ML20211Q609

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Documents from H Schierling Chronological & Reading Files from Sept 1981 - Dec 1983.Forwards App O Documents.App O & N Documents Available in PDR
ML20211Q609
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/25/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Holmes G
MHB TECHNICAL ASSOCIATES
Shared Package
ML20211Q614 List:
References
FOIA-86-151 NUDOCS 8703030142
Download: ML20211Q609 (5)


Text

U.S. NUCLEAR RE!ULATORY COMMISS!!N NAc *Osa e toutST NvWEFSI F01A-86-151

/.. .r.,uk wtSi'ONSE TviE y,

h*"

$ S RESPONSE TO FREEDOM OF -

M **

INFORMATION ACT (FOlA) REQUEST g,g 2 5 1987 REQUESTER o -,-a,,,,,,..-

Mr. Gregory A. Holmes PART l.-RECORDS RELEASED OR NOT LOCATED (See checked boxes)

No agency records subsect to the request have been located.

No addrhonal agency records subt set to the request have been located.

Agency records oubrect to the request that are ident$ed in Appendix N a,e ai,eady avsiiabie ,o, pubiic inspection and conving in the NRC Public Document Room,

)(

1717 H Street, N.W., Washington, DC.

X Agency records subject to the request that are identified in Appendix 0 a,e being made avaaase fo, pueme inspection and copying in th. NRC Pubiec Document Room,1717 H Street, N.W., Washington, DC, in a folder under the FOIA number and requester name.

The nonpropretary vers on of the proposat(s) that you agreed to accept in a telephone conversation with a member of rny staff is now being made avasable for public inspection and coying at the NRC Pubic Document Room,1717 H Street, N W , Washington, DC. in a folder under this FOIA number and requester name.

Enclosed is informaton on how you may obttin access to and the charges for copying records placed in the NRC Public Document Room,1717 H Street, N.W., Washmgton, DC.

Agency records subsect to the request are enclosed. Any applicable charge for cop' e s of the records provkled and payment procedures are noted in the comments section.

Records subrect to the request have been referred to another Federal agencybest for review and direct response to you.

In view of NRC's response to this request, no further action is being talten on appeal letter dated PART II.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certa.n information in the requested records is being wrthheld from public disclosure pursuant to the FOIA exemptions described in and for the reasons stated in Part it, sec-tions 8 C, and D. Any released portons of the ruments for whch ordy part of the record is being withhold are being made available for public inspection and copying in the NRC Public Docurnent Room,1717 H Street, etW., Washington, DC, in a folder under this FOIA number and requester name.

Comments f

(

i 8703030142 B60304 PDR FOIA PDR HOLMES86-151 l

l SIGNATU AECTOR, Divts' RutES AND RECORDS , ,

Y ^: -

% W

U:

'h* ^V I e i

I s CRC FZM 464 (Part p i to es>

l

l Re: F01A-86-151 APPENDIX N

1. 1/7/82 Ltr to Mr. Nunzio J. Palladino, Jr. from William R.

Ratliff, re: on 12/22/81 American Consulting Engineers Council was asked to comment on an issue raised by the State of California and other intervenors in the matter of Diablo Canyon. (5 pages) AN0: 8201110554.

2. 1/18/82 Ltr to Mary L. Basch from Darrell G. Eisenhut, re: Ltr dtd 12/20/81, for public hearing on PG&E on the full power license scheduled for January 19, 1982. (3 pages)

AN0: 8202110015

3. 2/11/82 Ltr to Mr. Phillip A. Crane, Jr., from Richard C.

DeYoung, re: November 3, 1981 mtg held in Bethesda, Maryland to discuss seismic design problems at Diablo Canyon (5 pages) AN0: 82030101366

4. 2/12/82 Ltr to George A. Maneatis from R.L. Cloud, re: Ltr to Mr.

B.H. Faulkenberry written by Paul Anderson and Ned Denison that provides clarification to the two exceptions listed in NUREG-0862. (4 pages) AN0: 8202230476

5. 2/17/82 Ltr to The Honorable Leon F. Panetta from William J.

