1-RB+040 1 i
?
l I
DATE: 06/30/09: COMANCHE PEAK UNIT 1 PAGE: 279 REVI5!0Ns 1- PRESERvlCE INSPECTION $UMMARY (L . ,- OUTAGE 0 (1984),, PERIOD, BASELINE INTERVAL CLA$$ 2 COMPONENTS
'b JAFETY INJECTION
^l1 l
ASIE G i
' ~
. SEC. XI NE 1 SLRMARY EXAMINATION AREA CAT'GY EXAM NAR0 REMARKS f IRMBER IDENTIFICATION ITEM NO MffMcD PROCEDURE IIIM **CALIBRAfl0N BLOCK **
10 s1 1 105 2501R 2 202200 TBX 2 2524 6 CF UT OL 181 206 R0 X PIPE To ELBOW C5.21 .UT 455 181 206 R0 X
- TBX-9" l
10 st-1 122 601R-2 T2900 TBX 2 2525 1 CF PT ISI 11 R10 X
[
\ N0ZZLE TO SAFE END C5.11 SI 1 RS 038A Y 10-sf 1 106-2501R 2 203600 TBX 2 2525-8 C-F UT OL 151 206 R0 X .PT PERFORMED BY TU FOLLOWING REWORK.
PIPE TO EL80W C5.21 UT 455 151-706 R0 X
$1-1 RS 038A V PT WQA 3.09-8.10R0' X
$1 1-RS 038A 5 PT ISI 11 R10 X
- TBX 9**
D
l PAGE: 280 i DATE: '06/30/89' COMANCHE PEAK UNIT 1 I
.. REVIS10N: '1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1964), PERIOD, BASELINE INTERVAL l2.I
/D- t CLASS 2 COMP 0NENTS
'f Q xF5fDUAL NEAT REMOVAL ASME G SEC. XI NE PJeMAY EXAMINATION AREA CATGY EXAM NRR0 REMARKS IRMBER IDENTIFICATION - ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
10 RM 1 056 601e 2 204100 TBX 2 2530-1 CF PT Cl-QAP 10.2 1R2 x PERFORMED BY S44 FOLLOWING REWORK.
TEE 70 PIPE C5.11 RN 1 SB 008-1 CF PT ISI 11 R10 x 204400 Tax 2-2530-4 PIPE TO VALVE C5.11 RN 1 58 006-2 10 RM-i 024-601R 2 204500 TBM 2 2530 5 C-F PT ISI 11 R10 X VALVE TO PIPE C5.11 4N 1 SB 008-3 J .
i
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 281 REVISION: 1 PRESERVICE INSPECTION SiseWtf
'O QUTAGE O (1984), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS SAFETY fMJECTION ASME G SEC. XI NE
SUMMARY
EXAMINAfl0N AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK
10 51 1 093 601R 2 206500 TBX 2 2530 24 CF PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK.
ELBOW 70 P!PE C5.11 51 1 SB 002-V 10 51 1 095 2501R-2 207000 TBX 2 2530 29 CF UT OL 151 206 RO X PIPE TO VALVE C5.21 UT 458 151 206 R0 X
$1 1-58 002 3 PT 151 11 Rio X
- TtX 9'*
CF 151 206 R0 I r ],207100 TBX 2 2530 30 UT OL X VALVE TO P!PE C5.21 UT 658 ISI 206 R0 X S1 1 58-002 4- PT ISt 11 R10 X
- TBX 9'*
207900 T8X 2 2530 38 C7 UT OL NoA 3.09-8.44RO X PT PERFORMED SY TU FOLLOWING REWORK. UT PIPE 70 P!PE C5.21 UT 458 NQA 3.*? 8. 64R0 X PERFORMED BY TU FOLLOWING REWORK.-
$1 1 58 002 5' PT . NQA 3.09 8.10R0 X
- T3X-9**
O L _
- DATE '06/30/89 COMANCHE PEAK UNIT 1 PAGE: 282
' REVISION:' 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE D (1984),. PERIOD, BASELINE INTERVAL
.( RESIDUAL MEAT REMOVAL CLASS 2 COMPONENTS ASME G
-~ SEC. XI NE SUMMART EMMINATION AREA CATGY EW NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM N0 3EETHOD PROCEDURE IIIM ** CALIBRATION BL(4K'*
10 RH 1 056- @ M 208050 TBK+2 2530 39L. CF PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. W LD 4) C5.12 RN 1 88 006 V 10 RN-1 024 601 2 e
208100 TBX 2 2530 40L CF PT 151 11 R10 X LONC. SEAM (2.5T ADJ. W LD 5) C5.12 RH 1 88-006-v i
1 I
(.
u 1
I D' COMANCHE PEAK b.ilf 1 PAGE:- '283-
.DATE: 06/30/49
- 1= 'PRESERVICE INSPECTION
SUMMARY
, . . 'REVIS10W:
DUTAGE 0 (1984), PERIOD, BASELINE INTERVAL f ..~ []
V. CLASS 2 COMPONENTS-SAFETY INJECTION l
ASME G
~
SEC. K! NE SUMMART EXAMINATION AREA CATGY EMAM NRR0 REMARKS lamber IDENTIFICATION ITEM No METHOD PROCEDURE I'l 1 M ** CALIBRATION BLOCK **
10 $f 1 093-601R 2 208200 TBM 2 2530 41L CF PT !$1 11 R10 X LONG. SEUI (2.5T ADJ. WELD 24) C5.11 S! 1 88 002-V b~
J
l
-1 I
5 1
'DATE: 406/30/89 COMANCHE PEAK tmlf 1 - PAGE: 284
' REVISION:' 1 PRES 2RVICE INSPECTION
SUMMARY
PN. DUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
'( ) ~- CLASS 2 COMPONENTS RktfDUALNEATREMOVAL~
ASME C
~
SEC. XI NE
-S' M T EXAMINAT;0N AREA CATCY EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'* ,
1
......................................,. l I
10 RM 1 026-601R-2 200300 TEX 2-2531 1 CF' PT ISI 11 RIO X VALVE TO PIP 2 C5411 RM 1 88 007 5 c
208400 TsX 2 2531 2 Cf PT NDE 300 R2 X PERFORMED OT 7?) FOLLOWING REWORK.
P!PE To TEE C5.11 RM 1 SB-007 V
.(
DATE: 06/30/09 COMANCHE PEAK UNIT 1 > PAGE: 285 1 PRESERVICE INSPECTION SupetARY l ..'.. [OREV'.$10N -
- OUTAGE O (19W.), PERIOD, BASELINE INTFRVAL i ..A. .i CLASS 2 COMPONENTS :
SAFETY fMJECTION i
ASME G
~_
' ' SEC. XI NE SLMMARY EXAMINAT10W AREA CATGY EFAM NRR0 REMARKS NUMBER 10ENTIFICAfl0N ITEM NO MEYh00 . PROCEDURE IIIM ** CALIBRATION BLOCK'*
10-1f.1 083 2501R-2 ~
i210100 TBR 2 2531 19 C.F UT 0L !$1 206 20 X PIPE To ?!FE C5.21 'UT 455 !$1 206 RD X SI i se 033 5 PT 151-11 Rio X
- TBX 9" t
Kma_m__ .a- . - -- . - - - - _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _
.' r T
.. DATES ~ 06/30/89 COMANCHE PEAK UNIT 1 P%t: 286
. -LREVISION: 1 PRESERV!CE INSPECTION Su MART
- 2 QUTAGE O (1984), PERIOD, BASELINE INTERVAL
.[\
. CLASS 2 COMPONENTS RESIDUAL NEAT REMOVAL
,. ASME G SEC. XI NE SUMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER. IDENTf71 CATION ITEM NO ME1AOD PRCK:EDURE IIIM ** CALIBRATION BLOCK **
..1,p RN 1 026 601R 2 210200 .TBM 2 2531 20L CF PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. WELD 1) C5.12 RH*1 SB-007 V 210250 TBX 2 2531 20L CF . PT ISI 11 A10 X LONG. SEAM (2.51 ADJ. WELD 2) C5.12 RH*1*SB 007 V
.thP.gio2EK'l2 -
210500 TBr*2 2532 t CF PT IS! 11 R10 X
,# P1PE To TEE C5.11
'( .
, RH.1.Sg-009 V 210600 TBX.2 2532 3 C-F PT ISI 11 Rio X RE EXAMINED AFTER REWORK.
TEE TO PIPE C5.11 RM 1 SB-009 V
'O b
i
i DATEi.06/30/09 COMANCHE PEAK UNIT 1 PAGE: 287
- ' 1EVIS!0N:
. PRESERVICE INSPECTION
SUMMARY
DUTAGE D (1984), PERIOD, BASELINE INTEPAL
'.U' CLASS 2 COMP 0NENis W ETY INJECTION ASME G SEC. XI NE SMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS EMBER IDENTIFICATION ITEM M METHOD PROCEDURE IIIM- ** CALIBRATION BLOCK **
