ML20205C014
ML20205C014 | |
Person / Time | |
---|---|
Site: | University of Illinois |
Issue date: | 03/13/1987 |
From: | Chrissotimos N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | Miley G ILLINOIS, UNIV. OF, URBANA, IL |
References | |
NUDOCS 8703300090 | |
Download: ML20205C014 (2) | |
Similar Documents at University of Illinois | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3121999-10-26026 October 1999
[Table view]Informs That Tf Dragoun Will Be NRC Inspector Assigned to Univ of Illinois at Urbana-Champaign Effective 991026 ML20216F9651999-09-20020 September 1999 Forwards Amend 11 to License R-115 & Safety Evaluation.Amend Approves Safstor Decommissioning Plan for Univ of Illinois Advanced Triga Research Reactor & Authorizes That Plan Be Included as Supplement to Safety Analysis Report ML20212F0291999-09-16016 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Amend to License R-115.Proposed Amend Would Approve Safstor Decommissioning Plan for Univ of Illinois Advanced Triga Research Reactor ML20210N9961999-08-0303 August 1999 Submits Statement of Intent to NRC That at Such Time That Physical Decommissioning of Univ of Il Nuclear Reactor Lab Is Required,Necessary Funds Will Be Appropriated ML20210E9801999-07-22022 July 1999 Forwards Draft Environ Assessment for Univ of Illinois Safstor Decommissioning Plan ML20195D3211999-06-0707 June 1999 Forwards,For Info,Notice & Solicitation of Comments Pursuant to 10CFR20.1405 & 10CFR50.82(b)(15) Re Proposed Action to Decommission Univ of Il at Urbana-Champaign Univ of Il Advanced Triga Research Reactor ML20206S0011999-05-11011 May 1999 Forwards Response to RAI Re Univ of Il Research Reactor. Revised TS with Rev Marks,Encl ML20206A5381999-04-20020 April 1999 Forwards Request for Addl Info Re Review of Licensee Amend Request for License R-115 Submitted on 981113 ML20205N4341999-04-12012 April 1999 Forwards Amend 10 to License R-115 & Se.Amend Removes Authority from License to Operate Reactor,Authorizes possession-only of Reactor & Makes Other Changes to TSs Commensurate with possession-only Status ML20205J0351999-03-26026 March 1999 Informs That Licensee Was in Violation of Surveillance TS 4.2(a) Requiring Control Rod Reactivity Worth Semiannually Not to Exceed Eight Months.Ts Revs in Support of Safstor Eliminate Subject Surveillances ML20203C1091999-02-0303 February 1999 Forwards Response to RAI Re Univ of Il Advanced Triga Reactor Facility ML20202C8691999-01-27027 January 1999 Forwards Request for Addl Info Re Amend Request for FOL R-115 for Univ of Illinois at Urbana-Champaign Advanced Triga Reactor That Was Submitted on 981005 ML20199L1221999-01-21021 January 1999 Informs That Jf Stubbins Will Replace B Jones as Department Head for Univ of Il Nuclear Engineering Dept,Effective 990122 ML20199D4471999-01-12012 January 1999 Forwards Response to NRC 981209 RAI & Revised Pages to TS as Appropriate ML20196K1141998-12-0909 December 1998 Forwards RAI Re Univ of Illinois at Urbana-Champaign Advance Triga Reactor,Submitted on 981005.Response Requested within 60 Days of Date of Ltr ML20195D6001998-11-13013 November 1998 Forwards Safstor Decommissioning Plan for Univ of Il Nuclear Reactor Lab. Proprietary Matl Encl.Proprietary Encl Withheld ML20196G7501998-11-13013 November 1998 Informs That Gts Duratek Info Submitted in Licensee 981113 Safstor Plan,Is Not to Be Considered Proprietary Per 10CFR2.790.Licensee Grants NRC Permission to Duplicate & Disseminate as Necessary Gts Duratek Info ML20154G0421998-10-0505 October 1998 Forwards Listed Documents in Support of Safstor Option for Decontamination & Decommissioning of Univ of Il Nuclear Reactor Lab.Documents Revise Facility License & TS in Support of Facility Status ML20151X2291998-09-11011 September 1998 Informs That Based on Review of Univ of Il Nuclear Reactor Lab (Uinrl) Operator Requalification Program Submitted on 980831,NRC Concludes That Uinrl