Dircks, re: ltr dated 1/13/82 regarding a constituent's suggestion for independent review of contractor's work for the design anc construction of nuclear power plants. (8 pages)AN0: 8202240266

6. 3/1/82 Policy 1ssue (Comission Meeting). Re: Diablo Canyon Proposed Seismic Design Verification Program. (50 pages)

AN0: 8203150207

7. 3/1/82 Ltr to Mr. Robert L. Cloud from Roger F. Reedy, re:

Report of R.F. Reedy, Inc. Review of Cygna Energy Services (EES)(45pages)AN0: 8203170168

8. 3/3/82 Memo for Chairman Palladino, Comissioner Gilinsky, Bradford, Ahearne and Roberts from Darrell G. Eisenhut, re: Information Item - Transcript of Meeting with Representatives of Governor of California and of Joint Intervenors(BN-82-19((3pages)AN0: 8206300118
9. 3/5/82 Ltr to Mr. Robert L. Cloud from Roger F. Reedy, re:

Report of R.F. Reedy, Inc., Review of URS/J.A. Blume &

Associates, Engineers. (43 pages) AN0: 8203160320

Re: F01A-86-151 APPENDIX N (Continued)

10. 7/12/82 NRC Staff response to " Natural Resources Defense Council, Inc., and Sierra Club Fetition to the Commissioners to Exercise Their Inherent Supervisory Authority to Delineate-the Scope of the Limited Work Authorization Proceeding for the Clinch River Breeder Reactor" (22 pages)

ANO: 8207130283 i

9 3

- _ -. . .- . . , . . ~ , . . _ . _ _ , _ ,_.__. - - . . _

.__r_ _ -..._ , , , , . ,

Re: F01A-86-151 APPENDIX 0

1. 1/12/82 Letter of Transmittal to Ken Herring from Robert L. Cloud Associates. Re: Criteria & Methocology for Independent Calculations and Criteria for. Independent Evaluation. (4 PageS)
2. 1/15/82 Ltr to Mr. R.H. Engelken from R.L. Cloud, re: ltr to Engelken to Crane, PG&E dtd 12/30/81. (55 pages)
3. 2/1/82 Ltr to the Honorable John D. Dingell, re: the implication of the recent seismic design errors detected at the Diablo Canyon Nuclear Power Plant. (30 pages)
4. 2/5/82 Ltr to Mr. Harold Denton from Phillip A. Greenberg. Re:

ltr to confirm telephone conversation to be held on 2/17/72 regarding the seismic reverification program for Diablo Canyon. (1 page)

5. 2/8/82 Ltr to Mr. Ray Heer f rom W.E. Cooper, Re: Transcript of February 3,1982, NRC mtg with PG&E, Seismic Design Review Diablo Canyon, Unit 1. (4 pages)

-6. 2/10/82 Ltr to Mr. George A. Maneatis from William E. Cooper, re:

DCNPP Design Reverification Program: Responses to Mr.

Skjei (hRC) Questicns. (3 pages)

7. 3/1/82 Ltr to Mr. Philip A. Crane, Jr., from B.H. Faulkenberry, re: NRC Inspection of Diablo Canyon Units 1 and 2. (12 pages)
8. 3/1/82 Ltr to Mr. Harold R. Denton from R.L. Cloud, re: Design Verification Program Seismic Service Related Contracts Prior to June 1978, Revision I, Phase I. (65 pages)
9. 3/5/82 Ltr to Mr. Malcolm H. Furbush, Joel-Reynolds and The d Honorable Edmund G. Brown, Jr., from Harold R. Denton, re:

staff recomendation that the Diablo Canyon Seismic Design Verification Program - Phase I be performed by a contractor (such as Teledyne). (3 pages) 10, 3/8/82 Ltr to Robert L. Cloud from Roger F. Reedy, re: Report of R.F. Reedy, Inc., Review of Pacific Gas and Electric Company. (53 pages)

11. 3/8/82 Ltr to The Honorable Don Albosta from William J. Dircks, re: the independent audit of the Diablo Canyon Nuclear Power Plant. (4 pages)

, . u.

K Re: F01A-86-151 APPENDIX.0 (Continued) l

12. 3/8/82 Memo for William J. Dircks from Samuel J. Chilk, re:

staff requirements - discussion and possible vote on staff recommendations on Diablo Canyon program plan and independence of audit, 10:00 am, Thursday, March 4, 1982, Commissioners' Conference Room, DC Office (0 pen to Public Attendance). (3 pages)

13. 7/E7/82 Transcript of meeting with Brookhaven National Laboratory Teledyne Engineering Services, and Pacific Gas and Electric Company. Regarding Diablo Canyon, Independent Seismic Evaluation of the Containment Annulus Structure and Selected Piping System. (138 pages) l i

- - - --