10 SI 1 078-601R 2 211300 TBX 2 2532 10 CF PT IS! 11 R10 X PIPE To ftDOW C5.11.
$1 1 88-003 1 211400 tex 2 2532 11 CF PT ISI 11 Rio X ELBOW 70 P!PE C5.11 SI 1 88-003 V 10 51 1 082 2501R 2 212200' tex-T 5 32 19 CF UT OL 151 206 R0 X P!PE TO VALVE C5.21 UT-455 151 206 RO X
,( S1 1 88 003 8 PT - ISI 11 R10 X
- TBM-9**
212300 TBX 2 2532-20 CF UT 0L ISI 206 R0 X VALVE TO PIPE C5.21 UT 455 151 206 R0 X
- TBX 9**
-212400 TBX 2 2532*21 CF UT-OL 151 206 R0 X PIPE To PIP' C5.21 UT 458 131 206 RO X l' SI 1 58 Ou3 10 PT !$1 11 Rio X
- TBX 9**
1 O
- - - _ _ - - - - - . _ . - - - - - - - - - - - - - - - - _ - - - _ _ _ - _ _ _ _ _ _ w
t
.DATE: 06/30/89- COMANCHE PEAK UNIT 1 PAGE: 288
. REVISION: 1 PRESERVICE INSPECTION SUW4ARY
'g GUTAGE D (1984), PERIOD, BASELINE INTERVAL Q CLA$$ 2 COMPONENTS RfSIDUAL NEAT REMOVAL ASME G
~
SEC. XI- 5E
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE' IIIM **CALIBRAflou BLOCK'*
8 RM 1 027 601R-2 213700 TBX 2 2532 34 CF PT Is! 11 R10 X P!PE 70 ELB0W C5.11 Rt-l 58 009 4 7 213800 Tex 2 2532 35 CF PT 151 11 Rio X ELBOW TO PIPE C5.11 RM 1 58-009 4-6A 10 RM 1 025-601R 2 214650 ftX 2 2532 43L C-F PT 151 11 R10 X
/'~ LONG. SEAM (2.5T ADJ WELD 2) C5.12
- ( . Rn a-ss 00v v 214700 TBX 2 2532 44L CF PT 151-11 Rio X l LONG. SEAM (2.5T ADJ. WELD 3) C5.12 RM 1 $8 009 V 1
l' l
O
DATE: 06/30/09 COMANCHE PEAK UNIT 1 PAGE: 299 REVis!DN .1L PRLSERVICE INSPECTION
SUMMARY
QUTAGE O (1984), PERIOD, BASE 11NE INTERW L -
f-( CLASS 2 COMPONENTS
\ SAFETY INggjg 1-ASME G l'
- sEC. XI N r. ;
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 RCMARKs !
NUMBER IDENTIFICATION ITEM No METHOD PROCEDUC IIIM ** CALIBRATION BLOCK'*
10 s!-1 078-601R 2 l i
l 214850 . tex 2 2532 45L CF PT 151 11 Rio X LONG. SEAM (2.5T ADJ. WELD 10) C5.12
.51 1 88 003 V 214900 TBX 2 2532 46L CF PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. WELD ii) C5.12 SI 1 se 003-v F
i
r b
COMANCHE PEAK UNIT 1 PAGE: 290 l- DATE: .06/30/89 l
REVISION: :1 PRESERVICE INSPECTION
SUMMARY
b'
.-]
OUTAGE D (1984), PERICO, BASELINE INTERVAL CLASS 2 COMPouENTS
( .
M SIDUAL NEAT. REMOVAL ASME G
- -SEC. XI NE SU MART EXAMINATION AREA. . CATGY : EXAM NRR0 'REMARCS NUMBER IDENT!FICATION ITEM NO METHOD PROCEDURE IIIM .** CALIBRATION SLOCK**
10 RN.1 027 60iR 2 215050 Tux 2 2532 47L C-F. PT !$l 11 R10 X LONG. SEAM (2.5T 2 J. WELD 34) C5.12 RH*1 CO 009 V 215100 T8X 2 2532 48L CF PT ISI 11 Rio X LONG. SEAM (2.5T ADJ. WELD 35) C5.12 RH 1*SO 009 V 1
(
s j
l l;
DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: '291 REvit!0N: 1 PRESERVICE INSPECTION SUMMART t
?
[7 OUTAGE 0 (1984), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS
, gFETY INJECTION ASME C
~
SEC. XI NE
SUMMARY
EXAMINATION AREA CATCT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEE NO METHOD PROCEDURE I11M ** CALIBRATION BLOCK **
M [*i 082-2501R 2 215300 TBX 2 2533 1 CF UT OL 181-206 R0 X PIPE TO PIPE (PENETRATION) C5.21 UT 45S 151 206 R0 X
$1 1 S8 056 1 PT ISt 11 RIO X
- TBX 9**
215%00 1BX 2 2533 3 CF UT OL 151 206 R0 X TEE TO PIPE C5.21 UT 455 151 206 R0 X S! 1 SB 056 V' PT 151-11 R10 X
- TBX 9**
215600 TBX 2 2533-4 CF UT OL 151 206 R0 X C5.21 UT 45S 1SI 206 R0 X
.(~N PIPE TO REDUCER ISI-11 Rio
)v) ' ,
. 1BX.,..
6-s! 1 304-2501R 2 215700 T81t 2-2533 5 CF UT OL 151 206 R0 X PT PERFORMED ST TU FOLLOWING REWORK.
REDUCER TO PIPE C5.21 UT 455 151 206 R0 X SI 1 SB 056 V PT N0A 3.09 8.10R0 X
- TBX-5**
'8SI10872$01Rg2 215900 TBX 2-2533 7 CF UT OL 151 206 R0 X RIDUCING TEE TO PIPE C5.21 UT 45S ISI 206 R0 X
- *TBX 18**
10 St-1 083 2501R 2 217100 TBX 2 2534 1 CF UT OL 151 206 RD X PIPE TO PIPE (PENETRATION) C5.21 UT 45$ ISI 206 RD X SI-1 RB 033 1 PT !st 11 Rio X O. **TBx 9"
-a- - - - - - -- - - - - - - - - - - - - - - -
i-l 11 l
,DATE: 06/30/89 - ~ COMANCHE PEAK UNIT 1 PAGE: 292
(.
.. REVISION: 1 PRESERVICE INSPECT 10M SLDIMART -
OUTAGE O (1984), PERIOD, BASELINE INTERVAL
[f"~
class 2 COMP 0NENTS '
l' ' ' SAFETY INJECTION ASME G f SEC. XI NE
SUMMARY
EXAMINAt!ON AREA' CATGY: EXAM NRR0 REMARKS
-NUMBER IDENTIFICATION ITEM No METHOD ' PROCEDURE 1IIN ** CALIBRATION BLOCK" 10 s! 1 083 2101R 2 217300 ' TBX 2 2534 3 CF UT OL 'Is! 206 R0. X
< LTEE TO PIPE C5.21 UT 455- 151 206 R0 X s! 1 RB 033 V PT !st 11 R10 X
217800 TBX 2'2534-8 TEE TO PIPE C5.21 UT 45s 151 206 R0 X PT PERFORMED BT B&R FOLL W'NG REWORK.
SI 1 RB 033-Y PT cl.0AP 10.2 1R2 X
- TBM-18**
y 118400 TBX 2 253414 CF UT OL 151 206 R0 X
( EL90W 70 PIPE C5.21 UT 45s 1s1 206 R0 X
.s! 1 RB 052 V PT ist 11 R10 X
- TBX 5"
~10-s! t 095 2501R 2 219300' TBX 2 2535 t' CF UT OL 151 206 R0 X PIPE TO Pl#ff PENETRATION) C5.21 UT 45s !$1 206 R0 X si.1 RB 001-6 PT 1s1 11 Rio X
,$ f ' h _. _
i; DATE: 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 293 g
l . REvls!ON: 1 PRESERVICE INSPECTION SUIMARY I' -__
QUTAGE O (1984), PERIOD, SASELINE INTERVAL
\ CLASS 2 COMP 0NENTS l SAFETY INJECTION ASME C.
SEC. XI NE
SUMMARY
EXAMINAfl0N AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK" 10 s! 1 095 2501R-2 220400' T5X 2 2535 12 CF UT OL ist-206 R0 X PIPt TO REDUCER C5.21 UT 455 151 206 RO X s! 1*RB 001.V PT ISI 11 R10 X
- TBM 9**
6 st 1 170 2501R 2 220600 tex 2 2535 14 CF UT OL 181 206 R0 X PIPE To VALVE C5.21 UT-60s. 151 206 R0 X s! 1 Re 016-2 PT ISI 11 Rio X "TsX 5"
[* 6-51 1 171 2501R 2 220900 7tX 2 2535 17. CF UT-OL 151 206 R0 X EL90W TO PIPE - C5.21 UT 60s ISI 206 R0 X S1 1 R8 017 2 PT ISI-11 R10 X
- T gg.5 "
i I
s j l
g DATEff06/30/89 COMANCHE PEAK UNIT 1 PAGE: 294 WEVISION! 1 PRESERVICE INSTECTION
SUMMARY
,>'" OUTAGE 0 (1964), PERIOD, BASELINE INTERVAL' CLASS 2 COMPONENTS CONTAftPtENT SPRAY ASME G SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS elUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
16-cT 1 002-151R-2 131200 TBE 2 2536 4 CF PT 151 11 R10 X PIPE TO ELBOW C5.11 CT-1 SB 011 5 l
221300 TBM 2-2536 5 CF PT 151 11 Rio X ELBOW 70 PIPE C5.*1 CT 1 SB 011 V a
2?1400 TBM 2 2536-6 CF PT 151 11 R10 X PIPE TO ELBOW C5.11 f CT 1 SB 011 V A
221500 fBM 2 2536 7 CF PT !$l 11 R10 X ELBOW TO P!PE C5.11 CT 1 SB 011 4 221600 TBM 2 2536 8 CF PT 151-11 R10 X P!PE TD ELBOW C5.11 CT 1 SB-011 V 221700 TBM 2-2536 9 CF PT 151 11 R10 X ELBOW TO PIPE C5.11 CT 1 SB 011 Y-221800 TBM t 253610 CF PT 151-11 Rio X PIPE TO VALVE C5.11 CT 1 85 011 3B I
k l
l
- _ _ _ _ _ . _ - . _ _ _ _ - _ = - _ _ - _ _ _ _ _ - -
DATE: 06/30/89 C0MANCHE PEAK UNIT 1 PAGE: 295
- p. REVis!0N:' 1- PRESERVICE INSPECTI'ON StpMART
)A CUTAGE O (1984), PER:10D, BASELINE INTERVAL CLASS 2 COMPONENTS CONTAINMENT SPRAY ASME. G
~
SEC. XI NE SUNMART EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK" 16 CT 1-002-151R 2 221900 TBX-2 25 M*11L CF PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. WELD 5) C5.12 CT 1 SB 011 V 221950 T8X 2 25M 11L CF PT 181-11 R10 X
.LONG. SEAM (2.5T ADJ. WELD 6) C5.12
.CT 1 SS 011 V 222000 TBX 2 25M 12L CF PT ISI-11 Rio X LONG. SEAM (2.5T ADJ. WELD 7) C5.12 CT 1 SS 011 V
.f '
222050 tex 2-25M 12L CF PT ISI 11 Rio X LONG. SEAM (2.5T ADJ. WELD 8) C5.12 CT 1 SB 011 v 222100 TBX 2-25M 13L CF PT 151-11 R10 X LONG. SEAM (2.5T ADJ. WELD 9) C5.12 CT 1 58 011 V 222150 1BL 2 25M 13L CF PT !$1 11 R10 X LONG. SEAM (2.5T ADJ. WELD 10) C5.12 CT*1<:*2 011*V 16 CT 1 001 151R 2
-222300 TBX 2 2537 4 CF PT 181 11 Rio X PIPE 70 ELBOW C5.11 CT 1 SO 012 1 Q
O
k-(
l' -DATE: 06/30/39- COMANCHE PEAK UN!T 1 PAGE: '296 REVll!0N: 1. 72ESERVICE INSPECTION $UMMARY
'M--
, QUTArd 0 (1984), PERIOD, BASELINE INTERVAL k CLAt$ 2 COMPONENTS
^~
SEC. XI' WE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENT!FICAfl0N ITEM NO METNOD PROCEDURE IIIM **CALIBRAfl0N BLOCK **
l- 16-CT 1 001-151R 2 222400 tex 2 2537 5 C-F PT 151 11 P.10 X ELBOW To PIPE C5.11 CT 1 58 012-V 222500- Tex 2-2537 6 CF PT ISI 11 Rio X P!PE TO ELBOW C5.11 CT 1 88 012-V-222600 TBx 2 2537 T CF PT ISI.11 Rio X ELBOW TO PIPE C5.11 CT 1 $8 012 2 f
Is 222700 Tex d 2537-8 CF PT 151 11 R10 X PIPE TO ELBOW C5.11 CT 1 Ss 012 V
- . 222800 T8% 2 2537 9 CF PT ISI 11 R10 X ELBOW TO PIPE C5.11 CT 1 SS 012 V 222900 Tex 2 2537 10 CF PT 151 11 Rio X P!PE TO VALVE C5.11 CT 1 te 012 3 223000 Tex 2 2537 11L CF PT 151 11 Rio X LONG. SEAM (2.$T ADJ. WELD 5) C5.12 CT 1 $s 012 V l
DATE:' 06/30/89 COMANCHE PEAK UNIT 1 PAGE: 297
- REVISION: -1: PRESERVICE INSPECTION
SUMMARY
-[m l OUTAGE O (1964), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS
\. -
'CONTA!NMfMT SPRAY ASME C SEC. XI NE.
