Review of PRA for Seabrook Nuclear Power Plant, Monthly Progress Rept for Sept 1985
ML20214F766
Person / Time
Site: Seabrook, 05000000
Issue date: 10/18/1985
From: Kato W
BROOKHAVEN NATIONAL LABORATORY
To: Lyon W
Office of Nuclear Reactor Regulation
Shared Package
ML20213E815 List:
References
CON-FIN-A-3778, FOIA-87-6 NUDOCS 8705260274
Download: ML20214F766 (4)


Text

. ,

0 -

g: r

. BRODKHAVEN NATIONAL LABORATORY i

Q } ASSOCIATED UNIVERSITIES. INC.

Upton. Long Island. New York 11973 (516) 282' 2444 Department of Nuclear Energy FTS 666' October 18, 1985 Mr. Warren Lyon Reactor Systems Branch Division of Systems Integration Office of Nuclear Reactor Regulation Mail Stop P-1132 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Lyon:

Enclosed is the September monthly report for the activities sponsored by your Branch. Also included are the computerized budget sununaries and the fee recovery cost status for each program. I would suggest that you and your staff review the reports to determine whether there are any discrepancies.

If there are, p' ease notify the principal investigator.

We hope this meets with your approval. If there are any questions re-garding format, distribution, or budget reporting, please contact Mr. A. J.

Weiss, Administrative Technical Assistant, FTS 666-4473.

Sincerely yours, r Y. Kato

[We Deputy Chairman WYK/jw Enclosures cc: R. Bari, BNL W. Houston, NRC M. Kaltman, NRk THIS COPY FOR l K. Pulsipher, NRC J. Rosenthal, NRC B. Sheron, NRC A. J. Weiss, BNL Bh1 Technical Monitors 8705260274 870515 )

PDR FOIA SHOLLYB7-6 PDR Uh

I \

MONTHLY HIGHLIGHTS FOR SEPTEMBER 1985

" Review of the Probabilistic Risk Assessment for the Seabrook Nuclear Power Plant" (FIN A-3778)

BNL Principal Investigators: M. Khatib-Rahbar (FTS 666-2626)

W. T. Pratt (FTS 666-2630)

NRC Project Manager: W. Lyon (FTS 492-9405), RS Branch

1. Scope /

Purpose:

This proj ect is to provide technical support to the Reactor Systens Branch in reviewing the accuracy and completeness of the Seabrook Proba-bilistic Safety Study (SPSS). BNL will perfonn a critical review of the plant design and PRA methods supplemented by audit calculations of selec-ted accident sequence

  • to con fi nn the validity of the methods and resul ts.
2. Work Performed During Period:

A draft of the final report was submitted to the NRC Project Manaaer.

Meetings were held with the NRC Project Manager and the applicant to dis-cuss issues raised during the review.

3. Problems / Delays:

No problem areas.

4 Summary of Progress to Date/ Milestones-Task I: , Work is nearly complete on the review and evaluation of the "back-end" of the PRA for the Seabrook Nuclear Station. Two preliminary ,

reports have been submitted for review to the MlC Project Manager. Com- l ments have been received, and have been incorporated into a draft final  ;

report.

5. Next Reporting Period:

Comments from the NRC reviewers will be incorporated into the final report.

l l

l l

i I k

F 1 a A 1. C 1 A L 5 T A T L S S t c T C.w a d 1995 ACCOLAT T T T I F ARC FTA 00917o WFvTCv CF PCA Frn 5FAnnOOK P. F F A-3776 SuFEcVTSrx : Kn PelkCTFAL IAvFSTICATLc i chAIT v.

T F n 'e t h A T I nn UAIF : 09/30/Fe t, f l AIL "! i Yt4h

.< t

  • P4 Tr ret t 1 0TnrCT *

.iare r F r..C I :

(tge sie r r vto15 3) . ri o 6.c3 II OTWCCT SAIA"Ir5 : 1,931. 17,o;e.

goir nTAL v cEcvTre a it. 70.

AnF bl FFcCl : U. 4 sdrC A T G AC T C : o. L.

foAVEL F)cEt5cd : .i. (.

1&ctnFCT Fa rt*S5 d : 70u. 14, ell.  !

6Fr.FW4L 6 APPfn.

  • 1,162. 22,776.

In14 L CIbTS : 3,709 75,0fd.

Prkrth14ur (1 A(ni t pi l,r 3 3Ct 'J T : 849 (F) 64 CAon vL!t G + Fy 3 C FL' ;C RFLFlitte TL JPIF) i 1

III F l'.\ 01 A U STATLc :

FV 1904 5 1 icd

  • C A F JFL T n FT Ice s F ge n e yy tqng yI,gnjNG C..& 4 v t vi G Fv*t i i . e. i tvet otrer Tt 9Agr o4L. her0F0

(- n1 I al (e h i (2 Ki

10. si % . 09 O.

-i 3

( E F RECOVrf<Y CubT CTATU*3 i

FIN: A-377H TITLE: REVIEW OF PRA FOR SEABROOK NPP PERIOD: SEPTEMBER 1985

$ $ FYOti TAttK/ PLANT PERIOD CUMllL A'11VI *

-A Seabrook Docket 50-443 3.801. 75 010. 1 10T AL U 3.001. 75.010.