Forwards Request for Addl Info Re Review of Licensee Amend Request for License R-115 Submitted on 981113
ML20206A538
Person / Time
Site: University of Illinois
Issue date: 04/20/1999
From: Alexander Adams
NRC (Affiliation Not Assigned)
To: Holm R
ILLINOIS, UNIV. OF, URBANA, IL
References
TAC-MA4833, NUDOCS 9904280199
Download: ML20206A538 (4)


Text

4 %

-April 20, 1999 Mr. Rich:rd Ll H Im, R::ct::r Administr:t::r University of Illinois at Urbana-Champaign Department of Nuclear Engineering Radiation Science Laboratory 214 Nuclear Engineering Laboratory 103 South Goodwin Avenue Urbana, IL 61801-2984-

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MA4833)

Dear Mr. Holm:

We are continuing our review of your amendment request for Facility License No. R-115 for the University of Illinois at Urbana-Champaign Advanced TRIGA Reactor that you submitted on November 13,1998. During our review of your amendment request, questions have arisen for which we require additionalinformation and clarification. Please provide responses to the enclosed request for additionalinformation within 30 days of the date of this letter. In accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. Following receipt of the additional information, we will continue our evaluation of your amendment request.

If you have any questions regarding this review, please contact me at (301) 415-1127.

Sincerely, ORIGINAL SIGNED BY:

Alexander Adams, Jr., Senior Project Manager Events Assessment, Generic Communications and Non-Power Reactors Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-151

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION: 9 E-MAIL HARD COPY PDoyle ' TBurdick t; Docket l95e 50-15E 4 LMarsh g TDragoun MMendonca PUBLIC AAdams I TMichaels LMarsh OGC (015-B18) EHylton SHolmes CBassett DMatthews REXB r/f WEresian Pisaac

/ o\ '

REX PM -

f 280019 REXB:BC PI A yi n LMarsh i

4/ 99. 4 /99 4/2499 O FICIAL RECORD COPY DOCUMENT NAME: G:\SECY\ ADAMS \RAIA4833 9904290199 990420 PDR ADOCK 05000151 -

PDR y

D

(.

/$p %qIg UNITED STATES

[

21 .j g

NUCLEAR REGULATORY COMMISSION WAsHINoTON. D.C. 2055W1 b

g- j8 April 20, 1999 Mr. Richard L. Holm, Reactor Administrator

' University of lilinois at Urbana Champaign Department of Nuclear Engineering Radiation Science Laboratory 214 Nuclear Engineering Laboratory 103 South Goodwin Avenue Urbana,IL 61801 2984

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MA4833)

Dear Mr. Holm:

We are continuing our review of your amendment request for Facility License No. R-115 for the University of lilinois at Urbana-Champaign Advanced TRIGA Reactor that you submitted on November 13,1998. During our review of your amendment request, questions have arisen for which we require additionalinformation and clarification. Please provide responses to the enclosed request for additionalinformation within 30 days of the date of this letter, in accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. Following receipt of the additional information, we will continue our evaluation of your amendment request.

If you have any questions regarding this review, please contact me at (301) 415-1127.

Sincerely, Alexander Adams, Jr. eni Project Manager Events Assessment, G ic Communications and Non Power Reactors Branch Division of Regulatory improvement Programs '

Office of Nuclear Reactor Regulation Docket No. 50151 Enciosure:

As stated

- cc w/ enclosure:

See next page

F, s l o University of Illinois Docket Nos. 50-151/356 cc:

The Honorable Tod Satterthwaite Mayor of the City of Urbana P. O. Box 219 Urbana, IL 61803 l lilinois Department of Nuclear Safety Manager, Office of Nuclear Facility Safety 1035 Outer Park Drive l

Springfield, IL S270b i

Dr. Barclay G. Jones, Head '

Department of Nuclear Engineering University of Illinois at Urbana-Champaign 103 South Goodwin Avenue Urbana, IL 61801-2984

f( . 4 e

ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN ADVANCED TRIGA REACTOR DOCKET NO. 50-151

1. The regulations in 10 CFR 50.82(b)(1) requires non power reactor licent;ees that permanently cease operation make application for license termination w thin 2 years following permanent cessation of operations. Do you want to make application for license termination along with the submission of your decommissioning plan (DP), or will you be making application under separate cover in the future?
2. The regulatory program for non-power reactors has been moved from Region ill to NRC Headquarters. Please propose changes to the administrative secticn of your technical specifications (TSs) to reflect this enange.
3. The decommissioning plan gives the cost of maintaining the facility in a SAFSTOR condition as $23,000 per year plus 25 percent of two person's time. Please estimate the total cost in dollars to maintain the facility in a SAFSTOR status, is this cost in 1999 dollars? Please verify that the University intends to continue to maintain a fund statement of intent to meet the criteria of 10 CFR 50.75(e). Your current statement of intent states that funds needed for decommissioning will be requested at the time when a decision to decommission the facility is made. Has this request been made?

Please describe the means for adjusting cost estimates over the storage period.

4. As required by 10 CFR 50.82(b)(4), please provide a description of the controls and limits on procedures and equipment to protect occupational and public health and safety during the SAFSTOR period, a description of your planned final radiation survey, and a description of TS, quality assurance, and physical security plan provisions in place during decommissioning.
5. Please propose and justify a TS to ensure periodic surveillance of the facility during the SAFSTOR period. This could be based on your computer monitoring system and/or the weekly physical check of the facility. If based only on the computer monitoring system, please discuss how you will verify the quality of the information provided by the system. For physical checks, is there a minimum set of equipment and conditions that must be verified?
6. In your application you provided examples of surveillance checklists for the SAFSTOR period. Are these checklists parts of the precedures required by the technical specifications? If not, does a new required procedure category of SAFSTOR procedures need to be added to the TSs?
7. Please discuss the likelihood and consequences of accidents during the SAFSTOR l period. Are these accidents bounded by the existing analysis?

i

8. Please submit an environmental report as required by 10 CFR 51.53(d). As part of that report, please discuss the radiological impact on the reactor staff and the public of placing 1. . facility into a SAFSTOR condition and maintaining the reector during the SAFSTOh period.