Monthly Operating Rept for Mar 1987
ML20206H430
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/31/1987
From: Hintz D, Ruiter G
WISCONSIN PUBLIC SERVICE CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-87-58 NUDOCS 8704150353
Download: ML20206H430 (5)


Text

.

DCCKET 50-305 KEW%UNEE NUCLEAR POWER PLANT

SUMMARY

CF OPEEATING EXPEPIENCE March, 1987 CPERATIONS: Ihe scheduled retueling shutdown continued through this entire reporting period.

MAINTENANC': ISC spent considerable time performing refueling mode instrument calibrations, replaced numerous solenoid valves for equipment qualification considerations and replaced a source range nuclear instrument.

Electricians rewired many Limitorque motor operated valves to obtain torque bypass and postion limit switch separation, performed grease changes and tnen followed it all up with MOVATS testing. They also replaced numerous air operated valve limit switches for EQ concerns and completed several Appendix R modifications.

The Mechanics supported several rcutine outage evolutions such as refueling, Steam Generator sludge la nci ng and eddy current testing, Safety Valve testing and various ISI inspections.

Additio na lly , they cleaned the Diesel Generator oil storage tanks and rebuilt the Emergency Personnel Airlock door linkage.

8704150353 870331 PDR ADOCK 05000305 R PDR I il

4 A V E' R AG E DA I LY U N IT PCW ER L EV EL DOCKEI NC- 50-305 UNIT- KEWAUNEE COMPLETED BY- G. B. RUITER TELEPHCNE- 414-388-2560 X225 REPORT MONTH MARCH, 1987 AVERAGE DAILY DAY PCUEP LEVEL (MWE-NET) 1 0 2 0 3 0 4 0 5 0 6 0 7 0 4 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 23 0 24 0 25 0 26 0 27 0 28 0 29 0 H

l 30 0 31 0 l

4

.n -, - , - _ _ .- , , -,, ,--e. . , .x ,

O N ! 1 5 H "*DO W N "; 4 1 D P O O F R P P C fl C 1 1 C N S

  • i DOCKE1 NC: 8. O - 3 C 's UNIT NAMP: Renaunee DAll: April 1, 1987 CCMPLETED 01: G. H. Ruiter TELEPHONE: 414-Jou-256c x225 REPORT MONTH - M ARCH, 1987 i NO. l DATE lTYIE IDORATIONlFEA50hlMETHOEILER NUMBER lSYS l COMPONENT l CCMMENTS 1 I l f -f -t - 4 -f l --l l 4 I I I I i 1 i l i I I i 1 1 3/ 1/H71 S 1 744.0 1 1 4 i NA 1 ZZ l ZZZZZZ l 1. Continued Cycle III-IIII refueling outage. I I i 1 1 I I I I I i 1 -

1 I i 1  !  ! I I I I I I i 1 1 i l I l i 1 i i i i 1 i i i i l i I I I I I i 1 I I I I I I I I I I i i l 1 i 1 1 I I I I I i 1 1 I I i l 1 I I I I I I I i 1 1 1 1 1 I I i i l i 1 1 1 1 1 1 I I I I I I i 1 1 1 1 I I I I I I I I I I I I I I I 1 i 1 1 I i l i l i I 1 i i l I i l I I I i i i i i i i i I I I I I I i i 1 i I i l I i i I I i 'l 1 1 I i 1 1 I I I I I I I I I I I I I I I I I I I i 1 1 l l 1 1 1 1 I I I i 1 1 I I I i 1 1 1 1 1 I I I I i 1 I I I i 1 1 1

' 1 I I i 1 1 1 I I I I I I I i 1 I I I I I I I i 1 I I i 1 I I I l i I 1 1 1 I I l i 1 1 I i 1 1 I I I I I I I I I I I I I I I I I I