Operator Requalification Program Meets Requirements of 10CFR55 & Acceptable ML20239A1821998-08-31031 August 1998 Forwards Rev 0 to Univ of Il Nuclear Reactor Lab Reactor Operator Requalification Program, in Support of Current Shutdown Status & Future Possession Only Amend to Facility License ML20236H0601998-07-0101 July 1998 Informs of Licensee Decision to Permanently Cease Operation of Univ of Il Advanced Triga Reactor Effective 980809. Understands That Licensee Must Submit Decommissioning Plan & Request for Termination of License within 2 Yrs ML20247D8081998-04-30030 April 1998 Ack Receipt of Ltr Dtd 980305,transmitting Changes to Physical Security Plan for Univ of Il Nuclear Reactor Lab Submitted Under Provisions of 10CFR50.54(p) ML20216J7901998-04-16016 April 1998 Forwards SRO License Certificates to M Dillavou & a Smit at Univ of Illinois Advanced Triga Reactor.W/O Encl ML20247R9551998-04-0101 April 1998 Forwards Preliminary Drawing for Univ of Il at Urbana-Champaign Advanced Triga Control Console Conversion Project ML20217F3271998-03-24024 March 1998 Forwards Results of Operator Inital Exam Conducted on 980302-03.W/o Encl ML20216F5281998-03-0505 March 1998 Forwards Administrative Changes to Physical Security Plan for Univ of Illinois Nuclear Reactor Lab.Changes Do Not Decrease Effectiveness of Plan.W/O Encls ML20198R5271998-01-20020 January 1998 Discusses Arrangements for Administration of Operator Licensing Exams at Univ of Illinois Reactor Scheduled for Week of 980302.In Order to Meet Schedule,Furnish Matl Listed in Encl 1 at Least 30 Days Prior to Exam Date ML20198T2791998-01-16016 January 1998 Ack Receipt of Which Transmitted Changes to Univ of Illinois Nuclear Reactor Lab Emergency Plan, Submitted Under 10CFR5.54(q) ML20199J6901998-01-12012 January 1998 Informs NRC in Writing of Discovery of Procedural & TS Violation on 971117 & 21 Re Fuel Temperature & Power Indications.Corrective Actions:Procedure Will Be Out & Observed for All Operations Regardless of Simplicity ML20198G0881997-12-24024 December 1997 Discusses Arrangements Made for Administration of Operator Licensing Exams at Univ of Illinois Reactor.Written & Operating Exams Scheduled for Wk of 980302.Ref Matl for Reactor/Senior Reactor Operator Licensing Exams Encl ML20198C1531997-12-23023 December 1997 Requests That Concerning Univ of Illinois,Urbana- Champaign Nuclear Reactor Laboratory Emergency Plan,Be Disregarded.Ltr Was Sent in Error ML20217P3201997-08-22022 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Nrr.All Related Repts, Correspondence & Inquires W/Docket Number Specified Should Be Directed to Listed Address ML20210K0961997-08-15015 August 1997 Forwards Emergency Plan for Nuclear Reactor Lab at Univ of Il in Urbana,Il. Ltr Attached to Rev Bar Copy,Outlines Changes Made to Plan ML20149J2411997-07-24024 July 1997 Provides Reminder That License R-115 for Univ of Illinois at Urbana-Champaign Advanced Triga Reactor Will Expire on 980809 & Guidance for Preparing Application for Renewal ML20149J2821997-07-24024 July 1997 Forwards Insp Rept 50-151/97-201 on 970623-26 & Notice of Violation ML20148T5051997-06-30030 June 1997 Forwards Draft & Final Versions of Emergency Plan for Nuclear Reactor Laboratory at Univ of Il in Urbana,Il. Changes Made Do Not Decrease Effectiveness of Plan ML20140C4651997-06-0202 June 1997 Informs NRC That J Ralston Is No Longer Employed as Facility Operations Supervisor IAW TS Section 6.8(b)(3) ML20137R7971997-04-0909 April 1997 Forwards Senior Reactor Operator License Certificate to Rl Holm.W/O Encl ML20137R7871997-04-0909 April 1997 Forwards SRO License Certificates for Jr Faircloth & Kj Mushinski.W/O Encl ML20134Q1041997-02-14014 February 1997 Forwards Rept Re Problem W/One Kilowatt Interlock and Corrective Action Taken ML20059K2221993-10-26026 October 1993 Informs That Encl Map Entitled, TLD Locations Outside RB May Not Have Been Included in Re