SUMMARf EXAMINAfl0W AREA CATGY EXAM NRRO REMARKS NUMBER IDENTIFICAfl0N ITEM No METHOD PROCEDURE 1IIM **CALIBRAT10N BLOCK **
16 CT 1 001 151R 2 223050 T8x 2 2537 11L CF PT ISI 11 R10 X
'LONG. SEAM (2.5T ADJ. W LD 6) C5.12 CT 1 $s 012 V 223100 TBx 2 2537 12L CF PT !$1 11 Rio X q
LONG. SEAM (2.5T ADJ. W LD 7) C5.12 CT 1 88 012 V 223150 Tex 2 2537 12L CF PT !$1 11 Rio X LONG. SEAM (2.57 ADJ. W LD 4) C5.12 CT 1 Se 012 V
%.)
223200 TOK 2 2537 13L C-F PT 151 11 RIO X LONG. SEAM (2.5T ADJ. W LD 9) C5.12 CT 1-88 012 V 223250 TBX 2 2537 13L CF PT !$1 11 R10 X LONG. SEAM (2.5T ADJ. W LD 10) C5.12 CT 1 88 012 V 10 CT 1 010 301R 2 223300 Tex 2 2536 1 CF PT !$1 11 R10 X N0ZZLE TO PIPE C5.11 CT 1 88 004 1 223500 TBx 2 2538 3 CF PT IS.1 11 R10 X ELaw 70 PIPE C5.11 CT 1 88 004 1 5A
' 8 h
(
\
l l
n DATE:- 06/30/89 COMANCHE PEAK UNIT 1' PAGE: 298 REVjSION: 1 PRESERVICE 1NSPECT10N
SUMMARY
GUTAGE 0 (1984), PERIOD, BASELINE INTERVAL f CLASS 2 COMPONENTS CONTAINMENT SPRAY
. AIME G' SEC. XI NE l
SUMMARY
EXAMINATION AREA.' ~CATGY EXAM NRR0 REMARKS ~
I' '
IAMBER' IDENTIFICATION ITEM No METHOD PROCEDURE IIIM- **CALIBRAT10N BLOCE**
10-CT 1 010 301R 2 223700 Tex 2 2538 5 CF PT 151-11 Rio X 1:
E EL30W TO PIPE C5.11 l CT 1 SS 004 1 6A 1
L.
224000 TsX 2 2538 8 CF PT 151 11 R10 X PIPE TO ELBOW C5.11 CT 1 SO 004 52A 224500 feX 2 2538 13 CF PT 151 11 Rio X P!PE TO FLANGE C5.11 -
CT 1 st 004 4 1 u( ' 224750 TBM 2 2538 1CT 060 CG PT NQA 3.09 8.10R0 . X-M LVE 800Y WELD C6.20 CT t se 004 1CT 060 225050 TsX 2 2538 1C7 065 CG PT NQA 3.09 8.10R0 X PT PERFORMED FOLLOWING REWORK.
VALVE 800Y WELD C6.20 CT*1*Ss 004 1CT 065 16 CT 1 024-301R 2 226100 ftX 2 2538 30 CF PT 151 11 Rio X PIPE TO EL90W- C5.11 CT 1 88 004A V 226200 ftX 2 2538-31 CF PT ISI 11 R10 X ELBOW To P!PE C5.11 CT 1 St 004A v
r 4
' j f '- k v
'(
-- DATE: 06/30/89 COMANCHE PEAK UWlf 1 PAGE: 299
. REVISION: 1 PRESERVICE INSPECTION GUMMARY l i- DUTAGE D (1964), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS CONTAINMENT SPRAY
- ASME G SEC. XI NE
SUMMARY
EXAMINAfl0N AREA CATGT EXAM NRR0 REMARKS NUMBEE 4DENTIFICAT!0N- ITEM No METN00 PROCEDURE I11M ** CALIBRATION SLOCK**
16-CT-1 0?4 301R 2 22A300- TsX 2 2538 32 CF PT 151 11 R1D X PIPE 70 N0ZZLE C5.11 CT-1 SO 004A 9 10-cT 1 010 301R 2 226400 T8X 2 2538 33L CF PT 151-11 R10 X LONG. SEM (2.5T ADJ. kELD 1) C5.12 CT 1 88 004 V 226500 TBX 2 2538 34L CF PT !$1 11 Rio X
(' LONG. SEM (2.5T ADJ. WELD 3) C5.12
- ( CT 1 88 004 V 226600 TBX 2 2538 35L CF PT 181 11 R10 X LONG. SEM (2.5T ADJ. WELD 5) C5.12 CT 1 88 004 V 226750 TBX 2 2538 36L CF PT 151 11 R10 X LONG. SEM (2.5T ADJ. WELD 8) C5.12 CT 1 SB 004 V 227050 Tex 2 2538 39L CF PT 181 11 R10 X LONG. SEAN (2.5T ADJ. WELD 13) C5.12 CT 1 88 004 V 16 CT 1 024 301R 2 227950 ft4 2 2538 48L CF PT !st 11 Rio X t
t0NG. SEM (2.5T ADJ WELD 30) C5.12 CT 1 58 004A V l
v
[. i p
i l
.l
.'DATE: 06/30/89 COMANCNE PEAK UNIT 1 PAGE: 300 p
l.M REVISION: 1 PRESERVICE INSPECTION SUNMARY
( ' j"'%
OUTAGE D (1984), PERICD, 8ASELINE INTERVAL -
CLASS 2 COMPONENTS
( ,/
CONTAINMENT SPRAY j\i ASME G SEC. XI NE
'SUNMARY EXAMINATION AREA CATGY EXAM. NRR0 REMARKS NUMBER IDENTIFICATION ITEN NO METN00 PROCEDURE IIIM ** CALIBRATION BLOCK **
?
i 16 ci 1 024 301R-2 228000 TBX 2 2538 49L CF PT IS! 11 R10 X LONG. SEAM (2.5T ADJ. WELD 31) C5.12 CT 1 SS 004A V 228050 TBX 2 2538 49L CF PT 151 11 Rio X LONG. SEAM (2.57 ADJ. WELD 32) C5.12 CT-1 SS 004A V 10 cT 1 009 301R 2
.228200 Tex 2 2538A 1' CF PT ISI 11 R10 X NGZ2LE To P!PE C5.11
& CT 1 58 017 7
%/
228400 Tar 2 2538A 3 CF PT ISI 11 R10 X ELBOW TO P!PE C5.11 CT 1 58 017 6 3A 228800 TBX 2 2538A 7 CF PT !$1 11 Rio X EL90W 70 P!PE C5.11 CT 1 Se 017 4 tA 229100 TBX 2 2538A 10 CF PT 181 11 R10 X EL80W TO PIPE C5.11 CT 1 58 017 V 229200 TBX 2 2538A.11 CF PT ISI 11 Rio X PIPE TO FLANGE C5.11 .
.----______..._-,_______..________,__m, _ _ , , _ _ _
}
.DATE:. 06/30/09 COMANCHE PEAK UNIT 1 PAGE: 301
, REV1 BION: .
