ML20212A005

From kanterella
Revision as of 22:37, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Full & Complete Review of Plant Safety.Problems Re Objectivity of Rl Cloud & Assoc & Independence & Throughness of Investigation Discussed.Refusal of License Urged If Doubt Exists as to Plant Ability to Withstand Earthquakes
ML20212A005
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/26/1982
From: Denise Edwards
HOUSE OF REP.
To: Palladino N
NRC COMMISSION (OCM)
Shared Package
ML20211Q614 List:
References
FOIA-86-151 NUDOCS 8703030260
Download: ML20212A005 (1)


Text

.- - _ - - _ _ _ _ - - _ _ - - - _ _ _ _ _ - _ _ - - _ _ . _ _ _ - _

e

'.*e

. OCN ESWARDS ,

waarsesseTem erFwse ioww oyraiev.cauro==a gan3 gas.3on aseTwicT emesas COMMITTEE ON Congregg of tfje Tdnitch 5tates - "" '"'c 'O~ "'.i i =

t.3m m su c-v= on Jpouse of Representatibeg en ana .n,7 m -1 ?:..p

'~

. .mer==.r.~. eaur.-

""'"*~"**

- =rausu-Essfjington, D.C. 20515 11300 rootwr L SowLrvame COMMITTEE ON HaTwame. Cauroama 94548

  • *"^** " * """*"*'*

January 26, 1982 , . , . . ,.

Nunzio J. Palladino Chairman """-

Nuclear Regulatory Commission n. . . . . ;*,. jg, [y [ ,$[

Washington, D.C. 20555

, g

(

l

Dear Chairman Palladino:

I am writing once again to urge the Nuclear Regulatory Commission to conduct a full and complete review of the safety of the Diablo Canyon Nuclear Power Plant.

I am distressed to learn of the problems encountered with the investigation done by Robert L. Cloud Associates, under contract to Pacific Gas and Electric Company. *here appear ~

to be many irregularities and inconsistencies between the j october draf t of his report, which was submitted to PG&E for review, and the November draft which was then released to the Commission and the public. Because of the apparent collaboration of PG&E and Dr. Cloud on the November version of the report, there hav'e arisen many questions,as to the objectivity of Dr. Cloud, the independence of his investigation, the thoroughness of his investigation, and the subsequent safety of the plant itself.

I realize that there has been a great deal of controversy

. over the licensing and operation of this plutt. However, the ultimate question which remains to be w.swered.is whether or not the facilib.7 is safe and can withstad an earthquake with no ill' effects. If any doubt exists as to this plant's safety, then I urge the Commission to refuse licensing at this time.

I appreciate your time and efforts in this matter.

With kindest regards.

Sirtcerely, C u ,r- -

Member of Cohgress -

DE:mck _

0703030260 PDR FOIA 860304 HOLMES86-151 ppg

- ~ -- . _. ., -

n __ _. _