Request for Authorization to Operate at 0.5 Rem Limit Per 10CFR20.1301(c).Map Provided to Help Clarify Text ML20057D4501993-09-28028 September 1993 Informs That on 930920,set of Liquid Std Samples Shipped to B Hart of Univ of Western Ontario Instead of Geological Samples.No Formal Procedure Exists for Shipping of Radioactive Matl.Draft Procedure Encl ML20056E3581993-08-16016 August 1993 Forwards Operator/Senior Operator License Certificates for L Golchert & Jh Romans,Per Commission Request.W/O Encls ML20056E0711993-08-0303 August 1993 Forwards Results for Operator Initial Exam Conducted on 930728.W/o Encl ML20056C4521993-06-0909 June 1993 Forwards Initial Exam Repts 50-151/OL-93-01 & 50-356/OL-93-01 During Wk of 930517.W/o Encl ML20128P8531993-02-16016 February 1993 Forwards Amend 6 to License R-115 & Safety Evaluation.Amend Approves Installation of Microprocessor Based Instrumentation & Control Sys on Licensee Triga Reactor.Tss Amended to Reflect New Sys ML20127J5471993-01-19019 January 1993 Forwards Answers to Request for Addl Info Re Authorization to Possess & Use U-235 ML20127D7051993-01-11011 January 1993 Forwards Revised Page 15 to Ts,Per 930111 Telcon ML20127B2471993-01-0505 January 1993 Forwards Response to NRC 921229 Request for Addl Info Re Listing of Scrams Provided by New Ga Co Control Console That Are Not Part of TS & How New Control Console Provides Interlocks Required by TS ML20126L2061993-01-0404 January 1993 Forwards RAI in Relation to Completion of Review of 920527 Application for Amend to License R-115 1999-09-20 Category:NRC TO EDUCATIONAL INSTITUTION MONTHYEARML20059G8401990-09-0505 September 1990
[Table view]Advises That Written & Operating Exams Scheduled for Wk of 901029.Encl Listed Info Requested ML20055D8381990-07-0202 July 1990 Requests That Reactor Operator Requalification Program Be Revised to Include Addl Info Identified in Encl Request for Addl Info within 30 Days of Ltr Date.Per Generic Ltr 87-07, 10CFR55.29 Supercedes 10CFR55 ML20236E3571989-03-10010 March 1989 Forwards Exam Rept 50-151/OL-89-01 of Exams Administered on 890221-23 ML20236A7571989-03-10010 March 1989 Advises That 890307 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable ML20206J1351988-11-16016 November 1988 Requests Ref Matl Listed in Encl Be Provided for Written & Oral Exam Scheduled for Wk of 880220.All Reactor & Senior Reactor Operator License Applications Should Be Submitted at Least 60 Days Prior to Exam Dates ML20236B8771987-10-21021 October 1987 Advises That 870929 Changes to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Marking 10CFR2.790(d) Info Should Be on Bottom & Top of Each Page of Security Plan ML20236M5781987-08-0404 August 1987 Forwards Amend 5 to License R-115 & Safety Evaluation.Amend Updates Reporting Requirements of Tech Spec Section, Administrative Controls to Reflect Recent Changes & Modifies Paragraph 3.A Re Max Reactivity Insertion ML20206S1891987-04-16016 April 1987 Forwards Safety Insp Repts 50-151/87-01 & 50-356/87-01 on 870331-0402.No Violation Noted ML20205C0141987-03-13013 March 1987 Notifies of 870416 Public Meeting W/Nrr & Region III Representatives in Rosemont,Il to Discuss Rev to 10CFR55, Operators Licenses & Implementation of Rev.Meeting Agenda Encl ML20210P6711987-02-0303 February 1987 Informs That 861215 Changes to Emergency Plan in Compliance w/10CFR50.54(q) & Guidance Criteria in Rev 1 to Reg Guide 2.6 & ANSI/ANS-15.16-1982, Emergency Planning for Research Reactors. Implementation Requested Immediately ML20213G1301986-11-0303 November 1986 Forwards Insp Rept 50-151/86-01 on 861008 & Notice of Violation.Violation Classified as Severity Level IV Due to Low Safety Significance Associated W/Wiring Error ML20215L7921986-10-23023 October 1986 Forwards Notice of Significant Licensee Meeting on 861028 in Region III to Discuss Findings of Recent Insp Re Reactor Operations W/Defective Std Control Rod Position