ML20214N127

From kanterella
Revision as of 02:52, 19 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to 860415,0615 & 0814 Ltrs & 860825 Telcon Re Potential Dismantlement & Decommissioning of Facility & Related Concerns.Meeting Rept 50-146/86-165 Re Apparent Exposure Discrepancies Encl
ML20214N127
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 08/28/1986
From: Elsasser T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tydeman J
AFFILIATION NOT ASSIGNED
Shared Package
ML20214N114 List:
References
NUDOCS 8609160111
Download: ML20214N127 (2)


See also: IR 05000146/1986165

Text

.

  • ', f, o

g UNITED STATES

y - fg NUCLEAR REGULATORY COMMISSION

o,

..d

j

l REGION 1

631 PARK AVENUE

% ,d KING OF PRUSSIA. PENNSYLVANIA 19406

Mr. James Tydeman

1402 Wall Street AUG 2 81986

Saxton, Pennsylvania 16678

Dear Mr. Tydeman:

This is in response to your letters of April 15, June 15, and August 14 all of this

year. Your interest in current events at the Saxton plant as well as the requests

outlined in the above correspondence were discussed during our telephone conversa-

tion on August 25, 1986. This letter is a followup to our conversation and pro-

vides information relative to past events and future plans for Saxton. As I indi-

cated, we apologize to you for the delay in responding to your requests. We un-

derstand your concern and the concern of the local population in keeping abreast

of plans for potential dismantlement and decommissioning of Saxton. As outlined

later in this letter, I have initiated steps to improve communications between

yourself and the NRC with respect to the Saxton facility.

The concerns outlined in your correspondence appear to lie in two general areas.

The first, addressed in your letters of April 15 and June 15 relate to dosimetry

discrepancies identified by the licensee which occurred in 1970. The other general

concern relates to present activities at Saxton which are preliminary to dismantle-

ment and possible decommissioning of the facility. This latter concern was dis-

cussed at length during our telephone conversation.

With respect to the apparent exposure discrepancies, enclosed please find the NRC

Region I report which addressed the meeting held with GPU here in the Region I

office on February 18, 1986. Also enclosed is correspondence from GPU to NRC

Region I which summarizes the findings of their investigation into the apparent

exposure discrepancies which were discovered in October 1985 related to events

which occurred in the 1969-1970 time frame. As we discussed on the telephone, NRC

is satisfied with GPU's investigation of this matter. GPU hired a consultant to

investigate this matter, and we have discussed this investigation report with them

on the telephone. The enclosed GPU letter of June 17, 1986 is an accurate summary

of that report.

Two other items are also pertinent to your interest in the exposure discrepancies.

There was a question of whether three or four individuals were involved in the in-

vestigation. As we discussed, there were four film badges involved, but only three

of these were assigned to specific individuals. You had also requested the names

of the individuals involved. Also as we discussed, privacy act considerations

prevents us from obtaining and releasing to you those names. However, as I told

you all three individuals were personally interviewed by GPU's consultant and they

are satisfied that this matter has been properly resolved. If you should have

further questions in this area, the appropriate NRC Region I contact is

Mohammed Shanbaky. Dr. Shanbaky, who is Chief of the Facilities Radiation Pro-

tection Section, can be reached at (215) 337-5258. His section has cognizance

of all matters pertaining to radiological controls at Saxton.

8609160111 860909 6

DR ADOCK 0500

-

.

,

-

.

Mr. James Tydeman 2

AUG 2 81986

On July 25, a meeting was held between NRC and GPU here in the Region I office.

The report of that meeting is also enclosed, as you requested. The main topic of

that meeting was GPU's plans for disposal of the large quantity of groundwater

in-leakage which exists at the Saxton site. Plans for dismantlement were only

mentioned in passing at that meeting.

As we discussed, the formal procedure for dismantlement and decommissioning comes

under the purview of our office of Nuclear Reactor Regulation (NRR). The contact

in this regard is Robert Carter who can be reached at (301) 492-8206. I believe

that you have had previous dealings with Mr. Carter relating to Saxton. In this

regard, a meeting has been tentatively scheduled between NRR and GPU on September

10, 1986 to discuss GPU's future plans for Saxton. Items such as the formal pro-

cess to be followed by GPU with regard to dismantlement and decommissioning will

be discussed at that meeting. Subsequent to this meeting, NRR will establish the

necessary procedural steps to be followed by GPU with respect to future activities

at the Saxton site.