- 1. PRESERVICE INSPECTION SL304ARY OUTAGE O (1984), PERIOD,' BASEL3ME INTERVAL
.,-[ /
CLASS 2 COMPONENTS L L ~ CONTAINMENT SPRAY
. .ASME G
~
SEC. XI NE 1 SW94ARY EXAMINAT10N AREA CATGY EXAM NRR0 REMARKS NU49ER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
I
- 10 CT 1 009-301R 2 229450 TBX 2 2538A 1CT 097 CG PT NoA 3.09 8.10R0 X VALVE 80DY WLD C6.20 CT 1 se 017 1CT 097
. )
229750 TBX 2 2538A 1CT 094 .CC PT NoA 3.09 8.10R0 X p VALVC 50DY WLD C6.20 CT 1 se 017 1CT 096 230200 T8X 2 2538A*21L CF PT ISI 11 R10 X
~ LONG. SEAM (2.5Y ADJ. WELD 1) C5'.12 CT*1 88 017 V 230300. ftX 2 2538A 22L CF PT 151 11 Rio X LONC. BEAM (2.5T ADJ. W LD 3) C5.12
- CT 1 88 017 V 230600 TBX 2 2538A 25L CF PT 151 11 R10 X LONG. $EAM (2.57 ADJ. WLD 10) C5.12 CT 1 58 017 V
-230650 Tex 2 2538A 25L CF PT 181 11 R10 X Louta IEAM (2.5T ADJ W LD 11) C5.12
'0 CT 1 011 301R 2 1
.231200 TBX 2 253b t CF PT 151 11 R10 X N0Z2LE TO ELBOW C5.11 CT 'l se 0131 I
,ne.g DATE: 06/30/89 COMANCHE PEAX UNIT 1 PAGE: 302 REVIS10Nt' 1 PRESERVICE INSPECTION
SUMMARY
I V
] QUTAGE O (1964), PERIOD, SASELINE INTERVAL CLASS 2 COMPONENTS CONTAINMENT SPRAT ASME G SEC. XI NE SUBe%RY EXAMINAfl0N AREA CATGY EXAM NRR0 REMARKS
.NUMSER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIN ** CAL!sRATION BLOCK **
10-CT 1 011 301R 2 231300 ftM 2 2539 2 CF PT 151 11 R10 X EL90W TO PIPE C5.11 CT 1 88 013 1 1 231600 Tex 2 2539 5 Cr PT .181 11 kl0 X PIPE TO ELBOW C5.11 CT 1 se 013 1 5A 232000 Tex 2-2539-9 C F- PT IS! 11 Rio X FLBOW 70 PIPE C5.11 -
CT 1 st 013 v
./%
.j 232100 ~ TBK 2 2539 10' CF PT 151 11 R10 X PIPE To FLANGE C5.11 CT 1 88 013 V 232450 tex 2 2539 1CT 045 CC PT NeA 3.09-8.10A0 X VALVE BODY WELD C6.20 CT 1 se 013 1CT 045 232750 Tex 2 2539-1CT-042 CC PT NQA 3.09-8.10R0 X VALVE toDT WELD C6.20 CT 1 se 013 1CT 042 16-CT 1 025-301R 2 233300 TBK 2 2539 22 CF PT 151-11 RIO X N0ZZLE TO P!PE C5.11 CT 1 SB 014 27 LO
-__ -_._____________m___ _ _ _ _ _ . _ _ _ _ . _ _ _ . . _
ls 1 I
l 1 DATE: 06/30/89' COMANCHE PEAK UNIT 1 PAGE: 303
.. REVISION: 1 PRESERVICE INSPECTION SumARY
'l .CUTAGE O (1984), PERIOD, BASELINE INTERVAL D CLASS 2 COMPONENTS CONTAINMENT SPAAY ASME G _1 SEC. XI NE )
SIAMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS .
NUMBER IDENTIFICATION. ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK" I 16 cT 1 025 301R 2 233600 TBX 2 2539 25 CF PT 151 11 210 X PIPE TO EL30W C5.11 CT 1 st 014 V 233700 TBX 2 2539 26 CF PT 181 11 R10 X ELBOW 70 P!PE C5.11 CT*1 88 014 V 10 cf-011-301R 2 2341.50 TBX 2 2539 33L CF PT ISI 11 110 X LONG. SEAM {2.5T ADJ. ELD 5) C5.12 CT 1 58 013-V 10 cT 1 011 301R 2 234700 Tst 2 2539 36L CF PT 151 11 Rio X LONG. SEAM (2.5T ADJ. WELD 9) C5.12 CT 1 SS 013-V 234750 TsX 2 2539 36L CF PT 151 11 Rio X LONG. SEAM (2.5T ADJ. WELD 10) C5.12 CT 1 SS 013 V 16 CT 1 025 301R 2 235900 T8X 2 2539 48L CF PT ISI-11 110 X LONG. SEAM (2.5T ADJ. WELD 26) C5.12 CT 1 88 014 Y
/
- - . _ _ _ _ - _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ - - _ . _ = - - - _ - _ . _ _ _ _ _
DATE: 06/30/89 COMANCNE PEAK UNIT 1 PAGE: 304 REVISION: 1 PRESERVICE INSPECTION
SUMMARY
.("~N OUTAGE O (1964), PERIOD, BASELINE INTERVAL
'(] CONTAINMENT SPRAY CLASS 2 COMPONENTS ASME G
~
SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM No METNOD PROCEDURE IIIM " CAL 18AATION BLOCK **
16 CT 1025 MLR .2 236000 TBX 2 2539 49L CF PT !$1 11 RIO X LONG. SEAM (2.5T ADJ. WELD 25) C5.12 CT 1 SB 014 v 236100 TBX 2 2539 50L CF PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. WELD 23) C5.12 CT 1 SS 014 V 10 CT 1 011 301R 2 236250 feX 2 2539 52L CF PT ISI 11 R10. X
-- LONG. SEAM (2.5T ADJ. WELD 2) C5.12 CT 1 $8 Ot3 V 10-CT 1-012 3018 2 236300 TBX 2 2539A 1 C*F PT 151 11 R10 X WOZZLE TO Ett0W C5.11 CT 1 88 014-11A 236400 TBX 2 2539A 2 CF PT ISI 11 R10 X ELBOW TO PIPE C5.11 CT 1 $8-014 V 236500 TBX 2 2539A 3 CF PT IS! 11 Rio X PIPE TO EL90W C5.11 CT 1 SS 014 11 3A 237000 tex 2 25394 8 C*F PT 151 11 R10 X l ELBOW TO PIPE C5.11 I CT 1 Sa 014 13 1A O
7 1
a i
PAGE: 305 I DATE: 06/30/89 COMANCHE PEAK UNIT 1 REVis!0N: 1 PRESERVICE INSPECTION
SUMMARY
. t'~~N QUTAGE D (19M), PERIOD, BASELINE INTERVAL s
k
.%s -
CLASS 2 COMPONENTS 50NTAINMENT SPRAY l
ASME G
- SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE 111M ** CALIBRATION BLOCK'*
10tCT 1 012 301R 2 151 11 Rio. x l 237300 Tex 2 2539A 11 CF PT EL90W TO PIPE C5.11 CT 1 88 014 v
. a 237650 TBx 2 2539A 1CT 010 CG PT NRA 3.09 8.10R0 X -1 VALVE 80DY WELD C6.20 CT 1 St 014 1CT 010 237950 Tex 2 2539A 1CT 013 CG PT NQA 3.09 8.10R0 X VALVE BODY WELD C6.20 CT 1 se 014 1CT 013
~
238200 Tsu 2 2539A 20L 'CF PT is! 11 R10 X LONG. SEAM (2.5T ADJ. WELD 2) C5,12 CT 1 88 014 V-238250 Tax 2 2539A 20L CF PT !st 11 R10 x LONG. SEAM (2.5T ADJ. WELD 3) C5.12 CT 1 SS 014 V 238500 Tex 2 2539A 23L CF PT 151 11 R10 x LONG. SEAM (2.5T ADJ. WELD 8) C5.12 CT 1 SS 014 V 238700 TSX 2 2539A 25L CF PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. WELD 11) C5.12 CT 1 88 014 V O
I l
DATES. 06/30/09 COMANCHE PEAK UNIT 1 PAGE: 306
- . . . REV!BIDW . '1. PRESERVICE INSPECTION SUMARY O.
QUTAGE O (1984),. PERIGO, BASELINE INTERVAL
.f
\d CLASS 2 COMPONENTS CNENICAL & VOLtME CONTROL h .G
-s
~
ASME SEC. XI NE
SUMMARY
EXAMlWATIDW AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
8 cs i 567 151R 2 240100. TBX 2 2540 10 CF PT ISI 11 R10 X PIPE TO TEE C5.11 CS 1-AB 002 22A 8 ts.1-063 151R 2 240400 TBX 2 2540 13 CF PT IS! 11 R10 X TEE TO P!PE C5.11 CS 1 AB 002-21 1A 240500 TEX 2-2540 14 CF PT ISI 11 R10 X
, PIPE TO ELBOW C5.11 CS 1 AB-002 21 2 240600 TEX 2 2540 15 C* PT ISI 11 R10 X
' ELBOW TO PIPE C5.11 CS 1 AB-002 21 3 CF PT NSA 3.09-8.10R0 X PT PERFORMED ST TU FOLLOWING REWORK.
240700 TBX 2 2540 16 PIPE TO ELBOW C5.11 CS 1 AB 002 21 4A CF PT NQA 3.09-8.10R0 X PT PERFORMED BT TU FOLLOWING REWORK.
~210500 TBX 2 2540-17 ELBOW TO PIPE C5.11
- CS 1 AB 002 21 5A CF PT Ql*QAP 10.241R2 X PERFORMED BT B&R FOLLOWING REWORK.
241000 TBX 2 2540 27 PIPE TO ELBOW c5.11 CS 1 88 001 3
/
+t DATE: ,06/30/09 COMANCHE PEAK UNIT 1 PAGE: 307 I .