Interlock, Per 861021 Telcon ML20210H5051986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20137S3791986-02-11011 February 1986 Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls ML20137N7991986-01-29029 January 1986 Forwards Exam Rept 50-151/OL-86-01 of Exam Administered on 860115 & 16 ML20135H3701985-09-17017 September 1985 Advises That 850708 Proposed Emergency Plan Changes May Be Incorporated as Part of Approved Emergency Plan ML20134D3291985-08-13013 August 1985 Forwards Exam Rept 50-151/OL-85-01 for Exams Administered on 850724-25 IR 05000151/19850011985-06-10010 June 1985 Ack Receipt of 850418 & 0506 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-151/85-01. Deviations Contained in 10CFR2,App C ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20137G4721971-06-23023 June 1971 Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form 1990-09-05 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217N3121999-10-26026 October 1999
[Table view]Informs That Tf Dragoun Will Be NRC Inspector Assigned to Univ of Illinois at Urbana-Champaign Effective 991026 ML20216F9651999-09-20020 September 1999 Forwards Amend 11 to License R-115 & Safety Evaluation.Amend Approves Safstor Decommissioning Plan for Univ of Illinois Advanced Triga Research Reactor & Authorizes That Plan Be Included as Supplement to Safety Analysis Report ML20212F0291999-09-16016 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Amend to License R-115.Proposed Amend Would Approve Safstor Decommissioning Plan for Univ of Illinois Advanced Triga Research Reactor ML20210E9801999-07-22022 July 1999 Forwards Draft Environ Assessment for Univ of Illinois Safstor Decommissioning Plan ML20195D3211999-06-0707 June 1999 Forwards,For Info,Notice & Solicitation of Comments Pursuant to 10CFR20.1405 & 10CFR50.82(b)(15) Re Proposed Action to Decommission Univ of Il at Urbana-Champaign Univ of Il Advanced Triga Research Reactor ML20206A5381999-04-20020 April 1999 Forwards Request for Addl Info Re Review of Licensee Amend Request for License R-115 Submitted on 981113 ML20205N4341999-04-12012 April 1999 Forwards Amend 10 to License R-115 & Se.Amend Removes Authority from License to Operate Reactor,Authorizes possession-only of Reactor & Makes Other Changes to TSs Commensurate with possession-only Status ML20202C8691999-01-27027 January 1999 Forwards Request for Addl Info Re Amend Request for FOL R-115 for Univ of Illinois at Urbana-Champaign Advanced Triga Reactor That Was Submitted on 981005 ML20196K1141998-12-0909 December 1998 Forwards RAI Re Univ of Illinois at Urbana-Champaign Advance Triga Reactor,Submitted on 981005.Response Requested within 60 Days of Date of Ltr ML20151X2291998-09-11011 September 1998 Informs That Based on Review of Univ of Il Nuclear Reactor Lab (Uinrl) Operator Requalification Program Submitted on 980831,NRC Concludes That Uinrl Operator Requalification Program Meets Requirements of 10CFR55 & Acceptable ML20247D8081998-04-30030 April 1998 Ack Receipt of Ltr Dtd 980305,transmitting Changes to Physical Security Plan for Univ of Il Nuclear Reactor Lab Submitted Under Provisions of 10CFR50.54(p) ML20216J7901998-04-16016 April 1998 Forwards SRO License Certificates to M Dillavou & a Smit at Univ of Illinois Advanced Triga Reactor.W/O Encl ML20217F3271998-03-24024 March 1998 Forwards Results of Operator Inital Exam Conducted on 980302-03.W/o Encl ML20198R5271998-01-20020 January 1998 Discusses Arrangements for Administration of Operator Licensing Exams at Univ of Illinois Reactor Scheduled for Week of 980302.In Order to Meet Schedule,Furnish Matl Listed in Encl 1 at Least 30 Days Prior to Exam Date ML20198T2791998-01-16016 January 1998 Ack Receipt of Which Transmitted Changes to Univ of Illinois Nuclear Reactor Lab Emergency Plan, Submitted Under 10CFR5.54(q) ML20198G0881997-12-24024 December 1997 Discusses Arrangements Made for Administration of Operator Licensing Exams