ML20206S189
| ML20206S189 | |
| Person / Time | |
|---|---|
| Site: | 05000356, University of Illinois |
| Issue date: | 04/16/1987 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bradley Jones ILLINOIS, UNIV. OF, URBANA, IL |
| Shared Package | |
| ML20206S194 | List: |
| References | |
| NUDOCS 8704220352 | |
| Download: ML20206S189 (2) | |
See also: IR 05000151/1987001
Text
_
.
.
-
APR 16 G87
Docket No. 50-151
Docket No. 50-356
University of Illinois
ATTN:
Barclay G. Jones, Ph.D.
Acting Head, Department of
Nuclear Engineering
l,
214 Nuclear Engineering Laboratory
'
103 S. Goodwin Avenue
Urbana, IL 61801
l
Gentlemen:
This refers to the routine safety ins)ection conducted by Mr. W. J. Slawinski
of this office during the period Marc 1 31 through April 2, 1987, of activities
at the University of Illinois Nuclear Reactor Laboratory authorized by NRC
Operating Licenses No. R-115 and No. R-117 and to the discussion of our findings
l
with you,- Drs. J. G. Williams and B. J. Micklich and others at the conclusion
l
oftheinspectionandtothetelephoneconversatIonwithMr.CraigPohlodon
l
April 14, 1987.
l
The enclosed copy of our inspection re) ort identifies areas examined during
the inspection. Within these areas, tie inspection consisted of a selective
'
examination of procedures and representative records, observations,
independent measurements and interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a co)y of
this letter and the enclosed inspection report will be placed in the
iRC
Public Document Room.
,
l
l
u
!
4[g
I
ammump
G
m
o
.
AFR 16 G87
Docket No. 50-151
Docket No. 50-356
University of Illinois
ATTN:
Barclay G. Jones, Ph.D.
Acting Head, Department of
1
Nuclear Engineering
214 Nuclear Engineering Laboratory
103 S. Goodwin Avenue
Urbana, IL 61801
Gentlemen:
This refers to the routine safety inspection conducted by Mr. W. J. Slawinski
of this office during the period March 31 through April 2, 1987, of activities
at the University of Illinois Nuclear Reactor Laboratory authorized by NRC
Operating Licenses No. R-115 and No. R-117 and to the discussion of our findings
with you, Drs. J. G. Williams and B. J. Micklich, and others at the conclusion
of the inspection and to the telephone conversation with Mr. Craig Pohlod on
April 14, 1987.
.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
,
examination of procedures and representative records, observations,
independent measurements and interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
@
J
\\
emome
O
m
_
_
_
.
.
,
University of Illinois
2
AFR 1 6 507.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
M s h ed by y,3, g ,
W. D. Shafer, Chief
Radiological Protection Branch
Enclosure:
Inspection Reports
No. 50-151/87-001 DRSS ;
No. 50-356/87-001 DRSS
cc w/ enclosure:
DMB/ Document Control Desk (RIDS)
Licensing Fee Management Branch
l
l
RIII
R
al:(I
Slawiysli)iTnma
W.6
\\
r
r
~
-
-
--- -
-
-
-
.
-
-
- -
-
-