Text
.
..W7
'?*
1,, CON T R AC;T.40 COut.
PAGE.OE PAGLS e A, M.,ENDME. NT OF SOL!CITATIO. N/MODIFIC. A. T. ION'O, F.CONTR. ACT. ~
?) n-'l. ' 3.i ~. '.
1,cas.on ons au unarat,)
i i
O is not.
_) is required to sign this document and return copies to the issuing Of fice E. IMPORT ANT: Con tractor Ia OcscuwuoNO, a nom N rnova,c A noN aureannes h, ucr sect.on scoame...ncwine wun ta tiew trace w enut maruer where fea su.>
1 The purpose of this modification is to extend the period of performance through September 30, 1
1988, to add an additional GE simulator to the contract and to schedule four simulator j
courses during FY 1988.
Therefore, the subject contract is hereby revised as follows:
1.
ARTICLE I - STATEMENT OF WORK, Paragraphs A and B are revised as folloys:
8712O20067 871124 PDR CDNTR
~~
NFEC-05-84-159 PDR Emesot as prov6ded hereen, all terms and conditions of the document' referenced in item 9A or ICA, as heretofore changed, remains unchanged and in full force -
&nd ef fect.
15A. N AME AND T a T LE OF $1GNC H (Type oc print) 16A, NAME AND T8TLL OF CONT RACilNG Of FICLH (Type or print)
- m ew Eu 2. M h Elois J. Wiggins M N, /W /# 7 NEW %CMd 150. CON T R ACTOR /Of f E H H ISC. DAIL SIGN (D 16 0. UNI T 0 51 AT E5 0F AM RICA 16C. OAT 1. 54GN LO i
[/
OY I
i (Stnature/f person eutyraed to eigny (Sstne urEf Contf I Off.cerp f
N$N 7540 ol.157 8070 ~
3o los ST ANDARD (ORM 30 (HCV.10 6 3)
PHCVIOUS LO1T SON UNUL ADE(;
Pregretwd tw G5A
~
.I AH (as C8 H) 53.24 3 l
.__.._..._______________.___m___
s
,o.,
j
(,,'
- r i NRC,05.-84-:159.L '
l 0
"e
! Modification 7,
~ -
, i P. age. 2:0f.3:
~ ;
~
A.
Objective The objective of this contract is to acquire, through lease, simulator time utilizing the Contractor's Boiling Water Reactor BWR/6, BWR/3, j
Refuel Floor Simulator Systems.
1 B.
Scope The Contractor shall made available simulator time utilizing the Perry Simulator (BWR/6), the Dresden Unit 2 Simulator (BWR/3), and the Refuel l
Floor Simulator systems. The simulator time shall be used to reinforce l
NRC instruction for BWR Simulator Courses. Overall, the simulator time i
shall provide an integral contribution to the NRC instruction regarding i
technical training in the area of system design and operation of BWR
)
systems.
l 2.
ARTICLE I - STATEMENT OF WORK, Paragraph C is revised to add the following:
C.
Work Statement 1.
Requirements c.
8WR Refuel Floor Simulator System l
(1) The Contractor shall make available for use forty (40) hours of leased simulator time utilizing the GE BWR Refuel Floor Simulator located in San Jose, California.
l (2) The Contractor shall furnish a classroom for participants to secure belongings while attending the simulator.
j (3) The Contractor shall provide the ne:essary simulator support personnel to facilitate simulator instruction.
(O The Contractor shall make available the necessary reference materials (i.e., Refuel Floor and maintenance procedures, l
etc.) to support the instruction for a class of up to six (6) participants.
2.
Schedule of Leased Simulator Time Simulator Dates Location (1) Refuel Floor November 16-20, 1987 San Jose, CA.
(2) Refuel Floor March 14-18, 1988 San Jose, CA.
(3) Refuel Floor June 6-10, 1988 San Jose, CA.
(4) Refuel Floor August 1-5, 1988 San Jose, CA.
v,
- *?;., -
y.
.g',
(
j
.f.
-('
~ (( *
- 8
^
~.,
~
?
,.'rt
~
- e....n.. < 3
. ;-. "_.c.
c ',
- c 3,
v,,.;,.:y _.
.. k_ g
.p..
r
. g.,
.~..v.
~
+
. g +
.e
- ~..
L;
.1 a,
n,4.,
^,
NRC-05-84-159
- Modification 7.
Page 3 of 3
/
3.
ARTICLE II - PERIOD OF PERFORMANCE, is revised as follows:
The period of performance under this contract is from Obcember 5,1983 through September 30, 1988.
4.
ARTICLE III - CONSIDERATION AND PAYMENT, is revised to add the following:
A.
In full consideration of the Contractor's performance of the Statement of Work, NRC shall pay the Contractor the sums delineated below in accordance with ARTICLE 7 of the General Provisions entitled
" Payment."'
r Simulator Date Scheduled Amount (1) Refuel Floor
-November 16-20, 1987
$18,600' (2) Refuel Floor March'14-18, 1988
$18,600 (3) Refuel Floor June 6-10, 1988
$18,600 (4) Refuel Floor August 1-5, 1988
.$18,600 5.
The following courses which Uere scheduled previously, will not be given:
Simulator Date Scheduled Amount 3
(1) Perry December 5-9, 1983
$14,200 L
(2) Perry April 2-6, 1984
$30,700 (3) Perry August 20-24, 1984
$30,700 (4) Perry August 6-8, 1985
$17,700 (5) Perry November 18-22, 1985
$29,500 Funds already cbligated under this contract are sufficient to cover perfor-mance of this work.
All other terms and conditions, including the total obligated amount of
$253,470.00, remain the same.