.I I I I 1 i 1 i- i- i I n - -

_. a_ __ 4 -

.. a TYPE REASON METBCD SYSTEM & COMPOREN1 CODES F: Forced A-Equipment Failure (Explain) 1-Manual From NUEEG-0161 S: Scheduled B-Maintenance or Test 2-Manual Scras C-Refueling 3-Antonatic Scras D-Regulatory Fertraction 4-Continuations E-Operator Training & License Examination 5-Load Reductions F-4dministrative 9-Cther G-operational stror IF"Fl ain)

H-Other IExplaar)

CPF F A T I N G *#

  • D A T A R EPO R I DOCKE1 NO- 50-105 *

. COMPLETFD DT- G. H. Pul1ER OP ER A T I N G ST AT D 5 1EIEPHONE- 414-3dH-2560 I225 1 UNIT NAME KEWAUNEE **********************************************

2 REPORTING PERIOD MARCH, 19H7

  • NOTES
  • 3 LICENSED THEPM AL POW ER (PWT) 1650
  • The unit was shot down for the entire *
  • reporting period for the scheduled
  • 4 NAMEPL ATE R ATING (GROSS MWE) 560
  • refueling outage.
  • 5 DESIGN ELECTRICAL RATING (NET M W E) 535 *
  • 6 NAIIMU1 DEPEND ABLE CAP ACITT (GECSS MWE) 529 *
  • 7 MAIIMUM DEPENDADLR CAPACITY (NE1 MWE) 503 **********************************************

8 IF CHAMGPS OCCUR IN CAPACITY FATINGS (ITfMS NUMBER 3 THROUGH 7) SINCE LAST PEPORT, GIVE REASONS None 9 PO W EP LEVFL TO WHICH RES1RICTED, IF ANY (N ET MWE) None 10 REASONS FOR RSS1RICT10NS, IF AEY THIS MONTH TR-TO-DATE CUMULATIVE 11 BOURS IN PEPORTING PERIOD 744 2160 112129 12 EURSER OF HOUR 5 6EACTOR EAS CFI1TCAL 0.0 1314.3 94915.6 13 REACTOR PESERVE SH7TUGWN HOUPS 0.0 0.0 2330.5 14 BOURS GENEPATOS CN-LINF 0.0 1313.8 93384.5 15 UNIT PESEEVE SHUTDOWN HOURS 0.0 0.0 10.0 16 GROSS THEFMAL ENERGY GENEPATED (9WH) 0 2140335 146954049 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 714600 4H497200 18 NET ELECTRICAL E4ERGY GEBERATED (MWH) 0 682580 46178466 19 DNIT SERVICE FACTOR 0.0 60.8 83.3 20 UNIT AVAILABILITY FACTOR 0.0 60.8 83.3 21 ONIT CAPACITY FACTOR (USING MDC NFT) 0.0 62.8 79.8 -

22 UNIT CAPACITY FACTOR (USING DFE NPT) 0.0 59.1 77.0 23 UNIT FORCED OUTAGE RATE 0.0 0.0 1.1 24 SMUTDOW4 S SCHEDULED OV ER NEIT C PONTHS (1YPE, DATE, AND DURA 1!ON OP FACH)

Done 25 IF SHUT DOWN AT EN D OF R EPORT PEPIOD, ES11 MATED DATE OF STARTUP - April 4, 1987

NRC-87-58 WPSC (414) 433-1234 TELEX 5101012698 WPSC GRB TELECOPIER (414] 433-1297 EASYUNK 62891993 WISCONSIN PUGUC SEmACE CORPORATION 600 North Adams + RO. Box 19002 + Green Bay, WI 54307-9002 April 10, 1987 10 CFR 50.36 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative " Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for March 1987 are enclosed in accordance with Technical Specification 6.9.1(c).

Very truly yours,

//

D. C. Hintz Vice President - Nuclear Power l

DJM/jms I

1 Enc.

cc - US NRC - Region III Mr. Robert Nelson, NRC Sr Resident Inspector )

RR #1, Box 999, Kewaunee, WI 54216 INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway, Atlanta, GA 30339 I