ML20248E219

From kanterella
Jump to navigation Jump to search
Mod 16,reflecting Return of Equipment to Tva,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators
ML20248E219
Person / Time
Site: Browns Ferry, Sequoyah, Bellefonte, 05000000
Issue date: 08/16/1989
From: Edgeworth P, Rachel Johnson
NRC OFFICE OF ADMINISTRATION (ADM), TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20248E215 List:
References
CON-NRC-05-84-153, CON-NRC-5-84-153 NUDOCS 8910050106
Download: ML20248E219 (2)


Text

%

  1. fAENDMENT OF SOLICITATION / MODIFICATION OF CONTRACTl-rr

'I1 2

2 C ecCTivc oATc.

m acaves TeoN/eu=CHA,c aca.wO.

s. caoscCT e.o. a/ w, pue.9,ugigo.s.CAliON NO. 7 C"""^=

d /[r 9,/$ M 7

,RFPA-I.E, 4 153 dtd 9/19fER

. AO-.N

-0.

m.~

n, m o co g

. w.s,o<O.,<

co,c

~

U.S. Nuclear Regulatory Commission Division of Contracts & Property Management Washington, D.C.

20555 9A. AuCNOMCr4T OF 50t tCIT ATION NO.

g/)

e. N Auc AN D AOonC55 08; CorwT n AC Tc,H (fdo.. *ce r, coun ty, store end 2& Codef Tennessee Valley Authority Power Operations Training Center
90. DAT CO iSEE ETEAf J JJ PO Box 2000 Soddy-Daisy, TN 37379 soA. wooirscA140N 06 CONT R4CT/OHOCH

-i i

no.

2 X

NRC-05-84-153.

S OU. DAJ LO (SEE ITEM 123 I2/12/83' lFAciurY cOoE cooe

11. THIS ITEM ONLY APPLIES TO AMENOMENTS OF SOpCITATIONS.

f es extended,.

is t or ex.

mbered solicitation is amender 3 as set forth in Item 14[ The', hour and date specified for reaint of Of ers The above nu Of fers caust actrio.wiedge receipt of th's arnendment prior to the hour and date specified in the solicitation or es ar tee-copies of the amendment (bl Or acknowledging receipt of t is amendment on ear:h copy of the o h

submitted; or (c) Dy separate letter or telegram which includes a reference to the solicitatiori and amendsnent numbers.

(a) Or completing hems 6 and 15.and returning

MENT TO DE RECElvED AT THE PLACE OEsiGNATED FOR THE RECEf PT OF OFFERS PRIOR TO d by telegram or IN nEJECTION OF YOUR OFFER. of by virtue of this amendment youdesire tochangean offer stready sutamitted.such chang i

d date specified..

letter, provided each telegram or letter males reference to the solicitation and this amendment, and is reaived prior to the o in AccoVNisNG AND APDHOPHI ATsord CATA (t/ required)

N/A

13. THIS ITEM APPLIES ON LY TO tAODIFICATIONS OF CONTRApTS/OflOERS, IT MOOlFIES THE CONTRACT / ORDER NO. AS DESCRIBED (N ITEM 14.

dSpecify authorityf THC CHArdCES SCT FOHT H eN AT CM 14 AHC MAOC IN.THc Cor6 g l A. T Has cHacc 040En is #5$ULO PUR$UANT TO:

Yn ACT OT;OE A No IN sTCM loa.

ho,stes its payinf o//iff.

G. THE ADovC NUuoCRCO CONT R ACT/OROCR 85 MOOf f4CO TO stCFLCCT THE ADMINISTRA approprig:io.s dale. e(c.) SCT FOR TH sN E TEM IE.9URSUANT TO THC AUTHORITV OF FAR 43.3o3(b).

C. THas f u%CMLN TAL AGra(Et.EN T 85 CNT LRCO #NT O PUR$UAN T TO AUT HOHsT Y Of-s 1974-42 U.S.C. 5845 Economy Act 1932, U.S.C. 1535 and Energy Reorganization Act of X

O. O s HC H ISper.lr twe of eno6l.eet,on and sushoris v) 2 cog;c,,o inc ;sso;ng o,,;cc.

O is ooi. B is required to sign ints document and return E. IMPORT ANT: Contractor tdect onetter sehere leasible.1 2 <. DCsc u s ei son OF AuEnomCNi tuoOsr scA T SON (Orcanued bv UCTs<ction heedints. sneaudins ech (See Attached)

\\

loa, n toerstofone ehea9ed,scenalns ganchanged sad ie. 8ves fo*Ce r...e om

.n

..<ere*Med in Hem 9 A et E,u,n n.

...c, c in, e, e

. ne < ono..... o u A. unuc Ano v a nCv cOue n Ac t enc Oo scen crire -a rr. <r enQ tt

~ c u a,,,c.,r,...n a r s,

,.,o.1 xw v

Paul J. Edgeworth, Contracting Of ficer, N

w R. J p

-J o sen, Nuclear Training Manager n,c. O A ic 3.c un>

,m;nc;w -

..,c uA,(., c,4; a o v,,,ny 3, A m, 0 9,,t...(

n.,

c r a.,,.<

,,b.,,

3?3 v7,.a p/g p _

- ~ ~ " 7.7.:. r f,-...;;:.7.,,;,;; r -

,ranOnnO rone b o c v. io e n V

3 o 3 <,

c,nt..

. or Csn

.,e n eo m.m.no r aa <a cr a' u " >

ouov <>vs< o m m.,,,,,.....,.

8910050106 890816 PDR CONTR

- m e nne rysw

(

s e

s

.h llodification No. [ /b %

NRC-05-84-153 Page 2 of 2 The purpose of this 11 modification is to 1) modify the Agreement to show return of the CE Yellow Creek Engineering flodel on October 13, 1988, provided to TTC under flodification No. 6 and six sections of the Hartsville Engineering 11odel on February 21, 1989, provided to TTC under tiodification No. 3 to Tennessee Valley Authority (TVA) and 2) TVA responsibility for transportation and moving costs. Accordingly, this Agreement is revised to read as follows:

1.

Article II, Scope of Work, Add new paragraph "P" to read as follows:

P.

"NRC returned TVA's CE Yellow Creek Engineering t1odel on October 13, 1988 and six sections of the Hartsville Engineering flodel (consisting of the radwaste building and equipnient) on February 21, 1989 in good condition to the appropriate TVA tite. The remaining 22 sections (bases or pedestals) consisting of the reactor building, auxiliary building, turbine building-part41 and fuel building-partial are located at NRC's TTC.

TVA's agreement to be responsible for transportation, disassembly, and packing of the designated equipment returned on the above aforementioned dates hereby releases the ilRC from any cost associated with the return of that equipment.

All other terms and conditions, including the estimated cost of $3,957,733.60 remain unchanged.

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ -