MONTHYEARLIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With LIC-98-0105, Monthly Operating Rept for July 1998 for Fort Calhoun Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fort Calhoun Station LIC-98-0092, Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 1 LIC-98-0078, Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 1 LIC-98-0070, Monthly Operating Rept for Apr 1998 for Ft Calhoun Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ft Calhoun Station LIC-98-0058, Monthly Operating Rept for Mar 1998 for Fcs,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fcs,Unit 1 LIC-98-0035, Monthly Operating Rept for Feb 1998 for Fcs,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fcs,Unit 1 LIC-98-0016, Monthly Operating Rept for Jan 1998 for Fort Calhoun Station1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fort Calhoun Station LIC-98-0002, Monthly Operating Rept for Dec 1997 for Fcs,Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fcs,Unit 1 LIC-97-0191, Monthly Operating Rept for Nov 1997 for Fcs,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fcs,Unit 1 LIC-97-0179, Monthly Operating Rept for Oct 1997 for Fcs,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Fcs,Unit 1 LIC-97-0163, Monthly Operating Rept for Sept 1997 for Fcs,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Fcs,Unit 1 LIC-97-0149, Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 1 LIC-97-0137, Monthly Operating Rept for Jul 1997 for Fort Calhoun Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Fort Calhoun Station LIC-97-0115, Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 11997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 1 ML20148L9291997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Fort Calhoun Station Unit 1 LIC-97-0081, Monthly Operating Rept for April 1997 for FCS1997-04-30030 April 1997 Monthly Operating Rept for April 1997 for FCS LIC-97-0054, Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 1 ML20136G5911997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Fort Calhoun Station ML20134M4281997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Fort Calhoun Station Unit 1 LIC-97-0002, Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 ML20134M4341996-12-31031 December 1996 Revised Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 LIC-96-0196, Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 1 LIC-96-0174, Monthly Operating Rept for Oct 1996 for FCS Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for FCS Unit 1 LIC-96-0152, Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 1 LIC-96-0134, Monthly Operating Rept for Aug 1996 for Fort Calhoun Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Fort Calhoun Station LIC-96-0113, Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 11996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 1 LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 11996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 LIC-96-0084, Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 11996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 1 ML20117G0821996-04-30030 April 1996 Monthly Operating Rept for April 1996 for FCS ML20117G0841996-03-31031 March 1996 Revised MOR for March 1996 for FCS LIC-96-0036, Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 11996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 1 LIC-96-0016, Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 1 LIC-96-0004, Monthly Operating Rept for Dec 1995 for Fort Calhoun Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Fort Calhoun Station LIC-95-0233, Monthly Operating Rept for Nov 1995 for FCS Unit 11995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for FCS Unit 1 ML20093G7571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Fort Calhoun Station Unit 1 LIC-95-0172, Monthly Operating Rept for Aug 1995 for Fort Calhoun Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Fort Calhoun Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20203B0991998-12-31031 December 1998 Performance Indicators for Dec 1998 LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with1998-12-31031 December 1998 1998 Omaha Public Power District Annual Rept. with LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20196G2251998-12-18018 December 1998 Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment ML20198M3141998-11-30030 November 1998 Performance Indicators Rept for Nov 1998 LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated1998-11-25025 November 1998 Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated ML20203B0721998-11-16016 November 1998 Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity Expansion ML20196E4981998-10-31031 October 1998 Performance Indicators Rept for Oct 1998 ML20196G2441998-10-31031 October 1998 Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59 LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With ML20155G4261998-09-30030 September 1998 Performance Indicators for Sept 1998 ML20154A1251998-08-31031 August 1998 Performance Indicators, Rept for Aug 1998 LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With ML20238F7231998-08-17017 August 1998 Owner'S Rept for Isis ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency 1999-09-30
[Table view] |
Text
- - - -
l 7.- '9 .
1 AVERAGE DA LY UNIT POWER LEVEL DOCKET NO. 50-285 j UNIT Fort Calhoun Station 94 3 October 12, 1982 COMPLETED BY R. W. Short TELEPHONE (402) 536-4543 MONTil September, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Neti
, 465.8 409.0
,7 2
465.3 408.4 18 3 454.2 408.5 39 4 454.0 20 398.0 5 450.3 21 348.9 ,
6 '450.1 22 407.4 7 441.6 23 407.8 8 407.7 24 407.4 9 407.2 25 408.0 30 405.6 26 407.6
- 403.1 407.4 27 12 402.7 406.6 73 33 403.6 29 405.7 34 ' 406.5 3o 404.5 15 408.3 3 36 408.4 F
INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting snonth. Compute to the nearest whole nyoawatt.
(9/77 )
- y, 8210190746 821012 .
PDRADOCK05000g n .-
e __ -_
- g. -m OPERATING DATA REPORT DOCKET NO.
DATE October 12, 1982 COMPLETED BY R. W. Short TELEPHONE (4U2) 636-4543 OPERAT!NG STATUS
- 1. Unit Name: Fort Calhoun Station Notes
- 2. Reporting Period: September, 1982 1500
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 501
- 5. Design Electrical Rating (Net MWe): 470
- 6. Maximum Dependable Capacity (Gross MWe): 501
- 7. Maximum Dependable Capacity (Net MWe): 478
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,if Any(Net MWe): A
- 10. Reasons For Restrictions.lf Any: None This Month Yr to.Date Cumulative
!I. Hours In Reporting Period 720.0 6,551.0 79,032.0
- 12. Number Of Hours Reactor Was Critical 720.0 6,484.9 62,723.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,309.5
- 14. Hours Generator On.Line 720.0 6,475.8 61,565.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 ~0.0
- 16. Gross Ther nal Energy Generated (MWH) 945,045.5 9,428,643.3 76,130,473.4 .
- 17. Gross Ekctrical Energy _ Generated (MWH) 315,928.0 _ , 3,158,905.9 25,232,851.5
- 18. Net Electrical Energy Generated (MWH) 299.504.4 3,010,342.0 23,858,210.5
- 19. Unit Service Factor 100.0 98.9 77.9
- 20. Unit Availability Factor 100.0 98.9 77.9
- 21. Unit Capacity Factor (Using MDC Net) - 87.0 96.1 65.6 22.- Unit Capacity Factor (Usir.J DER Net) 87.0 96.1 65.3
- 23. Unit Forced Outage Rate 0.0 1.1 3.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
1983 refueling outage scheduled to commence January 3, 1983 for three months.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operationl: None Forecast Achiesed l INITIA L CRITICALITY I
INITIA L ELECTRICITY .
COMMERCIAL OPERATION l
(9/77) -l g -,, - - - . ,
- y. . = - . . , ..
s_ .
- , i
~
DOCKET NO.'
50-285 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME Fort Calhoun Station DATE Octnher 1982 COMPLETED BY R. W Short' REPORTMONTH Senternber.1982 TELEPHONE (402) 536-4543 n.
- B E
, .5 E 3 jY5 Licensee ,E r, Cause & Corrective No. Date g 3g ,s s 5 Event g {go, Action to j H
f: 4,s jgg Report a mO g Prevent Recurrence 6
There were no unit shutdowns during the month of September, 1982.
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Repori ILER) File INUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5 G4)perational Error (Explain) Exhibit I Same Sourec (9/77) Il-Other (Explain)
O e
/; !
Refueling Information Ebrt Calhoun - Unit tb. 1
. Report for the ncnth cnding september 1982.
- 1. Scheduled date for next refueling shutdown. January 3, 1983
- 2. Scheduled date for restart following refueling. April 1, 1983
- 3. Will refueling or resumption of operation thereafter require a . technical specification change or other license amendment? Yes
- a. If answer is yes, what, in general, will these be?
A Technical Specification Change
- b. If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Caraittee to deter-mine whether any unreviewed safety questions are associated with the core reload.
- c. If no such review has taken place, when is it scheduled?
- 4. Scheduled date(s) for subnitting proposed licensing action and support information. November 1, 1982
- 5. Inportant licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performan analysis methods, significant changes in fuel design, new operating procedures.
- 6. The number of fuel assenblies: a) in the core 133 assmblies b) in the spent fuel pool 237 "
c) spent fuel pool storage capacity 483 "
d) planned spent fuel pool storage capacity 728 "
- 7. 'Ihe projected date of the last refueling that can be
.. discharged to the spent fuel pool assuming the present licensed capacity. 1985 l l
1 Prepared by
< M '
Date October 1, 1982 V /
- T - 4" w p
OMAHA PUBLIC POWER DISTRICT Fort Calhoun Station Unit No. 1 September, 1982 Monthly Operations Report I. OPERATIONS
SUMMARY
Fort Calhoun Station began a power reduction September 3, 1982 from a nominal 100% power and stabilized at 85% power on September 8 for fuel con-servation in order to meet the January 3, 1982 refueling schedule. On September 20, 1982,'the plant reduced power to 50% for several hours when a condensate pump was lost and the backup pump developed seal leakage. After repairs were made, the 85% power level was resumed on September 21, 1982.
The annual Emergency Drill was held September 15, 1982 exercising full implementation of the E=ergency Procedures.
Annual licensed operator requalification training at Combustion Engin-eering simulator in Windsor, Connecticut continued throughout the month.
Arrival of uranium hexaflouride (UF6) began on September 23 and will continue through October 7, 1982.
The spent fuel shipping cask with spent fuel pins was shipped off-site October 1, 1982. These fuel pins are for DOE analysis of high burnup fuel.
New fuel receipt, inspection and storing for Cycle 8 has been completed for 36 bundles. Four more new fuel bundles are to be delivered in November.
No safety valve or PORV challenges occurred.
A. PERFORMANCE CHARACTERISTICS NONE B. CHANGES IN OPERATING bETHODS NONE
-C. RESULTS OF SURVEILLANCE TESTS AND INSPECTIONS Surveillance tests.as required by the Technical Specifications Section 3.0 and Appendix B, were performed in accordance with the annual surveillance test schedule. The following is a summary of the surveillance tests which resulted in Operation Incidents and are not reported elsewhere in the report:
L_ ..
(,
i1 Monthlydperations' Report September, 1982 Page Two C. -(Continued)
Operations Incident Deficiency 0I-1581 ST-RPS-1, Power Range Safety Channels Test.
F.3 Channel "A" Reset Demand Alarm did not annunciate within t,he desired setpoint tolerance.
OI-1589 ST-ESF-5, Automatic Load Sequencer Check F.1-Sequencer Timer for HPSI Pump did not time out within the desired tolerance.
D. CHANGES, TESTS AND EXPERIMENTS CARRIED OUT WITHOUT COMfISSION APPROVAL
- Procedure Description SP-FAUD-1 Fuel Assembly Uplift Condition Detection.
This procedure did not constitute an unreviewed safety question as defined by 10CFR50.59 since it only involved evaluating data from a surveil-lance test.
E. RESULTS OF LEAK RATE TESTS NONE F. CHANGES IN PLANT OPERATING STAFF NONE G. TRAINING Operations training consisted of annual simulator requalification for NRC licensed personnel and hot licensed training for NRC licensed candidates.
Emergency plan training was conducted for all personnel at the Fort Calhoun Station.
Annual Emergency Drill was conducted to exercise the plant, state, and local-Emergency Response Plans.
- i. =
L.
f <.
j',..
' Monthly Operations Report September, 1982 Page Three G. TRAINING (Continued)
System training was conducted for non licensed operators and maintenance.
Three individuals received SRO upgrade examinations by the NRC.
H. CHANGES, TESTS AND EXPERIMENTS REQUIRING NUCLEAR REGULATORY
- COMMISSION AUTHORIZATION PURSUANT TO 10CFR50.59 NONE II. MAINTENANCE (Significant Safety Related)
M. O. # Date Description Corrective Action 16199 8-21-82 FH-12 Spent Fuel Handling Bridge will Repaired per Maintenance Order not motor to position. Procedure.
16365 8-25-82 HCV-218-3, Safety Injection to Charg- Tightened release arm screws.
ing pump motor box is leaking oil.
16018 8-26-82 FP-1B, diesel fire pump cooling line Cleaned strainer, for heat exchanger appears to be plug-ged.
1632h 8-20-82 PCV-18h9, has air leak. Tightened body to bonnet bolts.
16319 8-18-82 AC-12A, Raw Water Strainer will not Replaced fuse.
run.
1659h 2-13-82 AI-31A, RPS V0PT Calculator- alarm Replaced alarm module.
does not annuciate within surveil-lance Test tolerances.
1529h 6-22-82 HCV-50TA, Containment Isolation Vent Replaced solenoid.
Header Valves would not close during the performance of Surveillance Test ST-ISI-WD-1.
16503 8-30-82 Ground on HCV-820B & 821B. Temporarily capped lines in containment.
O b W. G. Gates Plant Manager
.