Again, let me apologize for the delay in responding to your requests for informa-

tion pertaining to Saxton. I hope the enclosures and information provided in this

letter have been responsive to your needs. If you require additional information,

please write or contact me directly at (215) 337-5378. To further improve NRC

Region I communication with you on this issue, I have included your name on our

normal distribution list for correspondence related to the Saxton facility.

Sinc el ,

j -=e et? ,

,

Thomas C.' sasser, Chief

Reactor Projects Section 3C

Division of Reactor Projects

Enclosures: As Stated

cc w/encis:

R. Carter, NRR

M. Shanbaky, DRSS

Uret1ED ST ATES

yte sf 4,,

' ,

. #' > - *, C:UCLEAR CECULATORY COWLS $lON

CEGION I

j ei, E

sai pann Avenus

L l mias or nunia. ===mvami. ....

g f

          • MM 2 01955

Docket No. 50-146

General Public Utilities Nuclear

ATTN: Mr. R. Heward, Jr.

Vice-President

Radiological and Environmental Controls

P. O. Box 480

Middletown, Pennsylvania 17057

Gentlemen:

Subject: Saxton Nuclear Facility Personnel Dosimetry Discrepancies

(NRC Region I Meeting 86-165)

A meeting was held at the NRC Region I office on February 18, 1986 between

representatives of GPU Nuclear Corporation end the NRC Region I staff concern-

ing personnel dosimetry records from the Saxton Nuclear Facility.

The subjects discussed at this meeting and a listing of individuals attending

the meeting are included in the NRC Region 1 Sumary, which is enclosed with

this letter.

No reply to this letter is required. Your cooperation with us is appreciated.

Sincerely,

-

Ik

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Meeting Sumary M86-165

cc w/ encl:

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (h5IC)

Comonwealth of Pennsylvania

Q(hhY, . )=b

. _ _ _ _ _ _ . . _ .

Q ..

. .

.

..

U. S. HUCLEAR REGULATORY COMMISSION

REGION I

,

Meeting No. M86-165

Docket No. 50-146

License No. OPR-4 ,

Licensee: , GPU Nuclear Corporat ion

P. O. Box 480

Middletown, Pennsylvania 17057

Facility Name: Saxton Nuclear Experimental Corporation ,

Meeting At: Region I Office, King of Prussia, PA

Meeting Conducted: February 18, 1986

NRC Personnel: a[ 4 20 %

John R. ite,Sr. Rad [ation date

Specia ist

Approved By: M. f 10

date

II

Moharaed M. Shanbaky, Gfiief

Facilities Radiation Protection

Section

l

Meeting Summary:

A meeting was held February 18, 1986, between representatives of GPU Nuclear

Corporation and NRC Region I staff to discuss the preliminary results of an

investigation of personnel dosimetry record anomalies found while GPU was com-

the Saxton Nuclear Facility (now decomis-

piling).

sioned records associated with

,

h

,

3

' l' h - .i .

),

. . _ _ _ _

-. . . _ ___

-

.

-

,

MEETING SUMMARY

Licensee Fersonnel, General Public Utilities (GPU)

Mr. J. Hildebrand, Manager, Radiation Protection

Mr. G. Loddy, Consultant

Mr. M. Ikbal, GPU

Mr. D. McGan, GPU

Mr. M. Roach, GPU

NRC Personnel

Dr. R. Bellamy, Chief, Emergency Preparedness and Radiological Protection

Branch

Dr. M. Shanbaky, Chief, Facilities Radiation Protection Section

Mr. E. McCabe, Chief, Reactor Projects Section 3B

Mr. R. Summers, Project Engineer

Mr. J. White, Senior Radiation Specialist

Meeting Details

On February 18, 1986, a meeting was held at the NRC Region I Office to discuss

the licensee's preliminary investigation into exposure record discrepancies

associated with some workers previously employed at the Saxton Nuclear

Facility (now decomissioned). The records in question were for the period of

exposure from 1969 to 1970 and indicated anomalous dosimetry data for about

three personnel. The records were found November 7,1985, while the licensee

2 was attempting to compile a personnel exposure records file for the Saxton

facility. The NRC was subsequently informed of record discrepancies and of

the licensee's efforts to resolve the data.

The licensee presented the results of a preliminary evaluation and outlined

the investigative technique employed. Since the dosimetry processor is

defunct, difficulty has been experienced in obtaining records that may clarify

the anomalous data.

The licensee will continue his efforts to fully explain the discrepancies in

the records and committed to inform the Region by May 30, 1986 on conclusions

derived from the investigation.

,