. REVIS10N: 1 PRESERVICE INSPECTION
SUMMARY
,[:
~
OUTAGE 0 (1964), PERIOD, BASELINE INTERVAL
- CLASS 2 COMPONENTS CMENICAL & YOLLME CCBITROL ASME G SEC. XI NE SLMMARY EXAMINATION AREA CATGY EXAM ~ NRR0 REMARKS NUH0ER IDENTIFICATION ITEM NO METHOD PROCEDur:E IIIN ** CALIBRATION BLOCK **
8 CS 1 063 151R-2 211900 T0X 2 2540 28 CF PT ISI 11 R10 X ELBobi 70 P!PE C5.11 CS 1 58 001 V 212000 Tex 2 2540-29 CF PT ISI 11 Rio X P!PE TO ELBOW C5.11 CS 1 St-001 V
-242100 TSX 2 2540-30 CF PT !$1 11 R10 X EL90W 70 PIPE C5.11 C5 1 SS 001 V O 243300 TBX 2 2540 42 CF PT ISI 11 Rio X
PIPE TO EL90W C5.11 CS 1 88 001 V 243400 TEX 2 2540 43 CF PT 151 11 R10 X ELBOW TO PIPE C5.11 CS 1 88 001 V 243500 TBX 2-2540 44 CF PT ISI 11 Rio X PIPE TO ELB0W C5.11 CS 1 58 001 V 243600 TBX 2 2540-45 CF PT ISI 11 R10 X ELBOW 70 PIPE C5.11 CS1SS002-}$,.,
<r
L l
DATE: 06/30/89 CCMANCHE PEAK UNIT 1 PAGE: 308 REVISION: 1 PRESERVICE INSPECTION SLMMART
[ \i 0UTAGE 0 (1984) - PERIOD, BASELINE INTERVAL l (. CLASS 2 COMPONENTS CMENICAL & VOLUME CONTROL l ASME G
~.
SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS l
nim 8ER IDENTIFICAT10N ITEM NO METHOD PROCEDURE IIIM ** CAL 18AAfl0N SLOCK**
8 CS-1 063 151R 2 215500 Tax 2 2540-64 CF PT WQA 3.09 8.10R0 X PT PERFORMED ST TU FOLLOWING REWORK.
P!PE TO VALVE C5.11 j CS 1 880091 245900 Tsx 2 2540 67L CF PT ISI 11 Rio X LONG. SEAM (2.5T ADJ. WELD 13) C5.12 CS 1 AS 002 V 245950 TEX 2 2540 67L C7 PT ISI-11 RfD x LONG. SEAM (2.5T ADJ. WELD 14) C5.12 CS 1 AS 002-V
/
240000 T8X 2 2540 68L CF PT 151 11 R10 X LONG. SEAM (2.5T ADJ. E LD 15) C5.12 CS 1 A8-002 V 2'6050 Tax 2 2540 68L CF PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. WELD 16) C5.12 CS 1 A8-002 V 246100 78x 2 2540-69L CF PT 151-11 R10 X LONG. SEAM (2.57 ADJ. WELD 17) C5.12 CS 1 AS 002 V 246200 T8x 2-2540 70L CF PT Isi 11 R10 X LONG. SEAM (2.5T ADJ. WELD 26) C5.12 CS 1 58 001*V o
1
DATE: 06/30/89 -COMANCHE PEAK UNIT 1 PAGE: 309 REVISION: 1 PRESERVICE INSPECTION SLMMARY
, , 'A' QUTAGE O (1964), PERIOD, SAT 4LINE INTERVAL k ~ f.MD81 CAL 5.VOLtME CONTit0L CLASS 2 COMPONENTS ASME G
~
SEC. XI NE.
SUMMART EXAMINATION AREA CATGY EXAM NRR0 REMARKS NLMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIN ** CALIBRATION BLOCK'*
8 CS 1 063-151R 2 24250 TBX 2 2540-70L CF PT 151-11 R10 X LONG. SEAM (2.5T ADJ. WELD 29) C5.12 CS 1 SS 001 V 246300 TEX 2 2540 71L CF PT 151 11 R10 X LONG SEAM (2.5T ADJ. WELD 30) C5.12 CS 1 Se 001 V 246450 TBX 2 2540 72L CF PT 151 11 Rio X LONG. SEAM (2.57 ADJ. WELD 42) C5.12 CS 1 58 001-V
~l 246500 TBX 2 2540 73L C-F PT !$1 11 Rio X LONG. SEAM (2.5T 'ADJ. WELD 43) C5.12 )
CS 1 Se 001 V 246650 TBX 2 2540 73L CF PT 151-11 R10 X LONG. SEAM (2.5T ADJ. WELD 44) C5.12 CS 1 $3 001 V 246700 TBX 2 2540 74L CF PT 181 11 R10 X LONG. SEAM (2.5T ADJ. WELD 45) C5.12 j CS 1 88 002-V ;
-l 246850 TtX 2 2540 75L CF PT 151 11 Rio X !
i LONG. SEAM (2.5T ADJ. WELD 64) C5.12 CS 1 88 009 V i
4
DATE: "04/30/89 COMANCHE PEAK UNIT 1' PAGE: 310
,REvls10N:-' 1 PRESERV!CE INSPECTIDW $UMMARY CUTAGE D (1984), PERIOD, BASELINE INTERVAL l( ;
l l-
- ( y .
CNEMICAL 8 volt w CONTROL-CLASS 2 COMPONENTS s.SME C SEC. XI NE BLMMARf EXAMINATION AREA .CATGY FW NRR0 RENARKS NUFBER IDENTIFICATION ITEM @ METHOD PROCEDURE IIIM ** CAL!tRATION BLOCK **
....... .............................. .n..... .......... ............... .... ........................................
CS.1.As 002 V V
t
-_____m __.___m._..m_ _ _ . _ _ _ _ _ . _ _
- g. - - - - . . - - - , . _ _ _ _ _
s 9 ATE: 06/30/99 COMANCHE FEAK UNIT 1 PAGE: 311 REVI$10N 1 PRESERVICE INSPECTION SUMMART QUTAGE O (1984), PERIOD, SASELINE INTERVAL
-( / CLASS 2 COMPONENTS gfETT INJECTION AS8E C SEC. XI. NE SUMMART EXAMINAfl0N AREA CATGT EXAM NRR0 REMARKS NUMBER IDENT!flCATION ITEM NO METN00 PROCEDURE IIIM **CALIBRAfl0N BLOCK'*
6-sf 1 038 151R 2 257000 TBX 2 2541 1 PT ISI 11 R10 X AUGMENTED EXAM.
FLANGE TO PIPE
$1 1 38 009 14 217600 TBX 2 2541 7 PT ISI 11 R10 X AUGMENTED EXAM.
FLINGE TO PIPE S1*1 58 009 8 248000 T8X 2 2541 11 PT ISI 11 R10 X AUGMENTIC EXAM.
FLANGE TO PIPE
$1 1 SB 009 4 1A O 218400 feX 2 2541 15 PT 151 11 R10 X AUGMENTED EXAM.
PIPE TO TEE
$1 1 38 009 1C 6-St 1 041 151R 2 151 11 Rio X AUGMENTED EXAM.
249500 T8X 2 2541 26 PT PIPE TO VALVE S1 1 85 010-22 g;31 1 311 151R 2 PT 151 11 R10 X AUGMENTED Ef.AM.
219900 TBX 2 25C. 30 PIPE TO VALVE
$1 1 38 010 16 6 St 1 038 151R 2 PT 151-11 Rio X AUGMEWTED EXAM.
250$00 TBX 2 2541 36 PIPE TO VALVE BI 1 30 004 18A f%v)
4 -DATE: 06/30/89 COMANCNE PEAK UNIT 1' PAGE: 312 REV!S10N: 1 PRESERVICE INSPECTION
SUMMARY
- QUTAGE 0 (1984), PERIOD, BASELINE INTERVAL
- /
\ CLA$s 2 COMPONENTS SAFEff .NJECtf0N AsuE G
~~
SEC. XI NE sundRT EXAJt!NAT!DM AREA CATGY EXAM NRR0 REMARKS NUMBEP IDENTIFICAfl0N ITEN NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6-tI.1 038 151R 2 250600 TBX 2-2541 37 PT 151 11 Rio X AUGMENTED EXAM.
VALVE TO PIPE ;
$1 1-58 00417 o
251500 TBX 2 2541 46 PT ISI 11 R10 X AUGMENTED EXAM.
PIPE TO EL90W 51 1 95-004-8 251700 TBX 2 2541 48 PT ISI 11 Rio X. AUGMENTED EXAM.
PIPE TO ELBOW
$1 1 58 004 6A s
r
'N PT 'St.11 Ric X AUGMENTED EXAM.
251800 TBX 2 2541 49 EL80W 70 PIPE St.1 88 004 5
!$1 11 R10 X AUGhENTED EXAM.
251900 Tex 2 2541 50 PT PIPE TO TEE
$1 1 88 004 4 kst1037151R-2 151 11 R10 X AUGMENTED EXAM.
252400 78X-2 34155 PT PIPE TO VALVE
$1 1 58 004 23A PT 151*11 R10 X AUCMENTED EXAM.
252500 TBX 2 2541 56 VALVE TD P!PE
$1 1 88 004 24 C
's
COMANCHE PEAK UNIT 1 PAGE: 313 DATE 06/3C/09
. REyl% ION: 1 PRESERVICE INSPECT 10N
SUMMARY
DUTAGE O (1984), PERIOD, BASELINE INTERVAL
.( .
CLA$s 2 COMPONENTS I b' l SAFETT INJECTION l
. ASME G
~
SEC. XI NE
SUMMARY
EXAMINATION AREA CATGT EXAM NRR0 REMARKS NUMBER IDENTIFICAfl0N ITEM No METHOD PROCEDURE IIIN ** CALIBRATION BLOCK **
git 1037-151R 2 253300 tex *2 2541 64 PT Isi 11 R10 X AUGMENTED EXAM.
P!PE TO VALVE
$1 1 88 001 5 6 sf 1 07D-151R 2 253400 Tex 2 2542 1 PT cl eAP 10.2 1R2 X PERf0RMED ST s&R FOLLOWIWG REWORK.