at Univ of Illinois Reactor.Written & Operating Exams Scheduled for Wk of 980302.Ref Matl for Reactor/Senior Reactor Operator Licensing Exams Encl ML20217P3201997-08-22022 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Nrr.All Related Repts, Correspondence & Inquires W/Docket Number Specified Should Be Directed to Listed Address ML20149J2821997-07-24024 July 1997 Forwards Insp Rept 50-151/97-201 on 970623-26 & Notice of Violation ML20149J2411997-07-24024 July 1997 Provides Reminder That License R-115 for Univ of Illinois at Urbana-Champaign Advanced Triga Reactor Will Expire on 980809 & Guidance for Preparing Application for Renewal ML20137R7971997-04-0909 April 1997 Forwards Senior Reactor Operator License Certificate to Rl Holm.W/O Encl ML20137R7871997-04-0909 April 1997 Forwards SRO License Certificates for Jr Faircloth & Kj Mushinski.W/O Encl ML20056E3581993-08-16016 August 1993 Forwards Operator/Senior Operator License Certificates for L Golchert & Jh Romans,Per Commission Request.W/O Encls ML20056E0711993-08-0303 August 1993 Forwards Results for Operator Initial Exam Conducted on 930728.W/o Encl ML20056C4521993-06-0909 June 1993 Forwards Initial Exam Repts 50-151/OL-93-01 & 50-356/OL-93-01 During Wk of 930517.W/o Encl ML20128P8531993-02-16016 February 1993 Forwards Amend 6 to License R-115 & Safety Evaluation.Amend Approves Installation of Microprocessor Based Instrumentation & Control Sys on Licensee Triga Reactor.Tss Amended to Reflect New Sys ML20126L2061993-01-0404 January 1993 Forwards RAI in Relation to Completion of Review of 920527 Application for Amend to License R-115 ML20126F5651992-12-22022 December 1992 Advises That 921201 Request to Withhold 921125 Affidavit of Wk Hyde of General Atomics Along W/ Univ of Illinois Specific I&C Sys Software - Mods, Granted ML20141M4351992-08-10010 August 1992 Requests Addl Info & Clarification Re 920609 Application for Amend to License R-115 for Univ of Il Advanced Triga Research Reactor ML20059G8401990-09-0505 September 1990 Advises That Written & Operating Exams Scheduled for Wk of 901029.Encl Listed Info Requested ML20055D8381990-07-0202 July 1990 Requests That Reactor Operator Requalification Program Be Revised to Include Addl Info Identified in Encl Request for Addl Info within 30 Days of Ltr Date.Per Generic Ltr 87-07, 10CFR55.29 Supercedes 10CFR55 ML20247M8271989-03-30030 March 1989 Discusses Licensee Requests for Changes to Requalification Program.Requests Include Extension of Max Time Period of 24 Months for Requalification Cycle to Account for Changes in Outage Schedules & Reorganization of Training Programs ML20236A7571989-03-10010 March 1989 Advises That 890307 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable ML20236E3571989-03-10010 March 1989 Forwards Exam Rept 50-151/OL-89-01 of Exams Administered on 890221-23 ML20206J1351988-11-16016 November 1988 Requests Ref Matl Listed in Encl Be Provided for Written & Oral Exam Scheduled for Wk of 880220.All Reactor & Senior Reactor Operator License Applications Should Be Submitted at Least 60 Days Prior to Exam Dates ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20147E6621988-01-19019 January 1988 Partial Response to FOIA Request.App G Documents Already Available in Pdr.App H Documents,Re INPO Accreditation Training,Encl & Available in PDR ML20236B8771987-10-21021 October 1987 Advises That 870929 Changes to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Marking 10CFR2.790(d) Info Should Be on Bottom & Top of Each Page of Security Plan ML20236M5781987-08-0404 August 1987 Forwards Amend 5 to License R-115 & Safety Evaluation.Amend Updates Reporting Requirements of Tech Spec Section, Administrative Controls to Reflect Recent Changes & Modifies Paragraph 3.A Re Max Reactivity Insertion ML20214U9841987-06-0303 June 1987 Forwards Revised NRC Form 398,personal Qualifications statement-licensee & NRC Form 396,certification of