Mod 7,extending Period of Performance Through 880930,adding Addl GE Simulator to Contract & Scheduling Four Simulator Courses Through FY88,to Dresden & Perry Simulator
ML20236T746
Person / Time
Site: Dresden, Perry, 05000000
Issue date: 11/24/1987
From: Ettl M, Wiggins E
GENERAL ELECTRIC CO., NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To:
Shared Package
ML20236T739 List:
References
CON-NRC-05-84-159, CON-NRC-5-84-159 NUDOCS 8712020067
Download: ML20236T746 (3)


Text

.

..W7

'?*

1,, CON T R AC;T.40 COut.

PAGE.OE PAGLS e A, M.,ENDME. NT OF SOL!CITATIO. N/MODIFIC. A. T. ION'O, F.CONTR. ACT. ~

?) n-'l. ' 3.i ~. '.

1,cas.on ons au unarat,)

i i

O is not.

_) is required to sign this document and return copies to the issuing Of fice E. IMPORT ANT: Con tractor Ia OcscuwuoNO, a nom N rnova,c A noN aureannes h, ucr sect.on scoame...ncwine wun ta tiew trace w enut maruer where fea su.>

1 The purpose of this modification is to extend the period of performance through September 30, 1

1988, to add an additional GE simulator to the contract and to schedule four simulator j

courses during FY 1988.

Therefore, the subject contract is hereby revised as follows:

1.

ARTICLE I - STATEMENT OF WORK, Paragraphs A and B are revised as folloys:

8712O20067 871124 PDR CDNTR

~~

NFEC-05-84-159 PDR Emesot as prov6ded hereen, all terms and conditions of the document' referenced in item 9A or ICA, as heretofore changed, remains unchanged and in full force -

&nd ef fect.

15A. N AME AND T a T LE OF $1GNC H (Type oc print) 16A, NAME AND T8TLL OF CONT RACilNG Of FICLH (Type or print)

  • m ew Eu 2. M h Elois J. Wiggins M N, /W /# 7 NEW %CMd 150. CON T R ACTOR /Of f E H H ISC. DAIL SIGN (D 16 0. UNI T 0 51 AT E5 0F AM RICA 16C. OAT 1. 54GN LO i

[/

OY I

i (Stnature/f person eutyraed to eigny (Sstne urEf Contf I Off.cerp f

N$N 7540 ol.157 8070 ~

3o los ST ANDARD (ORM 30 (HCV.10 6 3)

PHCVIOUS LO1T SON UNUL ADE(;

Pregretwd tw G5A

~

.I AH (as C8 H) 53.24 3 l

.__.._..._______________.___m___

s

,o.,

j

(,,'

  • r i NRC,05.-84-:159.L '

l 0

"e

! Modification 7,

~ -

, i P. age. 2:0f.3:

~ ;

~

A.

Objective The objective of this contract is to acquire, through lease, simulator time utilizing the Contractor's Boiling Water Reactor BWR/6, BWR/3, j

Refuel Floor Simulator Systems.

1 B.

Scope The Contractor shall made available simulator time utilizing the Perry Simulator (BWR/6), the Dresden Unit 2 Simulator (BWR/3), and the Refuel l

Floor Simulator systems. The simulator time shall be used to reinforce l

NRC instruction for BWR Simulator Courses. Overall, the simulator time i

shall provide an integral contribution to the NRC instruction regarding i

technical training in the area of system design and operation of BWR

)

systems.

l 2.

ARTICLE I - STATEMENT OF WORK, Paragraph C is revised to add the following:

C.

Work Statement 1.

Requirements c.

8WR Refuel Floor Simulator System l

(1) The Contractor shall make available for use forty (40) hours of leased simulator time utilizing the GE BWR Refuel Floor Simulator located in San Jose, California.

l (2) The Contractor shall furnish a classroom for participants to secure belongings while attending the simulator.

j (3) The Contractor shall provide the ne:essary simulator support personnel to facilitate simulator instruction.

(O The Contractor shall make available the necessary reference materials (i.e., Refuel Floor and maintenance procedures, l

etc.) to support the instruction for a class of up to six (6) participants.

2.

Schedule of Leased Simulator Time Simulator Dates Location (1) Refuel Floor November 16-20, 1987 San Jose, CA.

(2) Refuel Floor March 14-18, 1988 San Jose, CA.

(3) Refuel Floor June 6-10, 1988 San Jose, CA.

(4) Refuel Floor August 1-5, 1988 San Jose, CA.

v,

  • *?;., -

y.

.g',

(

j

.f.

-('

~ (( *

  • 8

^

~.,

~

?

,.'rt

~

- e....n.. < 3

. ;-. "_.c.

c ',

c 3,

v,,.;,.:y _.

.. k_ g

.p..

r

. g.,

.~..v.

~

+

. g +

.e

~..

L;

.1 a,

n,4.,

^,

NRC-05-84-159

Modification 7.

Page 3 of 3

/

3.

ARTICLE II - PERIOD OF PERFORMANCE, is revised as follows:

The period of performance under this contract is from Obcember 5,1983 through September 30, 1988.

4.

ARTICLE III - CONSIDERATION AND PAYMENT, is revised to add the following:

A.

In full consideration of the Contractor's performance of the Statement of Work, NRC shall pay the Contractor the sums delineated below in accordance with ARTICLE 7 of the General Provisions entitled

" Payment."'

r Simulator Date Scheduled Amount (1) Refuel Floor

-November 16-20, 1987

$18,600' (2) Refuel Floor March'14-18, 1988

$18,600 (3) Refuel Floor June 6-10, 1988

$18,600 (4) Refuel Floor August 1-5, 1988

.$18,600 5.

The following courses which Uere scheduled previously, will not be given:

Simulator Date Scheduled Amount 3

(1) Perry December 5-9, 1983

$14,200 L

(2) Perry April 2-6, 1984

$30,700 (3) Perry August 20-24, 1984

$30,700 (4) Perry August 6-8, 1985

$17,700 (5) Perry November 18-22, 1985

$29,500 Funds already cbligated under this contract are sufficient to cover perfor-mance of this work.

All other terms and conditions, including the total obligated amount of

$253,470.00, remain the same.