AUGMENTED EXAM.
FLANGE TO PIPE 51 1 s8 006 18 253900 TsX 2-2542 6' PT cl-oAP 10.2 1R2 X PERFORMED ST s&R F06 LOWING REWORK.
AUGMENTED EXAM.
P!PE TO FLANGE 51 1 88 006-20 254500 Tex 2-2542 12 PT !st 11 R10 K AUGMENTED EXAM.
PIPE TO TEE S1 1 88 008 8 PT 151 11 R0 X AUGMENTED EXAM.
254600 Tex 2 2542 13 TEE TO PIPE
$1 1 se 006 7 PT !st.11 R10 X AUGMENTED EXAM.
255100 TBX 2 2542 18 PIPE TO VALVE
$1 1 se 006 2 PT 151 11 R10 X AUGMENTED EXAM.
2552Q TBX 2 2542 19 VALVE TO PIPE
$1 1 s8 004 21 (v<
f DATES: 06/30/89 COMANCHE PEAK UNIT 1 'PAGE: 314 REv!$10N: 1- - PRESERVICE IN$PECTION
SUMMARY
QUTAGE D (1984), PERIOD, BASELINE INTERVAL CLAS$ 2 COMPONENTS
$AFETY INJECTION ASME G 2 NE SEC.'XI SLMMARY EXAMINAT10N AREA CATGY EXAM NRR0 REMARKS NUMBER-IDENTIFICATION- ITEM No METHOD PROCEDURE IIIN- ** CALIBRATION SLOCK**
8tf.1-047._11}M 256100 tex 2 2542 26 PT NQA 3.09 8.10R0 X PT PERFORMED BY TU FOLLOWING REWDRK.
PIPE Tc WALVE AUGMENTED EXAM.
- $1 1 58 031 3 4
t m_m-__._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _
J]
~ COMANCHE PEAK UNIT 1 PAGE: 315 j DATE: '06/30/89 -
REVl&l0N 1 PRESERVICE INSPECTION stastARY CUTAGE D (1964), PERIOD, BASELINE INTERVAL d f ~
CLASS 2 COMPONENTS CNENICAL & VOLUME CONTROL ASME G SEC. XI NE
SUMMARY
EXAMINATION AREA' CATGY EXAM NRR0 REMARKS i IAMsER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
6 CS 1 240 151R 2 CF PT !$1 11 R10 X 256500 . Tex 2 2550-4 PIPE TO VALVE C5.11 Cs 1 AB 003 17 i l
I CF PT 181 11 Rio x 256600 TBx*2 2550+5 VALVE 70 PIPE C5.11 CS 1 AS-003 16 257200 Tex 2 2550 11 CF PT !$1 11 R10 X EL90W TO PIPE C5.11
' CF PT 151 11 Rio x 257600 . Tax 2-2550 15 Pl*E TO FLANGE C5.11 CS 1 AB 003-6A 257800 Tex 2 2550 17 CF PT 151 11 R10 x
'i PIPE TO ELDOW C5.11 CS 1 As 003 3 CF PT !st 11 R10 x 258000 Tex 2 2550 19 PIPE TO FLANGE C5.11 CS 1 A3 003*1A 6 CS 1 230 151R 2 CF PT 01 0AP 10.2-1R2 N PERFORMED BY R&R FOLLOWING REWORK.
259000 ftx-2 2550-29 PIPE TO EL30W C5.11 {
Cs 1 As 003 30 l
l l
w-________-____ - _ - _ _ _ _ _ _ _ _ _ - _ _ . - - - - - - _ - - - _ ___ _ _ _ - _ _ _ _ _ _ - ._-_ _ .. _ - - - - -
I-I*
DATE: ' 06/30/09 COMANCHE PEAK UNIT 1 PAGE: 316 .
I REVISIOWs. 1'_ PRESERVICE INSPECT 10N SulmARY
'f[Y affAGE O (1964),- PERIOD, BASELINE INTERVAL-;
3 . ~ CLASS 2 COMPONENTS-
$NEMICAL & VOLtME CONTROL ASME E
~,
.SEC. XI NE SmMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS hMBER IDENTIFICATION ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
l 6 es 1 230 151R 2 259100 TBX 2 2550-30 CF PT IS! 11 R10 X ELS0W TO PIPE . C5.11 CS 1 AB 003a31A
-259300 Tax 2 2550 32 CF PT ISI-11 R10 1 PIPE TO EL90W C5.11 CS 1-As 003 338 259600 TsK+2 2550 33 C*F PT ISI-11 R10 X EL90W TO PIPE C5.11 C3 1 .lB 003 34A 259700 TBM 2-2550 36 CF PT 151-11 Rio X P!PE To ELBOW C5.11 CS 1 AB 003 36 2 1
'259900 Tex 2 2$50 38- CF PT Cl-QAP 10.2-1R2 X PERFORMED BY B&R FOLLOWING REWORK.
PIPE TO FLANGE C5.11 CS 1 AS 003 40A 6 cs 1 240 151R-2 260050 TBX 2 2550 39L CF PT ISI 11 Rio I LONG. SEAM (2.57 ADJ WELD 4) C5.12 CS 1 AS*003 V 260100 Tex 2 2550 40L CF PT 151 11 210 X LONC. SEAM (2.5T ADJ. WELD 5) C5.12 CS 1 AS 003 V v
A 4 ).
j COMANCHE PEAK UNIT 1 PAGE: 317 j DATE:- 06/30/09 '
i iRfv!S!0Ns .1 PRESERVICE INSPECTION
SUMMARY
,m
(L7 AGE 0 (1984), PERIOD, BASELINE INTERVAL t
' - CLASS 2 CONPONENTS CHEMICAL 8 VOLUME CONTROL 3 -i ;
e ASME G l
.- 1
- xC. XI NE StmMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS ITEM NO METHOD PROCEDURE I I I M- **CALIBRAT!ON SLOCK**
NUMBER- 10ENTIFICAfl0N-6-CS 1 240 T)1R 2 CF PT 151 11 R10 X
~260200 Tex *2 2550-41L LONG. SEA;4 (2.5T ADJ. ELD 11) C5.12 CS 1 A5 003 V 260350 TBK 2 2550 242L CF PT 151-11 Rio X
. LONG. SEAM (2.5T ADJ. ELD 15) C5.12 CS 1 AS 003-V I
CF PT 151 11 R10 X 260450 TBM 2 2550 43L LONG.' SEAM (2.$f ADJ. E LD 19) C5.12 CS 1 AS*003 v O
U 6-CS i 239-151R-2 260550 TBW 2 2550 44L C-F PT ISI 11 Rio X LONG. SEAM (2.5T ADJ. W LD 29) C5.12 CS 1 AS 003 V 260600 TBx-2 2550 45L CF Pr ISI 11 Rio X LONG. SEAM (2.5T ADJ. W LD 30) C5.12 C& 1 AB-003 V 260700 TBX 2 2*10 4(L CF PT IS! 11 R10 X LONG. SEA (2.5T ADJ. WLD 33) C5.12 !
l CS-1 As 003 V 1
260850 TsX 2 2550 47L CF PT ISI 11 R10 X LONG. SEAM (2.5T ADJ. W LD 38) C5.12 CS 1 A8 003 V O
e COMANCHE PEAK UNIT 1 PAGE: 318-DATE: 06/30/89
- REVISION
- 1 ~PRESERVICE INSPECTION SUMMART OUTAGE O (1984), PERIOD, BASELINE INTERVAL-1
' ?% ..
CLASS 2 COMPONENTS
, CHEMf CAL 8 VOLtAIE CONTROL ASME G SEC. El NE
SUMMARY
EXAMINAT10N AREA CATGY EXAM NRR0 REMARKS NUMBER. IDENTIFICATION .. ITEM NO METHOD - PROCEDURE IIIN ** CALIBRATION BLOCK'*
6-Cs 1 240-151R-2 260950 T8X 2 2550-48L CF PT IS! 11 R10 X LONG. SEAM (2.5T ADJ. WELD 17) C5.12 CS 1 AB 003 V ggs1357-151R-2_
261000 TBM-2 2551 1 C*F PT ISI 11 R10 t REDUCING TEE TO PIPE C5.11
$1 1 58 010 32 261200 T8X 2 2551 3 CF PT ISI 11 R10 X h ELBOW 70 PIPE C5.11 l ( $1 1 88 010 30 262000 TBK 2 2551 17L CF PT !$1 11 R10 X LONG. SEAM (2.5T ADJ. WELD 31 C5.12 St 1 85 010 V i
1 L
\~
s
COMANCNE PEAK UNIT 1 PAGE: 319
-DATE: 06/30/89 1- PRESERVICE INSPECTION SupMART REVISION:
I' OUTAGE D (1984), PERIOD,, SABELINE INTERVAL CLASS 2 COMPONENTS
' $AFETY INJECTION I
I G
ASME; NE l sEC. X SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMSER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION SLOCK**
4 St-1 051 2501R 2 UT OL !$1 206 R0 X PT PERFORMED BT B&R FOLLOWING REWORK.
263500 TBX 2 2560 9 UT 45S 151 206 RO X AUGMENTED EXAM.
PIPE TO EL80W
$1 1 RS*0M 9 PT GI-QAP 10.2 1R2 X
- TBX 4**
UT-OL ISI 206 RD X AUGMENTED EXAM.
263600 TBX 2-2560 10 ELBOW TO PIPE UT 455 151 206 to X
$1 1 RS 006 10 PT 151 11 Rio X eeigx.4..
- 2 st i 057 250iR 2
( d64600 TsX 2 2560 20 ELBOW TO PIPE PT 151 11 R10 X AUGMENTED EXAM.
SI 1 Re 006-24A I
2 st 1 Of5 2501R-2 PT !$1 11 R10 X ~ AUGMENTED 5XAM.
266000 TBX 2 2560 34 ELBOW TO PIPE SI 1 RS-000-50s 4 st 1 300 1501R 2 PT N0A 3.09-8.10R0 X PT PERFORMED ST TU FOLLOWING REWORK.