Medical Exam by Facility Licensee.Forms Revised to Reflect Changes to 10CFR55 Effective on 870526.W/o Encls ML20206S1891987-04-16016 April 1987 Forwards Safety Insp Repts 50-151/87-01 & 50-356/87-01 on 870331-0402.No Violation Noted ML20205C0141987-03-13013 March 1987 Notifies of 870416 Public Meeting W/Nrr & Region III Representatives in Rosemont,Il to Discuss Rev to 10CFR55, Operators Licenses & Implementation of Rev.Meeting Agenda Encl ML20210P6711987-02-0303 February 1987 Informs That 861215 Changes to Emergency Plan in Compliance w/10CFR50.54(q) & Guidance Criteria in Rev 1 to Reg Guide 2.6 & ANSI/ANS-15.16-1982, Emergency Planning for Research Reactors. Implementation Requested Immediately ML20213G1301986-11-0303 November 1986 Forwards Insp Rept 50-151/86-01 on 861008 & Notice of Violation.Violation Classified as Severity Level IV Due to Low Safety Significance Associated W/Wiring Error ML20215L7921986-10-23023 October 1986 Forwards Notice of Significant Licensee Meeting on 861028 in Region III to Discuss Findings of Recent Insp Re Reactor Operations W/Defective Std Control Rod Position Interlock, Per 861021 Telcon ML20210H5051986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20137S3791986-02-11011 February 1986 Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls ML20137N7991986-01-29029 January 1986 Forwards Exam Rept 50-151/OL-86-01 of Exam Administered on 860115 & 16 ML20135H3701985-09-17017 September 1985 Advises That 850708 Proposed Emergency Plan Changes May Be Incorporated as Part of Approved Emergency Plan ML20134D3291985-08-13013 August 1985 Forwards Exam Rept 50-151/OL-85-01 for Exams Administered on 850724-25 IR 05000151/19850011985-06-10010 June 1985 Ack Receipt of 850418 & 0506 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-151/85-01. Deviations Contained in 10CFR2,App C 1999-09-20 |
Text
. . _ - _. _
.d ,,
MAR 131987 Docket No. 50-151 University of Illinois ATTN: Dr. George H. Miley Chairman Nuclear Engineering Program 214 Nuclear Engineering Laboratory 103 S. Goodwin Avenue Urbana, IL 61801 Gentlemen:
A public meeting will be held to provide inferrration abcut the recent revision to 10 CFR Part 55, " Operators' Licenses" and its implementation. U. S. NRC representatives from NRR and the Regicn III office will be present. A limited number of recms have been rade available at a special rate by the hotel (800-228-2828 for reservations).
Questions regarding the rule change directed to the Region III poir.t of contact in advance of the meeting will be given high priority during the meeting.
Attached is the agenda for this me.eting.
Date: April 16, 1987 Time: 8:00 A.M. to 5:00 P.M.
Place: Ramada Hotel O' Hare 6600 N. Mannheim Road Rosemont, IL Point of
Contact:
Mr. Thomas M. Burdick U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137(312)790-5566
^
Sincerely, "Or in 1 signed by N.J. Chrissotftcos' N. J. Chrissotimos, Acting Director Division of Reactor Safety
Attachment:
As. stated cc w/attachn:ent:
C. Pohlod, Reactor Supervisor
, DCS/RSB(RIDS)
Licensing Fee Management Branch
' RIIIA R I RIII
(/ k-Burdick/jlk H1 Chrissotimos 8703300090 870313 Y
__ ,g .,, _
-- m , u__ _ _ _ - . _ .
v ..
PUBLIC MEETING 10 CFR 55 AND CONFORMING AMENDMENTS IMPLEMENTATIONOF_THEREQU,IREMENTSOF_THERULE
' AGENDA Thyrsday, April 16, 1987 TIME DISCUSSION T_0P_IC SPEAKER 0800-0810 WELCOME A. BERT DAVIS REGIONAL ADMINISTRATOR 0810-0830 OPENING REMARKS WILLIAM T. RUSSELL, DIRECTOR HUMAN FACTORS TECHNOLOGY 0830-0930 10 CFR 55 REVISIONS SUSAN F. SHANKMAN HEADQUARTERS STAFF 0930-0945 BREAK 0545-1030 10 CFR 55.45~, SIMULATION JERRY WACHTEL FACILITY EVALUATI0li PROGRAM HEADQUARTERS STAFF 1130-1300 LUNCH BREAK 1300-1330 EXAMINER STANDARDS CHANGES (Regional Staff) 1330-1500 OPEN DISCUSSION PERTAINING WILLIAM T. RUSSELL TO 10 CFR 55 REVISIONS, AND NRC STAFF IMPLEMENTATION, AND EXAMINER STANDARDS CHANGES 1500-1530 BREAK 1530-1700 OPEN DISCUSSION - CONTINUED