267500 TBX 2 2561 10 AUGMENTED EXAM.
PIPE TO EL80W
$1 148-014 '1 i
PT NoA 3.09 8.10R0 X PT PERFORMED BT TU FOLLOWING REWORK. l 267600 TsX 2-2561 11 AUWfENTED EXAM.
l ELBOW TO PIPE
$1*1.se 014 6 l- >
l l I r i
{
E- l
I'
.\i r.
W' ' DATE:. 06/30/E9 COMANCHE PEAK UNIT 1 PAGE: 320 CVIS10N: 1 PREEERVICE INSPECTION SUMMART
- CUTAGE D (1984), PERIOD, BASELINE INTERVAL 3
k D ASS 2 COMPONENTS SAFETY INJECTION A8ME G L SEC. XI NE SUMMART EXAMINATION AREA CATGV -EXAM NRR0 REMARKS NUMBER IDENTIFICATION ITEM NO METN00 PROCEDURE. IIIM ** CALIBRATION BLOCK"
.f 4.s1 1 300 1501R 2 267700 TBK 2 256112 PT !st 11 Rio X AUGMENTED EKAM.
PIPE TO ELBOW
$1 1 58 014-5 4-st-1 051 2501R 2 UT OL 151-206 R0 X 10% NOT EXAMINED WITN 45$, SE'E RR C 5.
270200 TBX 2 2561 36 ELBOW To PIPE UT 45$ ISI 206 R0 X PT PERFORMED BY Tu FOLLOWING REWORK.
NDE 300 R2 X AUGMENTED EXAM.
81 1 2-013 12 PT
- TBX 4**
I j
3 51 1 2 W 1501R 2 1
270800 TBX 2 2562 3 PT !$1 11 R10 X AUGMENTED EXAM.
PIPE Tr EDUCIEG ELBou SI 1 SB-011 2A 4 st-1 044 1501R 2 151-11 Rio X AUGMENTED EXAM.
270900 TBX 2 2562 4 PT REDUCING ELBOW TO P!PE
$1 1 BB C11 3 3 51 1 335-1501R 2 272500 TBX 2 2562 20 PT Cl-QAP 10.2 1R2 X PERFORMED BT B&R FOLLOWING REWORK.
AUGMENTED YXAM.
PIPE TO ELBOW 31 1 50 0238 31 1 if2 51 1,p48-1501R 2 PT 151 11 Rio X AUGMENTED EXAM.
272920 TBX 2 2562 26 PIPE TO ELBcW 51 1 58 0238 25 i%
- c hy DATE
- 06/30/89 COMANCHE PEAK UNIT 1 PAGE
- 321
. afv!SIONs.
1 PRESERVICE INSPECTION Sule%RY
/ -CUTAGE 0 (1964 b - PERIOD, BASELINE INTERVAL k CLASS 2 COMPONENTS SAFETY INJECTION ASME G SEC. XI NE
SUMMARY
EXAMI;lATION AREA'- CATGT EXAA NtR0 REMARKS
< NUMBER IDENTIFICATION ITEM M0 METHOD PROCEDULE- IIIN **CALIBRATlou BLOCK **
i 1 1/2 Sf 1 048 1501R 2 i
272930 Tar 2 2562 27 PT ISI-11 R10 sX AUGMENTED EXAM.
ELBOW TO PIPE.
i 51 1 88-0238 24 i
3 51 1 297 1501R-2
'27330U TBX 2 2563 2 PT ISI 11 It10 X AUOMENTED EXAM.
P!PE To REDUCING ELDOW )
i
~
4-S1 1 039-1501R 2
. f) -151-11 R10 X AUGMENTED EXAM.
\ / 473400 tex 2 2563-3. PT REDUCING EL90W TO PAPE
$1 1 58 015 3 PT 151 11 R10 X AUGMENTED EXAM.
273500' T5X 2 2563 4 P!PE TO ELBOW Cl 1 Ss 015 6-273600 TBK 2 2563 5 FT ISI 11 ki0 X AUGMENTED EXAM.
ELBOW TO PIPE S1 1 85<015 5 PT 151 11 R10 X AUGMENTED EXAM.
273700 TBX 2 2563 6 PIPE TO EL90W
$1*1 58 015 6 3 51 1 336 1501R 2 PT IS!*11 R10 X AUGMENTED EKAM.
275200 Tex 2 2563 21 ELBOW 70 PIPE l [ ' St 1 se 023A 3 1:\
l-I
DATE: 06/30/89 COMANCHE PEAK UNIT 1 Pard 322 L r.g REVISION: . 1 PRESERVICE INSPECTION
SUMMARY
CUTAGE O (1964), PERIOD, BASELINE INTERVAL
( d[
A CLASS 2 COMPONENTS SAFETY INJECTION G
,. ASME.
SEC. XI NE SUMAAT EXAMINATION AREA CATGY EXAM NRR0 REMARKS NUMBER.10ENTiflCAfl0W ITEM NO METHOD PROCEDURE IIIM ** CALIBRATION BLOCK'*
1 1/2 SI 1-049-1501R 2 275710 TsX t 2563 27 PT 151-11 RIO X AUGMENTED EXAM.
PIPE 70 ELBOW SI 1 SB 023A 9 275720 TBX 2 2563 28- PT cl-QAP 10.2 1R2 X PEk?OKMED BY B&R FOLLOWING REWORK.
ELBOW TO PIPE AUGMENTED EXAM.
SI 1 88 023A 10 4 SI 1 021 2501R 2 UT OL ISI 206 R0 X 20E NOT EXAM]NED WITH 45$, SEE RR C 5.
279900 TBX 2 2564 40 UT-455 151 206 RD X AUGMENTED EXAM.
/ TEE TO PIPE SI-1 SB 0368 9A PT IS3 11 R10 X
- TSX 4**
280000 T8X 2-2564 41 PT cl-QAP 10.2 1R2 X PERFORMED F / B&R F0f. LOWING REWORK AUGMENTED ,XAM.
PIPE TO ELBOW 81 1 88 0365 8 eeygg.4ee UT OL 151 206 RO X AUGMENTED EXAM.
280100 T8X 2 2564 42 Ett0W TO PIPE UT 455 ISI 206 R0 X
$1 1 88 0368 7 PT ISI 11 R10 X
/ **TBX 4**
4 SI 1 008 2501R 2 ilT-OL 151 206 R0 X PT PERFORMED FOLLOWING REWORK. AUGMENTED 280400 TsX 2 2564 45 UT 455 ISI 206 R0 X EXY PIPE TO EL80W SI-1-$s 0368 4 PT ISI 11 R10 X
- T5X 4**
I
r.
l COMANCHE PEAK UNIT 1 PAGE: 323
.DATE::06/30/89 REVisl0Ns. 1 PRESERVICE INSPECTION
SUMMARY
CUTAGE D (1964), PERICE, SASELINE INTERVAL
. '[
' d class 2 COMPONENTS SAFETY INJECTION ASME G EC. XI NE FJG4ARY EXAMINATION AREA CATGY EXAM NRR0. REMARKS NUMBER IDENT!FICATION ITEM WO METN00 PROCEDURE IIIM ** CALIBRATION BLOCK **
4 s!-1006-2501R 2 UT OL 151 206 R0 X AUGMENTED EXAM.
260500 tex 2 2564 46 ELBOW 70 PIPE UT 45s Is! 206 R0 X 51 1 88-0368-3 PT ISI-11 Rio X
-**TBX 4**
3 S1 1 176 2501R 2 PT Is! 11 R10 X AMIMENTED EXAM.
280800 TBX 2 2564 49 PIPE To EL909 51-1 88-0369 20 1 1/2 st 1-049 1501R-7 t
U X AUGMENTED EXAM.
281490 ftX 2 2565 20 PT 181 11 R10 PIPE TO ELBOW SI 1 se-023s 6 PT !st-11 R101 X AUGMENTED EXAM.
'281500 tex 2 2565 21 ELBOW 70 PIPE
$1 1 58-0238 7 S t.1 050 1501R 2 1 PT 151 11 Rio X AUGMENTED EXAM.
262100 TBX 2 2565 30 PIPE To ELBOW '
$1 1 se 022 6 2 st 1 338 1501R-2 PT NQA 3.09-8.10R0 X PT PERFORMED BY TU FOLLOWING REWORK. 3 2Ci600 TBX 2 2565 37 AUGMENTED EXAM.
REDUCER TO PIPE f
$1 1 se 022 15 O
)
I DATE: 06/30/89- COMANCHE PEAK UNIT 1 PAGE: 325 L. REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OUTAGE O (1984), PERIOD, BASELINE INTERVAL
. f_ % CLASS 2 COMPONENTS
- )SAFETYfMJECil0N ASME G J SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM- NRR0 REMARKS NUMBER IDENT!f! CATION ITEM NO METHOD PROCEDURE IIIN ** CALIBRATION BLOCK **
4 Sf 1 060 2501R 2 UT OL- ISI 206 R0 X 10% NOT EXAMINED WITH UT, SEE RR C 5.
283100 TBX 2 25M-2 PIPE TO ELBOW UT 455 151 206 RD X PT PERFORMED BY B&R FOLLOWING REWORK.
SI 1 SB 018-19A PT GI-QAP-10.2 R2 X AUGMENTED EXAM.
- TBX-4**
UT OL 181 206 R0- X 101 NOT EXAMINED UlTH 45S, SEE RR C 5.
283200 TBX 2-2566-3 ELBOW TO PIPE UT 453 ISI 206 R0 X AUGMENTED EXAM.
51 1 88 018 20 PT ISI.11 R10 X
- TBX 4**
4-St 1 306 2501R-2 UT-OL ISI 206 R0 X AUGMENTED EXAM.
.84600 TBX 2 2566 17
\ ELBOW TO PIPE UT 455 !$1 206 R0 X Sl*1 RB i& 5 PT ISI-11 R10 X
- TBX 4**
2 51 1 066-2501R 2 286400 TBX 2 2566 35 PT 151-11 R10 X AUGMENTED EXJ.
PIPE TO ELB0W SI.1 RB 042 2 151 11 Rio X AUGMENTED EXAM.
286500 TBX 2 2566 36 PT ELBCAl TO PIPE SI 1 RB 042 3 2-St 1 062 2501R 2 287200 TBX 2 2566-43 PT IS! 11 410 X AUGMENTED EXAM.
PIPE TO ELBOW SI 1 RB 008 29A I
(
COMANCNE PEAK UNIT 1 PAGE: 325
'DATE: 06/30/89
, REVISION: 1 PRESERVICE INSPECTION
SUMMARY
OLJTAGE D (1984), PERIOD, BASELINE INTERVAL
. /~ %
CLASS 2 COMPONENTS
~ . 6AFETY INJECTION -
ASME G
~~
SEC. XI NE
SUMMARY
EXAMINATION AREA CATGY EXAM NRR0 REMARKS e NUMBER IDENTIFICATION ITEM N0' METHOD ' PROCEDURE IIIM ** CALIBRATION BLOCK'*
2 SI 1 062 2501R 2 PT !$1 11 R10 X AUGMENTED EXAM.
287300 TBM 2-2566 44 ELBOW TO PIPE SI 1 kB-008 30 1 2 SI 1-064 2501R 2 290500 TEX 2 2566 76 PT ISI 11 R10 X AUQMENTED EXAM.
ELBOW TO Pn/E SI 1 RB 023A 23 4 91 1 045 1501R 2
(.: 72500 TBM 2 2567 19 PT 151 11 R10 X AUGMENTED EXAM.
'.('
ELBOW TO PIPE
. SI 1 88 014 27 PT 151 11 R10 X AUGMENTED EXAM.
-295600 T5X 2 2567 50 PIPE TO ELBOW
- $1 1 88 018 7 PT 151 11 R10 X AUGMENTED EXAM.
-295700 TRX-2 2567 51 ELBOW TO PIPE
$1 1 58 018 8 2-SI 1 307 2501R 2 PT 181 11 R10 X AIJ1MENTED EXAM.
296500 TBX 2 2568-6 PIPE TO REDUCER S? 1-Rs 015-6 u
-i COMANCHE PEAK UNIT 1 PAGE: 326 DATES 06/30/89 l
. PRESERVICE INSPECTier
SUMMARY
' l
.RfVISION:
1
/ C QUTAGE D (1984), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS SAFETY INJECTION d
I
. ASME G
~
SEC. XI NE SuletARY EXAMINAfl0N AREA CATGY -EXAM NRR0 REMARKS j NUMSER IDENTIFICATION ITEM No METHOD PROCEDURE 1IIM "CALIBRAT!DN BLOCK'*
2 S1 1 058 2501P 2 PT 151 11 R10 X AUGMENTED EXAM.
296600 TBM 2 2568 7 REDUCER TO PIPE SI 1 as 015 28 4 51 1 052 2501R 2 UT OL ISI 206 R0 X AUGMENTED EXAM.
298300 TBX 2 2568 24 Ett0W TO PIPE UT 455 131 206 RD X St 1 St 025 228 PT- ISI 11 Rio X
- tex 4**
4-St 1 039 1501R 2 i
'N AUGMENTED EXAM.
298900 78X 2 2568 30 PT 181 11 R10 X PIPE TO ELBOW St-1 se 025 12A PT ISI 11 R10 X AUGMENTED EXAM.
299000 TBX 2-2568 31 ELBOW TO PIPE SI 1 St 025 11A
!$1-11 Rio X AUGMENTED EXAM.
299100 T8X 2 2568 32 PT PIPE TO ELBOW SI 1 98 025 8A l
1 f
t
) _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _-
i DATES. 06/30/39 ; COMANCHE PEAX UNIT.1 PAGE: 327 REVISION: 1 PRESERVICE INSPECT 10N Supe 4ARY
' /N mffAGE 0 (19'f' PERIOD, BASELINE INTERVAL hk ' . ; LASS 2 COMPONENTS RE$! DUAL NEAT REMOVAL ASME C
^
SEC. XI NE SWetART EXAMINATION AREA CATGY EXAM NRR0 . REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCX** )
j i
. tex RNAPRN-01 301200 TBX-2 3100 1 1WS C-C PT IS! 11 Rio X RNR PUMP #1 WELDED SUPPORT C3.70
^
301210 TBX 2 3100 1 2WS' CC PT !$1 11 R10 X RNR PWIP #1 WELDED SUPPORT C3.70 301220 TBX 2 3100 1*3WS CC PT 151 11 RIO X i RNR PWIP #1 )(LCED SUPPORT C3470 O , TBX RNM4H 02 C-C PT 151 11 Rio X Ri IS ACCEPTABLE, SEE TAB F OF PSI FINAL 301300 - TBX 2 3100 21WS RNR PUMP #2 WELDED SUPPORT C3.70 REPORT. EXTRA EXAM NOT REQUIPED.
C-C PT 151 11 RIO X RI IS ACCEPTABLE, SEE TAB F 0F PSI FINAL 301310 TBX 2 3100 2 2WS RNR PWIP #2 WELDED SUPPORT C3.70 REPORT. EXTRA EXAM NOT REQUIRED.
CC 151 11 R10 X R1 IS ACCEPTABLE, SEE TAB F 0F PSI FINAL 303 20 TBX 2 3100-2 3WS PT RNR PWIP #2 WELDED SUPPORT C3.70 REPORT. EXTRA EXAM NOT REQUIRED.
- (,
r
~
COMANCHE PEAK UNIT 1 PAGE: 328.
'DATE: I06/30/89 i
~ REVISION: ' 1 PRESERVICE INSPECTION SUISMAY 1 i O CUTAGE O (1964), PERIOD, BASELINE INTERVAL ,.
CLASS 2 COMPONENTS CNEMICAL'8 VOLUME CONTROL ~
ASME G .
~
-SEC. XI kE -j SUIMARY EXAMINATION AREA CATGY EMAM NRR0 REMARKS NUMBER .! IDENTIFICATION ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
TBW CSAPCH 01 301400 TBM 2 3110 1 1WS CC PT 151 11 R10 x l
CENTRIFUGAL CHARGING PUMP #1 C3.70 WELDED SUP.
i i
1
'(
1 w-b i
gc l
/ t 1
1 DATE:. 06/30/09 COMANCHE PEAK UNIT 1 PAGE: 329 i REVit!ON: . 1 - PREEURVICE INSPECTION
SUMMARY
.D QUTAGE O (1984), - PERIOD, SASELINE INTERVAL
( E CHENICAL & VOLLSE CONTROL' CLASS 2 COMPONENTS ASME G SEC. XI NE SLMMARY EXAMINATION AREA CATGY EXAM NRR0 REMARKS' NUMBER 1 IDENTIFICATION ITEM NO METHOD PROCEDURE IIIN **CALIBRAtl0N BLOCK **
TBX CSAPCN 01 301410 TBX 2 3110 1 2WS CC PT 151 11 Rio X CENTRIFUGA4 CHARGING PUMP #1 C3.70 WELDED SUP.
301420 TBX 2 3110 1 3WS C-C PT 151 11 Rio X CENTRIFUGAL CHAR *alWG PUMF #1 C3.70 WELDED s'.lP.
301430 T8X 2 3110 1 4WS CC PT !$1 11 R10 X C3.70
.g- CENTRIFUGAL CHARGING PUMP #1 t WELDED SUP.
O ftX CSAPCH-02 301500 TBX 2 3110 2 1WS' CC PT ISI 11 R10 X EXTRA EXAM, NOT REQUIRED.
CENTRIFUGAL CHARGING PUMP #2 C3.70 WELDED SUP.
301510 TBX 2 3110 2 2WS CC PT !$1 11 R10 X EXTRA EXAM, NOT REQUIRED.
CENTRIFUGAL CHARG!NG PUMP #2 C3.70 WELDED SUP.
301520 tex 2 3110-2 3WS C.C PT 151-11 R10 X EXTRA EXAM, Not REQUIRED.
CENTRIFUGAL CMA2GING PUMP #2 C3.70 WELDED SUP.
[
X
'DATE: 06/30/89 COMANtME PEAK UNIT 1 PAGE: 330 I' PRESERVICE INSPECTION SLMMARY REv!SION: 1 DUTAGE 0 (1964), PER!ts , BASELINE INTERVAL fyf(f~ .
F CLASS 2 COMPONENTS
[ CMENICAL & VOLUME CONTRDL ASME G
~.
SEC. Il NE
SUMMARY
EXAMINATION AREA 'CATGY EXAM- NRR0 REMARKS EUMBER IDENTIFICAT!0N ITEM No METHOD PROCEDURE IIIM ** CALIBRATION BLOCK **
TsW.CSAPCH-02 CC PT ISI 11 R10 K EXTRA EXAM, NOT REQUIRED.
301530 Tex 2 3110-24WS CENTRIFUGAL CHARGING PLMP #2 C3.70 WELDED SUP.
s l
i I
i 4
l
DATE: 06/30/09 COMANCHE PEAK UkIT 1 PAGE: 331 REVltt0N: 1 PRESERVICE INSPECTION sulmARY OUTAGE 0 (1964), PERIOD, BASELINE INTERVAL CLASS 2 COMPONENTS
%) SAFETY INJECTION
^l t
G
'f ASME
- $EC. xl NE l
SUIMART EXAMsNAT!DN AREA -i CATCY EXAM NRR0 REMARKS NLMBER IDENTIFICATION l ITEM NO METHOD PROCEDURE 11IM ** CALIBRATION BLOCK
M3 Tax CIAPSI-02 ,
l 301600 Tax 2 3140 C-D UT OL ISI 15 R6 x di
$1 PUMP 82 BOLTING (2 B1/2 C4.30 832)
)
y k
e I
s
)
v ,
l
- _ _ _ _ _ - . _ _ _ _ . . - _ _ - _ - _ _ _